HomeMy WebLinkAbout2091 RUTHERFORD RD; B; CBC2022-0184; PermitBuilding Permit Finaled
(city of
Carlsbad
Commercial Permit
Print Date: 12/01/2022 Permit No: CBC2022-0184
Job Address: 2091 RUTHERFORD RD, # B, CARLSBAD, CA 92008-7316 Status: Closed -Finaled
Permit Type: BLDG-Commercial Work Class: Tenant Improvement
Parcel#: 2121202500 Track#:
Valuation: $201,806.28 Lot#:
Occupancy Group: B & S-1 Project#:
#of Dwelling Units: Plan#:
Bedrooms:
Bathrooms:
Construction Type:V-B
Orig. Plan Check#:
Occupant Load: 162 Plan Check#:
Code Edition: 2019
Sprinkled: Yes
Project Title:
Description: PROLOGIS: COM-Tl (1,926 SF) NON-STRUCTURAL
FEE
BUILDING PLAN CHECK
Property Owner:
DC T RUTHERFORD LLC
PO BOX 173382
DENVER, CO 80217
(303) 597-2400
BUILDING PLAN REVIEW -MINOR PROJECTS (LDE)
BUILDING PLAN REVIEW -MINOR PROJECTS (PLN)
CERTIFICATE OF OCCUPANCY
COMM/IND Tl -NON-STRUCTURAL
SB1473 -GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMIP)
Total Fees: $1,912.29 Total Payments To Date: $1,912.29
Applied: 06/01/2022
Issued: 07/26/2022
Finaled Close Out: 12/01/2022
Final Inspection: 11/17/2022
INSPECTOR: Renfro, Chris
Contractor:
FAITH INDUSTRIES CONSTRUCTION INC
1308 LAS LOMAS DR
BREA, CA 92821-1930
(562) 458-6104
Balance Due:
AMOUNT
$606.58
$194.00
$98.00
$15.00
$933.20
$9.00
$56.51
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
Job Address 2091 RUTHERFORD ROAD
COMMERCIAL
BUILDING PERMIT
APPLICATION
8-2
Plan Check C.:f2l::.'l.o'ZZ h O L B't
Est. Value JI 2.011 ft31?, ~
PC Deposit .# '10'1• 6''2
Date ~-l-'2.o-ZZ--
Suite: B APN: 2121202500 ·-----
Tenant Name#: CARLSBAD DISTRIBUTION CENTER Lot #:._5_1 ___ Year Built: ________ _
Year Built:. __ _ Occupancy: B & S-1 Construction Type: V-B Fire sprinklers:(:)YES0NO A/C:0YES0No
BRIEF DESCRIPTION OF WORK: THE PROJECT SHALL CONSIST OF APPROXIMATELY 1,926 S.F. OF INTERIOR TENANT IMPROVEMENTS
FOR USE OF OFFICES.
D Addition/New:. ___________ New SF and Use,. _________ New SF and Use
______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
li!Tenant Improvement: _____ SF, Existing Use: _______ Proposed Use: ______ _
_ 1._92_6 ___ SF, Existing Use: OFFICE Proposed Use: _o_FF_1c_E ____ _
D Other: -------;1o~e:..c:e-.~i.,...,f::.....i::::,A.-:L-c:::..>,,<."'--~--l_o_A-.:........:.t).,_____,(lc----'-t_..t,,IE.02..--)-+-------------
PRIMARY APPLICANT
Name:.MU'l ~48U'.'D4 7t.R&~ S' ... t 11,1..
Address: 333 ELE CAMINO REAL
City: TESTIN State:._C_A __ Zip:92780
Phone: (714) 832-4616
Email: HNGUYEN@RENGELARCH.COM
DESIGN PROFESSIONAL
Name: RENGEL+COMPANY ARCHITECTS, INC
Address: 333 El CAMINO REAL
.JUtJ O 1 2022
PROPERTY OWNER Cll Y Ut t..._; AD
Name: PROLOGIS Bl I J
Address: 17777 CENTER COURT DRIVE NORTH, SUITE 100
City: CERRITOS
Phone: (562) 376-9242
State: CA Zip:._9_07_0_3 __ _
Email: TBRANGERS@PROLOGIS.COM
CONTRACTOR OF RECORD TS 7J
Business Name: _______________ _
Address: _________________ _
City: TUSTIN State:_C_A __ Zip: 92780 City:. _______ State:, ___ .Zip: ______ _
Phone: (714) 832-3333 Phone: __________________ _
Email: RRENGEL@RENGELARCH.COM Email: __________________ _
Architect State License: _c_14_1_9_9 ________ CSLB License #:. _______ Class:. ______ _
Carlsbad Business License# (Required): _______ _
APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. /agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): HUY NGUYEN SIGN:~
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719
05/02/2022
DATE:-------
Email: Building@carlsbadca.gov
REV. 04/22
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2022-0184)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 06/01/2022 Owner: DC T RUTHERFORD LLC
Issue Date: 07/26/2022 Subdivision: CARLSBAD TCT#85-24 UNIT#04
Status: Closed -Finaled Expiration Date: 02/06/2023
IVR Number: 40982
Address: 2091 RUTHERFORD RD, # B
CARLSBAD, CA 92008-7316
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector
Date Start Date Status
08/02/2022 08/02/2022 BLDG-84 Rough 188268-2022 Partial Pass Chris Renfro
Combo(14,24,34,44)
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
Partial pass rough combo in walls only.
08/09/2022 08/09/2022 BLDG-17 Interior 188842-2022 Passed Chris Renfro
Lath/Drywall
Checklist Item COMMENTS
BLDG-Building Deficiency
09/22/2022 09/22/2022 BLDG-Final Inspection 192267-2022 Failed Chris Renfro
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
Not ready. Need final paperwork. Need to
shut down power to check Egress and
emergency exit signs. Fire extinguisher
needs to be installed in cabinet. Call for
final inspection when complete
11/17/2022 11/17/2022 BLDG-Final Inspection 196802-2022 Passed Chris Renfro
Thursday, December 1, 2022
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
Reinspection Inspection
Reinspection
Passed
No
Yes
Yes
Yes
Yes
Passed
Yes
Reinspection
Passed
No
No
No
No
No
Passed
Yes
Yes
Yes
Yes
Yes
Incomplete
Complete
Incomplete
Complete
Page 1 of 1
OFFICE USE ONLY SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
RECORD ID# _________________ _
PLAN CHECK# __________________ 1
BP DATE
~ Telephone# 17&:;J-,➔76. ?'
State
Cf;::
Zip Code o<:B APN# 0
Plan File#
D
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San
Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous ma\erials. If any of the items are circled,
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
~ Other Health Hazards (}Y None of These.
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISION (HMD): if the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy:
YES t-JQ," (for new construction or remodeling projects)
1. D 121' _ Is your business listed on the reverse side of this form? (check all that apply).
2. 0 Ejj/ Will your business dispose of Hazardous Substances or Medical Waste in any amount?
3. 0 4,1' Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
4.
5.
6.
7.
8.
□ □ □ □ □
pounds and/or 200 cubic feet? I Will your business store or handle carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
0 CalARP Exempt
I
Date Initials
0 CalARP Required
I
Date Initials
0 CalARP Complete
I
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD): The following questions are intended to identify the majority of air pollution
issues at the planning stage. Your project may require additional measures not identified by these questions. Some residential projects may be exempt from APCD
requirements. If yes is answered for either questions 1, 2 or 5 or for more comprehensive requirements, please contact APCD at apcdcomp@sdcounty.ca.gov;
(858) 586-2650; or 10124 Old Grove Road, San Diego, CA 92131 .
YES f 1. D Will the project disturb 100 square feet or more of existing building materials?
2. D Will any load supporting structural members be removed?
3. D O (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPA-approved
building inspector course?
4. 0 D (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, a
notification may be required at least 1 O working days prior to commencing asbestos removal. Additionally, a notification may be required prior to
1 / the removal of a load supporting structural member(s) regardless of the presence of asbestos.
5. D Ll Will the project or associated construction equipment emit air contaminants? See the reverse side of this form for typical equipment requiring an
• / APCD permit. if yes, contact APCD prior to the issuance of a building permit.
6. 0 10" (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda ?
Briefly describe business activities: Briefly des ribe proposed project: ,., 9
Date
FIRE DEPARTMENT
BY· DATE· I I
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMD• APCD COUNTY-HMD APCD COUNTY-HMD APCD
.. *A stamp m this box onlv exempts businesses from completing or updating a Hazardous Materials Business Pian. Other permitting requirements may still apply
HM-9171 (9/18) County of San Diego -DEH -Hazardous Materials Division
Ccicyof
Carlsbad
STORM WATER STANDARDS
QUESTIONNAIRE
E-34
Development Services
Land Development Engineering
1635 Faraday Avenue
442-339-2750
www.carlsbadca.gov
I JC I o INSTRUCTIONS: :)
To address post-development pollutants that may be generated from development projects, the city requires that new
development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management
Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer
to the Engineering Standards (Volume 5).
This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water
standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your
project will either be subject to 'STANDARD PROJECT' requirements, 'STANDARD PROJECT' with TRASH CAPTURE
REQUIREMENTS, or be subject to 'PRIORITY DEVELOPMENT PROJECT' (POP) requirements.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City
staff has responsibility for making the final assessment after submission of the development application. If staff determines
that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed
by you, this will result in the return of the development application as incomplete. In this case, please make the changes to
the questionnaire and resubmit to the city.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the
questions, please seek assistance from Land Development Engineering staff.
A completed and signed questionnaire must be submitted with each development project application. Only one completed
and signed questionnaire is required when multiple development applications for the same project are submitted
concurrently.
PROJECT INFORMATION
PROJECT NAME: f' t--,P t--e? e, I _s ~ &:'W/vM--APN:
,
ADDRESS: J-;JC?( ~L/rf7/2P /l-0.
The project is (check one): D New Development D Redevelopment Iv· A
The total proposed disturbed area is: ft2 ( ) acres Ix 1 A-
The total proposed newly created and/or replaced impervious area is: ft2 ( ) acres /'I.' It--
If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the
SWQMP # of the larger development project:
Project ID SWQMP#:
Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city. (v < ,,\:
This Box for City Use Only
YES NO Date: Project ID:
City Concurrence:
□ □ By:
E-34 Page 1 of 4 REV 02/22
;
STEP1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a "development project", please answer the following question:
YES NO
Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building
or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? □ ti
If you answered "yes" to the above question, provide justification below then go to Step 6, mark the box stating "my project
is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information.
Justification/discussion: (e.g. the project includes only interior remodels within an existing building):
If you answered "no" to the above question, the project is a 'development project', go to Step 2.
STEP2
TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS
To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer
the following questions:
Is your project LIMITED to one or more of the following:
YES NO
1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria:
a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-ti erodible permeable areas; OR □ b) Designed and constructed to be hydraulically disconnected from paved streets or roads; OR
c) Designed and constructed with permeable pavements or surfaces in accordance with US EPA
Green Streets auidance? /
2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ it(/ accordance with the USEPA Green Streets guidance?
3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ Ef'
If you answered "yes· to one or more of the above questions, provide discussion/justification below, then go to Step 6, mark
the second box stating "my project is EXEMPT from PDP ... " and complete applicant information.
Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with
the USEPA Green Street guidance):
If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3.
E-34 Page 2 of 4 REV 02/22
,
f
i r:"' ,-· ~,:1;· ,;: ixi• wM•Q1mr~~y¥~ltwt111;~•1~~ ·:;· ···w-t-B11R1•!~fi'l5111il v,,, -¾1 'Ti"i _,, .. '"' \ j:, 0f_:ff':<p lj;;,,Cl~" m ;, "°1 tJ§eY l , ,.,, ¾ d7. t1S-0 ' @% '1t J,;•,;~11l,. it,.< I .r,sw ti"'" ;; " '
;;;,,:: 11t r,;:; ;)l:«i/~;s . , " • , 4~ .. ~ 1
1 ~ ,
1
,
1
~ ~-" ,,' I, ' ", w • , ~ / Ut f'>?::tB:!Mt:: ';~~~~&:1;!1!:;'.:¥,~ yJ
l ;; t '"" ;; «, dS_E fi ((,.,J'?, ti:~°'X v ~" i"'.) ;ti-1,;i'/:~ ,;;/Ji;~ ,/'§¾< 1', h' ~ \ ¾f./18.fil.J'{~ :tf½-~G-i30¼11< i'/h,;~~4Hfl}'[f£i~~~l~Jfi~~@f~,0fjf~Wcl,h:;:ic;,t".,;_ff m" ¼r.df@%¾.",W, f' ffi~l)Yr ,tjjfji~ q =,
To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )):
YES NO
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces □ ~ collectively over the entire project site? This includes commercial, industrial, residential, mixed-use,
and public development projects on public or private land.
2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious ~v surface collectively over the entire project site on an existing site of 10,000 square feet or more of □ impervious surface? This includes commercial, industrial, residential, mixed-use, and public
development projects on public or private land.
3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of
impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a □ 1]2)/ facility that sells prepared foods and drinks for consumption, including stationary lunch counters and
refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial
Classification (SIC) code 5812).
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious
□ [b/ surface collectively over the entire project site and supports a hillside development project? A hillside
development project includes development on any natural slope that is twenty-five percent or areater.
5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of
ml impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a □ land area or facility for the temporary parking or storage of motor vehicles used personally for
business or for commerce.
6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious street, road, highway, freeway or driveway surface collectively over the entire project □ ci/ site? A street, road, highway, freeway or driveway is any paved impervious surface used for the
transportation of automobiles, trucks, motorcycles, and other vehicles.
7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of
impervious surface collectively over the entire site, and discharges directly to an Environmentally □ It!/ Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200
feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an
isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).*
8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square « feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC)
codes: 5013, 5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square ~ feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily
Traffic (ADT) of 100 or more vehicles per day.
10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land □ [0/
and are expected to generate pollutants post construction?
11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of ct( impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC □ 21.203.040)
If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment
project, go to step 4. If your project is a new project, go to step 6, check the first box stating, "My project is a PDP ... " and
complete applicant information.
If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT'. Go to step 5, complete the
trash capture questions ..
• Environmentally Sensitive Areas include but are not hm1ted to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special
Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies
designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments);
areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management
Plan; and any other equivalent environmentally sensitive areas which have been identified by the City.
E-34 Page 3 of 4 REV 02/22
I/
.,,
'
STEP4
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP)
ONLY
Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)):
YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of
less than 50% of the surface area of the previously existing development? Complete the percent impervious
calculation below:
Existing impervious area (A) = sq. ft. □ [!/
Total proposed newly created or replaced impervious area (B) = sq. ft.
Percent impervious area created or replaced (B/A)*100 = %
If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface
and not the entire development. Go to step 6, check the first box stating, "My project is a PDP ... " and complete applicant
information.
If you answered "no," the structural BMP's required for PDP apply to the entire development. Go to step 6, check the first
box stating, "My project is a PDP ... " and complete applicant information.
STEPS
TO BE COMPLETED FOR STANDARD PROJECTS
Complete the question below regarding your Standard Project (SDRWQCB Order No. 2017-0077):
YES NO
Is the Standard Project within any of the following Priority Land Use (PLU) categories?
R-23 (15-23 du/ac), R-30 (23-30 du/ac), Pl (Planned Industrial), CF (Community Facilities), GC (General □ V Commercial), L (Local Shopping Center), R (Regional Commercial), V-B (Village-Barrio), VC (Visitor
Commercial), 0 (Office), VC/OS (Visitor Commercial/Open Space), Pl/O (Planned Industrial/Office), or
Public Transportation Station
If you answered "yes", the 'STANDARD PROJECT' is subject to TRASH CAPTURE REQUIREMENTS. Go to step 6,
check the third box stating, "My project is a 'STANDARD PROJECT' subject to TRASH CAPTURE REQUIREMENTS
... " and complete applicant information.
If you answered "no", your project is a 'STANDARD PROJECT'. Go to step 6, check the second box stating, "My project is
a 'STANDARD PROJECT' ... " and complete applicant information.
STEP6
CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION
D My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must
prepare a Storm Water Quality Management Plan (SWQMP) per E-35 template for submittal at time of application.
0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT'
stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project
Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project.
0 My project is a 'STANDARD PROJECT' subject to TRASH CAPTURE REQUIREMENTS and must comply with TRASH
CAPTURE REQUIREMENTS of the BMP Manual. I understand I must prepare a TRASH CAPTURE Storm Water
Quality Management Plan (SWQMP) per E-35A template for submittal at time of application.
Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations
~hibits to verify if 'STANDARD PROJECT' stormwater requirements apply.
My project is NOT a 'development project' and is not subject to the requirements of the BMP Manual.
Applicant Information and Signature Box
Applicant Name: ~ .¾,ilk_ Applicant Title: r121/VCfPkV :ti=
Applicant Signature::-?.....--, , r , , , , ~ ~ 6 . I· .?-.;2-
( /
\__/
E-34 Page4 of 4 REV 02/22
{'city of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
8-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
This checklist is intended to help building permit applicants identify which Cli111ate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) must be included with the building permit application. The Carlsbad
Municipal Code (CMC) can be referenced during completion of this document by clicking on the provided links to each
municipal code section.
NOTE: The following type of permits are not required to fill out this form
❖ Patio l ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum re~ by ordinance,
check NIA and provide an explanation or code section describing the exception. ,,,,-
Details on CAP ordinance requirements are available at each section by clicking on the municipal ccla...: provided. The
project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) an~ergy Code and
Green Code sections. -
-~ .~ --------....-:--. •.----..--r•r-.-.----....,--. -· --.-------. ---------
, ' . . -. -' . r • " --•
'M.a.-_.,•·f--~•-., ____ ,.-------'--~---~~ .. :.a· ......... ~ ..... ..L,;.__.. __ ---·----~~-~ _ ___.._. __ ...__ --------------
Project Name/Building
Permit No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone:
BP No.:
IB-?;I <3 f>.. r TTt-I f-&/V G-17v t-47 MP rq..r y N~rpc;, 5
ffev CNvttNZJ ~-N/ ~t-.J ~ -z'?-7/bl)
9 {v\ { T1r Contact Email: 1.7 /Vl I T]t &F-BN &/5-v ((f:Cft,. CDJ
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
B-50
Contact Phone:
Contact Email:
Page 1 of7 Revised 04/21
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For
alterations and additions to existing buildings, attach a Permit Valuation breakdown on a se arate stieet.
Building Permit Valuation (BPV) $ breakdown ;:2-pk f3'Z:, 6. 2..-1!,
D Residential
□ New construction
□ Additions and alterations:
□ BPV < $60,000
□ BPV ~ $60,000
□ Electrical service panel upgrade only
I □ BPV ~ $200,000 .
[0 Nonresidential
□ New construction
l:;l/ Alterations:
1tY' BPV ~ $200,000 or additions~ 1,000
square feet
□ -spv ~ $1,000,000 -
□ ~ 2,000 sq. ft. new roof addition
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area is residential use
2A*, 3A*, 18, 28, *Includes detached, newly constructed ADU 4A*, 38, 4A
N/A N/A All residential additions and alterations
1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
only.
*Multi-family dwellings only where interior finishes are removed
1A, 4A* 1 B, 4A*· and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
1 B, 28, 38, 48 and 5
18,5
18, 28, 5 Building alterations of~ 75% existing gross floor area
28,5 1 B also applies if BPV ~ $200,000
~ir~--eheck1h~ eexes, el(plain all nett~ ar.iEI exteption items, and -providesuppamng calculaliaRS-.m .
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) 18.21.155 and 18.30.19Q,and the California Green Building Standards Code (CALGreen) for more
information. Appropriate details and notes must be placed on the plans according to selections chosen in the design.
A O Residentialadditionoralteration~$60,000buildingpermitvaluation. □ N/A __________ _
Details of selection chosen below must be placed on the plans referencing CMC □ Exception: Home energy score~ 7
18.30.190. (attach certification)
Year Built Single-family Requirements Multi-family Requirements
□ Before 1978 Select one option:
□ Ductsealing □ Attic insulation □ Cool roof □ Attic insulation
D 1978 and later Select one option:
D Lighting package D Water heating Package
□ Between1978and1991 Select one option:
□ Ductsealing □ Attic insulation □Cool roof
□ 1992 and later Select one option:
□ Lighting package D Water heating package
Updated 4/16/2021 3
B. Nonresidential* new construction or alterations 2! $200,000 building permit valuation,
or additions 2! 1,000square feet. See CMC 18.21.155and CALGreen Appendix AS D N/A
AS.203.1.1 Choose one: D .1 Outdoorlighting D .2 Restaurant service water heating (CEC 140.5)
D .3 Warehouse dock seal doors. D .4 Daylight design PAFs D .5 Exhaust air heat recovery □ N/A
AS.203.1 .2.1 Choose one: D .95 Energy budget (Projects with indoor lighting OR mechanical)
D .90 Energy budget (Projects with indoorlightingANDmechanical) □ N/A
AS.211.1** D On-site renewable energy:
D N/A
AS.211.3..,. D Green power. (If offered by local utility provider, 50% minimum renewable sources)
D N/A
AS.212.1 D Elevators and escalators: (Project with more than oneelevatorortwoescalators)
D N/A
AS.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen)
D N/A
• Includes hotels/motels and high-rise residential buildings
----------
•• Foralterations;:: $1,000,000 BPVand affecting> 75% existing grossfloorarea, OR alterationsthatadd 2, OOOsquarefeetof new roofaddition: comply
with CMC 18.30.130 (section 28 below) instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1 (c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to
CAP section 38 below (low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary) -· -
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
kWdc
Exception
-
D
D
D
D
B. D Nonresidential new construction or alterations 2!$1,000,000 BPV AND affecting 2!75% existing floor area, OR addition that increases
roof area by 2!2,000 square feet Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
□ Gross Floor Area (GFA)Method
GFA:
□ If< 1 O,OOOs.f. Enter: 5 kWdc
Min. System Size:
0 If ~ 1 O,OOOs.f. calculate: 15 kWdc x (GFA/10,000) **
kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
Updated 4/16/2021 4
□ Time-Dependent Valuation Method
Annual TDVEnergy use:*** ______ x .80= Min. system size: ______ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A O Residential and hotel/motel new construction. Refer to CMC 18.30.1 70 when completing this section.
Provide complete details on the plans.
D For systems serving individual dwelling units choose one system:
□ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
□ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential)
D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
D Exception:
D For systems serving multiple dwelling units, install a central water-heating system with ALL of thefollowing:
D Gas or propane water heating system
D Recirculation system per CMC 18.30.150(B) (high-rise residential, hotel/motel) or CMC 18.30.170(B) (low-
rise residential)
D Solar water heating system that is either:
D .20 solar savings fraction
D .15 solar savings fraction, plus drain water heat recovery
D Exception:
B. 0 Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide
complete details on the plans.
D Water heating system derives at least 40% of its energy from one of the following (attach documentation):
D Solar-thermal D Photovoltaics D Recovered energy
D Water heating system is (choose one):
D Heat pump water heater
D Electric resistance water heater(s)
. ;bsolar water heating system with .40 solar savings fraction
\7Exception: 8x 1?f71/'?=? C{a r'E?Po:5f:::5-i)
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to
demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a
performance approach to comply with energy-related measures will need to attach to this checklist separate calculations
and documentation as specified by the ordinances.
Updated 4/16/21 5
4. Electric Vehicle Charging
A D Residential New construction and major alterations*
Please refer to CMC 18.21.140 when completing this section.
□ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE Ready parking space required □Exception: _____________ _
□ Multi-family residential: □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable"
I I I
Calculations: Total EVSE spaces= .10x Total parking spaces proposed (rounded upto nearestwholenumber) EVSE Installed= Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
*Major alterations are: (1 )foroneand two-family dwellings and townhouses with attached garages, alterations have a building permit
valuation 2:$60,000 or include an electrical seNice panel upgrade; (2) for multifamily dwellings (three units or more without attached
garages), alterations have a building permit valuation;::: $200,000, interiorfinishes are removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing systems are proposed.
*ADU exceptions for EV Ready space (no EV ready space required when):
(1) The accessory dwelling unit is located within one-half mile of public transit.
(2) The accessory dwelling unit is located within an architecturally and historically significant historic district.
(3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure.
(4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit.
(5) When there is a car share vehicle located within one block of the accessory dwelling unit.
B. D Nonresidential new construction (includes hotels/motels) D Exception : _____________ _
Please refer to CMC 18.21.150 when completing this section
Total Parking Spaces
Proposed EVSE (10% of total) Installed (50% of EVSE)
~
Calculation· Refer to the table below·
Total Number of Parking Spaces provided Number of required EV Spaces
D 0-9 1
D 10-25 2
D 26-50 4
D 51-75 6
D 76-100 9
D 101-150 12
D 151-200 17
D 201 andover 1 O percent of total
Other "Ready" Other "Capable"
\Jz:JM5
Number of required EVSE Installed Spaces
1
1
2
3
5
6
9
50 percent of Required EV Spaces
Calculations: Total EVSEspaces= .10 xTotal parking spaces proposed (rounded up to nearestwhole number) EVSE Installed= Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
Updated 4/16/2021 6
5. D Transportation Demand Management (TDM): Nonresidential ONLY
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
Citystaffwill use the table below based on yoursubmitted plans to determinewhetherornoryourpermit requires a TOM plan. If TOM is applicable to your
permit, staff will contact the applicant to develop a site-specific TOM plan based on the permit details.
Employee ADT Estimation for Various Commercial Uses
Office (all)2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousing 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 10thEdition
13
11
4.5
3.5
3
1
2 For all office uses, use SANDAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calcylatjons;
Office: 20,450 sf
1. 20,450 sf I 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf = 8,334 sf
3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT
Acknowledgment: /
I acknowledge that the plans submitted may be s~~ct to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TOM plan and understa/ _'..hat an approved TOM Ian is a condition of permit i . uance.
ApplicantSignature:_,,.~=-~33_?_!-~_?-_?_?~}J~?.::........,,.c,..-,:;......,.<.-..::;.______ Date: V -/ c -:i.--:;,,----
Person other than Applicant to b for TDM compliance (if applicable):
Name(Printed): ~C{3' 7/v\ fTJ+· 7(~'
Phone Number: 1? ~ L"? 3r
EmailAddress:~M/ TJt g,,, /Se--NG-E-L..--~ ~fv',.
Updated 4/16/2021 7