04-26-2002 Residential Permit Permit No: CB012681
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title: .
Applicant:
RDA DESIGNS
Building Inspection Request Line (760) 602-2725
160 TAMARACK AV CBAD
RESDNTL Sub Type:
Lot#: 2042530500
$7,828.00 Construction Type:
RAD
0
VN
Status:
Applied:
Entered By:
Reference#: Plan Approved:
0 Structure Type: Issued:
O Bathrooms: 0 Inspect Area:
GOLDSTEIN RES/ 76 SF FOYER ADD Orig PC#:
Plan Check#:
Owner:
GOLDSTEIN FAMILY TRUST 03-27-98
160 TAMARACK AVE
CARLSBAD CA 92008
ISSUED
08/14/2001
JM
01/15/2002
04/26/2002
PO BOX 40
CARLSBAD CA 92018
760-940-6072 5967 04/26/02 0002 01 02
Total Fees: $372.12
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Inspector: '
Total Payments To Date: $272.68 Balance Due: em'-i/4 99.44
$84.29
$0.00
$54.79
$212.04
$0.00
$1.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
FINAL/4PPROVAL
Date: 5 .-/1---l 7 Clearance:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$372.12
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOA DOES IT APPLY to any
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
FOR OFFICE USE ONLY . /U?/
EST. VAL.--i:..LL.L.,h,4,.1----~.,..--,--r--,
'~--;.----+~l!Ufj
Validated By. _,,....,_,,__,_-----.C7-i,'7'".7'/-;z---f
Date. ________ ,._._-1----''--'+-'-''--+-
Business Name (at this address)
Lot No. Unit No. Phase No. Total# of units 7205 08/14/01 0002 01 02
Proposed Use F~ 272 ;S8
Desc~on of Wo7,k ,;,;..'Gr 5!z<'JV~? Ft-/!-. #of Stories # of Bedrooms # of Bathrooms
2. CONTACT'PERSON (if dlff•rent from applicant)
ir_
Name
3. APPLICANT 0 Contractor
Name Address
5, CONTRACTOR • COMPANY NAME
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
[Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]).
Name Address City State/Zip Telephone#
State License # _________ _ License Class _________ _ City Business license # _______ _
Designer Name Address City State/Zip Telephone
State License # _________ _
6. WORKERS' COMPENSATION
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
0 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
0 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My worker's compensation insurance carrier and policy number are:
Insurance Company _____________________ _ Policy No .. ____________ _ Expiration Date _______ _
{THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS 1$100) OR LESS)
0 CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compensation laws of California.
WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred
thousand dollars ($100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees.
SIGNATURE _____________________________ _
7. OWNER~8UILOER DECLARATION
I hereby affirm that I am exempt from the Contractor's License law for the following reason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
,;R' I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
0 I am exempt under Section ______ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction {include name /address/ phone number/ contractors license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work {include name / address / phone
number/ contractors license numb
0
e~,~l,~~;~~~~~=:~~~~!•-----c;,-------,,---,,,-------------------------------
5. I will provide some of the w Vsons to provide the work indicated (include name / address / phone number / type
.~~:/
~PEATY OWNER SIGNATURE
COMPLETE THIS SECTION FOR NO
DATE
Is the applicant or future buildin occupant required to submit a busineSs plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D YES D NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 YES D NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES O NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
8. CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097{i) Civil Code).
LENDER'S NAME-------------~
9. APPLICANT CERTIFICATION
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Citt of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST All LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" dee and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issu de shall expire by limitation and become null and void if the building or work
authorized by such permit is ot c ing or work authorized by such permit is suspended or abandoned
at any time after the work is com ~~~t;~~~~,~ r·:acr'-:J ode).
APPLICANT'S SIGNATURE DATE
PINK: Finance
City of Carlsbad Bldg Inspection Request
For: 03/14/2003
Permit# CB012681
Title: GOLDSTEIN RES/ 76 SF FOYER ADD
Description:
Type: RESDNTL Sub Type: RAD
Job Address:
Suite:
Location:
160 TAMARACK AV
Lot
APPLICANT RDA DESIGNS
0
Owner: GOLDSTEIN FAMILY TRUST 03-27-98
Remarks:
Total Time:
CD Description Comment
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
lns12ection Histo[Y
Date Description Act lnsp Comments
03/11/2003 89 Final Combo co PD
07/09/2002 17 Interior Lath/Drywall AP PD
07/09/2002 18 Exterior Lath/Drywall AP PD
06/27/2002 13 Shear Panels/HD's WC PD
06/27/2002 16 Insulation AP PD
06/20/2002 16 Insulation co RC SEE C.N.
06/19/2002 16 Insulation CA RC BY RON
06/17/2002 14 Frame/Steel/Bolting/Welding AP RC
06/17/2002 14 Frame/Steel/Bolting/Welding AP RC
06/17/2002 19 Final Structural WC RC
06/17/2002 34 Rough Electric AP RC
06/17/2002 39 Final Electrical WC RC
Inspector Assignment: PD ---
Phone: 7607299335
/ospecio,dL
Requested By: RON ALVAREZ
Entered By: CHRISTINE
06/12/2002 14 Frame/Steel/BoltingN/elding NR RC FLOOR BEAM NOT INSTALLED
06/12/2002 17 Interior Lath/Drywall WC RC ENGIN. FOR BEAM SIZE FILED
06/12/2002 34 Rough Electric NR RC
06/11/2002 14 Frame/Steel/Bolting/Welding CA RC BY CONTRACTOR
Inspection List
Permit#: CB012681 Type: RESDNTL RAD GOLDSTEIN RES/ 76 SF FOYER ADD
Date lnseection Item Inspector Act Comments
03/14/2003 89 Final Combo PD AP
03/14/2003 89 Final Combo RI
03/11/2003 89 Final Combo RI
03/11/2003 89 Final Combo PD co
07/09/2002 17 Interior Lath/Drywall PD AP
07/09/2002 18 Exterior Lath/Drywall PD AP
06/27/2002 13 Shear Panels/HD's PD WC
06/27/2002 16 Insulation PD AP
06/20/2002 16 Insulation RCB co SEE C.N.
06/19/2002 16 Insulation RCB CA BYRON
06/17/2002 14 Frame/Steel/Bolting/Weldin RCB AP
06/17/2002 14 Frame/Steel/Bolting/Weldin RCB AP
06/1 7 /2002 19 Final Structural RCB WC
06/17/2002 34 Rough Electric RCB AP
06/17/2002 39 Final Electrical RCB WC
06/12/2002 14 Frame/Steel/Bolting/Weldin RCB NR FLOOR BEAM NOT INSTALLED
06/12/2002 17 Interior Lath/Drywall RCB WC ENGIN. FOR BEAM SIZE FILED
06/12/2002 34 Rough Electric RCB NR
06/11/2002 14 Frame/Steel/Bolting/Weldin RCB CA BY CONTRACTOR
06/05/2002 14 Frame/Steel/Bolting/Weldin RCB co SEECN
05/09/2002 11 Fig/Foundation/Piers RCB AP OK TO POUR
Monday, March 17, 2003 Page 1 of 1
EsGi I Corporation
In Partnership with Government for Building Safety
DATE: 01/15/02
JURISDICTION: Carlsbad
PLAN CHECK NO.: 01-2681
PROJECT ADDRESS: 160 Tamarack Ave.
PROJECT NAME: Goldstein SFD Addition
SET: III
T
.
AN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
■ The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
■ Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Ron Alvarez Telephone#:
Date contacted: In person (by: ) Fax #:
Mail Telephone Fax In Person
□ REMARKS:
By: Kai Tumalieh Enclosures:
Esgil Corporation
0 GA 0 MB 0 EJ 0 PC LOG trnsmtl.dot
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
EsGil Corporation
In Partnership with Government for Building Safety
DATE: 10/23/01
JURISDICTION: Carlsbad
PLAN CHECK NO.: 01-2681
PROJECT ADDRESS: 160 Tamarack Ave.
PROJECT NAME: Goldstein SFD Addition
SET: II
□ APPLICANT ~ □ PLAN REVIEWER
□ FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
P.O. Box 40, Carlsbad, CA 92018
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
~ Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Ron Alvarez (". H) Telephone#: (760)940-6072
Date contacted: 10( l_:,/c,1 (by: I=-. ) Fax #:
Mail ~phone ,.,...,,, Fax In Person
0 REMARKS:
By: Kai Tumalieh
Esgil Corporation
□ GA □ MB O EJ □ PC
Enclosures:
10/18/01 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad 01-2681
10/23/01
NOTE: The item numbers listed below refer to the numbers from the
previous list. These items have not been adequately addressed. The notes
in bold at the end of each item are to emphasize the remaining problem.
Please provide a response list stating where each item has been
addressed on the plans.
• Please make all corrections on the original tracings, as requested in the correction list.
Submit three sets of plans for commercial/industrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted in
one of two ways:
a) Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-
2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning,
Engineering and Fire Departments.
b) Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver
all remaining sets of plans and calculations/reports directly to the City of Carlsbad
Building Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed
by the City Planning, Engineering and Fire Departments until review by EsGil
Corporation is complete.
1. All sheets of plans must be signed by the person responsible for their
preparation. (California Business and Professions Code).
2. When special inspection is required, the architect or engineer of record shall
prepare an inspection program which shall be submitted to the building official for
approval prior to issuance of the building permit. Please review Section
106.3.5. Please complete the attached form. Please complete the special
inspection form attached.
ELECTRICAL (NATIONAL ELECTRICAL CODE)
12. Note on the plans that receptacle outlet locations will comply with NEC Art.
210-52(a). Please provide receptacle outlet at north wall of bedroom. The
requested information was not submitted.
• STRUCTURAL
13. Note: the structural calculation was not submitted. Therefore; the structural
portion will not be checked at this time. Please submit complete two sets of
structural calculation. The following are only sample corrections. Additional
corrections may follow.
,
Carlsbad 01-2681
10/23/01
1. PLEASE REVISE THE CALCULATION OF FLOOR BEAM FB-2. PLEASE
INCLUDE THE LOADS FROM EXISTING FLOOR.
2. PLEASE SPECIFY THE SPACING OF NEW ROOF RAFTERS AT NEW
SETTING ROOM.
3. PLEASE REVISE THE CALCULATION OF FLOOR BEAM FB-3. REVISE
THE SPAN USED IN DESIGN AND INCLUDE ROOF LOADS IN
CALCULATION.
4. REVISE THE CALCULATION OF FLOOR BEAM FB-4. PLEASE INCLUDE
ROOF WEIGHT IN CALCULATION.
5. REVISE THE CALCULATION OF FLOOR BEAM FB-5. PLEASE VERIFY
THE TRIBUTARY WIDTH USED IN CALCULATION.
6. PLEASE EXPAND THE LATERAL CALCULATION. PROVIDE LATERAL
CALCULATION:
A) FOR SECOND FLOOR ALONG GRID LINES A & B.
B) DESIGN SECOND FLOOR AND FIRST SHEAR WALLS ALONG GRID
LINE B, FOR LATERAL LOAD FROM NEW ADDITION AND EXISTING
BUILDING PORTION.
C) PROVIDE LATERAL DESIGN FOR FIRST FLOOR ALONG GRID LINES
1, 2 AND B.
14. Provide general structural specifications on plans (wood, concrete, reinforcing
etc.). THE REQUESTED INFORMATION WAS NOT SUBMITTED.
18. Provide connection of new shear walls to existing foundations; please specify the
required expansion anchor size, spacing, minimum required edge distance,
embendment and ICBO approval number. For example for new library east wall
and existing living east wall. See sheet 4.THE REQUESTED INFORMATION
WAS NOT SUBMITTED.
20. Provide positive connection between new addition and existing building. Provide
straps from new walls at top plates to tie the existing walls. PROVIDE STRAPS
AT SECOND FLOOR LEVEL.
,
Carlsbad 01-2681
10/23/01
21. Please clarify the framing over new Foyer.
I) PLEASE CLARIFY THE ORIENTATION OF BUILDING SECTION (C/6).
SEE SHEET 4.
II) LATERAL CALCULATION IS NOT SUBMITTED. PROVIDE LATERAL
CALCULATION OR SHOW THE FOLLOWING ON THE PLANS FOR
THE REQUIRED BRACED WALL PANELS. IF THE REQUIREMENTS
OF BRACED WALL PANELS IN CONVENTIONAL LIGHT FRAME
CONSTRUCTION ARE NOT POSSIBLE, PROVIDE DESIGN
CALCULATIONS FROM A LICENSED ENGINEER OR ARCHITECT.
A) SHOW ON THE PLANS THE LOCATION, LENGTH AND TYPE OF
BRACED WALL PANEL AS PER UBC SECTION 2320.11.3 AND
TABLE 23-IV-C-1.
I) BRACED WALL PANELS SHALL START AT NOT MORE THAN
8' FROM EACH END OF A BRACED WALL LINE.
II) BRACED WALL LINES SHALL BE IN LINE OR OFFSET FROM
EACH OTHER BY NOT MORE THAN 4 FEET.
B) ANY BRACED WALL PANEL REQUIRED BY SECTION 2320.11.3
MAY BE REPLACED BY AN AL TERNA TE BRACED WALL PANEL.
UBC SECTION 2320.11.4. FOR ALTERNATE BRACED WALL
PANELS IN ONE STORY BUILDINGS, SHOW COMPLIANCE WITH
THE FOLLOWING ON THE PLANS:
Ill) MINIMUM BRACED PANEL LENGTH IS 2'-8" IN WIDTH AND A
MAXIMUM HEIGHT OF 10'-0".
IV) EACH BRACED WALL PANEL IS SHEATHED ON AT LEAST
ONE FACE WITH 3/8" PLYWOOD SHEATHING NAILED WITH
8D COMMON OR GALVANIZED BOX NAILS PER 23-11-8-1 AND
BLOCKED AT ALL PLYWOOD EDGES.
V) A MINIMUM OF TWO ANCHOR BOLTS INSTALLED IN
ACCORDANCE WITH SECTION1806.6 BETWEEN HOLD DOWN
DEVICES.
VI) AN APPROVED HOLD DOWN DEVICE FASTENED TO THE
FOUNDATION AND CAPABLE OF PROVIDING AN UPLIFT
CAPACITY OF NOT LESS THAN 1,800 POUNDS IS PROVIDED
AT EACH PANEL END.
• CITY SPECIAL REQUIREMENTS:
22. All new residential buildings, including additions, require a soils report. An
update letter is required if the report is more than 3 years old. If a room addition is
less than 1000 sq. ft. in area and only one story. Provide soil report your addition
is two story. PROVIDE FOUNDATION HORIZONTAL SETBACK FROM FACE IF
DESCENDING SLOPE AND /OR RETAINING WALLS FOR ALL STRUCTURAL
FOOTING. PER SOIL REPORT RECOMMENDATION ON PAGE 12. ARE
THERE SLOPES AND RETAINING WALLS ON SITE PLANS?
Carlsbad 01-2681
10/23/01
To speed up the review process, note on this list (or a copy) where each correction item
has been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a result
of corrections from this list. If there are other changes, please briefly describe them and
where they are located in the plans.
Have changes been made to the plans not resulting from this correction list? Please
indicate:
Yes □ No □
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact Kai Tumalieh at Esgil Corporation. Thank you.
EsGil Corporation
In Partnership with Government for Building Safety
DATE: 08/23/01
JURISDICTION: Carlsbad
PLAN CHECK NO.: 01-2681
PROJECT ADDRESS: 160 Tamarack Ave.
PROJECT NAME: Goldstein SFD Addition
SET: I
□ APPIDNT Q JURIS.
□ PLAN REVIEWER
□ FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
P.O. Box 40, Carlsbad, CA 92018
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
~ Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Ron Alvarez ( v',H.) Telephone#: (760)940-6072
Date ~d: e.-:l.4-0 1 (by:~) Fax #:
Mail/ Telephone_,, Fax In Person
0 REMARKS:
By: Kai Tumalieh
Esgil Corporation
0 GA O MB O EJ O PC
Enclosures:
08/16/01 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad 01-2681
08/23/01
PLAN REVIEW CORRECTION LIST
SINGLE FAMILY DWELLINGS AND DUPLEXES
PLAN CHECK NO.: 01-2681 JURISDICTION: Carlsbad
PROJECT ADDRESS: 160 Tamarack Ave.
FLOOR AREA: 650 Addition
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION:
DATE INITIAL PLAN REVIEW
COMPLETED: 08/23/01
FOREWORD (PLEASE READ):
STORIES: Two
HEIGHT: 22 ' -6" (App. per UBC)
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 08/16/01
PLAN REVIEWER: Kal Tumalieh
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinance by the Planning Department, Engineering Department, Fire
Department or other departments. Clearance from those departments may be required prior to
the issuance of a building permit.
Present California law mandates that residential construction comply with the 1998 edition of
the California Building Code (Title 24 ), which adopts the following model codes: 1997 UBC,
1997 UPC, 1997 UMC and 1996 NEC (all effective 7/1/99).
The above regulations apply to residential construction, regardless of the code editions adopted
by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process. please note on this list (or a copy} where each
correction item has been addressed. i.e .• plan sheet number. specification section. etc.
Be sure to enclose the marked up list when you submit the revised plans.
Carlsbad 01-2681
08/23/01
1. Please make all corrections on the original tracings, as requested in the correction
list. Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
a) Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
b) Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
2. On the cover sheet of the plans, specify any items requiring special inspection, in
a format similar to that shown below. Section 106.3.2.
• REQUIRED SPECIAL INSPECTIONS
In addition to the regular inspections, the following checked items will also require
Special Inspection in accordance with Sec. 1701 of the Uniform Building Code.
ITEM REQUIRED? REMARKS
EXPANSION/EPOXY ANCHORS
3. When special inspection is required, the architect or engineer of record shall
prepare an inspection program which shall be submitted to the building official for
approval prior to issuance of the building permit. Please review Section
106.3.5. Please complete the attached form.
4. Glazing in the following locations should be of safety glazing material in
accordance with Section 2406.4 :
a) Fixed or operable panels adjacent to a door where the nearest exposed
edge of the glazing is within a 24-inch arc of either vertical edge of the door
in a closed position and where the bottom exposed edge of the glazing is
less than 60 inches above the walking surface. Window adjacent of door in
bedroom.
5. Specify roof material and application. Chapter 15. At new flat roof.
6. Per local ordinance, a Class A roof is required.
7. Show roof drains and overflows. Sections 1506.2 and 1506.3.
Carlsbad 01-2681
08/23/01
• ENERGY CONSERVATION
8. Note on the plans: "The manufactured windows shall have a label attached
certified by the National Fenestration Rating Council (NFRC) and showing
compliance with the energy calculations."
9. The version of the computer program that you have used is no longer current.
Provide new calculations, using acceptable updated residential computer energy
programs. As of June 1, 2001, they are the following:
• Micropas 6.00 & 6.01
• EnergyPro 3.0, 3. You are using version 2.1. Please revise your
energy calculation.
10. Show the efficiency of the space heating (or cooling) system. Is the existing FAU
unit capable of heating the existing building and new addition?
ELECTRICAL (NATIONAL ELECTRICAL CODE)
11.,_ Show on the plan the amperage of the electrical service, the location of the
service panel and the location of any sub-panels. If service is over 200 amps,
submit single line diagram, panel schedule and load calculations. Are upgrading
the electrical service due to the new addition?
12. Note on the plans that receptacle outlet locations will comply with NEC Art.
210-52(a). Please provide receptacle outlet at north wall of bedroom.
• STRUCTURAL
13. Note: the structural calculation was not submitted. Therefore; the structural
portion will not be checked at this time. Please submit complete two sets of
structural calculation. The following are only sample corrections. Additional
corrections may follow.
14. Provide general structural specifications on plans (wood, concrete, reinforcing
etc.).
15. Please specify new slab on grade thickness and reinforcement on plans.
16. Note cross bridging or blocking. Floor joists and rafters 12" or more in depth shall
be supported laterally by bridging at intervals not exceeding 8 feet, unless both
edges are held inline. Sec. 2306.7.
17. Show nailing will be in compliance with Table 23-11-8-1.
Carlsbad 01-2681
08/23/01
18. Provide connection of new shear walls to existing foundations; please specify the
required expansion anchor size, spacing, minimum required edge distance,
embendment and ICBO approval number. For example for new library east wall
and existing living east wall. See sheet 4.
19. Please extend of the second floor new shear wall at east of ( e) office to
foundation, or show how you to transfer the lateral load to foundation.
20. Provide positive connection between new addition and existing building. Provide
straps from new walls at top plates to tie the existing walls.
21. Please clarify the framing over new Foyer.
A) Are the floor joists (2x12 @16" o/c) Existing or new.
b) Provide detail to show support of floor joist at north side. See sheet 4.
C) Provide north -South building section through the new foyer.
• CITY SPECIAL REQUIREMENTS:
22. All new residential buildings, including additions, require a soils report. An
update letter is required if the report is more than 3 years old. If a room addition is
less than 1000 sq. ft. in area and only one story. Provide soil report your
addition is two story.
23. Overflow roof drains shall terminate in an area where they will be readily visible
and will not cause damage to the building. If the roof drain terminates through a
wall, the overflow drain shall terminate 12" minimum above the roof drain. Policy
84-35.
To speed up the review process, note on this list (or a copy) where each correction item
has been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a result
of corrections from this list. If there are other changes, please briefly describe them and
where they are located in the plans.
Have changes been made to the plans not resulting from this correction list? Please
indicate:
Yes □ No □
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact Kai Tumalieh at Esgil Corporation. Thank you.
Carlsbad 01-2681
08/23/01
NOTICE OF REQUIREMENT FOR SPECIAL INSPECTION
Do Not Remove From Plans
Plan Check No. 01-2681
Job Address or Legal Description 160 Tamarack Ave.
Owner _____________ Address. ________________ _
You are hereby notified that in addition to the inspection of construction provided by the
Building Department, an approved Registered Special Inspector is required to provide continuous
inspection during the performance of the phases of construction indicated on the reverse side of
this sheet.
The Registered Special Inspector shall be approved by the City of Carlsbad Building
Department prior to the issuance of the building permit. Special Inspectors having a
current certification from the City of San Diego, Los Angeles, or ICBO are approved as
Special Inspectors for the type of construction for which they are certified.
The inspections by a Special Inspector do not change the requirements for inspections by
personnel of the City of Carlsbad building department. The inspections by a Special
Inspector are in addition to the inspections normally required by the County Building
Code.
The Special Inspector is not authorized to inspect and approve any work other than that for which
he/she is specifically assigned to inspect. The Special Inspector is not authorized to accept
alternate materials, structural changes, or any requests for plan changes. The Special Inspector is
required to submit written reports to the City of Carlsbad building department of all work that
he/she inspected and approved. The final inspection approval will not be given until all Special
Inspection reports have been received and approved by the City of Carlsbad building department.
Please submit the names of the inspectors who will perform the special inspections on each of the
items indicated on the reverse side of this sheet.
(over)
2o·d
Carlsbad 01-2681
10/23/01
SPECIAL INSPECTION PROGRAM
ADDRESS OR LEGAL DESCRIPTION: / ~ () TAM JtA c.)< A ti F,. CA/l<Pl..f ..15.417 c.,d
PLAN CHECK NUMBER: ()/-2,#f OWNER'S NAME: (iOL.t) ~Jc,V
I, as the owner, or agent of the owner (contractors may not employ the special inspector),
certify that I, or the architecVengineer of record, will be responsible for employing the special
inspector(s) as required by Uniform Building Code (UBC) Section 1701.1 for the construction
project loc ed at the site list bove. UBC Section 106.3.5.
I, as the engineer/architect ofrecord, certify that I have prepared the following special inspection
program as required by URC Section 106.3.5 for the construction project located al the site listed above.
1. List of work requiring special inspection:
□0 Soils Compliance Prior to Foundation Inspection
Structural Concrete Over 2500 PSI 0 Prestressed Concrete
0 Structural Masonry D Designer Specified
EnalnNr"&IAr'-"'it.ct'a ,..I "'~
' ~< I.
'\ \
0 Fie D High Strength Bolting
~ Expansion/Epoxy Anchors 0 Sprayed-On Fireproofing 0 Other _____ _
2. Name(s) of indlvldual(s) or firm(s) responsible for the special inspections listed
above:
A. &IIS!dM g'J)6/AJ&E'l<.!Nt
B. ---------------------------------
C. ---------------------------------
3. Duties of the speclal Inspectors for the work listed above:
A.
B.
C.
Special inspectors shall check in with the City and present their credentials for approval lm2tJg beginning wor1( on the Job site.
2L09-0t>6-09L
Carlsbad 01-2681
08/23/01
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 01-2681
PREPARED BY: Kai Tumalieh DATE: 08/23/01
BUILDING ADDRESS: 160 Tamarack Ave.
BUILDING OCCUPANCY: R-3/U-l TYPE OF CONSTRUCTION: VN
BUILDING AREA Valuation Reg. VALUE
PORTION ( Sq. Ft.) Multiplier Mod.
Room Addition 650 City Val.
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
Bldg. Permit Fee by Ordinance 1..-1
Plan Check Fee by Ordinance Fl
Type of Review: 0 Complete Review O Structural Only
0 Repetitive Fee CG Repeats
Comments:
0 Other
D Hourly .__ ___ __.I Hour •
Esgil Plan Review Fee
($)
66,950
66,950
s410.s1 I
$266.831
$229.891
Sheet 1 of 1
macvalue .doc
•
City of Carlsbad
l@Nlt◄ii·ii!f4111¥1,1·■■,1441 ■,1·1
BUILDING PLANCHECK CHECKLIST
DATE: C,"5 (;JC[ {::Jt,C I PLANCHECK NO.: CB CA ;} (_c, ~( I
BUILDING ADDRESS: \ i..cC -i-t,-\,v\A(2._>\LCl. 4uC
PROJECT DESCRIPTION: 4kb JZ 1-\: 9
ASSESSOR'S PARCEL NUMBER: O(_<-/ ~ ~:;;5"' -(L,-;-EST. VALUE: u;;G_·,9S--C;
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
A Right-of-Way permit is required prior to
construction of the following improvements:
DENIAL
Please see the attached report of deficiencies
marked with □. Make necessary corrections to plans
or specifications for compliance with applicable
codes and standards. Submit corrected plans and/or
specifications to this office for review.
By: Date:
By: Date: ---------
By: ---------Date:
FOR OFFICIAL USE ONLY
ERING AUTHORIZATION TO ISSUE BUILDING PERMIT:
B
_.,.,.-
ATTACHMENTS
Dedication Application
Dedication Checklist
Improvement Application
Improvement Checklist
Future Improvement Agreement
Grading Permit Application
Grading Submittal Checklist
Right-of-Way Permit Application
Right-of-Way Permit Submittal Checklist
and Information Sheet
Sewer Fee Information Sheet
Date: C ![()9 /4~-<:•:1 (
ENGINEERING DEPT. CONTACT PERSON
Name: Casey R. Arndt
City of Carlsbad
Address: 1635 Faraday Avenue, Carlsbad, CA 92008
Phone: (760) 602-2775
CFO INFORMATION
Parcel Map No:
Lots:
Recordation:
Carlsbad Tract:
BUILDING PLANCHECK CHECKLIST
SITE PLAN
3RD
D 1. Provide a fully dimensioned site plan drawn to scale. Show:
~North Arrow /Right-of-Way Width & Adjacent Streets
~Existing & Proposed Structures ~Driveway widths
b-f:xisting Street Improvements /M/ Existing or proposed sewer lateral
,Ef.,,,Property Lines /!-/Existing or proposed water service
. .e'.' Easements ~-Existing or proposed irrigation service
D 2. Show on site plan:
~
Dr ·nage Patterns
. Building pad surface drainage must maintain a minimum slope of one
forcent towards an adjoining street or an approved drainage course .
.,ef. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
_,✓.:'drainage of 2% to swale 5' away from building."
):-" ~isling & Proposed Slopes and Topography y. ~rze, type, location, alignment of existing or proposed sewer and water service (s)
that serves the project. Each unit requires a separate service, however, second nwelling units and apartment complexes are an exception.
ewer and water laterals should not be located within proposed driveways, per
andards.
D 3. Include on title sheet:
Aite address
%, ~sessor's Parcel Number
,_J;<Legal Description
For commercial/industrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
H:\Development Services\MASTEAS\CHECKLISTS\Building Plancheck Cklst Form doc 2 Rev 7114/00
□ □
□ □ □
□ □
□ □
BUILDING PLANCHECK CHECKLIST
DISCRETIONARY APPROVAL COMPLIANCE
4a. Project does not comply with the following Engineering Conditions of approval for
Project No. ________________________ _
4b. All conditions are in compliance. Date: __________ _
DEDICATION REQUIREMENTS
5. Dedication tor all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ 15 000 , pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows: _________________ _
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 ½" x 11" plat map and
submit with a title report. All easement documents must be approved and signed
by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the
Engineering Department in person. Applications will not be accept by mail or fax.
Dedication completed by: ___________ _ Date: ____ _
IMPROVEMENT REQUIREMENTS
6a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the
construction exceeds $ 75.000 , pursuant to Carlsbad Municipal Code Section
18.40.040.
Public improvements required as follows: _____________ _
Attached please find an application form and submittal checklist for the public
improvement requirements. A registered Civil Engineer must prepare the
appropriate improvement plans and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process. The completed application form and the requirements on the
H \Oevelopmen1 Serv1ces\MASTERSICHECKLISTS\Buik11r>g Plarichook Cklst Fann.doc 3 Rev 7/14/00
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
□ □ □
BUILDING PLANCHECK CHECKLIST
checklist must be submitted in person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit.
Improvement Plans signed by: _________ _ Date: ____ _
6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $31 O so we may
prepare the necessary Future Improvement Agreement. This agreement must be
signed, notarized and approved by the City prior to issuance of a Building permit.
Future public improvements required as follows:
6c. Enclosed please find your Future Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Future Improvement Agreement completed by:
Date:
6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adjacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities (cut, fill import, export).
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Grading Permit must be issued and rough grading
approval obtained prior to issuance of a Building Permit.
Grading Inspector sign off by: Date: -----------
7c. Graded Pad Certification required. (Note: Pad certification may be required even
if a grading permit is not required.)
H \Development Services\MASTERSICHECKLISTS\Building P/ancheck Cklst Form.doc 4 R"" 7/14/00
□ □
□
□ □
□ □ □
□
BUILDING PLANCHECK CHECKLIST
7d .No Grading Permit required.
7e. If grading is not required, write "No Grading" on plot plan.
MISCELLANEOUS PERMITS
8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tying
into public storm drain, sewer and water utilities.
Right-of-Way permit required for:
9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153,
for assistance.
Industrial Waste permit accepted by:
Date:
10. NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first.
11. O Required fees are attached
D No fees required
WATER METER REVIEW
12a. Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during /ow-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used.
• All single family dwelling units received "standard" 1" service with 5/8" service.
H.\Development Serv1ceslMASTEAS\CHECKLISTSIBu1lding Plancheck Cklat Form doc 5 Rev 7114/00
□ □ □ 12b.
BUILDING PLANCHECK CHECKLIST
• If owner/developer proposes a size other than the "standard"', then
owner/developer must provide potable water demand calculations,
which include total fixture counts and maximum water demand in gallons
per minute (gpm). A typical fixture count and water demand worksheet is
attached. Once the gpm is provided, check against the "meter sizing
schedule" to verify the anticipated meter size for the unit.
• Maximum service and meter size is a 2" service with a 2" meter.
• If a developer is proposing a meter greater than 2", suggest the
installation of multiple 2" services as needed to provide the anticipated
demand. (manifolds are considered on case by case basis to limit
multiple trenching into the street).
Irrigation Use (where recycled water is not available)
All irrigation meters must be sized via irrigation calculations (in gpm) prior
to approval. The developer must provide these calculations. Please follow
these guidelines:
1. If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled "I",
and potable water is typically a circled "W". The irrigation service should
look like:
STA 1 +00 Install 2" service and
1.5: meter (estimated 100 gpm)
2. If the improvement plans do not list the irrigation meter and the
service/meter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
irrigation demand (largest zone with the farthest reach). Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use. Once
you have received a good example of irrigation calculations, keep a set for
your reference. In general the calculations will include:
• Hydraulic grade line
• Elevation at point of connection (POC)
• Pressure at POC in pounds per square inch (PSI)
• Worse case zone (largest, farthest away from valve
• Total Sprinkler heads listed (with gpm use per head)
• Include a 10% residual pressure at point of connection
3. In general, all major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA). As long as the project is located within the City recycled water
H·\Oevelopment Services\MASTERS\CHECKLISTS\Building Plaricheck Cklat Form.doc 6 Rav 7114/00
□ □ □
□ □ □
BUILDING PLANCHECK CHECKLIST
service boundary, the City intends on switching these irrigation
services/meters to a new recycled water line in the future.
12c. Irrigation Use (where recycled water is available)
1. Recycled water meters are sized the same as the irrigation meter above.
2. If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, this should have been identified, and implemented on the
improvement plans. Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees. However, if they front a street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay the San Diego
Water Capacity Charge. If within three years, the recycled water line is
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a refund.
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this.
13. Additional Comments:
H \08v8lopmenl Services\MASTERS\CHECKLISTS\Building Plaricheck Cklst Form.doc 7 Rev 7114/00
~ ~ ~ ~
N M " " ~ ~ ~ ~ ~ u u
C C C rn ~ ~ a:
f □
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLI~ n
Plan Check No. CB CJ/ :) b?J/ Address / btJ /flf,f'd,
Planner Greg Fio/)er
APN: 07 -;JS.) ~0 -
Phone (760) 602-4629 ______ _
(For non-residential development: Type of land used created by
this permit: _____________________ )
Legend: ~ Item Complete D Item Incomplete -Needs your action
Environmental Review Required: YES NO TYPE -----
DATE OF COMPLETION: ______ _
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
D D Discretionary Action Required: YES NO TYPE -----
APPROVAL/RESO. NO. _____ DATE ___ _
PROJECT NO. _______ _
OTHER RELATED CASES: __________________ _
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: -------------------------
Coastal Zone Assessment/Compliance \(
Project site located in Coastal Zone? YES~ NO
CA Coastal Commission Authority? YES NO I/
If California Coastal Commission Authority: Contact them a~1 11
200, San Diego CA 92108-1725; (619) 521-8036
Determine status (Coastal Permit Required or Exempt):
Ca ino Del Rf North, Suite
Coastal Permit Determination Form already completed? YES
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow-Up Actions:
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum
Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
H:IAOMIN\COUNTER\BldgPlnchkRevChklst
□□□
ffiJ □ □
r□ □
□
□□□
lnclusionary Housing Fee required: YES NO 'F
(Effective date of lnclusionary Housing Ordinance -May 21, 1993.) r
Data Entry Completed? YES __ NO __
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!)
Site Plan:
1. Provide a fully dimensional site plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines.
2. Provide legal description of property and assessor's parcel number.
Zoning:
1. Setbacks: f}q J') Front: Required Shown
Interior Side: Required ~ Shown ~
Street Side: Required / Shown ----
Rear: Required ! () Shown £5_.
2. Accessory structure setbacks: ---------Front: f'leqtlfrecr-Shown / Interior Side: Required Shown
Street Side· Required Shown
Rear: Required Shown
cture separation: Required Shown
3. Lot Coverage: Required ~60 Shown L£ot
4. Height: fl~t,r "•t:r ~ ;J-,vf Shown c) 2-.
' ~o;;i::, L 2---5. Parking: Spaces Required Shown
Guest Spaces Required -Shown -
Additional Comments
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER
H:\ADMIN\COUNTER\BldgPlnchkRevChklst