Loading...
HomeMy WebLinkAboutPRE 2022-0046; OAK TOWERS; Admin Decision LetterOctober 28, 2022 Elwood Design & Construction Tom Sanford 1106 2nd Street, #468 Encinitas, CA 92024 8FILE COPY SUBJECT: PRE 2022-0046 (DEV2022-0174) -OAK TOWERS APN: 203-261-07-00 {"city of Carlsbad Thank you for submitting a preliminary review for a mixed-use project proposed at 390 Oak Avenue. The project site, an approximately 0.67-acre lot, currently is developed with a two-story commercial building and on-site parking. The project proposes the construction of a new four-story mixed-use building with a subterranean parking garage for residential units, ground-floor commercial parking spaces with 10,520 square feet of commercial tenant space, and 30 residential units located on the second, third, and fourth floors. Residential units proposed range in size from one-bedroom to four-bedrooms, and the project proposes to dedicate three units for very-low-income households to receive a 50 percent density bonus. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. This preliminary review does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans, policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: General 1. General Plan and zoning designations for the property are as follows: a. General Plan: Village Barrio (V-B), 28-35 dwelling units per acre b. Zoning: Village-Barrio (V-B) Zone c. Village & Barrio Master Plan (VBMP); Village Center (VC) Land Use District d. The property is in the Village-Barrio Segment of the Coastal Zone. The Coastal land use designation and zone are the same as the general plan and zoning above. 2. The project requires the following applications: a. Tentative Tract Map (CT) for subdividing the property into five or more condominium/ownership units) b. Site Development Plan (for buildings exceeding 5,000 square feet) c. Coastal Development Permit (CDP) for development in the Coastal Zone. Community Development Department Planning Division j 1635 Faraday Avenue Carlsbad, CA 92008-7314 j 442-339-2600 www.carlsbadca.gov PRE 2022-0046 (DEV2022-0174} -OAK TOWERS October 28, 2022 Page 2 The Tentative Tract Map, Site Development Plan, and Coastal Development Permit applications must be submitted to the city concurrently. The City Cound~will be the final decision maker. 3. Density/Density Bonus. The project proposes 20 units, prior to density bonus, on a 0.67-acre lot, which is a density of 29.85 or 30 dwelling units per acre (du/ac). Per Section 2.5 of the VBMP, mixed- use projects in the VC district have a base density of a minimum of 28 du/ac and a maximum of 35 du/ac. Calculation provided is mathematically correct, however maximum density allowed should be used when calculating density bonus. Summary of density bonus as shown on plans: Base density: 30 du/ac Base units: 0.67 acres x 30 = 20 dwelling units Affordable housing proposed: 3 very low-income units; 15% of base units reserved for 50 percent density bonus: Proposed number of units: Proposed density: affordable housing 20 units + 50 percent = 30 units (per density bonus table in P- l(H), Density Bonus Supplemental Checklist 30 units 30 units+ .67 acres= 44.77 or 45 du/acre Summary of density bonus using maximum density: Base maximum density: 35 du/ac Base maximum units: 0.67 acres x 35 = 23.45 or 24 dwelling units (round up per CMC Section 21.86.040(G)) Affordable housing proposed: 3 very low-income units; 12.5 or 13% of base units reserved for 40 percent density bonus: Proposed number of units: Proposed density: affordable housing 24 units + 40 percent = 33.6 or 34 units (per density bonus table in P-l(H), Density Bonus Supplemental Checklist 30 units 30 units+ 2.95 acres= 44.77 or 45 du/acre Other adjustments to the calculation are available to reach a total of 30 units. Please reach out to the Planning Division to discuss if other options will be proposed. Pursuant to state density bonus law, the project qualifies for two (2) incentives or concessions and additional waivers, if needed. The project application should specify the number and types of concessions or waivers. 4. lnclusionary Housing Requirement: The project is subject to the City's lnclusionary Housing Ordinance. A project proposing 30 units will be required to provide 15% of total units (5 units) as affordable units. Any units not provided on site do have the option for alternative means of compliance. For a project of 30 units, 1.5 credits will need to be purchased for every affordable unit not provided on site. Please see the City's lnclusionary Housing Program Information Bulletin for more information: https:Uwww.carlsbadca.gov/home/showpublisheddocument/9634/637897580094270000 PRE 2022-0046 (DEV2022-0174} -OAK TOWERS October 28, 2022 Page 3 5. Parking. The 30-unit project includes eight (8) one-bedroom units, eight (8) two-bedroom units, 12 three-bedroom units, and two (2) four-bedroom units. A 50% density bonus is proposed and a total of 15% or 3 units are proposed to be set aside as Very-Low Income units. Pursuant to the VBMP, the parking ratios for multiple-family dwellings are as follows: Studio/one-bedroom: One space per unit Two or more bedrooms: One and half spaces per unit Visitor parking: None required in VC District Pursuant to state density bonus law, projects which provide at least 11% very low-income units and are located within one-half mile of a major transit stop, the maximum parking ratio that can be applied to the project is 0.5 spaces per unit. As the project proposes 15% very low-income units and is located within one-half mile of the Carlsbad transit station, the appropriate parking ratio to apply to the project is 0.5 spaces per unit. Therefore, the proposal to construct 30 units results in a parking requirement of 15 parking spaces (30 x 0.5 = 15 spaces). The cover sheet for the concept plan indicates a total of 54 parking stalls provided for residential units, resulting in a surplus of 39 parking stalls. Therefore, the proposed number of parking stalls far exceeds what is required. Given the limited availability of nearby on-street parking, staff is supportive of providing more parking than what is required pursuant to state density bonus laws. However, please be advised that providing additional parking onsite may impact the VMT analysis (if required). 6. Setbacks. Per Section 2.7.1 (A) of the VBMP, setbacks will be applied as follows; a. Front/Corner: Minimum of O feet; maximum of 5 feet to building (at the ground floor). Additional depth permitted where area includes a plaza, courtyard, or outdoor dining. Additional depth is also permitted to accommodate electrical transformers, utility connections, meter pedestals, and similar equipment only if other locations are infeasible as determined by the decision-maker b. Side: 0 Feet c. Rear: O Feet 7. Clear Zones. Per Section 2.6.l(A)(4) of the VBMP, A clear zone shall be provided at the intersection of a street and an alley or driveway to maintain a free line of sight. The clear zone shall consist of an isosceles right triangle measured 7.5 feet in both directions from the intersection of the two property lines. In addition, the clear zone shall not be occupied by a ground floor building footprint, site features taller than 36 inches, or landscaping that is taller than 30 inches. As currently designed, the project does not appear to comply. Please see the VBMP for an example. 8. Private Open Space. Per Section 2.7.l(E)(2) of the VBMP, private open space shall be provided at a minimum of 60 square feet per unit with a minimum dimension of 6 feet in any direction. Balconies for one-bedroom units on the third floor appear to be less than 60 square feet. 9. Common Open Space. Per Section 2.7.l(E)(3) of the VBMP, a project with 30 units will be required to provide a minimum of 450 square feet of open space, with a minimum dimension of 10 feet in any direction. Open space proposed on second floor near the Washington Street frontage appears to not meet the 10-foot minimum dimension standard and may not be counted toward this requirement. PRE 2022-0046 (DEV2022-0174) -OAK TOWERS October 28, 2022 Page 4 10. Height. Per Section 2.7.l(G)(l) of the VBMP, the maximum allowed structure height is 45 feet and four stories. 11. Height-Ground Floor. Per Section 2.7.l(G)(2) of the VBMP, the ground-floor plate height for the commercial units along Washington Street shall be a minimum height of 14 feet. 12. Building Massing. Per Section 2.7.l(H)(l) of the VBMP, wall planes that exceed 40 feet in length shall provide a minimum of five feet in variation in the wall plane, as well as a change in the roof line. 13. Ground Floor Street Frontage Uses. Per Section 2.7.1(1) of the VBMP, new ground floor street frontage uses permitted within the boundaries of the use. restriction area identified on Figure 2-2 (Washington Street Frontage) shall occupy more than one-half of the habitable space developed on the ground floor and shall span at least 80 percent of the building frontage. 14. Design Guidelines. Please refer to Section 2.8 of the VBMP for Area-Wide Design Guidelines. A detailed evaluation of the project's compliance with these design guidelines will occur during review of the formal project application submittal. 15. Bicycle Parking. Please revise the site plan to add a minimum of two locations for bicycle parking. Pursuant to Page 2-74 of the VBMP, bicycle parking should be provided at convenient places such as entrances or other visible and accessible areas. 16. Electrical Transformer. Please submit correspondence from SDG&E indicating whether a transformer wjll be required. If required, please identify the location on the plans and provide landscape screening. 17. Historical. Cultural and Paleontological Report. The existing structure proposed to be demolished is over 45 years old. In addition, the project proposes an underground parking structure that may impact cultural or paleontological resources. Please prepare a comprehensive report consistent with the California Environmental Quality Act and the city's Tribal, Cultural, and Paleontological Resources Guidelines, which can be found on line at: https://www .ca rlsbadca .gov /home/showpu blisheddocu ment/254/637 425976516870000 18. Noise Analysis. As the proposed project will be located in close proximity to railroad tracks, a noise analysis prepared by a registered acoustician will be required. The study shall be prepared in compliance with the requirements of the Noise Guidelines Manual. Please see link below for additional information https:ljwww.carlsbadca.gov/home/showpublisheddocument/238/637425974092370000 19. Early Notification. All development applications that require Planning Commission or City Council approval shall provide early public notification. This requirement may be met by sending a public notice to the surrounding property owners (GOO-foot radius) within 30 days of submittal of the PRE 2022-0046 (DEV2022-0174) -OAK TOWERS October 28, 2022 Page 5 development application pursuant to City Council Policy No. 84 and Form P-21. The policy and form may be referenced online at: City Council Policy No. 84: https:llrecords.carlsbadca.gov/Weblink/DocView.aspx7id=5156829&dbid=0&repo=CityofCarlsbad& cr=l Form P-21: https:llwww.carlsbadca.gov/home/showpublisheddocument/452/637843403622900000 20. Housing Crisis Act. The Housing Crisis Act of 2019 (SB 330) established a preliminary streamline application process for housing projects. It is not mandatory unless applicants seek the vesting and processing benefits offered under SB 330. Participation in the SB 330 streamline process would occur first, followed by the formal development application process required under Government Code (Gov. Code)§§ 65940, 65941, 65941.5, and Carlsbad Municipal Code (CMC) § 21.42.050. Acceptance by the city of a complete SB 330 Streamline Application (Form P-32) and fee will vest the project for 180 days in accordance with the ordinances, policies and standards in effect at the time the SB 330 Application is accepted. 21. Climate Action Plan. New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely impact development requirements of this project. A formal application submittal will need to include a completed Climate Action Plan Checklist (Form P-30) to determine what requirements will apply to the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in the California Green Building Standards Code and in Carlsbad Municipal Code Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the following address: http:llwww.gcode.us/codes/car1sbad/view.php7topic=18&frames=on To the extent that new GHG reduction requirements are in effect at the time of application for grading or building permits, the project will be required to comply with the effective requirements even if different than what is proposed in the project's planning approvals. GHG reduction requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new GHG reduction requirements results in substantial modifications to the project after planning approvals are obtained, then prior to issuance of grading or building permits, the applicant may be required to submit and receive approval of a Consistency Determination or an Amendment application for the project through the Planning Division. Land Development Engineering: 1. Complete a Stormwater Standards Questionnaire Form E-34. This questionnaire will guide you and the City in determining what type of reports and storm water mitigation must be completed to satisfy state and City storm water quality requirements. The questionnaire is located on the City of Carlsbad website. Since the impervious area is more than 5,000 square feet for this redevelopment, this project is a PRE 2022-0046 (DEV2022-0174} -OAK TOWERS October 28, 2022 Page 6 Priority Development Project (PDP). The post construction stormwater treatment BMPs shall be designed per the City of Carlsbad BMP Manual and shown on a conceptual grading plan and drainage plan with the discretionary application. 2. Prepare a Preliminary Storm Water Quality Management Plan utilizing the stormwater template E-35 on the City of Carlsbad website this project is subject to water quality BMPs. This project is exempt from the hydromodification criteria based on Hydromodification Exemption Analyses for Select Carlsbad Watersheds by Wayne Chang dated September 17, 2015. 3. This project is subject to the City of Carlsbad trash capture requirements for the entire property. Incorporate trash capture measures and calculations into the preliminary Storm Water Quality Management Plan. 4. Provide the average daily traffic (ADT) generated by the project for the existing and proposed conditions. Also, include peak hour rate calculations for the existing and proposed condition. Based on this information, this project may be subject to preparing a transportation impact analysis per the City of Carlsbad Transportation Impact Analysis Guidelines. Prior to acceptance or review of a transportation impact analysis, a scoping agreement is required to be approved by city staff. Contact Nick Gorman at Nick.Gorman@carlsbadca.gov for further assistance regarding transportation impact analysis requirements. 5. Submit a Climate Action Plan (CAP) checklist, form P-30 to demonstrate that this project is in compliance with CAP. If applicable per checklist, include a Transportation Demand Management (TDM) Plan and Greenhouse Gas (GHG) Analysis with discretionary application. Delineate all electric vehicle (EV) and EV capable parking spaces on the site plan. 6. A vehicle miles traveled (VMT) analysis may be required. Applicability of the requirement will be evaluated based on the project's environmental determination. Refer to the city's VMT guidelines which is available on the city's website. If a VMT analysis is required, two copies shall be submitted at the time of the discretionary application. 7. Provide a preliminary title report within 6 months of the application date, with current owner. Label 1 and annotate all existing easements affecting the property on the site plan. 8. It appears that the 40-foot half street width on Oak Avenue from Parcel Map 2689 is depicted incorrectly on the site plan. Clearly show the existing right-of-way, centerline and dimensions to the existing curb and existing sidewalk. 9. Clearly show the existing 30-foot right-of-way on Washington Street, and dimension the existing curb, sidewalk and berm. Show the existing 200-foot existing A.T. & S.F. railroad easement and how this existing easement aligns to the existing street. 10. Delineate the 20-foot radius public street dedication for Oak Avenue and Washington Street that is shown on Parcel Map 2689. No structures shall be permitted in the street right-of-way. PRE 2022-0046 (DEV2022-0174} -OAK TOWERS October 28, 2022 Page 7 11. Additional street right-of-way may be required on Washington Street with this development after an analysis of the existing street improvements along with the existing right-way can be provided. 12. Provide a typical street cross section for Oak Avenue and Washington Street indicating correct right- of-way width. 13. Show and call out the existing sewer easement centered 15-feet off of the northerly right-of-way of Oak Avenue per Parcel Map 2689. Provide this document with the discretionary application. A preliminary review suggests that no improvements or structures will be allowed in this existing easement. 14. If the applicant will be vacating the existing easement and providing new sewer service(s) for the property which the easement serves, these improvements along with a letter of permission from the existing owner shall be provided with the discretionary application. 15. Indicate the volume of grading (cut, fill, import, export, remedial) proposed for the project in cubic yards. The remedial quantities shall be determined by the recommendations of a geotechnical engineer. 16. Per CMC 15.16.060 this project will require a grading permit and grading plan and a separate improvement plan for work within the existing right-of-way. 17. Provide a conceptual grading plan, delineate existing and proposed contours, spot elevations and the method for draining the facilities around the proposed building and the parking garage per GS- 15 and CBC 1804.4. Provide finish floor and pad elevations. 18. Call out any retaining walls that will be utilized on the project site and show top of wall, bottom of wall elevations. Indicate maximum height of retaining wall, show footing and remedial excavation required in cross sections. 19. If stem walls or extended footings are incorporated into the building line, show on the grading plan along with the depth retaining. 20. A preliminary hydrology study will be required to determine the pre-development and post- development discharge flows. 21. Provide a geotechnical report to support the proposed development, including soil type, excavation requirements and any recommendations regarding BMPs. 22. Provide a legal description of the property on the site plan. 23. Prnvide bearing and distance for all property lines shown. 24. Add the owner's address, the developer's name and address if different than the owner and a vicinity map to the site plan. PRE 2022-0046 (DEV2022-0174) -OAK TOWERS October 28, 2022 Page 8 25. The site plan shows a removal of the existing curb and cutouts to support on street parking; however, there is already on street parking permitted on these streets, clarify. 26. Show all existing utilities: water, sewer, storm drain, dry utilities and overhead lines in Oak Avenue and Washington Street and laterals affecting the property. 27. Both a sewer and water analysis are required for this development to determine the availability of .infrastructure to support this project. 28. The existing water service will need to be removed and replaced with a new PVC tee at the main. A master meter may be allowed for the condominiums, coordinate with Carlsbad Municipal Water District with the discretionary application. The proposed water service and meter will require a backflow preventer. 29. Provide the water demand and sewer generation for this project per the City of Carlsbad Engineering standards. 30. Show proposed sewer laterals to support the condominiums. 31. Show existing topographic information within 15 feet of the property line, including fences, walls, structures, trees, contours, and existing utilities. 32. The trees along the property frontage at Oak Avenue and Washington Street are within the City of Carlsbad tree inventory. Removal of any of these trees will require approval per CMC 11.12.090, show the existing trees and the disposition. 33. Revise the trash enclosure to be consistent with the City of Carlsbad standard drawing GS-16. 34. Provide multiple cross-sections of the site to demonstrate differences in grade, including adjacent properties, show existing ground, fences and existing adjacent structures. Also show proposed improvements and underground parking garage and any remedial excavation required and shoring needed to construct. 35. Use NGVD 29 datum for vertical control for all design elevations per city Engineering Standard Volume 1, Chapter 2 and NAD83 state plane coordinates for horizontal control of CAD files. 36. Please be advised that a more in-depth review of the proposed development will occur with the discretionary permit application, when a more complete design of the project is provided. 1. NFPA 13 fire sprinklers required throughout. NFPA 72 automatic fire alarm required throughout due to occupiable floors above the third floor. 2. Plans provided do not show pedestrian fire department access or laddering pads on two sides of the building that would be adequate to access the building using ground ladders to reach required rescue windows. Architect shall either design to correct construction type found in Carlsbad Building Code PRE 2022-0046 (DEV2022-0174) -OAK TOWERS October 28, 2022 Page 9 1031.2 to be exempted from rescue window requirements or provide proper setbacks to allow for use of ground ladders to access rescue window openings on all sides. Building: The following comments are provided courtesy of the Building Division and will need to be clearly detailed in your final design prior to submitting for building permit construction plan review. 1. This project consists of more than three dwelling units and may be subject to CBC Chapter llA and/or 118 accessibility requirements and other / Federal accessibility requirements depending on the funding source(s) (Government funding will trigger HUD section 504 accessibility requirements). 2. Funding sources such as CTAC may trigger additional accessibility requirements above the minimum amounts required by the California Building Code. Please list those additional requirements, if applicable, in chart form on the cover sheet and provide details on the plans. 3. This is a mixed-use building including R-2 occupancy. Type of construction and consideration of area, and/or height/story increase, and the sprinkler system proposed, will have to be detailed on the cover sheet. 4. This building is considered an elevator building for accessibility plan review purposes. 5. This building is considered a high-rise building. Structural Observation will be required. CBC 1704.6. All necessary application forms, submittal requirements, and fee information are available at the Planning counter located in the Faraday Building at 1635 Faraday Avenue or online at https://www.carlsbadca.gov/departments/community-development/planning. You may also access the General Plan Land Use Element and the Zoning Ordinance online at the website address shown. Please review all information carefully before submitting. If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact Esteban Danna at the number below. You may also contact each department individually as follows: • Planning Division: Kyle Van Leeuwen, Associate Planner, at {442) 339-2611 • Land Development Engineering: Nichole Fine, Project Engineer, at {442) 339-2744 • Building Division: Jason Pasiut, Building Official, at (442) 339-2788 • Fire Department: Randy Metz, Fire Inspections, at (442) 339-2661 Sincerely, UVG ERIC LARDY City Planner PRE 2022-0046 (DEV2022-0174} -OAK TOWERS October 28, 2022 Page 10 EL:ED:JC Attachments: Land Development Engineering Redlines c: Roy & Nancy Salameh, 2642 Unicornio St., Carlsbad, CA 92009 Nichole Fine, Project Engineer Laserfiche/File Copy Data Entry