Loading...
HomeMy WebLinkAbout1911 PALOMAR OAKS WAY; ; CBC2021-0283; PermitBuilding Permit Finaled Commercial Permit Print Date: 08/30/2022 Job Address: 1911 PALOMAR OAKS WAY, BLDG-Commercial 2120910800 CARLSBAD, CA 92008-6511 Permit Type: Work Class: Tenant Improvement Parcel#: Valuation: Occupancy Group: #of Dwelling Units: $66,974.40 Track#: Lot#: Project#: Plan#: Bedrooms: Construction Type: Bathrooms: Orig. Plan Check#: Occupant Load: Plan Check#: Code Edition: Sprinkled: Project Title: Description: DRAM M ECHTER FARMS: MEZZANINE IN WAREHOUSE "WORK AREA" (1440 SF) Applicant: DRAMM AND ECHTER INC ROBERT ECHTER 1251 QUAIL GARDENS DR ENCINITAS, CA 92024-2368-SAN DIEGO (760) 438-5548 FEE BUILDING PLAN CHECK FEE (BLDG) Property Owner: RELECO LLC 1911 PALOMAR OAKS WAY CARLSBAD, CA 92008 BUILDING PLAN REVIEW-MINOR PROJECTS (LDE) BUILDING PLAN REVIEW -MINOR PROJECTS (PLN) COMM/IND Tl -STRUCTURAL COMMUNITY FACILITIES DISTRICT (CFD) FEE -NON-RES FIRE Plan Resub (3rd&Subsequent Submittal/hr) FIRES Occupancies< 50,000sq. ft. Tl PUBLIC FACILITIES FEES -inside CFD SB1473 -GREEN BUILDING STATE STANDARDS FEE SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION -COMMERCIAL (SMIP) TRAFFIC IMPACT Commercial-Industrial w/in CFD Total Fees: $5,804.74 Total Payments To Date: $5,804.74 (city of Carlsbad Permit No: CBC2021-0283 Status: Closed -Finaled Applied: 08/04/2021 Issued: 05/25/2022 Finaled Close Out: 07/20/2022 Final Inspection: 07/20/2022 INSPECTOR: Alvarado, Tony Balance Due: AMOUNT $336.92 $194.00 $98.00 $905.00 $435.74 $447.00 $411.00 $1,218.93 $3.00 $798.40 $18.75 $938.00 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure w ill bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or ot her similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov I {Cityof Carlsbad COMMERCIAL BUILDING PERMIT APP LI CATION 8-2 Plan Check Est. Value PC Deposit Date C&'2-t1hl -OZx3 70,ctY) Job Address /f// /4/o ,4,,Lv-04/(£ t<f/" Suite:. ____ APN:. ________ _ Tenant Name#: Pc o.Y>\..,_ (£c4fev: Lot#: YearBuilt: /99? Year Built: __ _ Occupancy: __ _ Construction Type: 7{t( Fire sprinklers~ESQNO A/C:~ES0No BRIEF DESCRIPTION OF WORK: M"'u..o..o ~:<:'&..i tD t A 10.0 ho, ) ~ , WO'<'r\ o...ni.A. .. 0 Addition/New: ___________ New SF and Use,. _________ New SF and Use ______ SF Deck, SF Patio Cover, SF Other (Specify). ___ _ ~enant Improvement: /'/'ft, SF, _____ SF, Existing Use: _______ Proposed Use: Ae--: "%./n;:,e- Existing Use: Proposed Use: ______ _ D Pool/Spa :. _____ SF Additional Gas or Electrical Features? ___________ _ D Solar: ___ KW, ___ Modules, M ounted: ORoof O Ground D Reroof: __________________________________ _ D Plumbing/Mechanical/Electrical Oother: __________________________________ _ PRIMARY APPLICANT Ro\':)C.<t Ee.rater Name: B•• , ., H ('c.fc (rt,, £, c Address: //..S-D G1:16d 6 t:t1-let1r 'f?,,. City: En ''<>t'f4f State: C-4 Zip: 9.:2 0;1? Phone: 7'ro -:1 JO -'f-:2zs,t Email: :6<:c..6 Ur' @ «~4.AIM e,J, l-e,c, Lt,M PROPERTY OWNER Name: Reier co LL C. Address: 191/ /' 1< lo ,M (iv-(2~ /Cf City: C-(<11-/.r .ko{ State: CA Zip: Phone: 7/40 -:?IO-t/:12f£ Email: 6 -e.e,/,-/:'-"' fl eu'~-1111 ec h,1..-rCO:tf DESIGN PROFESSIONAL CONTRACTOR OF RECORD Name: _________________ Business Name: ~ne;,.c Cc,,,,z ✓t? 4 c.&C/1,,t Address: Address:..,..... ________________ _ City:. _______ State:. ___ Zip: ____ City: £.rc<.Mcl1J;./4 State: CA; Zip:. _____ _ Phone: Phone:. __________________ _ Email: Email:. __________________ _ Architect State License: CSLB License #:. _______ Class: ______ _ Carlsbad Business License# (Required):. _______ _ APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above informat ion is correct and that the information an the plans is accurate. I agree to comply with al I City ordi nonces and S tote laws relating to bui /ding construction. ~ NAME (PRINT): R oJe,•f ,tlct,.ftr SIGN : ~ DATE: .7/lo/4; 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-2 8558 Email: Building@carlsbadca.gov REV. 07/21 THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _ A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING THIS FORM 15 AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO PERMIT ISSUANCE. (OPTION A): LICENSED CONTRACTOR DECLARATION: lherebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3 of the Business and Professions Code, and my license is in ful If orce and effect. I a/soaf firm under penalty of perjury one of the following declarations (CHOOSE ONE}: DI have and will maintain a certificate of consent to self-Insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit Is Issued. Policy No .. ______________________________________ _ -OR- DI have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit Is Issued. My workers' compensation Insurance carrier and pollcy number are: Insurance Company Name: ____________________ _ Policy No. ___________________________ Expiration Date: _______________ _ -OR- D Certificate of Exemption: I certify that In the performance of the work for which this permit is Issued, I shall not employ any person In any manner so as to become subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage Is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compensation, damages as provided for In Section 3706 of the Labor Code, Interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby afrlrm that there Is a construction lending agency for the performance of the work this permit Is Issued [Sec. 3097 (I) Civil Code). Lender's Name: ____________________ Lender's Address: ____________________ _ CONTRACTOR CERT/FICA TION: lcertifythatlhaveread the application and state that the above informationiscorrectandthat the information on the plans isaccurate. I agree to comply with all City ordinances and State laws relating to building construction. NAME (PRINT): -~--~~--:-~SIGNATURE: _________ DATE: ______ _ Note: If the person signing above Is an authorized agent for the contractor provide a letter of authorization on contractor letterhead. -OR - (OPTION B): OWNER-BUILDER DECLARATION: I hereby affirm that I am exempt from Contractor's License Law for the f ollowing reason: [9 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not Intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or Improves thereon, and who does such work himself or through his own employees, provided that such Improvements are not Intended or offered for sale. If, however, the building or Improvement Is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or Improve for the purpose of sale). -OR- ~' as owner of the property, am exclusively contracting with llcensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or Improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). -OR-. DI am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: AND, ~FORM 8-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner. By my signature below I acknowledge that, except for my personal residence In which I must have resided for at least one year prior to completion of the Improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed In Its entirety by licensed contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is submitted or at the following Web site: http:Ilwww./eginfo.ca.gov/ ca/aw. html. OWNER CERT/FICA TION: /certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. /agree to comply with all City ordinances and State laws relating to building construction. a NAME (PRINT): /!o~er:+-6. b fell' s1GN: _. Note: If the person signing above Is an authorized agent for the property owner lnclud DATE: __ f_·-_/K_-_JJ. __ 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: Email: Bulldlng@carlsbadca.gov 2 REV. 07121 I. C cityof Carlsbad OWNER-BUILDER ACKNOWLEDGEMENT FORM B-61 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov OWNER-BUILDER ACKNOWLEDGMENT FORM Pursuant to State of California Health and Safety Code Section 19825-19829 To: Property Owner An application for construction permit(s) has been submitted in your name listing you as the owner-builder of the property located at: Site Address __ l_'l_l_l_---#-L;,---'~~10:::..::/\1\....:....:....=<L-r' _a=-...ca!<L!.....CI C=J' __ tu._..::__::t:..""74Z...-,./_c.....__~'-'-/l'..:.._h_·.J....:._< /....:...• ----"""C._;_A'----Lf ci. 008' /' The City of Carlsbad ("City") is providing you with this Owner-Builder Acknowledgment and Verification form to inform you of the responsibilities and the possible risks associated w ith typical construction activit ies issued in your name as the Owner-Builder. The City will not issue a construction permit until you have read and initialed your understanding of each provision in the Property Owner Acknowledgment section below and sign the form. An agent of the owner cannot execute this notice unless you, the property owner, complete the Owner's Authorized Agent form and it is accepted by the City of Carlsbad. INSTRUCTIONS: Please read and initial each statement below to acknowledge your understanding and verification of this information by signature at the bottom of the form. These are very important construction related acknowledgments designed to inform the property owner of his/her obligations related to the requested permit activities. ~ I understand a frequent practice of unlicensed contractors is to have the property owner obtain an "Owner- Builder" building permit that erroneously implies that the property owner is providing his or her own labor and material personally. I, as an Owner-Builder, may be held liable and subject to serious financial risk for any injuries sustained by an unlicensed contractor and his or her employees while working on my property. My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an Owner-Builder and am aware of the limits of my insurance coverage for injuries to workers on my property. 11. ~I understand building permits are not required to be signed by property owners unless they are responsible for the const ruction and are not hiring a licensed contractor to assume this responsibility. 111. ~I understand as an "Owner-Builder" I am the responsible party of record on the permit. I understand that I may protect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own. IV. ./li:::.-1 understand contra ctors are required by law to be licensed and bonded in California and to list their license numbers on permits and contracts. V. /l,.£__1 understand if I employ or otherwise engage any persons, other than Ca lifornia lice nsed contractors, and the total value of my construction is at least five hundred dollars ($500), including labor and materials, I may be considered an "employer" under state and federal law. 1 REV. 08/20 • Owner-Builder Acknowledgement Continued VI. &:_1 understand if I am considered an "employer" under state and federal law, I must register with the state and federal government, withhold payroll taxes, provide workers' compensation disability insurance, and contribute to unemployment compensation for each "employee." I also understand my failure to abide by these laws may subject me to serious financial ri sk. VII. 4£__ I understand under California Contractors' State License Law, an Owner--Builder who builds single--family residential structures cannot lega lly build them with the intent to offer them for sale, unless al l work is performed by licensed subcontractors and the number of structures does not exceed four within any calendar year, or all of the work is performed under contract with a licensed general building contractor. VIII. /1L I understand as an Owner--Builder if I sell the property for which this permit is issued, I may be held liable for any financial or personal inj uries sustained by any subsequent owner(s) which result from any latent construction defects in t he workmanship or materials. IX. {L I understand I may obtain more information regarding my obligations as an "employer" from the Internal Revenue Service, the United States Small Business Administration, the California Department of Benefit Payments, and the California Division of Industrial Accidents. I also understand I may contact the California Contractors' State License Bo ard (CSLB) at 1--800--321-CSLB (2752) or www.cslb.ca.gov for more information about licensed contractors. X. !lf:.__1 am aware of and consent to an Owner--Builder building permit applied for in my name, and understand t hat I am the party legally and financially responsible for proposed construction activity at the following address: /f« /1,/4/f'f,~ 0/rJ M~ {7~~1/~,J Cq &cx,.f . XI. Lf[_1 agree that, as the party legally and financially responsible forth is proposed construction activity, I w ill abide by all applicable laws and requirement s that govern Owner--Builders as well as employers. XII. ~I agree to notify t he issuer of t his form immediately of any additions, deletions, or changes to any of the information I have provided on this form. Licensed contractors are regulated by laws designed to protect the public. If you contract with someone who does not have a license, the Contractor's State License Board may be unable to assist you with any financial loss you may sustain as a result of a complaint. Your only remedy against unlicensed Contractors may be in civil court. It is also important for you to understand that if an unlicensed Contractor or employee of that individual or firm is injured while working on your property, you may be held liable for damages. If you obtain a permit as Owner- Builder and wish to hire contractors, you will be responsible for verifying whether or not those contractors are properly licensed and the status of their workers' compensation coverage. Before a building permit can be issued, this form must be completed, signed by the property owner and returned to the City of Carlsbad Building Division. I declare under penalty af perjury that I have read and understand all af the information provided on this form and that my responses, including my authority to sign this form, is true and correct. I om aware that I have the option to consult with legal counsel prior ta signing this form, and I have either (1) consulted with legal counsel prior to signing this form or (2) have waived this right in signing this form without the advice of legal counsel. Property Owner Name (PRINT) !lit-J:)..._ Date 2 REV.08/20 Building Permit Inspection History Finaled (City of Carlsbad PERMIT INSPECTION HISTORY for (CBC2021-0283) Permit Type: BLDG-Commercial Application Date: 08/04/2021 Owner: RELECO LLC Work Class: Tenant Improvement Issue Date: 05/25/2022 Subdivision: CARLSBAD TCT#81-46 UNIT#01 Status: Closed -Finaled Expiration Date: 01 /17/2023 Address: 1911 PALOMAR OAKS WAY IVR Number: 34981 CARLSBAD, CA 92008-6511 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 07/20/2022 07/20/2022 BLDG-12 Steel/Bond 187268-2022 Passed Tony Alvarado Complete Beam BLDG-84 Rough 187 403-2022 Passed Tony Alvarado Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-1 4 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-Final Inspection 187404-2022 Passed Tony Alvarado Complete Checklist Item COMMENTS Passed BLDG-Structural Final Yes Tuesday,AugustJ0,2022 Page 1 of 1 DATE: 2/16/22 JURISDICTION: CARLSBAD PLAN CHECK#.: CBC2021-0283.RC2 ✓• EsG1I A SAFEbu,tt Company SET: III PROJECT ADDRESS: 1911 PALOMAR OAKS WAY □ APPLICANT □ JURIS. PROJECT NAME: MEZZANINE IN WAREHOUSE WORK AREA FOR RELECO LLC ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ lnterWest staff did not advise the applicant that the plan check has been completed. D lnterWest staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: (by: Mail Telephone Fax In Person 0 REMARKS: By: Paul Martinez, AIA lnterwest 2/09/22 Email: Enclosures: 9320 Chesapeake Dri ve, Suite 208 ♦ San Diego, California 92 123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 DATE: 11/03/2021 JURISDICTION: CARLSBAD PLAN CHECK#.: CBC2021-0283 ✓• EsG1I A SAFEbullt Company SET: II PROJECT ADDRESS: 1911 PALOMAR OAKS WAY D APPLICANT D JURIS. PROJECT NAME: MEZZANINE IN WAREHOUSE WORK AREA FOR RELECO LLC D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. [g] The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. [g] The applicant's copy of the check list has been sent to: ROBERT ECHTER D EsGil staff did not advise the applicant that the plan check has been completed. [g] EsGil staff did advise the applicant that the plan check has been completed. Person contacted : ROBERT Telephone#: 760 310 4774 Date contacted : (by: ) Email: BECHTER@DRAMMECHTER.COM Mail Telephone 0 REMARKS: By: Bert Domingo EsGil Fax In Person Enclosures: 11/01/2021 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 CARLSBAD CBC202 l-0283 11/03/2021 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. 7 GENERAL 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to lnterwest and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring TWO corrected set of plans and calculations/reports to lnterwest, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to lnterwest only will not be reviewed by the City Planning, Engineering and Fire Departments until review by lnterwest is complete. PLANS 2. All sheets of the plans and the first sheet of the calculations are required to be signed by the licensed architect or engineer responsible for the plan preparation. California State Law. Need signatures for the whole set. Also need signatories for the cover sheet due to accessibility Sorry, this cap compliance shall be on the plans. City of Carlsbad requires that all projects that qualify for CAP compliance will require a completed Climate Action Plan (CAP) Consistency Checklist (city form B-50) to be completed by the APPLICANT. For plans submitted to the City the following Climate Action Plan requirements apply, per Carlsbad ordinance: The applicant is to fill out the B-50 CAP Consistency Checklist. The scope of work and project valuation will determine which sections of the CAP are required. CARLSBAD CBC2021-0283 11/03/2021 Plan examiners review the 8-50 CAP Consistency Checklist for completion. For example: If new residential construction is the scope of work, CAP sections 2A, 3A, and 4A are required to be filled on the B-50 checklist. Only for projects that require CAP compliance: DO NOT APPROVE THE PLANS UNTIL THE 8-55 CAP PLAN TEMPLATE IS COMPLETED (MATCHING THE 8-50 APPLICATION) AND IMPRINTED ONTO THE PLANS. THE 8-55 FORM IS LOCATED AT THE END OF THE 8-50 FORM. Esgil Plan Examiners are not responsible for reviewing Transportation Demand Management. Links to the CARLSBAD MUNICIPAL CODE are here for reference to each CAP compliance section. Use the links to determine appropriate details and plan check correction questions. APPLICABLE CAP SECTIONS CMC 18.21 .140 4A CMC 18.21.150 48 CMC 18.21.155 1A, 18 CMC 18.30.130 28, 3A CMC 18.30.150 3A (Multiple dwellings), 38 CMC 18.30.170 3A (Multiple dwellings), CMC 18.30.190 1A 8 This PDF document has ptan check questions for each specific Carlsbad municipal code section: CARLSBAD CLIMATE ACTION PLAN.pdf Forms can be found here: https://www.carlsbadca.gov/departments/community- development/building/building-applications-forms/-folder-56 When a project requires CAP forms make sure CAP forms are scanned and sent back with the corrections list. Also when final plans are approved rubber band CAP forms to outside of the plans and do not put them inside the roll up. To speed up the review process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. CARLSBAD CBC2021-0283 11/03/2021 Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes , please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: □ Yes D No The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bert Domingo at Esgil. Thank you. DATE: 08/26/2021 JURISDICTION: CARLSBAD PLAN CHECK#.: CBC2021-0283 ✓• EsG1I A SAFEbuilt Company SET: I PROJECT ADDRESS: 1911 PALOMAR OAKS WAY □ APPLICANT □ JURIS. PROJECT NAME: MEZZANINE IN WAREHOUSE WORK AREA FOR RELECO LLC D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. [2J The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. [2J The applicant's copy of the check list has been sent to: ROBERT ECHTER D EsGil staff did not advise the applicant that the plan check has been completed . [2J EsGil staff did advise the applicant that the plan check has been completed. Person contacted: ROBERT Telephone#: 760 310 4774 Date contacted : (by: ) Email: BECHTER@DRAMMECHTER.COM Mail Telephone 0 REMARKS: By: Bert Domingo EsGil Fax In Person Enclosures: 08/09/2021 9320 Chesapeake Drive, Suite 208 ♦ San Diego, Californi a 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 CARLSBAD CBC2021-0283 08/26/2021 PLAN REVIEW CORRECTION LIST COMMERCIAL PLAN CHECK#.: CBC2021-0283 OCCUPANCY: TYPE OF CONSTRUCTION: ALLOWABLE FLOOR AREA: SPRINKLERS?: REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 08/26/2021 FOREWORD (PLEASE READ): JURISDICTION: CARLSBAD USE: ACTUAL AREA: STORIES: HEIGHT: OCCUPANT LOAD: DATE PLANS RECEIVED BY ESGIL CORPORATION: 08/09/2021 PLAN REVIEWER: Bert Domingo This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2019 CBC, which adopts the 2018 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2018 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. CARLSBAD CBC2021-0283 08/26/2021 GENERAL 1. Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to lnterwest and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring TWO corrected set of plans and calculations/reports to lnterwest, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to lnterwest only will not be reviewed by the City Planning, Engineering and Fire Departments until review by lnterwest is complete. PLANS 2. All sheets of the plans and the first sheet of the calculations are required to be signed by the licensed architect or engineer responsible for the plan preparation. California State Law. 3. Provide a Building Code Data Legend on the Title Sheet. Include the following code information for each building proposed: • Occupancy Classification(s) ♦ For Mixed Occupancy Buildings, state whether the "nonseparated" or "separated" option was chosen from Sections 508.3/508.4. ♦ Description of Use ♦ Type of Construction • Sprinklers: Yes or No • Stories ♦ Height • Floor Area ♦ Occupant Load ♦ Justification to exceed allowable area in Table 506.2 (if applicable) CARLSBAD CBC2021-0283 08/26/2021 + Justification to exceed allowable height or stories in Tables 504.3/504.4 (if applicable) SITE PLAN 4. Provide a fully dimensioned site plan drawn to scale. Sec. 107.2. Include the following: a) Clearly dimension building setbacks from property lines, street centerlines, and from all adjacent buildings and structures. b) North arrow. c) Property lines/easements.318 d) Streets/alleys. e) Existing and proposed buildings and structures. ADDITIONAL STRUCTURAL 5. The details on sheet SD-1 and SD-2 are hard to read. Please submit better and clear details. 6. Please show where the accessibility restroom for men and women. Please show the typical restrooms on the plans. To speed up the review process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: □ Yes □ No The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Bert Domingo at Esgil. Thank you. CARLSBAD CBC2021-0283 08/26/2021 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PREPARED BY: Bert Domingo PLAN CHECK#.: CBC2021-0283 DATE: 08/26/2021 BUILDING ADDRESS: 1911 PALOMAR OAKS WAY BUILDING OCCUPANCY: BULDING AREA PORTION (Sq.Fl) CTY ESTIMATE Air Conditioring Fire Sprinklers TOTAL VALUE Jurisdiction Code CB I 1997 UBC Building Permit Fee iJ 11'\1~: I 1997 UBC Plan Check Fee I i'\J ™: i] VakJation ~ By Ordinance Type ofRe~ew: P Complete Review r Repetitive Fee ~ 13 Repeats .,. r Other r Howl}' EaG■Fee .,. Reg. VALUE Mod. r Structural Only 1-------r @ • Comments: In addition to the above fee, an additional fee of$ $ /hr.) for the CalGreen review. ($) 70,000 70,000 1 , $318.3~ is due ( hour@ Sheet 1 of 1 Storage Rack Engineering, Inc 23142 kroyo Vista !<ancho Santa Margarita, CA 92688 Tel: 949.888.8850 Fax: 949.888.8851 All ,.A.bolhassani, P.E. President ~ Engineer of Record email: mall@storagerackenglneering.com www.storagerackenglneerlng.com SIQnedT/22/21 E1P!r< 913<Yl1 iss,. Prqject Name : DR.AMM AND ETCHER Prqject Number: V-062821-3 Date : 07 /22/21 Street ,Address : PAI-OMA!< O.,AKS PK\VY City/State : CARLSBAD, CA 92008 Babak A Abolh • assan1 Scope of Work : AMFI PLATFORM 24' x 65' 1 of42 Digitally sig Tli,ij, BabakAA DN:c=US, 8 o=STORAG ENGINEER! ou=A01410 ;;, A ETCHER 75669BCBE PLATFORM H~U• A STAIRS 1 E, cn=Ba SRE, INC PROJECT ,V-0,1121·3 Abolhassani .•}ylt,H,.,, ,,,_,_ Date:2021.07 ,,, __ ~1111"'" 15:30·47 -07'0 Al -•u•M( P.E. · 2.IN2Au_»-,,. .l'IMNMSMll•NM,Mk4 CA U6tll Tri, UI.--F--1,1.-#6/ -..,, ___ ...,,,,,,,.,~-.. ~--· .....,.Sl#~NHtAnyl,,N11¥,•- CITY 2of42 .:51 _____ - t:.:..:! g: ~· ·~ •t ;; II .. ' ~..; :~ \-. ~ a· ~ ~ ~~ ~ >-' _J "" ' ~ 'C;\ \J\ ~ -...- ~ ~ ...:... , .. ~ . -.-' ~ I ~ ~ < • ~ , ,J! •:, -1-----/X) ,..-,------t l .l. .. ., ~ ,, i " °' i ' ' 1W ~ , , . I /' ii J ~ .. ~ 111111 ~ ~ ... ,. ~ I k-~ ij§ i-i ~;~ i!"'' .... a.ii IH<!j ~ 'v -"'r~-' ~ "--,.., ~ t i ' ~ I i! ~ ii § ? ~ ~ ~.~ ~· iH .. .,., ~~ ~-. I ~ ., ~ "' ~ ~~ ~ ~ I \J\ •~ L . ij 6 )" :i:: ~~~~~ " CJ 11111111 "' ~ JiC) -~ ' !~~~·; ..... ~ a t~~J~ . • I\ :I .... ~ '·, i t ij p r Xi ~f c:. ,~ g. ~ ,ti"' i' !! r~ ~s~ ~~ = ~ a~~ ~~ Tl'=" In I • ~:§ ;;; ~ • l I~ 0 £ I i.t~i;} s~§ . ~ ~ ~;; JI N H ~-'"~ ; j -=-..-1Pi:s ~!~ii I· ~~i pQ-~ I f-!~~ . ,-B I' .. ,, §~~ l;:_ f, s I :s t !: ;2 .,, ,-N ii I ;JJisp .l:t ;§~ -., ,!; ~~~ "'~-::; ~~ ~~~ ~E " ~ -"' ~K ~~ =,r, < ~h _/ r ~ ~ ~ rn ,---; ii ~ ! , ~ I~ t ~ ' ~ D -\ J ~ ~ ~ 23142 Arroyo Vista Rancho Santa Margarita, CA 92688 Tel: 949.888.8850 Fax: 949.888.8851 8y: AA Prq/ect DRAMM i ETCHER Design Specifications Configuration: Platform 24X65 1) The analysis presented herein conforms to the requirements of the 2019 CBC, 2018 IBC and the ASCE 7· 16 2) Column steel minimum yield Fy= 46000 psi Beam steel minimum yield Fy= 50000 psi Brace steel minimum yield Fy= 36000 psi Other steel minimum yield Fy= 36000 psi 3) Bolts shall conform to Grade 5 unless noted otherwise on the plans or calculations. 4) Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein. Installer must Project It: V-06 :2821-3 provide any special Inspection as called out on plans or calculations, or as required by the ICC report indicated herein. 5) All welds shall conform to AW5 procedures, utilizing E70xx electrodes or similar. All such welds shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. 6) The slab is 6" thick with minimum 4000 psi compressive strength. Soil bearing capacity Is 1000 psf. Design Loads Occupancy Load LL= 125.0 psf Framing Dead Load Flooring= 6.0 psf Joist= 3.0 psf Beam= 3.0 psf Misc= 3.0 psf DL= 15.0 psf Ss= 1.008 S1= 0.366 Fa= 1.200 Fv= 1.900 Sos= 0.806 Soi = 0.464 Seismic Design Criteria R= 3.500 Importance factor, Ip= 1.000 Seismic Coeff, Cs= 0.2304 Seismic Design category= D Seismic Design Method= ASD Frame Type= STEEL OMRF age o 5 of42 23142,A,-royo Viste Rancho Santo Margarito, CA92688 Tel: 949.888.8850 Fox; 949.888.8851 By: AA Summary of Components Specifications Joist to Beam Connection Beam to Column Connection Live Load= 125 psf Dead Load= 15 psf Top of Deck= 132.0 in Column Fy= 46,000 psi Beam Fy= 50,000 psi Brace Fy= 36,000 psi Base Plate Fy= 36,000 psi Item Column Slab &Soil Perimeter Base Plate Comer Base Plate Project: DRAMM 1£ ETCHER Configuration: Platform 24X65 24.0fn 45 deg. KB Joist Knee Brace Column ~ Beam -r 132.0 In Conceptual Elevation Seismic Design Criteria Ss= 1.008 Sl= 0.366 Fa= 1.200 Fv= 1.900 Sos= 0.806 Soi= 0.464 R= 3.500 Importance factor, Ip= 1.000 Seismic Coeff, Cs= 0.230 Seismic Design Category= D Seismic Design Method= ASD Frame Type= STEEL OMRF Summary of Components Component HSS8x8x1/4 6 in x 4000 psi Slab with 1000 psf soil at grade 14 in x 14 in x 0.5 in thick (Centered Column). (4) anchors per baseplate 14 in x 14 in x 0.5 In thick Centered Column). (4) anchors per baseplate Anchor 0.75 in diam x 3.75 in embedment Hilti Kwikbolt TZ Wedge anchors with special inspection Knee Brace L3x3x1/4 (Rise/Run=24 in min) Knee Brace Conn (2) 1 in diam Grade S Bolts per end Joist to Beam Conn PL6x7x3/8 with (2) 0.75 in diam Grade 5 bolts Project If: V-062821-3 Beam to Column Conn WT7x11 (4) 0.75 in diam Grade 5 bolt (bolt spacing 3"c.c. & 1.5" edge to center Typ or better) Joist see attached Beam see attached Floor Deck 1-1/2" x 20 ga B deck w/ 3/4" Plywood attach w/#12 Tek@ 6" & 12" o.c. age o 6of42 23142 .Arroya Vista Rancho Santo Margarito, CA 92688 Tel: .949.888.8850 Fax: 94.9.888.8851 By: AA Loads Dead Loads Flooring ............................. . Joist ................................. . Beam ............................... .. Misc/HVAC ...................... . Seismic Load Prqject: DR.At-1M f ETCHER Configuration: Platform 24X65 6.0 psf 3.0 psf 3.0 psf 3.00 psf 15.00 psf Project #: Y.-062821-3 Live Loads LL ................ . 125.0 psf Lateral analysis is performed with regard to the 2018 IBC, 2019 CBC & ASCE 7-16 section 12.8.1, using Equivilant Lateral Force procedure ** For storage live loads, 25% of live load is considered In the determination of the effective seismic weight (W) per ASCE 7-16 section 12.7.2, item 2 V= Cs*W/R Cs-minl= Sds*Ie/R = 0.2304 Cs-min2= 0.044*Sds*I = 0.0355 Cs-min3= 0.55*51/(R/Ie) = 0.0058 eqtn 12.8-1 eqtn12.8-5 eqtn 12.8-5 eqtn 12.8-6 lf51>=0.6 Cs-minJ does not aoply .-------Cs ___ e_ff_=_o_.-2-30_4 ___ _,! Vcol 1r Vtransv=E= 0.2304 * 46.25 psf = 10.7 psf Column Shear= 10.7 psf * Trib Area per Column See table below H (TOD)= 132.0 in hl= 93.8 in M= Vcol*hl/2 Table 1. ASD Format Loads for Platform Columns Column Trib Area Base Shear, V Perimeter, Grid Cl 195 ft"2 2,087 lb Corner, Grid F2 103 ft"2 1,097 lb hl Axial DL (Static) 2,925 lb 1,538 lb Elevation <Pinned Basel Axial LL (Static) 24,375 lb 12,813 lb Framing weight, DL=D= 15 psf Deck Live Load, LL=L= 125 psf ** Leff=LL/4= 31.25 psf ** Effective Seismic Weight, W= (DL+LLeff) = 46.25 psf H (TOD)= 132.00 In Frame Depth= 288.00 in Pseismic 1,913 lb 1,006 lb Seismic Design Coeff Ss= 1.008 51= 0.366 Fa= 1.200 Fv= 1.900 Sds= 0.806 Sdl= 0.464 ** R= 3.50 I=Ie= 1.00 Site Oass= D Seismic Des. Catag= D rho= 1.00 Omega= 3.00 1.0 + 0.lO*Sds= 1.081 1.0 + 0.20*Sds= 1.161 M 195,656 in-lb 102,844 In-lb The following load combinations shall be checked herein for ASD loading on the steel components: 1) LC1: D + L ASCE Sec 2.4.1 eqtn 2 2) LC2: D + 0.75l+0.75*0.7E ASCE Sec 2.4.1 eqtn 6b D + 0.75*l + 0.525*E 3) LO: {1.0 + 0.10*Sds)D + 0.525*rho*E + 0.75l ASCE Sec 12.4.2.3, eqtn 6b 1.0806*D + 0.52S*E + 0.7S*l < <=== by Inspection, this governs over LC2 4) LC4: (1.0 + 0.20*Sds)D + Omega*E + Leff ASCE Sec 12.4.3.2, eqtn 5 1.161*0 + Omega*E + Leff Only for OMRF components 7of42 Project Title: Engineer: Project ID: Project Descr: Description: BEAM JOIST W12x22@46' O.C. 16'-3' BAY ~.:.:c9.(lft!i$!:.~iff/jfE,_§}~-i~ZJt~T;1;11;rltY"":: ____________________________ _ Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 T)~~Iefl.iP.i9i.ii:t~'?JtJ'.fiK1-::1~1!?:~I'.Hl='·f~J ___________________________ _ Analysis Method : Allowable Strength Design Beam Bracing : Completely Unbraced Bending Axis : Major Axis Bending Span = 16.250 ft Fy : Steel Yield : E: Modulus: 50.0 ksi 29,000.0 ksi iY"· • . ..,..,,._, ''; '"'t'~•• :--t•--•-•. ·;.••~ff"/>~'".:'.,;'"t•,",j~• "l •""";.t,N,_ . .,..!r.f;;;,11'-~f-:rr?:\~":P"I '.l-. ~P.tt~~.f.~~~ :..L ,'.;•;_:;:O:.b:.:.:.:t,r;-.1.i;-;"2.:fil_t;li:;.;,~ .. •:....' _______ s_e_rv_i_ce_lo_ad_s_e_n_te_red_._L_oa_d_F_a_c_to_rs_wi_·11_b_e_a:..:pp'-li_e_d_fo_r_ca_l_cu_la_ti_·o_n_s._ Beam self weiQht NOT internally calculated and added Uniform Load: D = 0.0150, L = 0.1250 ksf, Tributary Width= 4.0 ft Design OK ;~~fP.:.."€~<i})Jf/fdi,t,A..1fliJ.fl~J~.,~filW~TI~Rt~;r-~1,;.,1 '=-=--=---:----:-cc--c--=---=---=:-c-=-----Max1mum Bending Stress Ratio = 0.821 : 1 Maximum Shear Stress Ratio = ----~0.071 : 1 Section used for this span W12x22 Section used for this span W12x22 Ma : Applied 18.484 k-ft Va : Applied 4.550 k Mn/ Omega: Allowable 22.527 k-ft Vn/Omega : Allowable 63.960 k Load Combination +O+L +H Load Combination +O+L +H Location of maximum on span 8.125ft Location of maximum on span 0.000 ft Span # where maximum occurs Span # 1 Span # where maximum occurs Span # 1 Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.174 In Ratio= 0.000 in Ratio = 0.195 in Ratio= 0.000 in Ratio = 1,119>=360 0 <360 1000 >=240 0 <240 ~~:Max1""i1rm".'"Focest&:"sTress'esiio~a'~o'm6f11aif<>'ns:~~i ~'\;o . .u...c...-,••!l!l.. ........ .__;.i. .... p.~.r .,.~~-... .... ~.t,;...."'-'-~~~l•)t!4_l...,.,,....!~,1,m1:!---......,.,....:,r..,""-:a,~~:,~--=--~~--------~--~~~~- Load Combination Max Stress Ratios Summary of Moment Values Summary of Shear Values Segment Length Span# M V Mmax + Mmax -Ma Max Mnx Mme/Omega Cb Rm Va Max Vnx Vnx/Omega -+D-+tt Dsgn. L = 16.25 ft 0.088 0.008 • 1.98 1.98 37.62 22.53 1.14 1.00 0.49 -+D+l.-+tt 95.94 63.96 Osgn. L= 16.25ft 0.821 0.071 18.48 18.48 37.62 22.53 1.14 1.00 -+O+Lr-+tt 4.55 95.94 63.96 Dsgn.L= 16.25ft 0.088 0.008 1.98 1.98 37.62 22.53 1.14 1.00 -tO+S-+tt 0.49 95.94 63.96 Dsgn. L = 16.25 ft 0.088 0.008 1.98 1.98 37.62 22.53 1.14 1.00 -+0-+-0.750Lr-+-0.750L-+tt 0.49 95.94 63.96 Osgn. L = 16.25 ft 0.637 0.055 14.36 14.36 37.62 22.53 1.14 1.00 3.53 -+0-+-0.750L-+-0.750S-+tt 95.94 63.96 Dsgn. L = 16.25 ft 0.637 0.055 14.36 14.36 37.62 22.53 1.14 1.00 3.53 -+0-+-0.60W-+tt 95.94 63.96 Dsgn. L= 16.25 ft 0.088 0.008 1.98 1.98 37.62 22.53 1.14 1.00 0.49 -+D-+-0 .70E-+tt 95.94 63.96 Dsgn.L= 16.25ft 0.088 0.008 1.98 1.98 37.62 22.53 1.14 1.00 0.49 -t0-+-0. 750Lr-+-O. 750L-+-0.450W-+tt 95.94 63.96 Osgn. L = 16.25 ft 0.637 0.055 14.36 14.36 37.62 22.53 1.14 1.00 3.53 -t0-+-0. 750L-+-O. 750S-+-0.450W--tl 95.94 63.96 Dsgn. L = 16.25 It 0.637 0.055 14.36 14.36 37.62 22.53 1.14 1.00 3.53 -+0-+-0. 7 50L +0.750S-+-0.5250E--tl 95.94 63.96 Dsgn. L = 16.25 ft 0.637 0.055 14.36 14.36 37.62 22.53 1.14 1.00 +0.60D-+-0.60W-+-0.60H 3.53 95.94 63.96 Dsgn. L = 16.25 ft 0.053 0.005 1.19 8 of 42 1.19 37.62 22.53 1.14 1.00 0.29 95.94 63.96 Description : Load Combination Segment Length -+0.60D-+O. 70E-+0.60H Span# Max Stress Ratios M V Mmax+ Dsgn. L = 16.25 ft 0.053 0.005 1.19 Project Title: Engineer: Project ID: Project Descr: . File-C:\Use~\aiaS~l:\DOSlJME:;1.IENJ;R<:,\~1\D~M g ETCHER V-062821-;3 ALS ~ERSION:eci; ·;,: · ·. · · . · ·. , .... ; '.'.;':' . ·.,:.•.Software .... h!ENERCALC; INC:1983-2018,'Build::10.1a.1~.13;' · ... Summary of Moment Values Summary of Shear Values Mmax-Ma Max Mnx Mnx/Omega Cb Rm Va Max Vnx Vnx/Omega 1.19 37.62 22.53 1.14 1.00 .·· .. Pf~r~!i_;~~~X:imum. C>.efi"§~!§.rf.i ).:'.;;5[tliti8IT.l+;.i,:;:.:.'"'· ----,-------------,---------- Load Combination Span Max.•-• Defl Location in Span Load Combination Max.'+' Defl Location in Span 0.29 95.94 63.96 +D-il-<H 1 0.1951 8.171 0.0000 0.000 ( Verticai~ReacHons:1':l;JfYf,~r·•~,~';mr.;r,_:"rri Support notation: Far left is #1 Values In KIPS , ....... _ .. _.; .. ,: __ ..,., ""''~-..... , ................ -M~ ...... _____ ..._ _ _..., .. ,4. ~ .... •~-'·~----'-------------------------Load Combination Support 1 Support 2 Overall MAXimum 4.550 4.550 Overall MINimum 0.293 0.293 +D+H 0.488 0.488 +D-il -<fl 4.550 4.550 +D-ilr..+l 0.488 0.488 +D+S-<H 0.488 0.488 +D-+0.750Lr-+0.750L -<fl 3.534 3.534 +D-+0.750L-+0.750S-<H 3.534 3.534 +D-+0.60W-<H 0.488 0.488 +D-+0.70E-<fl 0.488 0.488 +D-+0.750Lr-+0.750L-+0.450W-<fl 3.534 3.534 +D-+0.750L-+0.750S+0.450W-<fl 3.534 3.534 +D-+0.750L +0.750S+0.5250E-<fl 3.534 3.534 +0.60D+0.60W+0.60H 0.293 0.293 +0.60D+0.70E+0.60H 0.293 0.293 D Only 0.488 0.488 Lr Only LOnly SOnly WOnly E Only HOnly 4.063 4.063 9of42 Project Title: Engineer: Project ID: Project Descr: ::· File= C:\User,;lall.iSREUJQ¢UME-. IENERCA~1\DRAMM & ETCIJER V;jl!i2821.J ALS YEllSJON.ec6 '; .j :--. "' . ·;,, .. • ;,,; .,;:r: ,. ; ·::,,.,;.; :Software· yii ht ENERCALc.:1Nc:·1983-2018, ilulld:10:1aJ2.13:j ,, ... Description : BEAM GRID C1-C2 W16X45 INTERIOR BEAM ~~_cpp~'if.~i:l#}l.¢.!1¢-;:,$.:·:;:J[E~I.t::·:.: .. '.·. :f~t-T ~I.~:._, ______________________ _ Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 ... :t-1·~1e~_~i~'P.r~f>~rt1es ::::;r"'lf Ji~~·::: ·;;~,;j·_::f:i~_-___________________________ _ Analysis Method : Allowable Strength Design Beam Bracing : Beam bracing Is defined as a set spacing over all spans Bending Axis : Major Axis Bending Fy : Sleet Yield : E: Modulus: 50.0 ksi 29,000.0 ksi r:·u~"'n"""'bra.,,.ce""-d--:L·,,,.e. ·n-'g""t-h"'s-:-w:~~,Wrn,~;;;:"''1"1!?;;~~•~1 i1 ...•......................... _ .................. -.~-L.:~r..,tl~t..::.: . .-<l~; Ji:~-.r.t:cd~-.-.__ ___________________________ _ First Brace starts at 4.0 ft from Left-Most support Regular spacing of lateral supports on length of beam = 4.0 ft Span = 23.0 ft ,r:-A--p-=p11'ed~.,.. -~i1o·•·"'a.,..d~s···~,f:':,.· '~~-• :,""·-T"·r;:':!~\·:-:;:~(=f.S~l Service loads entered. load Factors will be applied •or calculations. :.·1 .. .,.,._ .. --~,...~~ ... .-..... ..._.:::~~~\·~: . .!J...~~~1:.,.1.t·~.!.:,d., .. 11::.1:."",···',.,.,c__ ____________________ :....:._ __ ,, ____ _ Beam self wei~ht NOT internally calculated and added Uniform Load: D = 0.0150, L = 0.1250 ksf, Tributary Width = 16.250 ft t Msicm:so~A~rrt~riJ;1~~rrr·~;~-z~r2:.~ ... 1:"'-:;;~""{ ... ~~•-..,:r,,.;;1 .... 1 ____ c-c-~-~~-,~-~~------"=== Maximum Bending Stress Ratio = 0.733: 1 Maximum Shear Stress Ratio = Design OK Section used for this span W16x45 Section used for this span Ma : Applied 150.434 k-ft Va : Applied Mn / Omega : Allowable 205.339 k-ft Vn/Omega : Allowable Load Combination ~ -+H Load Combination Location of maximum on span 11.500ft Location of maximum on span Span # where maximum occurs Span # 1 Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.754 in Ratio= 0.000 in Ratio = 0.847 in Ratio = 0.000 in Ratio= 1"~, ..... , ..... ..,., .... ~F'·c ·~s.'"§t""' ... _t .... :![~2ict~""'H'-'r-~~!I bU..-¥.!!l!Y.!!hU>..ffi!L~.ress!!i:.9!it .... QJ.!6.<?!!l J.!J!t~s· i ,. 365>=360 0 <360 326 >=240 0 <240 Load Combination Max Stress Ratios Summary of Moment Values Segment Length Span# M V Mmax+ Mmax-Ma Max Mnx Mme/Omega Cb Rm -+O+H Dsgn. L= 3.94ft 1 0.045 0.025 9.16 9.16 342.92 205.34 1.57 1.00 Dsgn. L = 4.01 ft 1 0.071 0.017 14.58 9.16 14.58 342.92 205.34 1.15 1.00 Dsgn. L= 4.01 ft 1 0.078 0.008 16.12 14.58 16.12 342.92 205.34 1.02 1.00 Dsgn. L= 4.01 ft 1 0.078 0.010 16.09 13.68 16.09 342.92 205.34 1.04 1.00 Osgn. L = 4.01 ft 1 0.067 0.019 13.68 7.36 13.68 342.92 205.34 1.19 1.00 Osgn. L = 3.02ft 1 0.036 0.025 7.36 7.36 342.92 205.34 1.59 1.00 -+0+1.-++I Dsgn. L= 3.94ft 0.416 0.236 85.47 85.47 342.92 205.34 1.57 1.00 Dsgn. L = 4.01 ft 0.663 0.155 136.11 85.47 136.11 342.92 205.34 1.15 1.00 Osgn. L = 4.01 ft 0.733 0.073 150.43 136.11 150.43 342.92 205.34 1.02 1.00 Dsgn. L = 4.01 ft 0.731 0.092 150.19 127.72 150.19 342.92 205.34 1.04 1.00 Dsgn. L = 4.01 ft 0.622 0,174 127.72 68.69 127.72 342.92 205.34 1.19 1.00 Osgn. L= 3.02ft 0.335 0.236 68.69 68.69 342.92 205.34 1.59 1.00 -+O+l.r-++I Dsgn. L = 3.94ft 1 0.045 O.D25 9.16 9.16 342.92 205.34 1.57 1.00 Dsgn. L = 4.01 ft 1 0.071 0.017 14.58 9.16 14.58 342.92 205.34 1.15 1.00 Dsgn. L = 4.01 ft 1 0.078 0.008 16.12 14.58 16.12 342.92 205.34 1.02 1.00 Dsgn. L = 4.01 ft 1 0.078 0.010 16.09 13.68 16.09 342.92 205.34 1.04 1.00 Dsgn. L = 4.01 ft 1 0.067 0.019 13.68 7.36 13.68 342.92 205.34 1.19 1.00 10 of42 0.236 : 1 W16x45 26.163 k 111.090 k ..0-tl-+H 0.000 fl Span#1 -·-·-----··-·-- Summary of Shear Values Va Max Vnx Vnx/Omega 2.80 166.64 111.09 1.84 166.64 111.09 0.86 166.64 111.09 1.09 166.64 111.09 2.07 166.64 111.09 2.80 166.64 111.09 26.16 166.64 111.09 17.19 166.64 111.09 8.07 166.64 111.09 10.17 166.64 111.09 19.29 166.64 111.09 26.16 166.64 111.09 2.80 166.64 111.09 1.84 166.64 111.09 0.86 166.64 111.09 1.09 166.64 111.09 2.07 166.64 111.09 Project ntle: Engineer: Project ID: Project Descr: . ;: File= C:IU~\ala.SREIOOCUME-1\ENERCA~1\Q~MM & ETCl:JER V-062821-~Al,.S '{ERSION.ec:6 ., , . .. •. : ·' ·' , .-·--,? ·-; '. · . > .''·Softwae' . htENERCALC.INC.1983-:?018,Build;10.18.12.13 .' •·· I II: Description: BEAM GRID C1-C2 W16X45 INTERIOR BEAM Load Combination Max Stress Ratios Summary of Moment Values Summary of Shear Values Segment Length Span# M V Mmax+ Mmax-MaMax Mnx Mnx/Omega Cb Rm Va Max Vnx Vnx/Omega Dsgn. L = 3.0211 1 0.036 0.025 7.36 7.36 342.92 205.34 1.59 1.00 2.80 166.64 111.09 +D+S-+H Dsgn. L = 3.94 ft 1 0.045 0.025 9.16 9.16 342.92 205.34 1.57 1.00 2.80 166.64 111.09 Dsgn. L = 4.01 ft 1 0.071 0.017 14.58 9.16 14.58 342.92 205.34 1.15 1.00 1.84 166.64 111.09 Dsgn. L = 4.01 ft 1 0.078 0.008 16.12 14.58 16.12 342.92 205.34 1.02 1.00 0.86 166.64 111.09 Dsgn. L = 4.01 ft 1 0.078 0.010 16.09 13.68 16.09 342.92 205.34 1.04 1.00 1.09 166.64 111.09 Dsgn. L= 4.01 ft 1 0.067 0.019 13.68 7.36 13.68 342.92 205.34 1.19 1.00 2.07 166.64 111.09 Dsgn. L = 3.02 ft 1 0.036 0.025 7.36 7.36 342.92 205.34 1.59 1.00 2.80 166.64 111.09 +D+0.750Lr+0.750L-+H Dsgn. L= 3.94ft 1 0.323 0.183 66.39 66.39 342.92 205.34 1.57 1.00 20.32 166.64 111.09 Dsgn. L = 4.01 ft 1 0.515 0.120 105.73 66.39 105.73 342.92 205.34 1.15 1.00 13.35 166.64 111.09 Dsgn. L = 4.01 ft 1 0.569 0.056 116.86 105.73 116.86 342.92 205.34 1.02 1.00 6.27 166.64 111 .09 Dsgn. L= 4.01 ft 1 0.568 0.071 116.67 99.21 116.67 342.92 205.34 1.04 1.00 7.90 166.64 111.09 Dsgn. L= 4.01 ft 1 0.483 0.135 99.21 53.36 99.21 342.92 205.34 1.19 1.00 14.98 166.64 111.09 Dsgn. L= 3.02ft 1 0260 0.183 53.36 53.36 342.92 205.34 1.59 1.00 20.32 166.64 111.09 +D+0.750L +0.750S-+H Dsgn. L= 3.94ft 1 0.323 0.183 66.39 66.39 342.92 205.34 1.57 1.00 20.32 166.64 111.09 Dsgn. L = 4.01 ft 1 0.515 0.120 105.73 66.39 105.73 342.92 205.34 1.15 1.00 13.35 166.64 111.09 Dsgn. L= 4.01 ft 1 0.569 0.056 116.86 105.73 116.86 342.92 205.34 1.02 1.00 6.27 166.64 111.09 Dsgn. L = 4.01 ft 1 0.568 0.071 116.67 99.21 116.67 342.92 205.34 1.04 1.00 7.90 166.64 111.09 Dsgn. L= 4.01 ft 1 0.483 0.135 99.21 53.36 99.21 342.92 205.34 1.19 1.00 14.98 166.64 111.09 Dsgn. L= 3.02ft 1 0.260 0.183 53.36 53.36 342.92 205.34 1.59 1.00 20.32 166.64 111.09 +D+0.60W-+H Dsgn. L= 3.94ft 1 0.045 0.025 9.16 9.16 342.92 205.34 1.57 1.00 2.80 166.64 111.09 Dsgn. L= 4.01 ft 1 0.071 0.017 14.58 9.16 14.58 342.92 205.34 1.15 1.00 1.84 166.64 111.09 Dsgn. L= 4.01 ft 1 0.078 0.008 16.12 14.58 16.12 342.92 205.34 1.02 1.00 0.86 166.64 111.09 Dsgn. L = 4.01 ft 1 0.078 0.010 16.09 13.68 16.09 342.92 205.34 1.04 1.00 1.09 166.64 111.09 Dsgn. L= 4.01 ft 1 0.067 0.019 13.68 7.36 13.68 342.92 205.34 1.19 1.00 2.07 166.64 111.09 Dsgn. L = 3.02 ft 1 0.036 0.025 7.36 7.36 342.92 205.34 1.59 1.00 2.80 166.64 111.09 +D+0.70E+H Dsgn. L = 3.94ft 1 0.045 0.025 9.16 9.16 342.92 205.34 1.57 1.00 2.80 166.64 111.09 Dsgn. L= 4.01 ft 1 0.071 0.017 14.58 9.16 14.58 342.92 205.34 1.15 1.00 1.84 166.64 111.09 Dsgn. L= 4.01 ft 1 0.078 0.008 16.12 14.58 16.12 342.92 205.34 1.02 1.00 0.86 166.64 111.09 Dsgn. L= 4.01 ft 1 0.078 0.010 16.09 13.68 16.09 342.92 205.34 1.04 1.00 1.09 166.64 111.09 Dsgn. L= 4.01 ft 1 0.067 0.019 13.68 7.36 13.68 342.92 205.34 1.19 1.00 2.07 166.64 111.09 Dsgn. L= 3.02ft 1 0.036 0.025 7.36 7.36 342.92 205.34 1.59 1.00 2.80 166.64 111.09 +D+0.750Lr+0.750L+0.450W-+H Dsgn. L= 3.94 ft 1 0.323 0.183 66.39 66.39 342.92 205.34 1.57 1.00 20.32 166.64 111.09 Dsgn. L= 4.01 ft 1 0.515 0.120 105.73 66.39 105.73 342.92 205.34 1.15 1.00 13.35 166.64 111.09 Dsgn. L= 4.01 ft 1 0.569 0.056 116.86 105.73 116.86 342.92 205.34 1.02 1.00 6.27 166.64 111.09 Osgn. L= 4.01 ft 1 0.568 0.071 116.67 99.21 116.67 342.92 205.34 1.04 1.00 7.90 166.64 111.09 Dsgn. L= 4.01 ft 1 0.483 0.135 99.21 53.36 99.21 342.92 205.34 1.19 1.00 14.98 166.64 111.09 Dsgn. L= 3.02ft 1 0.260 0.183 53.36 53.36 342.92 205.34 1.59 1.00 20.32 166.64 111.09 +D+0.750l +0.750S+0.450W-+H Dsgn. L= 3.94ft 1 0.323 0.183 66.39 66.39 342.92 205.34 1.57 1.00 20.32 166.64 111.09 Dsgn. L= 4.01 ft 1 0.515 0.120 105.73 66.39 105.73 342.92 205.34 1.15 1.00 13.35 166.64 111.09 Dsgn. L= 4.01 ft 1 0.569 0.056 116.86 105.73 116.86 342.92 205.34 1.02 1.00 6.27 166.64 111.09 Dsgn. L= 4.01 ft 1 0.568 0.071 116.67 99.21 116.67 342.92 205.34 1.04 1.00 7.90 166.64 111.09 Dsgn. L = 4.01 fl 1 0.483 0.135 99.21 53.36 99.21 342.92 205.34 1.19 1.00 14.98 166.64 111.09 Dsgn. L= 3.02ft 1 0.260 0.183 53.36 53.36 342.92 205.34 1.59 1.00 20.32 166.64 111.09 +D+O. 750l +0.750S+0.5250E-+H Dsgn. l = 3.94ft 1 0.323 0.183 66.39 66.39 342.92 205.34 1.57 1.00 20.32 166.64 111.09 Dsgn. L = 4.01 ft 1 0.515 0.120 105.73 66.39 105.73 342.92 205.34 1.15 1.00 13.35 166.64 111.09 Dsgn. L = 4.01 ft 1 0.569 0.056 116.86 105.73 116.86 342.92 205.34 1.02 1.00 6.27 166.64 111.09 Dsgn. L = 4.01 ft 1 0.568 0.071 116.67 99.21 116.67 342.92 205.34 1.04 1.00 7.90 166.64 111.09 Dsgn. L= 4.01 ft 1 0.483 0.135 99.21 53.36 99.21 342.92 205.34 1.19 1.00 14.98 166.64 111 .09 Osgn. L= 3.02ft 1 0.260 0.183 53.36 53.36 342.92 205.34 1.59 1.00 20.32 166.64 111.09 +0.60D+0.60W+0.60H Dsgn. L = 3.94ft 1 0.027 0.015 5.49 5.49 342.92 205.34 1.57 1.00 1.68 166.64 111.09 Dsgn. L = 4.01 fl 1 0.043 0.010 8.75 5.49 8.75 342.92 205.34 1.15 1.00 1.11 166.64 111 .09 Dsgn. L = 4.01 ft 1 0.047 0.005 9.67 8.75 9.67 342.92 205.34 1.02 1.00 0.52 166.64 111.09 Dsgn. L = 4.01 ft 1 0.047 0.006 9.66 8.21 9.66 342.92 205.34 1.04 1.00 0.65 166.64 111.09 Dsgn. L = 4.01 ft 1 0.040 0.011 8.21 4.42 8.21 342.92 205.34 1.19 1.00 1.24 166.64 111.09 Dsgn. L = 3.02ft 1 0.022 0.D15 4.42 4.42 342.92 205.34 1.59 1.00 1.68 166.64 111.09 +0.60D+0.70E+0.60H Dsgn. L= 3.94ft 0.027 0.015 5.49 5.49 342.92 205.34 1.57 1.00 1.68 166.64 111.09 Dsgn. L = 4.01 ft 0.043 0.010 8.75 5.49 8.75 342.92 205.34 1.15 1.00 1.11 166.64 111 .09 Dsgn. L= 4.01 ft 0.047 0.005 9.67 8.75 9.67 342.92 205.34 1.02 1.00 0.52 166.64 111 .09 Dsgn. L= 4.01 fl 0.047 0.006 9.66 H1or42 9.66 342.92 205.34 1.04 1.00 0.65 166.64 111.09 Project Title: Engineer: Project ID: Project Oescr: , . -;·:File= C.\Users\aliaSRE\DOCl,JME-1\EJ\jERCA-1\DRAMM & ETCHER V-062821.J A!.S VERSION.ec6 , , t .. · !";:' . ·-:., : . · :•. · ·i·; '.''Softwa-eco rightENERCAlC. INC.198~2018, Build:10.18.12 3'.\ Description: BEAM GRID C1-C2 W16X45 INTERIOR BEAM Load Combination Max Stress Ratios Summary of Moment Values Summary of Shear Values Segment Length Span # M V Mmax + Mmax -Ma Max Mnx Mm</Omega Cb Rm Va Max Vnx Vnx/Omega Dsgn. l = 4.01 ft 1 0.040 0.011 8.21 4.42 8.21 342.92 205.34 1.19 1.00 1.24 166.64 111.09 Dsgn. L = 3.02 ft 1 0.022 0.015 4.42 4.42 342.92 205.34 1.59 1.00 1.68 166.64 111.09 ·· ¢.ie~~!CM~x!iij~:~o_ef!ec~i.ci~~I?'.L?Bt::····,_ .,,_ . _ ~-------------------------Load Combination Span Max. • -• Defl Location in Span Load Combination -+0-+L-+fi 1 0.8468 11.566 Support notation : Far left Is #1 Load Combination Overall MAXimum Overall MINimum -+0-+fi -+0-+L-+fi -+0-+Lr-+fi -+O+S->H -+0+0.750Lr+0.750l-+fi -+0+0.750L +0. 750S+H -+0+0.60W-+ti -+D+0.70E-+fi -+0+0.750Lr+0.750L+0.450W-+fi -+0+0.750L +0. 750S+0.450W-+fi -+0+0.750L +0.750S+0.5250E-+fi +0.60D+0.60W+0.60H +0.60D+0.70E+0.60H DOnly Lr Only LOnly sonly WOnly E Only HOnly Support 1 26.163 1.682 2.803 26.163 2.803 2.803 20.323 20.323 2.803 2.803 20.323 20.323 20.323 1.682 1.682 2.803 23.359 Support2 26.163 1.682 2.803 26.163 2.803 2.803 20.323 20.323 2.803 2.803 20.323 20.323 20.323 1.682 1.682 2.803 23.359 12 of 42 Max."+' Defl Location in Span 0.0000 0.000 Values In KIPS Project Title: Engineer: Project ID: Project Descr: ;.::FH~~ C:IU~ern\alia_:Sfl_El?()C~ME-1\E~ERr:A-1\DRAMM & ETCHER V-!)6282) .AL~.YERS)ON.ei:6 '.;' ·. •·" ·' ',.•,· : . •. '•,' .' ·~ '·. ·· ·' Soflw.re llghlENERCALC, INC:•1983-2018,B\Jlld:10.18.12.13 ;·' ... ,: . Description : BEAM W16X26 GRID A 1-A2 PERIMETER BEAMS Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 ... _: -~~eriaf.¥.r.<!i?_effi~--r:·.,:::: ~·2:rc:~~ -~~t:: ~ :;:-.·:: -----------------------------An a I y sis Method : Allowable Strength Design Beam Bracing : Beam bracing is defined as a set spacing over all spans Bending Axis : Major Axis Bending Fy : Steel Yield : E: Modulus: 50.0 ksi 29,000.0 ksi t~un1,-raC8Ci~(en·gthS~~?;r{"f-·:·:il1:r;~,r~rrf.(~1r::;~1,;;n?::•7~~ ,.~.~.-.,%.~ .... # ... ,...~..,,. .. ..; _.., ,.~--.. .:~~i;.1'.L.·.:~~,, ... .u!~.,~.,,-v.t.-,:::~;l:...:,.i.A;...:·1.t.:i·'~----------------------------first Brace starts at 4.0 ft from Left-Most support Regular spacing of lateral supports on length of beam = 4.0 ft ···•·····--····---· ------------ Span = 23.0 ft ::'-::"P.P!l~~:J~~~.s":.~E~::.~:;:: :·~:Elt~uTii::;~;J Service loads entered. Load Factors will be applied for calculations. -~----------------------------Beam self welQht NOT internally calculated and added Uniform Load : D = 0.0150, L = 0.1250 ksf, Tributary Width = 8.125 ft ~f-JYQE~L~N~tJMNrA.!JYt}:}f:IT~~'.~:}l~-Z-:1·~~~~:r:T~---R•mnn-• Maximum Bending Stress Ratio = 0.682 : 1 ---,M-a-axt--;--.m-u-m--:S;:c,h,-e_a_r·s'"'"tr_e_s_s-.Rc-a-:ti,-o-=----= Design OK 0.186: 1 Section used for this span W16x26 Section used for this span Ma: Applied 75.217 k-ft Va: Applied Mn / Omega : Allowable 11 O .279 k-ft Vn/Omega : Allowable Load Combination +0-+L-+f-l Load Combination Location of maximum on span 11.500ft Location of maximum on span Span # where maximum occurs Span # 1 Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection 0.734 in Ratio= 375>=360 Max Upward Transient Deflection 0.000 in Ratio= 0 <360 Max Downward Total Deflection 0.824 in Ratio= 335 >=240 Max Upward Total Deflection 0.000 in Ratio= 0 <240 ~ax~mllnfForce~·&'T:'svism~tef irm<>""''Hfnatra'i.is"',1J~'.1 ti,;:.dl_.,..... __ ,,,j.,._.,_..-,.;-,_-.,to<'lf,+.,4--~A.:,.. I!.....-.-,_ ... ,....... • ~ ... 9 " -~~.:._:::i,,;;~,t.!:, Load Combination Max Stress Ratios Summary of Moment Values Segment Length Span# M V Mmax+ Mmax-Ma Max Mnx Mme/Omega Cb Rm +0-+H Dsgn. L = 3.94ft 1 0.042 0.020 4.58 4.58 184.17 110.28 1.57 1.00 Dsgn. L = 4.01 ft 1 0.066 0.013 7.29 4.58 7.29 184.17 110.28 1.15 1.00 Dsgn. L= 4.01 ft 1 0.073 0.006 8.06 7.29 8.06 184.17 110.28 1.02 1.00 Dsgn. L= 4.01 ft 1 0.073 0.008 8.05 6.84 8.05 184.17 110.28 1.04 1.00 Dsgn. L= 4.01 ft 1 0.062 0.D15 6.84 3.68 6.84 184.17 110.28 1.19 1.00 Dsgn. L = 3.02ft 1 0.033 0.020 3.68 3.68 184.17 110.28 1.59 1.00 +0-+l-+H Dsgn. L = 3.94ft 1 0.388 0.186 42.74 42.74 184.17 110.28 1.57 1.00 Dsgn. L= 4.01 ft 1 0.617 0.122 68.06 42.74 68.06 184.17 110.28 1.15 1.00 Dsgn. L= 4.01 ft 1 0.682 0.057 75.22 68.06 75.22 184.17 110.28 1.02 1.00 Dsgn. L= 4.01 ft 1 0.681 0.072 75.10 63.86 75.10 184.17 110.28 1.04 1.00 Dsgn. L= 4.01 ft 1 0.579 0.137 63.86 34.35 63.86 184.17 110.28 1.19 1.00 Dsgn. L = 3.02ft 1 0.311 0.186 34.35 34.35 184.17 110.28 1.59 1.00 +0-+lr-+H Dsgn. L = 3.94 ft 0.042 0.020 4.58 4.58 184,17 110.28 1.57 1.00 Dsgn. L = 4.01 ft 0.066 0.013 7.29 4.58 7.29 184.17 110.28 1.15 1.00 Dsgn. L= 4.01 ft 0.073 0.006 8.06 7.29 8.06 184.17 110.28 1.02 1.00 Dsgn. L = 4.01 ft 0.073 0.008 8.05 6.84 8.05 184.17 110.28 1.04 1.00 Dsgn. L = 4.01 fl 0.062 0,015 6.84 3.68 6.84 184.17 110.28 1.19 1.00 13 of 42 W1 6x26 13.081 k 70.509 k +0-+L-+f-l 0.000 ft Span# 1 Summary of Shear Values Va Max Vnx Vnx/Omega 1.40 117.75 70.51 0.92 117.75 70.51 0.43 117.75 70.51 0.54 117.75 70.51 1.03 117.75 70.51 1.40 117.75 70.51 13.08 117.75 70.51 8.60 117.75 70.51 4.04 117.75 70.51 5.08 117.75 70.51 9.64 117.75 70.51 13.08 117.75 70.51 1.40 117.75 70.51 0.92 117.75 70.51 0.43 117.75 70.51 0.54 117.75 70.51 1.03 117.75 70.51 Project Title: Engineer: Project ID: Project Descr: iSte~i Beain C • ·' File= C:\User.;\alla.SRBDOCUME-11,ENER -1\DRAMM & ETCHERV-062821,3AI.S VERSION. ,i, , ,~ . i. !'•\ ··.· ··~ SoftwaeCO ' ht ENERCALCj INC:'1'98~2018, Buikl:10.18.1i13 ·: . ,• I l .,. I • • I ~ Description : BEAM W16X26 GRID A 1-A2 PERIMETER BEAMS Load Combination Max Stress Ratios Summary of Moment Values Summary of Shear Values Segment Length Span# M V Mmax+ Mmax-MaMax Mnx Mme/Omega Cb Rm Va Max Vnx Vnx/Omega Dsgn. L = 3.02ft 0.033 0.020 3.68 3.68 184.17 110.28 1.59 1.00 1.40 117.75 70.51 +D+S+H Dsgn. L= 3.94ft 1 0.042 0.020 4.58 4.58 184.17 110.28 1.57 1.00 1.40 117.75 70.51 Dsgn. L = 4.01 ft 1 0.066 0.013 7.29 4.58 7.29 184.17 110.28 1.15 1.00 0.92 117.75 70.51 Dsgn. L= 4.01 ft 1 0.073 0.006 8.06 7.29 8.06 184.17 110.28 1.02 1.00 0.43 117.75 70.51 Dsgn. L= 4.01 ft 1 0.073 0.008 8.05 6.84 8.05 184.17 110.28 1.04 1.00 0.54 117.75 70.51 Dsgn. L= 4.01 ft 1 0.062 0.015 6.84 3.68 6.84 184.17 110.28 1.19 1.00 1.03 117.75 70.51 Dsgn. L= 3.02ft 1 0.033 0.020 3.68 3.68 184.17 110.28 1.59 1.00 1.40 117.75 70.51 +D+0.750Lr+0.750L+H Dsgn. L = 3.94ft 1 0.301 0.144 33.20 33.20 184.17 110.28 1.57 1.00 10.16 117.75 70.51 Dsgn. L= 4.01 ft 1 0.479 0.095 52.86 33.20 52.86 184.17 110.28 1.15 1.00 6.68 117.75 70.51 Dsgn. L= 4.01 ft 1 0.530 0.044 58.43 52.86 58.43 184.17 110.28 1.02 1.00 3.14 117.75 70.51 Dsgn. L= 4.01 ft 1 0.529 0.056 58.33 49.61 58.33 184.17 110.28 1.04 1.00 3.95 117.75 70.51 Dsgn. L= 4.01 ft 1 0.450 0.106 49.61 26.68 49.61 184.17 110.28 1.19 1.00 7.49 117.75 70.51 Dsgn. L = 3.02ft 1 0.242 0.144 26.68 26.68 184.17 110.28 1.59 1.00 10.16 117.75 70.51 +D+0.750L +0.750S+H Dsgn. L= 3.94ft 1 0.301 0.144 33.20 33.20 184.17 110.28 1.57 1.00 10.16 117.75 70.51 Dsgn. L= 4.01 ft 1 0.479 0.095 52.86 33.20 52.86 184.17 110.28 1.15 1.00 6.68 117.75 70.51 Dsgn. L= 4.01 ft 1 0.530 0.044 58.43 52.86 58.43 184.17 110.28 1.02 1.00 3.14 117.75 70.51 Dsgn. L= 4.01 ft 1 0.529 0.056 58.33 49.61 58.33 184.17 110.28 1.04 1.00 3.95 117.75 70.51 Dsgn. L = 4.01 ft 1 0.450 0.106 49.61 26.68 49.61 184.17 110.28 1.19 1.00 7.49 117.75 70.51 Dsgn. L= 3.02ft 1 0.242 0.144 26.68 26.68 184.17 110.28 1.59 1.00 10.16 117.75 70.51 +D+0.60W+H Dsgn. L= 3.94ft 1 0.042 0.020 4.58 4.58 184.17 110.28 1.57 1.00 1.40 117.75 70.51 Dsgn. L= 4.01 ft 1 0.066 0.013 7.29 4.58 7.29 184.17 110.28 1.15 1.00 0.92 117.75 70.51 Dsgn. L = 4.01 ft 1 0.073 0.006 8.06 7.29 8.06 184.17 110.28 1.02 1.00 0.43 117.75 70.51 Dsgn. L= 4.01 ft 1 0.073 0.008 8.05 6.84 8.05 184.17 110.28 1.04 1.00 0.54 117.75 70.51 Dsgn. L= 4.01 ft 1 0.062 0.015 6.84 3.68 6.84 184.17 110.28 1.19 1.00 1.03 117.75 70.51 Dsgn. L = 3.02ft 1 0.033 0.020 3.68 3.68 184.17 110.28 1.59 1.00 1.40 117.75 70.51 +0+0.70E+H Dsgn. L = 3.94ft 1 0.042 0.020 4.58 4.58 184.17 110.28 1.57 1.00 1.40 117.75 70.51 Dsgn. L = 4.01 ft 1 0.066 0.013 7.29 4.58 7.29 184.17 110.28 1.15 1.00 0.92 117.75 70.51 Dsgn. L = 4.01 ft 1 0.073 0.006 8.06 7.29 8.06 184.17 110.28 1.02 1.00 0.43 117.75 70.51 Dsgn. L = 4.01 ft 1 0.073 0.008 8.05 6.84 8.05 184.17 110.28 1.04 1.00 0.54 117.75 70.51 Dsgn. L = 4.01 ft 1 0.062 O.D15 6.84 3.68 6.84 184.17 110.28 1.19 1.00 1.03 117.75 70.51 Dsgn. L = 3.02ft 1 0.033 0.020 3.68 3.68 184.17 110.28 1.59 1.00 1.40 117.75 70.51 +0+0.750Lr+0.750L+0.450W+H Dsgn. L = 3.94ft 1 0.301 0.144 33.20 33.20 184.17 110.28 1.57 1.00 10.16 117.75 70.51 Dsgn. L = 4.01 ft 1 0.479 0.095 52.86 33.20 52.86 184.17 110.28 1.15 1.00 6.68 117.75 70.51 Dsgn. L= 4.01 ft 1 0.530 0.044 58.43 52.86 58.43 184.17 110.28 1.02 1.00 3.14 117.75 70.51 Osgn. L = 4.01 ft 1 0.529 0.056 58.33 49.61 58.33 184.17 110.28 1.04 1.00 3.95 117.75 70.51 Osgn. L= 4.01 ft 1 0.450 0.106 49.61 26.68 49.61 184.17 110.28 1.19 1.00 7.49 117.75 70.51 Dsgn. L = 3.02ft 1 0.242 0.144 26.68 26.68 184.17 110.28 1.59 1.00 10.16 117.75 70.51 +D+0.750L +0.750S+0.450W+H Dsgn. L= 3.94 ft 1 0.301 0.144 33.20 33.20 184.17 110.28 1.57 1.00 10.16 117.75 70.51 Dsgn. L = 4.01 ft 1 0.479 0.095 52.86 33.20 52.86 184.17 110.28 1.15 1.00 6.68 117.75 70.51 Osgn. L= 4.01 ft 1 0.530 0.044 58.43 52.86 58.43 184.17 110.28 1.02 1.00 3.14 117.75 70.51 Dsgn. L = 4.01 ft 1 0.529 0.056 58.33 49.61 58.33 184.17 110.28 1.04 1.00 3.95 117.75 70.51 Dsgn. L= 4.01 ft 1 0.450 0.106 49.61 26.68 49.61 184.17 110.28 1.19 1.00 7.49 117.75 70.51 Dsgn. L= 3.02ft 1 0.242 0.144 26.68 26.68 184.17 110.28 1.59 1.00 10.16 117.75 70.51 +D+0.750L+0.750S+0.5250E+H Osgn. L= 3.94ft 1 0.301 0.144 33.20 33.20 184.17 110.28 1.57 1.00 10.16 117.75 70.51 Osgn. L= 4.01 ft 1 0.479 0.095 52.86 33.20 52.86 184.17 110.28 1.15 1.00 6.68 117.75 70.51 Osgn. L= 4.01 ft 1 0.530 0.044 58.43 52.86 58.43 184.17 110.28 1.02 1.00 3.14 117.75 70.51 Dsgn. L= 4.01 ft 1 0.529 0.056 58.33 49.61 58.33 184.17 110.28 1.04 1.00 3.95 117.75 70.51 Dsgn. L = 4.01 ft 1 0.450 0.106 49.61 26.68 49.61 184.17 110.28 1.19 1.00 7.49 117.75 70.51 Dsgn. L= 3.02ft 1 0.242 0.144 26.68 26.68 184.17 110.28 1.59 1.00 10.16 117.75 70.51 +0.600+0.60W+0.60H Osgn. L = 3.94ft 1 0.025 0.012 2.75 2.75 184.17 110.28 1.57 1.00 0.84 117.75 70.51 Dsgn. L= 4.01 ft 1 0.040 0.008 4.37 2.75 4.37 184.17 110.28 1.15 1.00 0.55 117.75 70.51 Dsgn. L = 4.01 ft 1 0.044 0.004 4.84 4.37 4.84 184.17 110.28 1.02 1.00 0.26 117.75 70.51 Dsgn. L= 4.01 ft 1 0.044 0.005 4.83 4.11 4.83 184.17 110.28 1.04 1.00 0.33 117.75 70.51 Dsgn. L = 4.01 fl 1 0.037 0.009 4.11 2.21 4.11 184.17 110.28 1.19 1.00 0.62 117.75 70.51 Dsgn. L= 3.02ft 1 0.020 0.012 2.21 2.21 184.17 110.28 1.59 1.00 0.84 117.75 70.51 +0.600+0.70E+0.60H Dsgn. L= 3.94ft 0.025 0.012 2.75 2.75 184.17 110.28 1.57 1.00 0.84 117.75 70.51 Dsgn. L = 4.01 ft 0.040 0.008 4.37 2.75 4.37 184.17 110.28 1.15 1.00 0.55 117.75 70.51 Dsgn. L = 4.01 ft 0.044 0.004 4.84 4.37 4.84 184.17 110.28 1.02 1.00 0.26 117.75 70.51 Dsgn. L = 4.01 ft 0.044 0.005 4.83 4,..10, 42 4.83 184.17 110.28 1.04 1.00 0.33 117.75 70.51 I 11: • Description: BEAM W16X26 GRID A 1-A2 PERIMETER BEAMS Load Combination Max Stress Ratios Segment Length Span # M V Mmax + Dsgn. L = 4.01 ft 1 0.037 0.009 4.11 Dsgn. L = 3.02 ft 1 0.020 0.012 2.21 Project Title: Engineer: Project ID: Project Descr: File= C:\Users\alla.SRE\OOCUME-1\ENERC'l-1\0RAMM & ETCHER V--062821-.3 ALS VERS[ON.ec6 t, :· " · . ·,•·',i.:.:'.· ;'·:,: · Sollwire'co yrightE~ERCALC,'iNC::19~2018,Buikf:10.18:12.1s':-r:: Summary of Moment Values Summary of Shear Values Mmax -Ma Max Mnx Mm</Omega Cb Rm Va Max Vnx Vnx/Omega 2.21 4.11 184.17 110.28 1.19 1.00 0.62 117.75 70.51 2.21 184.17 110.28 1.59 1.00 0.84 117.75 70.51 qv~~~iiM~i·n,·~m .oeniict1.;,.f1(£:'.t::•.~X~•·;:r~:::-.'.~'.-r::: ________________________ _ Loiid Combination Span Max. • -• Deft Location in Span Load Combination Max.'+' Deft Location in Span +D-tl-tH 1 0.8243 11.566 0.0000 0.000 LS~iifti.~~TR~~c(l~~-~-I:~-i:'],I:Ulli;H;/I:::~~'.~ic.. ___ s_u-'.-'ppo_rt_no_ta_tio_n_:_Fa_r_le_ft_ls_#1 _______ v_al_ue_s_ln_K_IP_S _______ _ Load Combination Support 1 Support 2 Overall MAximurn 13.081 13.081 Overall MJNlmum 0.841 0.841 +D+H 1.402 1.402 +D-tl-tH 13.081 13.081 +D-tlr-ll-i 1.402 1.402 +D•S-tH 1.402 1.402 +D...0.750Lr...0.750L•H 10.161 10.161 +Q-+,0,750L...0.750S+H 10.161 10.161 +D...0.60W-tH 1.402 1.402 +D...0.70E-tH 1.402 1.402 +D...0.750Lr...0.750L...0.450W-tH 10.161 10.161 +D...0.750L...0.750S...0.450W-tH 10.161 10.161 +D...0.750L ...0.750S...0.5250E-tH 10.161 10.161 ...0.60D...0.60W...0.60H 0.841 0.841 ...0.60D...0.70E...0.60H 0.841 0.841 D Only 1.402 1.402 Lr Only LOnly SOnly WOnly E Only HOnly 11.680 11.680 15 of42 23142 ,Arroyo Vlsta l<anc:ho Santa Margarita, CA 92688 Tel: 949.888.8850 Fax: 949.888.8851 By: AA Framing Connection Joist to Beam Connection Joist Lengt=L= 16.00 ft Trib Wldth=T= 4.00 ft Bolt Diam= 0.750 in # Bolt=N= 2 Fv= 21,000 psi Fu-steel= SB,000 psi t-min= 0.250 in ICheck Single Angle Connection Angle= PL6x7x3/8 Pallow= C * rv n= 2 Project: DRAMM !£ ETCHER DL= 15 psf LL= 125 psf Configuration: Platform 24X65 W= (DL +LL)"'T = 560 lb/ft Shear Capacity= Bolt Area * N * Fv = 18,S55 lb 24% OK Bearing Capacity= Bolt Diam * t-min * Fu * 1.2 * N = 26,100 lb 17% OK p Project #: V-062821-.3 Shear= w*L/2 = 4,480 lb C= 1.02 rv= 9,278 lb P= 4,480 lb (allowable capacity per bolt) Pallow= 9,463 lb e= 5.00 in P*e= 22,400 in-lb OK /2) Bolt Joist Connection Sx= [tp*d"2/6] -[b"2*n*(n"2-1)*(tp*(bolt diam+ 0.125)]/(6d) = 1. 758 in" 3 Bolt Diam= 0.750 in tp=Angle Thickness= 0.375 in d=Angle Vert. Dim= 6.00 in b=Fastener Vert Spcg= 3.00 in n=# fasteners= 2 Mcap= Sx * 0.6 * 36 ksl = 37,969 in-lb OK Beam to Column Connection Beam Lengt=L= 24.00 ft Trib Width=T= 16.25 ft Bolt Diam= 0.750 in # Bolt=N= 4 Fv= 21,000 psi Fu-steel= 58,000 psi t-min= 0.250 in DL= 15 psf LL= 125 psf w= (DL +LL)"'T = 2,275 lb/ft Shear Capacity= Bolt Area * N * Fv = 37,llOlb 74°,1, OK Bearing Capacity= Bolt Diam * t-min * Fu * 1.2 * N = 52,200 lb 52% OK 16 of42 Shear= w*L/2 = 27,300 lb 23142 kroyo Vista l<oncho Sonto Morgorlta, CA 92688 Tel: 949.888.8850 Fox: 949.888.8851 By: A.A. Project: DRAMM & ETCHER Project ii: V-062821-3 "B" Deck & Diaphragm Capacity Static Loads Double span condition, 1' wide trib width typical Deck Type= 20 ga B Deck Deck Span=Ld= 4.0 ft Fy= 38,000 psi DL= 15.0 psf LL= 12S.O psf Bending capacity Mpos= Mneg= Deflection capacity 0.07 * w * Ld"2= 0.125 * w * Ld"2= Defl= 0.0092 * w * (Ld)"4/(E*I) = 0.09 in Diaphragm Forces Deck Type= 20 ga B Deck Diaphragm Fp= 0.2*Sds*Ie*W = 7.46 psf Rn= Fp * B * L/2 = 1,455 lb Vn= Re/B = 89.5 lb/ft Max Diaph Shear= 89.5 lb/ft Configuration: Platform 24X65 Trib Width= 1.0 ft w=(DL+ll)"Trib width= 140.0 lb/ft Ix= 0.220 in"4 Spas= 0.235 ln"3 Sneg= 0.246 in"3 ~Ld~ w lilllllllOIIIIIII IIIIIIIIOlllllll~lillllllllil 1,882 in-lb 3,360 in-lb Mallow=0.6*Fy*Spos= 5,358 in-lb Mallow=0.6*Fy*Sneg= 5,609 In-lb OK OK Span=L= 24.00 ft Defl-allow= Ld/360 = 0.14 in B= 16.25 ft Sds= 0.806 I=Ie= 1.000 W=(Ll/4+DL) 46.25 psf Re= Fp * B * l/2 = 1,455 lb Ve= Re/L = 60.6 lb/ft Allowable Shear= 341.0 lb/ft OK ICC ER3056 Page of 17 of42 OK Vn N L-•t t Diaphragm Forces · Rn t 23142 ,Arroyo Vlsto 1-!oncho Santo Margarito, CA 92688 Tel: .949.888.8850 Fox: 949.888.8851 Column Section Loads By: AA Section= HSS8x8xl/4 Area= 7.10 in"2 Ix= 70.70 in"4 Sx= 17.70 in"J rx= 3.15 in unfactored loads Pmax= DL+LL+Ps = 29,213 lb See attached for column analysis Project: Dl<AMM IE ETCHER Configuration: Platform 24X65 Iy= 70.70 in"4 Sy= 17.70 in"3 ry= 3.15 in Mmax= 195,656 in-lb = 16.30 ft-kip age o 18 of42 Prqject It: V-06::/821-3 Fy= 46,000 psi Kx= 1.2 Ky= 1.2 Lx= 132 in Ly= 132 In Cm= 1.00 □ Project Title: Engineer: Project ID: Project Descr: . , . File;= C:\Use~\aliaSRE100CUMf-1\ENERCA~1u;>RAMM'.& l;TCHERV:062821-~ALS VERSIQN 7-22-21.ecS • ; ; ->::·',, .. '. ·. !.•·,.:"-i':•i,••-•:iI,--=software 'righlENERCALC,INC.l983-2018,Bund:10 .. 18.12.1J ,:.,- Description : COLUMN HSS8x8x1/4 · :coc1~}J'i(e_nijices· ··:;:-~17·~-_; ·_~·:: : :., , .. ·· :· .. Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-10 Load Combinations Used: ASCE 7-16 •~·-'Geneiiii1niQrmai1o,r•~ff?;.?-/?E: ; · ·•,-· . =·· ~, ::· ?:: Steel Section Name : Analysis Melhod : HSS8x8x1/4 Allowable Strength Overall Column Height 11.0 ft Top & Bottom Fixity Top & Bottom Pinned Steel Stress Grade Fy : Steel Yield Brace condition for deflection (buckling) along columns : E : Elastic Bending Modulus 46.0 ksi 29,000.0 ksi Column self weight included : 283.711 lbs• Dead Load Factor AXIAL LOADS , , . Axial Load at 11.0 ft, D = 2.925, L = 24.375, E = 1.913 k BENDING LOADS ... Moment acting about X-X axis at 9.0 ft, E = 16.30 k-ft ;;:7>~s7(.;Nlufi&JAri•{fJfflff17lJ~:~J::':7;~·:(";:::g•,;y·:y; Bending & Shear Check Results PASS Max. Axial+Bending Stress Ratio = Load Combination Location of max.above base 0.2216 : 1 +D+0, 70E+0.60H 8,933 ft At maximum location values are , .. Pa: Axial Pn / Omega : Allowable Ma-x : Applied Mn-x I Omega : Allowable Ma-y : Applied Mn-y I Omega : Allowable 4.548 k 195.569 k 9.266 k-ft 44.130 k-ft 0.0 k-ft 44.130 k-ft PASS Maximum Shear Stress Ratio= Load Combination 0.01845 : 1 +D+0. 70E+0.60H Location of max.above base Al maximum location values are ... Va: Applied Vn I Omega : Allowable 111'1'{,"TY,.,._.,,, .. '1'": •• , .... :"( .. .,,_~7't{.W'~~,.""'W(~:,llt.l't'.?,i~-.,._,,,.~,,, .. ,f"q i,.Load Coin6mat1on Results.2~•~~i-~-~.,,,.~.-,;:,;,. · ~~ ...... ..,, ................. -...... -., ..... .-.... -...____ ;,.r ~""~.d.l. :..~..:.: 0,0 ft 1.037 k 56.229 k X-X (width) axis : Fully braced against buckling about X-X Axis Y-Y {depth) axis: Fufly braced against buckling about Y-Y Axis Service loads entered, Load Factors will be applied for calculations. Maximum Load Reactions , . Top along X-X Bottom along X-X Top along Y-Y Bottom along Y-Y Maximum Load Deflections . , . Along Y-Y 0.09201 in at for load combination : E Only Along X-X 0.0 in at for load combination : 0.0 k 0.0 k 1.482 k 1.482 k 6.054ft above base 0.0ft above base Load Combination Maximum Axial + Bending Stress Ratios Stress Ratio Status Location Cbx Cby Kxlx/Rx KyLy/Ry Maximum Shear Ratios Stress Ratio Status Location +D+H 0.016 PASS 0.00 ft 1.00 1.00 0.00 0.00 0.000 PASS 0.00ft +D+L+H 0.141 PASS 0.00ft 1.00 1.00 0.00 0.00 0.000 PASS 0.00ft +D+Lr+H 0.016 PASS 0.00 ft 1.00 1.00 0,00 0.00 0,000 PASS 0,00ft +D+S+H 0.016 PASS 0,00 ft 1.00 1.00 0.00 0.00 0.000 PASS 0,00 ft +D-+-0.750Lr-+-0.750L +H 0.110 PASS 0.00 ft 1.00 1.00 0,00 0.00 0.000 PASS 0.00 ft +D-+-0.750L-+-0.750S+H 0.110 PASS 0.00 ft 1.00 1.00 0.00 0.00 0.000 PASS 0.00ft +D-+-0.60W+H 0.016 PASS 0,00 ft 1.00 1.00 0,00 0.00 0.000 PASS 0.00 ft +D-+-0.750Lr-+-0.450W+H 0.01 6 PASS 0.00ft 1.00 1.00 0,00 0.00 0.000 PASS 0.00 ft +D-+-0.750S-+-0.450W+H 0.016 PASS 0.00 ft 1,00 1.00 0.00 0.00 0.000 PASS 0.00 ft -+-0.60D-+-0.60W-+-0.60H 0,010 PASS 0.00ft 1.00 1.00 0.00 0.00 0,000 PASS 0.00 ft +D-+-0. 70E-+-0.60H 0,222 PASS 8.93 ft 1.00 1.00 0,00 0.00 0.01 8 PASS 0.00 ft +D-+-0. 750L-+-O. 750S-+-0.5250E+H 0,215 PASS 8,93ft 1.00 1.00 0,00 0.00 0.014 PASS 0,00 ft -+-0.60D-+-O. 70E+H 0,218 PASS 8.93ft 1.00 1.00 0.00 0.00 0.018 PASS 0.00ft 19 of42 Project Title: Engineer: Project ID: Project Descr: . : File= C:\Users\alia.SRE\DOCUME-1\ENERCA.-1\0RAMM & ETCHER V-062821-3 ALS VERSION 7-22-21.ecti ·.' ;;' : -·. . · ·.;•.;;_;;;'..'..!c,,;/j./:·:. ·:, ·,: Softwareco . htENERCAlC,"INC.198i2018,Build:10.18:12.13 ,'. Description: COLUMN HSS8x8x1/4 Load Combination +0-+H +O+l-+H +D+lr-+H +O+S-+H +0+0.750Lr..0.750L-+tt +0-+-0.750L-+-0.750S-+H +0-+-0.60W-+H +D..0.750Lr..0.450W-++i +0-+-0.750S..0.450W-++i +0.60D..0.60W..0.60H +0..0.70E..0.60H +0+0.750L ..0.750S..0.5250E-+H ..0.60D-t0.70E-++i DOnly Lr Only L Only sonly W0nly ~·, ~.~ . ·r-... .,,, . . : . ·• .. : ~:,. . Axial Reaction @Base 3.209 27.584 3.209 3.209 21.490 21.490 3.209 3.209 3.209 1.925 4.548 22.494 3.264 3.209 24.375 E Only 1.913 X-X Axis Reaction @Base @Top k Y -Y Axis Reaction @Base @Top 1.037 -1.037 0.778 -0.778 1.037 -1.037 1.482 -1.482 Note: Only non-zero reactions are listed . Mx -End Moments k-ft My -End Moments @ Base @ Top @Base @ Top ~J1ii~eJ{~i~(p'~-~fo ;~E7:Ti~<.:~·~~?:}~Y?J Axial Reaction x·':c-X::-:-Ax-:-is-=R=-e-ac-:-:tio-n--:-k --:-:Y-7Y:--:Ax:-i:-s =-Re-a-,cti=-·on--,.-,Mx~--=E=-nd-:-:Mo~me--,nts,---:-k-=-ft--:-M:-y-:-E=-n-:d-:-:M=-om_e_n.,..ts- Item Extreme Value @ Base @Base @ Top @ Base @ Top @ Base @Top @Base @ Top Axial@Base Reaction, X-X Axis Base . Reaction, Y-Y Axis Base Reaction, X-X Axis Top Reaction, Y-Y Axis Top Moment X-X Axis Base Momeni, Y-Y Axis Base Moment. X-X Axis Top Moment. Y-Y Axis Top Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum Maximum Minimum 27.584 · 3.209 3.209 1.913 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209 3.209 ir.-M··•""""''"'"1>"'ff'""f '"""'1f '"'i:"1fc'o~bln~ r ~~"".arm·p:;-i=i~~s,~1•1~ ;»rf,,-::r:o 1/'4 ,, ax1mum .!I ec ions, or.'. oa . m na 1ons,.~~':<,·''",,·1<;,;.-;;;,n~!J:n.'.c,,,:J, Load Combination Max. X-X Deflection Distance +0-+H 0.0000 in 0.000 ft -l{)+l-+H 0.0000 in 0.000 ft +O+Lr-+H 0.0000 in 0.000 ft +D+S-+H 0.0000 in 0.000 ft +0-+-0.750Lr..0.750L-+H 0.0000 in 0.000 ft +0-f{J.750L-f{J.750S-+H 0.0000 in 0.000 ft +0..0.60W-+H 0.0000 in 0.000 ft +0+0.750Lr-f{J.450W-+H 0.0000 in 0.000 ft +0..0.750S..0.450W-+H 0.0000 In 0.000 ft ..0.60D..0.60W+0.60H 0.0000 in 0.000 ft +D+0.70E-f{J.60H 0.0000 in 0.000 ft +0+0.750L ..0. 750S..0.5250E-++i 0.0000 in 0.000 ft ..0.60D..0.70E-+H 0.0000 in 0.000 ft DOnly 0.0000 in 0.000 ft 20of42 1.482 -1.482 Max. Y-Y Deflection Distance 0.000 in 0.000 ft 0.000 in 0.000 ft 0.000 in 0.000 ft 0.000 in 0.000 ft 0.000 In 0.000 ft 0.000 In 0.000 ft 0.000 in 0.000 ft 0.000 in 0.000 ft 0.000 In 0.000 ft 0.000 in 0.000 ft 0.064 in 6.054 ft 0.048 in 6.054 ft 0.064 In 6.054 ft 0.000 in 0.000 ft Description: COLUMN HSS8x8x1/4 . Maximum. Deflections tor Load Combinations Load Combination Max. X-X Deflection Lr Only 0.0000 in L Only 0.0000 in S Only 0.0000 in W Only 0.0000 in E Only 0.0000 in H Only 0.0000 in I? Sieei ·section' Properties :0 ::-~ 1 ~ii;:-1 HSS8x8x1/4 Depth 8.000 In I xx Design Thick 0.233 In S xx Width 8.000 in R xx Wall Thick 0.250 in Zx Area 7.100 in•2 I yy Weight = 25.792 pll S yy Ryy 0.000 in +Y I I I I C "· I . 0 1 /Load 1 0 co ,, 8.00in Project Title: Engineer: Project ID: Project Descr: ·, ·File= C:\Useis\alla,SRE\OOCUME-1\ENERCA-1\DRAMM & CHER V-062821-3 /1).S VERSION 7•22-21.ecii ;1;, · ... > ,, :· · .. :--: . ; ·. , ..:. · . .-. SoflwaeoopyrightENERCALc, 1Nc.1ga3-201a. 0u11d:10.~a.12.13 ,_~;) . 1'., .'_ -:,-i .,: . )' ' Distance 0.000 ft 0.000 ft 0.000 ft 0.000 ft 0,000 ft 0.000 ft +X Max. Y-Y Deflection 70.70 in•4 17.70 in•3 3.150 in 20.500 in•3 70.700 in•4 17.700 in•3 3.150 in 0.000 0.000 0.000 0.000 0.092 0.000 r;, '-,.__ In in in in in in 21 of 42 .. ' Distance 0,000 fl 0.000 fl 0.000 ft 0.000 ft 6.054 ft 0.000 ft C 111.000 in•4 28.100 in•3 211...2.13l 23142 Arrayo Vista Rancho Santo Margarita, CA 92688 Tel: 949.888.8850 Fax: 949.888.8851 By: AA Prq/ec:t: DRAMM It ETCHER Knee Brace Configuration: Platform 24X65 V= 1,097 lb/Brace Vl= 768 lb/Brace V2= 3,291 lb/Brace Knee Brace= L3x3xl/4 Area =Agross= 1.440 inA2 r = 0.592 in x= 24.0 in y= 24.0 in tmln= 0.1875 In Check Knee Brace Check brace member for Load case 4: Check Brace Compression ASD Shear Per Knee Brace Brace shear LC2 D + 0.75*L + 0.525*£ Brace shear LC4, Jndudes Overstrength Factor Omega 1.161*D +Omega*£+ Leff LC4Govems Fy= 36,000 psi Fu= 58,000 psi K= 1.0 W=Omega= 3.0 Olag Length=z= 33.9 in Check Brace Tension Tallow!= Agross * 0.6 * Fy Project #: V-062821-3 V -♦ y _L 11 .Ebmm P= V2*z/x = 4,649 lb = 31,104 lb Tension OK (K * LJr) = (1 *24 in/0.592 in) = 57.26 Cc= (2nA2E/Fy)A0.5 = 126.1 Fa = [1-((kl/r)A 2/2CcA 2}1Fy 5/3 + 3(kl/r)/8Cc • (kl/r)A3/8CcA3 = 17,690 psi fa= P/Area = 3,228 psi fa/Fa= 0.182 Compression OK Check Knee Brace Connection Bolt Shear Cap= Bolt Area * Fv * N = 32,987 lb Bolt Shear OK Bolt Bearing Cap= Bolt Diam * tmin * 1.2 * Fu * N = 26,100 lb Bolt Bearing OK Stress= 0.180 Bolt OK age 0 Anet= Agross -Hole Area = 1.2411nA2 Tallow2= 0.5 * Fu * Anet = 35,989 lb 22 of 42 Tension OK Bolt Diam= 1.000 in # Bolts=N= 2 Fv= 21,000 psi 23142 hroyo Vista l<oncho Santo Margarito, CA 92688 Tel: 949.888.8850 Fox: 949.888.8851 By: AA. PrC?)ect: DRAMM & ETCHER Project It: V-062821-3 Anchors Configuration: Platform 24X65 1) RMI Sec 2.2, item 7: (0.9·0.2Sds)D + (0.9·0.20Sds)*B*Papp · E*rho V ~Ill I II Ill 111111111111111111111111111111111111111111111111111 Ill 111111111111111 Loads Per Baseplate V= 4,174 lb DL= 5,850 lb Ueff= 12,188 lb Movt= v * H * n * rho = 1,652,904 In-lb Wst.= Lfl *DL + Lfl *rho*Ueff 13,324 lb Mst= Wst * D/2 = 13324 lb * 288 in/2 = 1,918,656 in-lb T= (Movt-Mst)/0 = (1652904in-lb · 1918656 in·lb)/288 In = ·923 lb T per Baseplate= -923 lb Net Seismic Tension per Baseplate LRFD Load Induding n Shear per Baseplate= 6,261 lb Net Seismic Shear Per Baseplate LRFD Load Induding n No Uplift Loads Per Anchor T per anchor= 0 lb Net Seismic Tension per Anchor LRFD Load Including n Shear per anchor= 1,565 lb Net Seismic Shear Per Anchor LRFD Load Induding n Anchor I H T Check (4) 0.75" diam x 3.75" min. embedment Hilti Kwikbolt TZ Wedge anchor(s) per baseplate Special inspection is required per I.C.C. #ESR 1917. DL LL D H= 132.0 In D= 288.0 in Ss= 1.0080 51= 0.3660 Fa= 1.2000 Fv= 1.9000 Sds= 0.8064 O= 3.0000 B= 1.0000 rho= 1.0000 (0.9·0.2Sds)=Lf1= 0.7387 # Anchors/column=nl= 4 Total Qty Anchor per frame=n2= 8 Alternate anchor is Hilti KWIK SOLT TZ2 per ESR 4266, same size and embedment indicated above Page of 23 of42 • = 11 S • • ----------------------Hilti PROFIS Engineering 3.0.71 www.hilti.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: Design: 14x14BP WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: Fastening point: Specifier's comments: 1 Input data Anchor type and diameter: Item number: Effective embedment depth: Material: Evaluation Service Report: Issued I Valid: Proof: Stand-off installation: Anchor plateR : Profile: Base material: Installation: Reinforcement: Seismic loads (cat. C, D, E, or F) Kwik Bolt TZ -CS 3/4 (3 3/4) not available her.ad = 3. 750 In., hnom = 4.313 In. Carbon Steel ESR-1917 1/1/2020 15/1/2021 Design Method ACI 318-14/ Mech eb = 0.000 in. (no stand-off); t = 0.500 in. I, x ly x t = 14.000 in. x 14.000 in. x 0.500 in.; (Recommended plate thickness: not calculated) Square HSS (AISC), HSS6X6X.250; (L x W x T) = 6.000 in. x 6.000 in. x 0.250 In. cracked concrete, 4000, f.' = 4,000 psi; h = 6.000 in. hammer drilled hole, Installation condition: Ory tension: condillon B, shear: condition B; no supplemental splitting reinforcement present edge reinforcement: none or < No. 4 bar Tension load: yes (17.2.3.4.3 (d)) Shear load: yes (17.2.3.5.3 (c)) Note: the Kwik Bolt TZ -CS anchor Is in the process of phase-out. Application also possible with Kwik Bolt TZ2 -CS under the selected boundary conditions. Application also possible with Kwik Bolt TZ2 -CS 3/4 (3 3/4) hnom2 under the selected boundary conditions. More information in section Alternative fastening data of this report R -The anchor calculation is based on a rigid anchor plate assumption. Input data and results must be cllecked ror confonnlty wllh Ute existing conditions and for plauslbll/tyl PROFIS Englnee~ng ( c) 2003-2021 Hilll AG. FL-9494 Scllaan Hiltl is a registered Trademarlt of Hiltl AG, Schaan 24of42 1 Al 7/22/2021 i = 11 S 9' • ---------------------Hilti PROFIS Engineering 3.0.71 www.hilti.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: Design: 14x14BP WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: Fastening point: Geometry [in.] & Loading (lb, in.lb] I <::o' X Input data and results must be cheeked for conformity with the existing conditions and for pausib!Utyl PROFIS Englnee~ng ( c ) 2003-2021 Hilt! AG, FL-9494 Schaan Hiltt Is a registered Trademark ot Hlltl AG, Schaan 25 of42 2 Al 7/2212021 2 1 : i i S • • ----------------------Hilti PROF IS Engineering 3.0. 71 www.hiltl.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: Design: 14x14BP WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: Fastening point: 1.1 Design results Case Description Load cas!l: Design loads 2 Load case/Resulting anchor forces Anchor reactions [lb] Tension force: (+Tension, -Compression) Forces [lb]/ Moments ~n.lb] N = -923; V, = O; Vy= -6,261; M, = 0; My = 0; M, = 0; Anchor Tension force Shear force Shear force x Shear force y 1 0 1,565 2 0 1,565 3 4 0 0 1,565 1,565 max. concrete compressive strain: 0.00 [%o] max. concrete compressive stress: 5 [psij resulting tension force In (x/y)=(0.000/0.000): 0 [lb] resulting compression force in (x/y)=(0.000/0.000): 923 [lb) 0 -1,565 0 -1,565 0 -1,565 0 -1,565 Anchor forces are calculated based on the assumption of a rigid anchor plate. 3 Tension load Load N0• (lb) Capacity ♦ N0 (lb] Steel Strength• N/A N/A Pullout Strength* NIA NIA Concrete Breakout Failure .. N/A NIA • highest loaded anchor ••anchor group (anchors in tension) Input data and results must be checked for conformity With the e.xisUng cond!Uons and for plausibility! PROFIS Englneerlng ( c ) 2003-2021 HIIU AG, FL-9494 Schaan HilU Is a registered Trademark of HilU AG, Schaon 26 of 42 3 Al 7/22/2021 Seismic Max. UIII. Anchor[%] yes 85 ' y 0 3 04 t\ ~y ~ Compression 0 1 02 Utilization 13" = N0J♦ N" Status NIA NIA N/A NIA N/A NIA 3 i = 11 S • • ---------------------Hilti PROFIS Engineering 3.0. 71 www.hilti.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: Design: 14x148P WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: Fastening point: 4 Shear load Load v •• Pb] Steel Strength* 1,565 Steel failure (with lever arm)* N/A Pryout Strength .. 6,261 Concrete edge failure In direction y-.. 6,261 • highest loaded anchor ••anchor group (relevant anchors) 4.1 Steel Strength V ... eq = ESR value ~ v ..... ~ v •• Variables A..v [in.2] 0.24 Calculations Vy,19 Pb] 11,745 Results v .... Pb] 11,745 refer to ICC-ES ESR-1917 ACI 318-14 Table 17.3.1.1 f..., (psi] 106,000 0.859 0.650 1.000 ~ v .. .., [lb] 7,634 lnpul data and resotto must be c:hecl<ed for conformity with the exlsllng conditions and for p&auslbilltyt Capacity ♦ Vn [lb] 7,634 N/A 42,757 7,443 V.,. (lb] 1,565 PROFlS Englnee~ng ( c) 2003-2021 HfltJ AG, FL-9494 Schaan Hilll Is a registered Trademark or Hllti AG. Schoon 27 of42 Utilization ll,, = V.J♦ V" 21 NIA 15 85 4 Al 7/22/2021 Status OK N/A OK OK 4 1 : 11 S • • ----------------------Hilti PROFIS Engineering 3.0.71 www.hilti.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: Design: 14x14BP WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: Fastening point: 4.2 Pryout Strength Vcpg = I<.., [ (~) 'I' ec,N 'i'oc1,N 'i'c.N 'i'cp,N No ] ,j, vcpg ;i: v.,. ~o see ACI 318-14, Section 17.4.2.1, Fig. R 17.4.2.1 (b) ~ ljl ec,N ljl od,N ljl cp,N Variables 2 ljl c.N 1.000 Calculatlons 495.06 Results 61,082 e.., N [in.] 3.750 0.000 c .. [in.] 10.000 17 ~(in.2] ljl ■<1,N 126.56 1.000 ♦ cancn,ta ♦- 0.700 1.000 ACI 318-14 Eq. (17.5.3.1b) ACI 318-14 Table 17.3.1.1 ACI 318-14 Eq. (17.4.2.1c) ACI 318-14 Eq. (17.4.2.4) ACI 318-14 Eq. (17.4.2.5b) ACI 318-14 Eq. (17.4.2.7b) ACI 318-14 Eq. (17.4.2.2a) ea,!! [in.] c._..., pn.] 0.000 9.000 )... f0 (psij 1.000 4,000 '1''"'2,N 'i' od,N 1.000 1.000 ♦-♦ v .... [lb] 1.000 42,757 lnpol data and results must be checlced for conronn11y with 1he existing conditlons and ror plauslbllltyl . PROFIS Engineering ( c) 2003-2021 HIIU AG, FL-9494 Scllaan HilU Is a reglslered Trademark ol Hlltl AG, Scllaan 28 of 42 'I' cp,N N0 [lb] 1.000 7,808 v .. Ob) 6,261 5 Al 7/22/2021 5 • = 11 S • • ----------------------Hilti PROF IS Engineering 3.0. 71 www.hilti.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: Design: 14x14BP WITH 4ANCHORS 0.75in PLATFORM 7-2 Date: Fastening point: 4.3 Concrete edge failure In direction y- (Ave) Vobg = Ave0 lj/ ec,V 'l'ed,V 'l'c,V 'l'r,,v '1'..-.v Vb cl> Voog ~V,,. Av. seeACI 318·14, Section 17.5.2.1, Fig. R 17.5.2.1(b) Ave0 = 4.5 c!, 'I' ec,V = ( 1 + 1 2e~) S 1.0 3c., lj/ ed.V = 0.7 + 0.3( 1.~.) S 1.0 'l'r,,v =~~1.0 . v. =(1(})°2 v'd.) ).• ~c:; • Variables c11 [in.) 9.000 I pn.) 3.750 Calculations 201.00 Results Vd/9 [lb) 10,633 C,a pn.] 9.000 ). . 1.000 Avc011n.2) 364.50 <I>...., ... 0.700 ecy [in.) 0.000 d0 pn.) 0.750 ljl ec.V 1.000 <1> .. - 1.000 ACI 318-14 Eq. (17.5.2.1b) ACI 318-14 Table 17.3.1.1 ACl318-14 Eq. (17.5.2.1c) ACI 318-14 Eq. (17.5.2.5) ACI 318-14 Eq. (17.5.2.6b) ACI 318-14 Eq. (17.5.2.8) ACI 318-14 Eq. (17.5.2.2a) lj/ c,V h1 [in.) 1.000 6.000 f~ [psij 'l'..,-.v 4,000 1.000 lj/ ed,V ljlh,V 0.900 1.500 "'-<l>V .... Vb] 1.000 7,443 Input data and results must bo checked for confonnity with the existing conditions and for plauslbilityl PROFIS Engineering ( c) 200~2021 Hilll AG, FL-9494 SChaan H~U Is a registered Trademar1< of Hi!U AG, Schaan 29 of42 v. Pb) 14,283 V,,. Pb) 6,261 6 Al 7/22/2021 6 i = i i S • • ----------------------Hilti PROFIS Engineering 3.0. 71 www.hilti.com Company: Address: Phone I Fax: I Page: Specifier: E-Mail: 7 Al Design: Fastening point: 14x14BP WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: 7/22/2021 5Warnings • The anchor design methods in PROFIS Engineering require rigid anchor plates per current regulations (AS 5216:2018, ETAG 001/Annex C, EOTA TR029 etc.). This means load re--0istribution on the anchors due to elastic deformations of the anchor plate are not considered -the anchor plate is assumed to be sufficiently stiff, in order not to be deformed when subjected to the design loading. PROFIS Engineering calculates the minimum required anchor plate thickness with CBFEM to limit the stress of the anchor plate based on the assumptions explained above. The proof if the rigid anchor plate assumption is valid is not carried out by PROFIS Engineering. Input data and results must be checked for agreement with the existing. conditions and for plausibility! Condition A applies where the potential concrete failure surfaces are crossed by supplementary reinforcement proportioned to tie the potential concrete failure prism into the structural member. Condition B applies where such supplementary reinforcement is not provided, or where pullout or pryout strength governs. • Refer to the manufacturer's product literature for cleaning and Installation instructions. • For additional information about AC! 318 strength design provisions, please go to https://submittals.us.hilti.com/PROFISAnchorDesignGuide/ • An anchor design approach for structures assigned to Seismic Design Category C, D, E or Fis given in ACI 318-14, Chapter 17, Section 17.2.3.4.3 (a) that requires the governing design strenglh of an anchor or group of anchors be limited by ductile steel failure. If this is NOT the case, the connection design (tension) shall satisfy the provisions of Section 17 .2.3.4.3 (b ), Section 17 .2.3.4.3 (c), or Section 17.2.3.4.3 (d). The connection design (shear) shall satisfy the provisions of Section 17.2.3.5.3 (a), Section 17.2.3.5.3 (b), or Section 17.2.3.5.3 (c). • Section 17.2.3.4.3 (b) / Section 17.2.3.5.3 (a) require the attachment the anchors are connecting to the structure be designed to undergo ductile yielding at a load level corresponding to anchor forces no greater than the controlling design strength. Section 17.2.3.4.3 (c) / Section 17.2.3.5.3 (b) waive the ductility requirements and require the anchors to be designed for the maximum tension / shear that can be transmitted to the anchors by a non-yielding attachment. Section 17.2.3.4.3 (d) / Section 17.2.3.5.3 (c) waive the ductility requirements and require the design strenglh of the anchors to equal or exceed the maximum tension/ shear obtained from design load combinations that include E, with E increased by co0. • Hilti post-installed anchors shall be installed in accordance with the Hilti Manufacturer's Printed Installation Instructions (MPII). Reference ACI 318-14, Section 17.8.1. Fastening meets the design criteria! Input data and results must be checked ro, confonmlty with 1110 exlsHng conditions and for plausibffityl PROFIS Engineertng ( c) 2003-2021 Hlltl AG, FL-9494 Schaan HilH Is a registered Trademark of HilU AG. Schaan 7 30 of42 i = 11 S 9' • ----------------------Hilti PROFIS Engineering 3.0.71 www.hilli.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: 8 Al Design: 14x14BP WITH 4 ANCHORS 0.75In PLATFORM 7-2 Date: 7122/2021 Fastening point: 6 Installation data Profile: Square HSS (AISC), HSS6X6X.250; (L x W x n = 6.000 in. x 6.000 in. X 0.25Q In. Hole diameter in the fixture: d, = 0.812 in. Plate thickness (input): 0.500 in. Recommended plate thickness: not calculated Drill Ing method: Hammer drilled Cleaning: Manual cleaning of the drilled hole according to instructions for use ls required. Anchor type and diameter. Kwik Bolt 'TZ -CS 3/4 (3 3/4) Item number: not available Maximum installation torque: 1,320 in.lb Hole diameter in the base material: 0.750 in. Hole depth in the base materfal: 4.500 in. Minimum thickness of the base materfal: 6.000 in. Hilt! KB-'TZ stud anchor with 4.31252 ln embedment, 3/4 (3 3/4), Carbon steel, installation per ESR-1917 6.1 Recommended accessories Drilling • Suitable Rotary Hammer • Properly sized drill bit Coordinates Anchor [in.] Anchor X y c .. 1 -5.500 -5.500 9.000 2 5.500 -5.500 20.000 3 -5.500 5.500 9.000 4 5.500 5.500 20.000 Cleaning • Manual blow-out pump .~ y 7.000 Q 3 ?1 I 1.500 11.000 c .. c.,, c+y 9.000 9.000 20.000 20.000 lnpul dala and results must be checlled ror conforml1y with the e.dsUng conditions and for plausiblfflyl 7.000 ryL ?? I 1.500 PROFIS Engineering ( c) 2003-2021 Hlltl AG, FL-9494 Schaan Hiltl Is a registered Trademar1< of HnU AG, Schaan 31 of42 Setting • Torque wrench • Hammer o .-.-0 "1 --~~ 8 0 ,-: 8 -9 ~ --X 0 0 9 ,-. 0 ~ -... 8 i = 11 S • • ---------------------Hilti PROFIS Engineering 3.0.71 www.hilti.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: Design: 14x14BP WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: Fastening point: 7 Alternative fastening 7.1 Alternative fastening data Anchor type and diameter: Item number: Effective embedment depth: Material: Evaluation Service Report: Issued I Valid: Proof: Stand-off installation: Anchor plateR : Profile: Base material: Installation: Reinforcement: Seismic loads (cat. C. D, E, or F) Kwlk Bolt TZ2 • CS 3/4 (3 3/4) hnoin2 2210312 KB-TZ2 3/4x6 1/4 he1.ac1 = 3.750 in., hnom = 4.500 in. Carbon Steel ESR-4266 3/1/2021 I 1211/2021 Design Method ACI 318-14 / Mech eb = 0.000 in. (no stand-off); t = 0.500 in. 1. x ly x t = 14.000 in. x 14.000 In. x 0.500 in.; (Recommended plate thickness: not calculated) Square HSS (AISC), HSS6X6X.250; (L x W x T) = 6.000 in. x 6.000 in. x 0.250 In. cracked concrete, 4000, fc' = 4,000 psi; h = 6.000 in. hammer drilled hole, Installation condition: Ory tension: condition B, shear: condition B; no supplemental splitting reinforcement present edge reinforcement: none or < No. 4 bar Tension load: yes (17.2.3.4.3 (d)) Shear load: yes (17.2.3.5.3 (c)) Max. Utilization with Kwik Bolt TZ2 -CS 3/4 (3 3/4) hnom2: 85 % Fastening meets the design criteria! Input data and results must be checked ror conronnlty witfl the existing conditions and ror plauslbllityl PROFIS Engineering ( c) 2003-2021 HIIU AG. FL-9494 Schaan Him Is a regfslered Trademark of Hi/U AG, Schaan 32 of42 9 Al 7/22/2021 9 i : i i S .J •----------------------Hilti PROF IS Engineering 3.0. 71 www.hilti.com Company: Page: Address: Specifier: Phone I Fax: I E-Mail: 10 Al Design: 14x148P WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: 7/22/2021 Fastening point: 7.2 Installation data Profile: Square HSS (AISC), HSS6X6X.250; (L x W x D = 6.000 in. x 6.000 in. x0.250 in. Hole diameter in the fixture: d1 = 0.812 in. Plate thickness (Input): 0.500 in. Recommended plate thickness: not calculated Drilling method: Hammer drilled Cleaning: Manual cleaning of the drilled hole according to Instructions for use is required. Anchor type and diameter: Kwik Bolt TZ2 -CS 3/4 (3 3/4) hnom2 Item number: 2210312 KB-TZ2 3/4x6 1/4 Maximum installation torque: 1,324 in.lb Hole diameter in the base material: 0.750 in. Hole depth in the base material: 4. 750 in. Minimum thickness of the base material: 6.000 in. Hilti KB-TZ2 stud anchor with 4.5 in embedment, 3/4 (3 3/4) hnom2, Carbon steel, installation per ESR-4266 7.2.1 Recommended accessories Drilling • Suitable Rotary Hammer • Properly sized drill bit Cleaning • Manual blow-out pump Input data and results must be checked for conronnlty with the exfsting conditions and for pauslbllltyl PROflS Engineertng ( c) 2003-2021 HIIU AG, FL-9494 Schaan Hi/II ls a registered Trademark or HUU AG, Schaan 33 of42 Setting • Torque wrench • Hammer 10 i = i i S ~ • ----------------------Hilti PROFIS Engineering 3.0. 71 www.hilti.com Company: Address: Phone I Fax: I Page: Specifier: E-Mail: 11 Al Design: Fastening point: 14x14BP WITH 4 ANCHORS 0.75in PLATFORM 7-2 Date: 7/22/2021 8 Remarks; Your Cooperation Duties • Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas and security regulations in accordance with Hilli's technical directions and operating, mounting and assembly Instructions, etc., that must be strictly complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted prior to using the relevant Hifti product. The results of the calculations carried out by means of the Software are based essentially on the data you put in. Therefore, you bear the sole responsibility for the absence of errors; the completeness and the relevance of the data to be put in by you. Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly with regard to compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an aid to interpret norms and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or suitability for a specific application. You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for the regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilli on a regular basis. ff you do not use the Auto Update function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software in each case by carrying out manual updates via the Hifti Website. Hilti will not be liable for consequences, such as the recovery of lost or damaged data or programs, arising from a culpable breach of duty by you. Input data and results must be checked tor conronntty with the e.xlsUng conditions and for plausibility! PROFIS Engineering ( c ) 2003-2021 Hlltl AG, FL-9494 Schaan Hilti is a registered Trademark of HIIU AG, Schaan 11 34 of42 2314:2 Arroyo Vista Rancho Sonta Margarita, CA 9:2688 Tel: 949.888.8850 Fax: 949.888.8851 By: AA Projeci: DRAMM 4: ETCHER Project it: V-062821-3 Perimeter Base Plate Section Perimeter Grid Cl Loads Width=W = 14.00 In Depth=D = 14.00 in Column Width=b = 8.00 In L (ctrd column)= 3.00 in Plate Thickness=t = 0.500 in 1) LCl: D + L Configuration: Platform 24X65 Bolt Edge Dist=e= 1.50 in a= 5.50 In Anchor c.c. =2*a=d = 11.00 in N=# Anchor/Base= 4 Fy = 36,000 psi 2) LO: (1.0 + 0.lO*Sds)D + 0.525*mo*E + 0.75L 1.0806*0 + 0.525*E + 0.75*L Axial Loads: Axial DL= 2,925 lb Axial LL= 24,375 lb Pseismlc=E= 1,913 lb 1.0 + 0.l0*Sds= 1.081 Axial Bearing stress=fa = P/A = P/(D*W) = 139 psi P Load Case 1= 27,300 lb P Load Case 3= 22,446 lb Eff. Axial Load, P= 27,300 lb Base Moment: Mb= 0 In-lb Pinned Base Ml= wL"2/2= fa*L"2/2 = 627 In-lb Moment Stress=fb = M/5 = 6*Mb/[(D*B"2] = o.o psi Moment Stress=fb2 = 2 * fb * 1../W Moment Stress=fbl = fb-fb2 = 0.0 psi M3 = (1/2)*fb2*L *(2/3)*L = (1/3)*fb2*L "2 = 0 in-lb 5-plate = (l)(t" 2)/6 = 0.042 ln"3/in fb/Fb = Mtotal/[(5-plate)(Fb)] 0.56 OK Check ancJior tension due to base moment, if any Tanchor = (Mb-(P*0.9)(a))/[(d)*N/2] = -6,143 lb No Tension Due to Base Moment Check anchor for seismic base shear and tension loads from base moment = 0.0 psi M2= fbl*L"2)/2 = 0 In-lb Mtotal = Ml+M2+M3 = 627 In-lb/in Fb = 0.75*Fy*l.0 = 27,000 psi I 0 . D _l 0 □ 0 0 Anchor Type= 0.75 in Diam x 3.75 Min. Embedment Hi/ti Kwikbolt TZ Wedge M= 0 in-lb d= 11.00 in /-w-/ # Bolt/Plate=N= 4 Anchor Tension,T= 0 lb Total base shear= 2,087 lb shear per anchor= 522 lb Check combined Stress: Tallow= 1,600 lb Vallow= 1,600 lb [0 lb/(1600 lb *1)]"1 + [522 lb/(1600 lb*l)]"l = 0.326 35 of42 2314:2 Arroyo Vlsta Rancho Sonta Margarita, CA 9:2688 Tel: 949.888.8850 Fax: 949.888.8851 By. AA Prqject: DRAMM ~ ETCHER Comer Base Plate Section Corner, Grid F2 Loads Width=W = 14.00 in Depth=D = 14.00 in Column Wldth=b = 8.00 in L (ctrd column)= 3.00 In Plate Thickness=t = 0.500 in 1) LCl: D + L Configuration: Platform 24X65 Bolt Edge Dist=e= 1.50 in a= 5.50 in Anchor c.c. =2*a=d = 11.00 in N=# Anchor/Base= 4 Fy = 36,000 psi 2) LC3: (1.0 + 0.lO*Sds)D + 0.525*rho*E + 0.7SL 1.0806*D + 0.525*E + 0.75*L Axial Loads: Axial DL= 1,538 lb Axial LL= 12,813 lb Pselsmic=E= 1,006 lb 1.0 + O.lO*Sds= 1.081 Axial Bearing stress=fa = P/A = P/(D*W) = 73 psi P Load Case 1= 14,350 lb P Load Case 3= 11,799 lb Eff. Axial Load, P= 14,350 lb Base Moment: Project It V-06.2.S:21-3 p Mb b j+-L w Mb= 0 In-lb Pinned Base Ml= WL "2/2= fa*L "2/2 = 329 in-lb Moment Stress=fb = M/S = 6*Mb/[(D*B"2] = o.o psi Moment Stress=fb2 = 2 * fb * L/W Moment Stress=fbl = fb-fb2 = 0.0 psi M3 = (1/2)*fb2*L *(2/3)*L = (1/3)*fb2*L" 2 = 0 in-lb 5-plate = {l){t"2)/6 = 0.042 In" 3/in fb/Fb = Mtotal/[(S-plate)(Fb)J 0.29 OK Check anchor tension due to base moment, if any Tanchor = {Mb-(P*0.9)(a))/[(d)*N/2] = -3,229 lb No Tension Due to Base Moment Check anchor for seismic base shear and tension loads from base moment Anchor Type= o. 75 in Diam x 3. 75 Min. Embedment Hi/ti Kwikbolt 7Z Wedge M= 0 in-lb d= 11.00 in # Bolt/Plate=N= 4 AnchorTension,T= O lb Total base shear= 1,097 lb shear per anchor= 274 lb Check Combined Stress: Tallow= 1,600 lb Vallow= 1,600 lb = 0.0 psi M2= fbl *L" 2)/2 = 0 in-lb Mtotal = Ml +M2+M3 = 329 in-lb/In Fb = 0.75*Fy*1.0 = 27,000 psi _ 8 1-1 L --1 r 0 0 □ D _l 0 0 I-w -I [O lb/(1600 lb *1)]"1 + [274 lb/(1600 lb*l)]"l = 0.171 36of42 23142 ,Arroyo Vista Rancho Santo Margarito, CA 92688 Tel: .949.888.8850 Fox: 949.888.8851 8y. AA Prqject: DRAMM $ ETCHER Prqject ~: V-062821-3 Perimeter Column Slab on Grade Configuration: Platform 24X65 loads SLAB ELEVATJON Base Plate B= 14.00 In D= 14.00 in Live Load Reduction Coef (phi) = 1.00 wldth=a= 8.00 In depth=b= 8.00 In Axial DL= 2,925 lb Pselsmic=E= 1,913 lb Axial LL= 24,375 lb DL+LL= 27,300 lb LOAD CASE #1: 1.2DL+l.6LL, ACSE 7-10, Sec 2.3.2, eqtn #2 Puncture Pu= 1.2*PDL + 1.6*PLL = 42,510 lb Apunct= [(c+t)+(e+t)]*2*t = 408 ln"2 Slab Bending Beam fixed at one end, free to deflect vertically but not rotate at other end Asoll= (Pu*144)/(fsoil) L= (Asoil)"0.5 = 6,121 in" 2 X= (L-y)/2 = 78.24 in M= w*x"2/6 8gMglgfc PIA) \(Jew = 27.6 in Fb= 5*(phi)*(f'c)"0.5 = 205.55 psi = (fsoil*x"2)/(144*6) = 882.9 In-lb LOAD CASE #2: 1.2DL+l.0E+l.0LL, ACSE 7-05, SEC 2.3.2. eqtn #5 Puncture Pu= 1.2*PDL + 1.0E + 1.0*PLL = 29,798 lb Apunct= [(c+t)+(e+t)]*2*t = 408 in"2 Slab Bending Beam fixed at one end, free to deflect vertically but not rotate at other end Asoil= (Pu*l 44)/(fsoil) L= (Asoil)"0.5 = 4,291 in" 2 x= (L•y)/2 = 21.3 In Fb= 5*(phi)*(f'c)"0.5 = 205.55 psi = 65.51 in M= w*x"2/6 = (fsoil*x"2)/(144*6) = 522.8 in-lb 37of42 Existing s.o.G. Concrete f'c= 4,000 psi tslab=t= 6.0 in phl=/2!= 0.65 Soil Bearing capacity fsoil= 1,000 psf eff. baseplate width=c= 11.00 In eff. baseplate depth=e= 11.00 in Fpunct= 2.66*phl*sqrt(f'c) = 109.4 psi DL= 15 psf LL= 125 psf Trib Area= 195 ft"2 fv/Fv= Pu/(Apunct*Fpunct) 0.95 y= ( c*e)"0.5 + t*2 = 23.0 In S-slab= 1 *t" 2/6 = 6.0 in"3 fb/Fb= M/(S-slab*Fb) 0.72 Fpunct= 2.66*phl*sqrt(f'c) = 109.4 psi OK OK fv/Fv= Pu/(Apunct*Fpunct) 0.67 y= (c*e)"0.5 + t*2 = 23.0 in 5-sJab= 1 *t" 2/6 = 6.0 in"3 fb/Fb= M/(5-slab*Fb) 0.42 OK OK :2.3142 Arroyo Vista Rancho Santa Margarita, CA 92688 Tel: 949.888.8850 Fax: 949.888.8851 By: AA Project: DRAMM It ETCHER Corner Column Slab on Grade Configuration: Platform 24X65 Loads SLAB ELEVATION Base Plate B= 14.00 in D= 14.00 in Live Load Reduction Coef (phi) = 1.00 wldth=a= 8.00 in depth=b= 8.00 in Axlal DL= 1,538 lb Pseismic=E= 1,006 lb Axial LL= 12,813 lb DL+LL= 14,350 lb LOAD CASE #1: 1.2DL+1.6LL, ACSE 7-10, Sec 2.3.2, eqtn #2 Puncture Pu= 1.2*PDL + 1.6*PLL = 22,345 lb Apunct= [(c+t)+(e+t)]*2*t = 408 in"2 Slab Bending Beam fixed at one end, free to deflect vertically but not rotate at other end Asoil= (Pu*144)/(fsoil) L= (Asoil)"0.5 = 3,218 ln"2 X= (L-y)/2 = 56.72 in M= w*x"2/6 Bmepfqfo etAn Yftw = 16.9 in Fb= 5*(phi)*(rc)"0.5 = 205.55 psi = (fsoil*x"2)/(144*6) = 329.1 in-lb LOAD CASE #2: 1.2DL+l.0E+1.0LL, ACSE 7-05, SEC 2.3.2. eqtn #5 Puncture Pu= 1.2*PDL + 1.0E + 1.0*PLL = 15,663 lb Apunct= [(c+t)+(e+t)]*2*t = 408 ln"2 Slab Bending Beam fixed at one end, free to deflect vertically but not rotate at other end Asoll= (Pu*144)/(fsoil) L= (Asoil)"0.5 = 2,255 in"2 X= (L-y)/2 = 12.2 in Fb= 5*(phl)*(rc)"0.5 = 205.55 psi = 47.49 in M= w*x"2/6 = (fsoil*x"2)/(144*6) = 173.6 in-lb. 38 of42 Pr<!lect l:I: V-062821-3 Existing S.O.G. Concrete re= 4,ooo psi tslab=t= 6.0 in phi=0= 0.65 Soil Bearing Capacity !soil= 1,000 psf eff. baseplate width=c= 11.00 in eff. baseplate depth=e= 11.00 In Fpunct= 2.66*phi*sqrt(rc) = 109.4 psi fv/Fv= Pu/(Apunct*Fpunct) DL= 15 psf LL= 125 psf Trib Area= 103 ft" 2 0.50 OK y= (c*e)"0.5 + t*2 = 23.0 in s-slab= 1 *t" 2/6 = 6.0 ln"3 fb/Fb= M/(S-slab*Fb) 0.27 OK Fpunct= 2.66*phi*sqrt(rc) = 109.4 psi fv/Fv= Pu/(Apunct*Fpunct) 0.35 OK y= (c*e)"0.5 + t*2 = 23.0 in 5-slab= 1 *t" 2/6 = 6.0 in"3 fb/Fb= M/(5-slab*Fb) 0.14 OK 23142 Arroyo Vista Roncho Sontc Morgorlto, CA 92688 Tel: 949.888.8850 Fox: 949.888.8851 By: AA Prqject: DRAMM & ETCHER Design Specifications Configuration: Typical Stair System 1) Toe analyses presented herein confo,ms to the requirements of the 2019 CBC 2) Stringer steel Fy= 36000 psi Tread steel Fy= 36000 psi Post steel Fy= 50000 psi Handrail steel Fy= 50000 psi 3) Bolts shall conform to A307 unless noted otherwise on the plans or calculations. 4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. Design Loads Exit Facility LL= 100 psf Framing DL= 10 psf Configuration 72 Sttinget Tte;icl Run 207in Typical Stair Elevation Page of 39 of42 Prqject #: V-062821-3 Ri5e 132 in 23142 Arroyo Vista Rancho Sonta Margarita, CA 92688 Tel: 949.888.8850 Fax: 949.888.8851 By: AA Tread & Connection Tread must resist 300 lb point load Bending Project. DRAMM & ETCHER Tread= 11" x 1/8" Diamond Plate Fy= 36,000 psi P= 300tb M= P*l/4 = 2,700 psi S= 1.050 in"3 Connection Shear=R= P = 300Ib Stringer & Connection Stringer must resist uniform load Stringer= MClOxB.4 Ix= 32.00 ln"4 Sx= 6.40 in"3 Bending Connection DL= 10 psf LL= 100 psf Fy= 36,000 psi M= w * L"2/8 = 104,012 psi Shear=R= w * l/2 = 1691Ib L= 36in Fb= 0.6 * Fy = 21,600 psi fb/Fb= (M/S)/Fb = 0,12 N=# Bolts= 2 Bolt Diam= 0.375 in tmin= 0.1375 in Rlse= 132 In Run= 207 in OK Tread Length=L= [Rlse"2 + Run"2]"0.5 = 246 In Support at Ctr= No Eff L= 246.0 in Fb= 0.6 * Fy = 21,600 psi fb/Fb= (M/Sx)/Fb = 0.75 N=# Bolts= 2 Bolt Diam= 0.500 in tmin= 0.1375 in OK Page Prqject #: V-062821-3 Deflection I= 4.560 in"4 E= 29,000,000 psi D= PL"3/(48*E*I) = 0.002 in Dallow=l/ 240 = 0.150in Fv= 10 ksi Fu= 58 ksi Shear capacity= N * Bolt Area * Fv = 2,209 lb OK Bearing capacity= N * Bolt Diam * tmln * 1.2 * Fu = 7,178 lb OK Trib Width= Tread Length/2 = 1.5 ft W= (LL + DL) * Trib Width = 165.0 plf Deflection E= 29,000,000 psi D= 5 * w * L"4/(384*E*I) = 0.707 In Dallow=lj 240 Fv= 10 ksi Fu= 58 ksi = 1,02Sin OK Shear capacity= N * Bolt Area * Fv = 3,927 lb OK T MC10x8.4 J_ Bearing capacity= N * Bolt Diam * tmin * 1.2 * Fu = 9,5701b OK of 40 of42 23142 Arroyo Vista Rancho Santa Margartt-a, CA 92688 Tel: 949.888.8850 Fax: 949.888.8851 By: AA Prqject: DRAMM & ETCHER Post & Handrail Post & Handrail designed to resist 200 lb point load Post P= 200Ib Post= TS 1.5 x 14 ga Height=H= 42.0 in S= 0.183 In Fy= 50,000 psi M= P*H/2 = 4,200 In-lb Post To Baseplate Connection Post Is welded directly to the baseplate with all around 1/8" fillet weld Baseplate to Floor Connection Mbase= 4,200 in-lb d= 4 In Toolt= Mbase/d = lOSOlb Fv= 21,000 psi Vallow (3/8")"2*pi/4 * Ft = 2,319 lb Handrail/Guardrail ' 1/Z" OK Fb= 0.6 * Fy Fb= 0.6 * Fy = 30,000 psi fb/Fb= (M/5)/Fb = 0.77 1-1/2"',M/2"1 IMA 11/X' 1ii/'1",1/t!/' ""41flf". 7/.'6" (I Handrail= TS 1.5 x 14 ga Length=L= 72.0 in = 30,000 psi S= 0.183 in Fy= 50,000 psi P= 200 lb M= P*L/4 = 3,600 in-lb fb/Fb= (M/S)/Fb = 0.66 OK Page D of 41 of42 Project#: V-062821-3 OK □ ·r H Post Elevation L + p Rail Elevation ... 7/15/2021 U.S. Seismic Design Maps OSHPD 1911 Palomar Oaks Way, Carlsbad, CA 92008, USA Latitude, Longitude: 33.1244575, -117.2906655 ·'" ~ ;-;===-'--=====;..:::===-=-....:----=========c.;:.;;;;:::;...'-'-'-.;.:__··..2-' _t___ .... . . '·' i I ~:::gn Code Reference Document I Risk Category !site Class -- jType Value l Ss 1.008 I I S1 0.366 ; SMs 1.21 I j SM1 null -See Section 11.4.8 I Sos 0.806 I So1 null-See Section 11.4.8 Type Value soc null -See Section 11.4.8 Fa 1.2 Fv null -See Section 11.4.8 PGA 0.442 FPGA 1.2 PGAM 0.53 TL 8 j SsRT 1.008 j SsUH 1.124 I I SsD 1.5 ; S1RT 0.366 I S1UH 0.404 I I S1D 0.6 i PGAd 0.5 7/15/2021, 1:57:01 PM ASCE7-16 II D -Defaull\See Section 11.4.3} Description MCER ground motion. (for 0.2 second period) MCER ground motion. (for 1.0s period} Site-modified spectral acceleration value Site-modified spectral acceleration value Numeric seismic design value at 0.2 second SA Numeric seismic design value at 1.0 second SA ' I I I .• _J Description Seismic design category Site amplification factor at 0.2 second Site ampliflcatlon factor at 1.0 second MCE0 peak ground acceleration Sile amplification factor at PGA Site modified peak ground acceleration Long-period transition period In seconds ! I Probabilistic risk-targeted ground motion. (0.2 second) l Factored uniform-hazard (2% probability of exceedance In 50 years} spectral acceleration 1' Factored deterministic acceleration value. (0.2 second) Probabilistic risk-targeted ground motion. (1.0 second} I Factored uniform-hazard (2% probability of exceedance in 50 years} spectral acceleration. I Factored deterministic acceleration value. (1.0 second) I i 0.897 : CRs I CR1 0.907 F •"""" oom~l,lsllo '"""'•Hoo w l,a. (Poak G=od ,.,.,, • .,,) I _______________ :_:_:_::_:_:_:_l~_:_:_:_:_:_:_::_:_:_o_:_:_::_:_:: ;~:;:~;_:od_f 1s 8 -· ___________________ _, https://seismicmaps.org 42 of 42 1/2 Building Permit Number: CBC2021-0283 {city of Carlsbad Community & Economic Development COMMUNITY FACILITIES DISTRICT NON-RESIDENTIAL NON-RESIDENTIAL CERTIFICATE: Non-residential land owner, please read this option ca refully and be sure you t horoughly understand before signing. The optio n you choose will affect your payment of the developed Special Tax assessed on your property. This option is available only at the time of the first build ing permit issuance. Property owner signature is required before permit issuance. Your signature confirms the accuracy of all information shown below. RELECO LLC (760) 438-5548 Name of Owner Telephone 1251 Quail Gardens Dr 1911 Palomar Oaks Way Address Encinitas, CA 92024-iego Project Address Carlsbad, CA 92008-6511 City, State 2120910800 Zip Assessor Parcel Number (APN) ~l~-O'i/-<J?-oo NA .:....:;,;_.c..,_, ____ _ Lot Number I mprovement Are, 05/07/1991 Annexation Date City, State Zip INDUSTRIAL -COMMERCIAL BUSINESS PARK Land Use Type $0.30 1,440.00 2022 Factor Square Feet Fiscal Year As cited by Ordinance No. NS-155 and adopted by the City of Carlsbad, Ca lifornia, t he City is authorized to levy a Special Tax in Community Facilities District No. 1. All non-residential property, upon the issuance of a building permit, shall have the opt ion to (1) pay the SPECIAL DEVELOPMENT TAX ONE TIME or (2) assume t he ANNUAL SPECIAL TAX -DEVELOPED PROPERTY for a period not to exceed twenty-five (25) years. Please indicate your choice by initialing t he appropriate line below: OPTION (1): I elect to pay the SPECIAL TAX -ONE TIME now, as a one-time payment. Amount of One-Time Special Tax: $435.74 ____ ....;.._ __ _ Owner's Initials 4C OPTION (2): I elect to pay the SPECIAL DEVELOPM ENT TAX ANNUALLY for a period not to exceed twenty-five (25) years. Maximum Annua l Special Tax: Owner's Initials __ _ I DO HEREBY CERTIFY UNDER PENALTY OF PERJURY THAT THE UNDERSIGNED IS THE PROPERTY OWNER OF THE SUBJECT PROPERTY AND THAT I UNDERSTAND AND WILL COMPLY WITH THE PROVISION AS STATED ABOVE. Title 'i-lf-c Print Name Date 8 -32 Page 1 of 1 {'city of Carlsbad CERTIFICATION OF SCHOOL FEES PAID This form must be completed by the City, the applica nt, and the appropriate school districts and returned to the City prior to issuing a building permit. The City will not issue any building permit without a completed school fee form. Project # & Name: Permit#: Project Address: Assessor's Parcel#: Project Applicant: (Owner Na me) DRAMM ECHTER FARMS CBC2021-0283 1911 PALOMAR OAKS WAY 2120910800 RELECO LLC Residential Square Feet: New/Additions: ------------------- Second Dwelling Unit: ------------------- Commer c i a I Square Feet: New/Additions: 1,440 New Mezzanine City Certification:City of Carlsbad Building Division Date: 03/24/2022 Certification of ApplicanUOwners. The person executing this declaration ("Owner'') certifies under penalty of perjury that (1) the information provided above is correct and true to the best of the Owner's knowledge, and that the Owner will file an amended certification of payment and pay the additional fee if Owner requests an increase in the number of dwelling units or square footage after the building permit is issued or if the initial determination of units or square footage is found to be incorrect, and that (2) the Owner is the owner/developer of the above described project(s), or that the person @ Carlsbad Unified School District 6225 El Camino Real Carlsbad CA 92009 Phone: (760) 331 -5000 D Encinitas Union School District 101 South Rancho Santa Fe Rd Encinitas, CA 92024 Phone: (760) 944-4300 x1166 D San Dieguito Union H.S. District 684 Requeza Dr. Encinitas, CA 92024 Phone: (760) 753-6491 Ext 5514 (By Appt. Only) D San Marcos Unified Sch. District 255 Pico Ave Ste. 100 San Marcos, CA 92069 Phone: (760) 290-2649 Contact: Katherine Marcelja (By Appt.only) D Vista Unified School District 1234 Arcadia Drive Vista CA 92083 Phone: (760) 726-2170 x2222 SCHOOL DISTRICT SCHOOL FEE CERTIFICATION (To be completed by the school district(s)) THIS FORM INDICATES THAT THE SCHOOL DISTRICT REQUIREMENTS FOR THE PROJECT HAVE BEEN OR WILL BE SATISFIED. The undersigned, being duly authorized by the applicable School District, certifies that the developer, builder, or owner has satisfied the obligation for school facilities. This is to certify that the applicant listed on page 1 has paid all amounts or completed other applicable school mitigation determined by the School District. The City may issue building permits for this project. Signature of Authorized School District Official: '\)Q.. n ~ -.,_,..,._ C~J µjlQ Le_ Gu.A/\ VY'~J Title: S '>\.. (V ii"\ V'\. ~C~½'.\~ Date: S -as--¢,Od:'Jl. Name of School District: CARLSBAD UNIFIED SCHOOL DISTRICT Phone:') fa o Z> 3 { -::;-CC() 6225 EL CAMINO ~EAL Community & EconomiSti\lSSMo~9aO~uilding Division 1635 Faraday Avenue I Carlsbad, CA 92008 I 760-602-2719 I 760-602-8558 fax I building@carlsbadca.gov OFFICE USE ONLY SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE RECORD ID # ___________________ 1 PLAN CHECK # ___________________ 1 Business Name Releco LLC Business Contact Robert Echter Telephone# 760-310-4774 BP DATE Project Address (include suite) 1911 Palomar Oaks Way City Carlsbad State CA Zip Code 92024 APN# 212-091-08-00 Mailing Address (include suite) 1911 Palomar Oaks Way City Carlsbad State CA Zip Code 92024 Plan File# CBC2021-0283 Project Contact Robert Echter Applicant E-mail bechter@drammechter.com Telephone# 760-310-4774 The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San Diego): Indicate by circling the item. whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Occupancy Rating: Facility's Square Footage (including proposed project): 5. Organic Peroxides 9. Water Reactives 13. Corrosives 1. Explosive or Blasting Agents 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS DIVISION (HMD): If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123. Call (858) 505-6700 prior to the issuance of a building permit. FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 1. 2. 3. 4. 5. 6. 7. 8. YES NO D ~ D ~ D ~ D D D D D j (for new construction or remodeling projects) Is your business listed on the reverse side of this form? (check all that apply). Will your business dispose of Hazardous Substances or Medical Waste in any amount? Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 pounds and/or 200 cubic feet? Will your business store or handle carcinogens/reproductive toxins in any quantity? Will your business use an existing or install an underground storage tank? Will your business store or handle Regulated Substances (CalARP)? Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). 0 CalARP Exempt I Date Initials 0 CalARP Required I Date Initials 0 CalARP Complete I Date Initials PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD): The following questions are intended to identify the majority of air pollution issues at the planning stage. Your project may require additional measures not identified by these questions. Some residential projects may be exempt from APCD requirements. If yes is answered for either questions 1, 2 or 5 or for more comprehensive requirements, please contact APCD at apcdcomp@sdcounty.ca.qov; (858) 586-2650; or 10124 Old Grove Road, San Diego, CA 92131. YES NO 1. 0 lit Will the project disturb 100 square feet or more of existing building materials? 2. D i!'J.. Will any load supporting structural members be removed? 3. 0 0 (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPA-approved building inspector course? 4. D D (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, a notification may be required at least 10 working days prior to commencing asbestos removal. Additionally, a notification may be required prior to the removal of a load supporting structural member(s) regardless of the presence of asbestos. 5. 0 O'l Will the project or associated construction equipment emit air contaminants? See the reverse side of this form for typical equipment requiring an APCD permit. If yes, contact APCD prior to the issuance of a building permit. 6. D O (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school bounda ? Briefly describe business activities: Wholesale Flower Sales Briefly describe proposed project: 1,600 ft2 storage platform FOR OFFICAL USE ONLY: + Date FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ________________________________ _ BY· DATE· I I EXEMPT OR NO FURTHER INFORMATION REQUIREO RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMO' APCD COUNTY-HMO APCD COUNTY-HMO APCD .. *A stamp In this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply HM-9171 (9/18) County of San Diego -DEH -Hazardous Materials Division ........ ·~---------------------------------------, Development Services Building Division C cityof Carlsbad CLIMATE ACTION PLAN CONSISTENCY CHECKLIST 8-50 8 1635 Faraday Avenue (760) 602-2719 www.carlsbadca.gov 1-17·'-1.. PU RPOSE ~ ~ /f"G /lfe S'A'!lr r-ul~ CAAU,/,f,ll Cc,~"( .. ,~ :j)~",.,.,,..,f .D,trl P,c.jf.r.;( u,{v.t. < N J.ook. '8-So .£,'t'.f This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements111h'/.u apply to their project. This completed checkli st (B-50) and summary (B-55) must be included with the building permit 7 application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by clicking on the provided links to each municipal code section. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool Consu ltation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen Inspector/Plans Examiner, or Green Building Residential Plan Examiner. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance, check N/A and provide an explanation or code section describing the exception. Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and Green Code sections. Project Name/Building Permit No.: plan check CBC2021-0283 BP No.: Property AddresS/APN: 1911 Palomar Oaks Wav. Carlsbad CA 92024 Applicant Name/Co.: Robert Echter Applicant Address: 1911 Palomar Oaks Way Carlsbad CA 92008 Contact Phone: 760-310-4774 Contact Email: bechte Contact information of person completing this checklist (if different than above): Name: Robert Echter Contact Phone: 760-310-4774 00 chter.com Company name/address: 1911 Palomar Oaks Way, Carlsba1 Contact Email: bechter@drammechter.com Applicant Signature: __ ~_-,,,,::::,,£_..,,c._£2_ _________ .0ate, 07? :2- 8-50 Page 1 of 7 Revised 04/21 _. Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet. Building Permit Valuation (BPV) $ breakdown -'--7..::.8,:..c8..::.5.::..5 _____ _ COIIIWCllenType 0 Residential D New construction D Additions and alterations: D BPV < $60,000 D BPV ~ $60,000 D Electrical service panel upgrade only D BPV ~ $200,000 Ii] Nonresidential D New construction D Alterations: D BPV ~ $200,000 or additions 2! 1,000 square feet D BPV ~ $1,000,000 D ~ 2,000 sq. ft. new roof addition 1. Energy Efficiency A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use 2A*, 3A*, 1B, 2B, *Includes detached, newly constructed ADU 4A*, 3B,4A NIA NIA All residential additions and alterations 1A,4A 4A 1-2 family dwellings and townhouses with attached garages only. *Multi-family dwellings only where interior finishes are removed 1A, 4A* 1B, 4A* and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 1 B, 2B, 3B, 4B and 5 1B, 5 1B,2B,5 Building alterations of~ 75% existing gross fioor area 2B,5 1 B also applies if BPV 2! $200,000 Please refer to Carlsbad Municipal Code (CMC) 18.21.155 and 18.30.190,and the California Green Building Standards Code (CAL Green) for more information. Appropriate details and notes must be placed on the plans according to selections chosen in the design. A D Residential additionoralterationo!'.$60,000buildingpennitvaluation. □ N/A __________ _ Details of selection chosen below must be placed on the plans referencing CMC □ Exception: Home energy score~ 7 18.30.190. (attach certification) Year Built Single-family Requirements Multi-family Requ irements □ Before 1978 Select one option: □ Ductsealing □ Attic insulation □Cool roof □ Attic insulation □ 1978 and later Select one option: □ Lighting package □ Water heating Package □ Between1978and1991 Select one option: □ Ductsealing □ Attic insulation □Cool roof □ 1992 and later Select one option: □ Lighting package □ Water heating package Updated 4/16/2021 3 . . Conveyor & Storage Solutions, Inc. 401 0 Morena Blvd, Ste 103, San Diego, 619-255-1428 2030 East 4th St, Ste 203-E, Santa Ana, 714-769-6388 2000A S Grove Ave, Ste 107, Ontario 877-227-7235 C.L.#730010 www.cssyes.com Optimizing your Warehouse for Success. Proposal # 21-M065 Date: Sales Rep: Email: Proposal Valid: May 14, 2021 Martin Olsen Martin@cssyes.com 15 Days Customer Dramm & Echter Ship To Dramm & Echter Address 1150 Quail Gardens Drive 1150 Quail Gardens Drive Encinitas, CA 92024 Encinitas, CA 92024 Contact Bob Echter Contact Bob Echter Phone 760.310.4774 Phone 760.310.4774 Email bechter@dram mechter. com Quantitv Description Unit Price Ext. Price 1 New AMFI Mezzanine 65'-0" Wide x 23-0" Deep x 11 '-0" TOD $60,500.00 $60,500.00 Handrail : 86 Lin. Ft. 42" tall guard rail with 14 ga. x 4" kick plate (IBC Approved) Staircases: 1 ea. IBC Style 7" x 11" 36" Tread 1,511 Sq. Ft. : ¾" Wood deck over 1 ½" Corrugated decking Gate : 1 ea. 8'-0" Double Swing gate Columns: 10" x 10"x 1/4" Square Tube Base plates : 16" Square Base plates Beams: Wide Flange I-Beams 16"-10" Tall Bracing: : Knee brace Seismic Zone : IV Sub Total $60,500.00 Other Items Labor to Install (See terms/conditions of 'Attachment S'), OSHA Trained Customer to supply forklift for installation Scissors Lift Rental Freight, FOB Origin, Prepaid (customer to supply forklift to unload materials) Permit Package & Submittal Process, Includes Structural Engineering Cales Payment Method: ACH, Wire Transfer, or E-Check Finance options available over $5,000. Ask your associate for details. If paying by credit card, a 3% convenience fee will apply Payment Terms: 50% Down Net on Receipt Terms & Conditions: See Attached Payment Agreement (Page 2) Date Available: Est 6-7 week lead time to deliver Notes: Approved by (Print Name) Signature SUB TOTAL Sales Tax Convenience fee GRAND Cancellation: Buyer subject to all costs directly resulting from cancellation, and will require written confirmation from Seller Price $11 ,400.00 $650.00 $1 ,500.00 Not Included $74 050.00 $4,805.00 $0.00 $78 855.00 Date ... 8. [j] Nonresidential* new construction or alterations~ $200,000 building pennit valuation, or additions~ 1,000 square feet. See CMC 18.21.155 and CALGreen AppendixA5 □ N/A A5.203.1.1 Choose one:□ .1 Outdoor lighting D .2 Restaurant service water heating (CEC 140.5) □ .3 Warehouse dock seal doors. □ .4 Daylight design PAFs □ .5 Exhaust air heat recovery □ N/A AS.203.1 .2.1 Choose one: D .95 Energy budget (Projects with indoor lighting OR mechanical) D .90 Energy budget (Projects with indoorlightingAND mechanical) □ N/A A5.211.1** D On-site renewable energy: □ N/A A5.211.3** □ Green power. (If offered by local utility provider, 50% minimum renewable sources) □ N/A A5.212.1 □ Elevators and escalators: (Project with more than one elevator or two escalators) □ N/A A5.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen) □ N/A * Includes hotels/motels and high-rise residential buildings ** For alterations?: $1,000,000 BPV and affecting> 7 5% existing grossffoorarea, OR alterations that add 2,000 square feet of new roofaddition: comply with CMC 18.30.130 (section 28 below) instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building pennit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to CAP section 38 below (low-rise residential Water Heating}, increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc* sheets if necessary) Total System Size: kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.) *Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type If proposed system size is less than calculated size, please explain. kWdc Exception □ □ □ □ B. D Nonresidential new construction or alterations ~$1,000,000 BPV AND affecting ~75% existing floor area, OR addition that increases roof area by ~2,000 square feet. Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: □ Gross Floor Area (GFA)Method GFA: □ If< 10,000s.f. Enter: 5 kWdc Min.System Size: □ If ~ 10,000s.f. calculate: 15 kWdc x (GFN10,000) ** kWdc **Round building size factor to nearest tenth, and round system size to nearest whole number. Updated 4/ I 6/2021 4 " . □Time-Dependent Valuation Method Annual TDV Energy use:*** ______ x .80= Min. system size:. ______ kWdc *** Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section. Provide complete details on the plans. D For systems serving individual dwelling units choose one system: D Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) D Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential) D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors D Exception: D For systems serving multiple dwelling units, install a central water-heating system with ALL of the following: D Gas or propane water heating system D Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low- rise residential) D Solar water heating system that is either: D .20 solar savings fraction D .15 solar savings fraction, plus drain water heat recovery D Exception: B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide complete details on the plans. D Water heating system derives at least 40% of its energy from one of the following {attach documentation): D Solar-thermal D Photovoltaics D Recovered energy D Water heating system is (choose one): D Heat pump water heater D Electric resistance water heater(s) □Solar water heating system with .40 solar savings fraction □ Exception: It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. Updated 4/ 16/2 I 5 . . . ·1 4. Electric Vehicle Charging A D Residential New construction and major alterations* Please refer to CMC 18.21.140 when completing this section. □ One and two-family residential dwelling or townhouse with attached garage: □ One EVSE Ready parking space required □ Exception : □ Multi-familyresidential· □ Exception · Total Parking Spaces EVSE Spaces Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready" I Other "Capable" I Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable" *Major alterations are: ( 1 )foroneand two-family dwellings and townhouses with attached garages, alterations have a building permit valuation2!$60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation 2: $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. *ADU exceptions for EV Ready space (no EV ready space required when): (1) The accessory dwelling unit is located within one-half mile of public transit. (2) The accessory dwelling unit is located within an architecturally and historically significant historic district. (3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure. (4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit. (5) When there is a car share vehicle located within one block of the accessory dwelling unit. B. D Nonresidential new construction (includes hotels/motels) □ Exception: ____________ _ Please refer to CMC 18.21.150 when completing this section Total Parking Spaces Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable" I I I Ca lculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces D 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 D 101-150 12 6 □ 151-200 17 9 □ 201 andover 10 percent of total 50 percent of Required EV Spaces Calculations: Total EVSE spaces= . 10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable" Updated 4/16/202 1 6 5. li]Transportation Demand Management (TOM): Nonresidential ONLY An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on yoursubmitted plans to determinewhetherornoryourpermit requires a TOM plan. lfTDM is applicable to your permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses Use Office (all)2 Restaurant Retai'3 Industrial Manufacturing Warehousing Emp ADTfor first 1,000 s.f. 20 11 8 4 4 4 EmpADTI 1000 s.f.1 13 11 4.5 3.5 3 1 1 Unless otherwise noted, rates estim ated from /TE Trip Generation Manual, 1 ()th Edition 2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to calculate employee ADT 3 Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration sample calculatjons: Office: 20,450 sf 1. 20,450 sf/ 1000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my permit require a TOM plan and underst hat an approved TOM plan is a condition of permit issuance. Date: 1/19 /2 :2 ~, Person other than plicant to be contacted for TOM compliance (if applicable): Name (Printed): Phone Number:. _____ _ Email Address: ___________________ _ Updated 4/16/2021 7 . . Conveyor & Storage Solutions, Inc. 4010 Morena Blvd, Ste 103, San Diego, 619-255-1428 2030 East 4th St, Ste 203-E, Santa Ana, 714-769-6388 2000A S Grove Ave. Ste 107, Ontario 877-227-7235 C.L.#730010 www.cssyes.com Optimizing your Warehouse for Success. Proposal# 21-M065 Date: Sales Rep: Email: Proposal Valid: May 14, 2021 Martin Olsen Martin@cssyes.com 15 Days Customer Dramm & Echter Ship To Dramm & Echter Address 11 50 Quail Gardens Drive 11 50 Quail Gardens Drive Encinitas, CA 92024 Encinitas, CA 92024 Contact Bob Echter Contact Bob Echter Phone 760.310.4774 Phone 760.310.4774 Email bechter@drammechter.com Quantity Description Unit Price Ext. Price 1 New AMFI Mezzanine 65'-0" Wide x 23-0" Deep x 11 '-0" TOD $60,500.00 $60,500.00 Handrail : 86 Lin. Ft. 42" tall guard rail with 14 ga. x 4" kick plate (I BC Approved) Staircases : 1 ea. I BC Style 7" x 11 " 36" Tread 1,511 Sq. Ft. : ¾" Wood deck over 1 ½" Corrugated decking Gate : 1 ea. 8'-0" Double Swing gate Columns : 1 0" x 1 0"x 1 /4" Square Tube Base plates : 16" Square Base plates Beams: Wide Flange I-Beams 16"-10" Tall Bracing: : Knee brace Seismic Zone: IV Sub Total $60,500.00 Other Items Labor to Install (See terms/conditions of 'Attachment S'), OSHA Trained Customer to supply forklift for installation Scissors Lift Rental Freight, FOB Origin, Prepaid (customer to supply forklift to unload materials) Permit Package & Submittal Process, Includes Structural Engineering Cales Payment Method: ACH, Wire Transfer, or E-Check Finance options available over $5,000. Ask your associate for details. If paying by credit ca rd, a 3% convenience fee will apply Payment Terms: 50% Down Net on Receipt Terms & Conditions: See Attached Payment Agreement (Page 2) Date Available: Est 6-7 week lead time to deliver Notes: Approved by (Print Name) Signature SUB TOTAL Sales Tax Convenience fee GRAND Cancellation: Buyer subject to all costs directly resulting from cancellation, and will require written confirmation from Seller Price $11,400.00 $650.00 $1 ,500.00 Not Included $74 050.00 $4,805.00 $0.00 $78 855.00 Date 1/18/22 ADT calculations Adding 1,511 ft2 mezzanine ADT calculation of 1 ADT per 1,000 ft2 time 1,511 ft2 = 1.5 ADT added .. -·•--.-,------------------------------------------------.. C City of Carlsbad CLIMATE ACTION PLAN (CAP) COMPLIANCE CAP Building Plan Template 8-55 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www .ca rlsbad ca .gov The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California Green Building Standards Code (CALGreen), current version. Use this form to summarize all applicable CAP measures for your project. IF CAP MEASURES ARE APPLICABLE, IMPRINT THIS COMPLETED FORM ONTO PROJECT PLANS. 1. ENERGY EFFICIENCY APPLICABLE: □YES □ NO Complies with CMC 18.30.190 & 18.21.155 O Yes O N/A Existing Structure, year built: _1_9_97 ___ _ Prepared Energy Audit? O Yes D No Energy Score: _____ _ Efficiency Measures included in scope: 2. PHOTOVOLTAIC SYSTEM APPLICABLE: □YES □ NO Complies with CMC section 18.30.130 and 2019 Ca lifornia Energy Code section 150.l(c)l4 D Yes D N/A Required Provided Size of PV system (kWdc): Sizing PV by load calculations 0Yes 0 No If by Load Calculations: Total calculated electrical load: 80% of load: Hardship Requested Hardship Approved 0 Yes ~ □Yes □No 3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: □ YES □NO 4. 5. Complies with CMC sections 18.30.150 O Yes O N/A and 18.30.170? Alternative Source: □ Electric □ Passive Solar Hardship Requested Hardship Approved D Yes o ves ELECTRIC VEHICLE (EV) CHARGING APPLICABLE: □ YES Complies with CMC section 18.21.140? Panel Upgrade? Total EV Parking Spaces: No. of EV Capable Spaces: No. of EV Ready Spaces: No. of EV Installed Spaces: Hardship Requested Hardship Approved Oves O N/A OYes O No Required Provided 0 Yes □Yes TRAFFIC DEMAND MANAGEMENT APPLICABLE: Compliant? TDM Report on file with city?