Loading...
HomeMy WebLinkAbout2420 GARY CIR; ; CBRA2021-0058; PermitBuilding Permit Finaled {city of Carlsbad Residential Associated Permit Print Date: 11/15/2022 Job Address: Permit Type: Parcel#: Valuation: Occupancy Group: #of Dwelling Units: 2420 GARY CIR, CARLSBAD, CA 92010-2804 BLDG-Associated Permit Residential Work Class: 1671551000 Track#: $4,366.54 Lot#: Project#: Plan#: Deck Bedrooms: Construction Type: Bathrooms: Occupant Load: Code Edition: Sprinkled: Project Title: Description: RODRIGUEZ: 218 SF DECK FEE BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) Orig. Plan Check#: PC2021-0024 Plan Check #: Property Owner: CO-OWNERS RODRIGUEZ PATRICK J AND VALERIE G 2420 GARY CIR CARLSBAD, CA 92010 SB1473 GREEN BUILDING STATE STANDARDS FEE STRONG MOTION-RESIDENTIAL Total Fees: $121.61 Total Payments To Date: $121.61 Building Division Permit No: CBRA2021-0058 Status: Closed -Finaled Applied: 05/03/2021 Issued: 09/02/2021 Finaled Close Out: 11/15/2022 Final Inspection: 11/15/2022 INSPECTOR: Renfro, Chris Balance Due: Alvarado, Tony AMOUNT $70.61 $49.43 $1.00 $0.57 $0.00 Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov PERMIT INSPECTION HISTORY for (CBRA2021-0058) Permit Type: BLDG-Associated Permit Residenti, Work Class: Deck Status: Closed -Finaled Scheduled Actual Inspection Type Date Start Date 07/26/2022 07/26/2022 BLDG-16 Insulation 08/01/2022 08/01/2022 BLDG-17 Interior Lath/Drywall 08/23/2022 08/2.3/2022 BLDG-13 Shear Panels/HD (ok to wrap) Checklist Item Application Date: 05/03/2021 Owner: CO-OWNERS RODRIGUEZ PATRICK J AND VALERIE G Issue Date: 09/02/2021 Subdivision: EL CAMINO MESA UNIT# 3 Expiration Date: 02/21/2023 Address: 2420 GARY CIR CARLSBAD, CA 92010-2804 IVR Number: 33129 Inspection No. Inspection Primary Inspector Reinspection Inspection Status 187854-2022 Passed Tony Alvarado Complete 188322-2022 Passed Tony Alvarado Complete 189693-2022 Partial Pass Chris Renfro Reinspection Incomplete COMMENTS Passed BLDG-Building Deficiency Partial pass on deck nail and shear wall under deck. Ok to wrap and coat deck Yes 11/15/2022 11/15/2022 BLDG-Final Inspection 196294-2022 Tuesday, November 15, 2022 Checklist Item BLDG-Structural Final BLDG-Electrical Final COMMENTS Passed Tony Alvarado Passed Yes Yes Complete Page 4 of 4 PERMIT INSPECTION HISTORY for (CBRA2021-0058) Permit Type: BLDG-Associated Permit Residenti, Application Date: 05/03/2021 Owner: CO-OWNERS RODRIGUEZ PATRICK J AND VALERIE G Work Class: Deck Issue Date: 09/02/2021 Subdivision: EL CAMINO MESA UNIT# 3 Status: Scheduled Date Closed -Finaled Expiration Date: 02/21/2023 Address: 2420 GARY CIR IVR Number: 33129 CARLSBAD, CA 92010-2804 Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers COMMENTS July 18, 2022:. 1. Rough combination building inspection, MEPS-partial pass. 2. Pending PVC, waste and vent lines, not under water leak 1 0 foot high water pressure test -pipe leak. 3. Contractor representative will fix leak, place under water leak pressure test. 4. Rest of rough combination MEPS scope of work -approved. July 18, 2022:. 1. Rough combination building inspection, MEPS-partial pass. 2. Pending PVC, waste and vent lines, not under water leak 1 O foot high water pressure test -pipe leak. 3. Contractor representative will fix leak, place under water leak pressure test. 4. Rest of rough combination MEPS scope of work -approved. July 18, 2022:. 1. Rough combination building inspection, MEPS-partial pass. 2. Pending PVC, waste and vent lines, not under water leak 10 foot high water pressure test -pipe leak. 3. Contractor representative will fix leak, place under water leak pressure test. 4. Rest of rough combination MEPS scope of work -approved. July 18, 2022:. 1. Rough combination building inspection, MEPS-partial pass. 2. Pending PVC, waste and vent lines, not under water leak 10 foot high water pressure test -pipe leak. 3. Contractor representative will fix leak, place under water leak pressure test. 4. Rest of rough combination MEPS scope of work -approved. July 18, 2022:. 1. Rough combination building inspection, MEPS-partial pass. 2. Pending PVC, waste and vent lines, not under water leak 10 foot high water pressure test -pipe leak. 3. Contractor representative will fix leak, place under water leak pressure test. 4. Rest of rough combination MEPS scope of work -approved. Passed Yes Yes Yes Yes Yes Tuesday, November 15, 2022 Page 3 of 4 PERMIT INSPECTION HISTORY for (CBRA2021-0058) Permit Type: BLDG-Associated Permit Residenti, Work Class: Deck Status: Closed -Finaled Scheduled Actual Inspection Type Date Start Date 07/18/2022 07/18/2022 BLDG-84 Rough Combo(14,24,34,44) Tuesday, November 15, 2022 Application Date: 05/03/2021 Owner: CO-OWNERS RODRIGUEZ PATRICK J AND VALERIE G Issue Date: 09/02/2021 Subdivision: EL CAMINO MESA UNIT# 3 Expiration Date: 02/21/2023 Address: 2420 GARY CIR CARLSBAD, CA 92010-2804 IVR Number: 33129 Inspection No. Inspection Primary Inspector Reinspection Inspection Status 187160-2022 Partial Pass Tony Alvarado Reinspection Incomplete Page 2 of 4 Building Permit Ins·pection History Finaled {city of Carlsbad PERMIT INSPECTION HISTORY for (CBRA2021-0058) Permit Type: BLDG-Associated Permit Residenti; Work Class: Deck Status: Closed -Finaled Scheduled Actual Inspection Type Date Start Date 01/06/2022 01/05/2022 BLDG-21 01/11/2022 Underground/Underflo or Plumbing 01/11/2022 BLDG-11 Foundation/Ftg/Piers (Rebar) Checklist Item Application Date: 05/03/2021 Issue Date: 09/02/2021 Expiration Date: 02/21/2023 IVR Number: 33129 Owner: CO-OWNERS RODRIGUEZ PATRICK J AND VALERIE G Subdivision: EL CAMINO MESA UNIT# 3 Address: 2420 GARY CIR CARLSBAD, CA 92010-2804 Inspection No. Inspection Primary Inspector Reinspection Inspection Status 173956-2022 Passed Tony Alvarado Complete 174242-2022 Cancelled Tony Alvarado Reinspection Incomplete COMMENTS Passed BLDG-Building Deficiency No 01/12/2022 01/14/2022 04/25/2022 05/16/2022 05/25/2022 01/12/2022 BLDG-11 Foundation/Ftg/Piers (Rebar) 01/14/2022 BLDG-12 Steel/Bond Beam Checklist Item 174402-2022 Passed Tony Alvarado 174692-2022 Passed Tony Alvarado COMMENTS BLDG-Building Deficiency All corrections addressed. Deputy special inspector report verified. Doweling into existing Footings per engineer's plans and third-party Deputy inspector report-approved. 04/25/2022 BLDG-15 Roof/ReRoof (Patio) 181236-2022 Passed Tony Alvarado Checklist Item BLDG-Building Deficiency COMMENTS April 25, 2022: 1. Roof OSB/Plywood Inspection; type of material, size, and method of attachment anchoring schedule, per plan -approved. 05/16/2022 BLDG-13 Shear Panels/HD (ok to wrap) 182803-2022 Partial Pass Chris Renfro Checklist Item BLDG-Building Deficiency COMMENTS Partial pass on shear walls and epoxy hold down. Special inspection reports collected 05/25/2022 BLDG-13 Shear Panels/HD (ok to wrap) 183503-2022 Partial Pass Chris Renfro Checklist Item BLDG-Building Deficiency COMMENTS Partial pass on shear walls on front window section only. Rear deck shear pending Tuesday, November 15, 2022 Complete Complete Passed Yes Complete Passed Yes Reinspection Incomplete Passed Yes Reinspection Incomplete Passed Yes Page 1 of 4 DAN HUFF INSPECTIONS DATE 2064 Meadowlark Ranch Circle (858) 583-3959 San Marcos, CA 92078 CERTIFIED INSPECTOR'S DAILY REPORT JOB NO. 0/ //] /2ozz COVERING WORK PERFORMED WHICH REQUIRED APPROVAL BY THE SPECIAL INSPECTOR OF JOB ADDRESS 2 DESCRIBE MATERIAL 0 REINFORCED CONCRETE O STRUCT STEEL ASSEMBLY O SPRAY-APPLIED FIREPROOFING 0 PRE-STRESSED CONCRETE '( EPOXY O OTHER _______ _ 0 REINFORCED MASONRY O WOOD FRAME R ARCHITECT ENGINEER E GENERAL CONTRACTOR DETAILED REPORT OF WORK INSPECTED LOCATION OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTEO, JOB PROBLEMS, PROGRESS, REMARKS, ETC 0 INCLUDES INFORMATION ABOUT· AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED. NUMBER, TYPE AND IDENT. NO'S OF TEST SAMPLES TAKEN, STRUCT. CONNECTIONS (WELDS MOE, H.T. BOLTS TORQUED) CHECKED; ETC : ,;...,t;i.o --. .,.., : C'.5 ~11-~D.;t l - ()(:? el ID/L SIGNATURE: DATE SIGNED: 0/ I CERTIFICATION OF COMPLIANCE: to the best of our knowledge, all of the reported work, unless otherwise noted, sustantially complies with approved plans, specifications, and applicable sections of the building codes. This report covers the locations of the work inspected only and does not constitute engineering pin Ion or project control.