HomeMy WebLinkAbout2766 OLYMPIA DR; ; CBR2022-0532; PermitPrint Date: 12/27/2022 Permit No: CBR2022-0532
Building Permit Finaled
Residential Permit
Job Address:
Permit Type:
Parcel #:
Valuation:
Occupancy Group:
2766 OLYMPIA DR, CARLSBAD, CA 92010-2143
BLDG-Residential
1674315300
$4,000.00
Work Class:
Lot #:
Project #:
Cogen
Status:
Applied:
Issued:
02/22/2022
03/11/2022
Finaled Close Out:12/27/2022
#of Dwelling Units:
Track #:
Plan #:
Closed - Finaled
Plan Check #:
Orig. Plan Check #:Bathrooms:
Final Inspection:07/13/2022Bedrooms:Construction Type:
Occupant Load:
Code Edition:
Sprinkled:
INSPECTOR:Alvarado, Tony
REVISION: CHANGE TO LOAD SIDE RMA BREAKER ROOF MOUNT PV SYSTEM 3.5KW 10 PANELS (E-REVIEW)Description:
Project Title:
Applicant: COMPLETE SOLAR
JON BROWN
3000 EXECUTIVE PKWY, # SUITE 504
SAN RAMON, CA 94583-4329(877) 299-4943
Contractor: COMPLETE SOLAR INC
3000 EXECUTIVE PKWY, # STE 504
SAN RAMON, CA 94583-4329
(877) 299-4943
AMOUNTFEE
BUILDING PLAN CHECK FEE (manual)$65.00
SB1473 – GREEN BUILDING STATE STANDARDS FEE $1.00
SOLAR–RESIDENTIAL: per kW $268.00 STRONG MOTION – RESIDENTIAL (SMIP)$0.52
Total Fees:$334.52 Total Payments To Date:$334.52 Balance Due:$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 442-339-2719 ï 760-602-8560 f ï www.carlsbadca.gov
Building Division Page 1 of 1
{"Cityof
Carlsbad
2766 Olympia Dr Carlsbad CA 92010
• Changed interconnection from load side breaker to RMA due to existing msp age ( Page 6)
Ben Cookson 9715069358
3000 EXECUTIVE PARKWAY SUITE 504 San Ramon 94583
permits@completesolar.com
X
X
X
X
X
06/15/2022
CBR2022-0532 CBR2022-0532
REVISION V.2
( City of
Carlsbad
Original Plan Check Number _______ _
CONTACT INFORMATION:
□ □ □ □
□ □
□ □
Ph Fax
www.carlsbadca.gov
□
□ □
Email
2766 Olympia Dr Carlsbad CA 92010
Installation of roof mount PV System 3.5KW 10 Panels
Complete Solar (Ben Cookson)Mike Silva
3000 Executive Pkwy Ste 504,
San Ramon, CA 94583
971-506-9358permits@completesolar.com
2766 Olympia Dr Carlsbad CA 92010
Carlsbad CA 92010
6199772442
emailmds@hotmail.com
Complete Solar Inc
3000 Executive Pkwy Ste 504, San Ramon, CA 94583
971-506-9358permits@completesolar.com
961988 C10 C46
BLOS1240539
N/A Complete solar
Ben Cookson 02/22/2022
□
□
D
□
{_ City of
Carlsbad
0 0
Addi
0 0
00
0 0
00 00
X
WTX 5058894 01 1/01/2023Insurance company of the west.
Ben Cookson 02/22/2022
□
□
□
□
□
□
□
Building Permit Inspection History Finaled
PERMIT INSPECTION HISTORY for (CBR2022-0532)
BLDG-Residential 02/22/2022Application Date:Permit Type:Owner:
Cogen 03/11/2022Work Class:Issue Date:Subdivision:CARLSBAD TCT#74-04
01/09/2023Expiration Date:Status:
IVR Number: 38832
Closed - Finaled 2766 OLYMPIA DR
CARLSBAD, CA 92010-2143
Address:
Scheduled
Date
Inspection Type Inspection No. Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
04/07/2022 04/07/2022 BLDG-35 Solar Panel 179999-2022 Failed Tony Alvarado Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency April 7, 2022:
1. Failed.
2. Called left message three times for
technician, called main solar company
office two times no response. Left
message with the PV solar company
coordinator reschedule at their
convenience
No
BLDG-Final Inspection 180000-2022 Failed Tony Alvarado Reinspection Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency April 7, 2022:
1. Failed.
2. Called left message three times for
technician, called main solar company
office two times no response. Left
message with the PV solar company
coordinator reschedule at their
convenience
No
BLDG-Structural Final April 7, 2022:
1. Failed.
2. Called left message three times for
technician, called main solar company
office two times no response. Left
message with the PV solar company
coordinator reschedule at their
convenience
No
BLDG-Electrical Final April 7, 2022:
1. Failed.
2. Called left message three times for
technician, called main solar company
office two times no response. Left
message with the PV solar company
coordinator reschedule at their
convenience
No
07/13/2022 07/13/2022 BLDG-35 Solar Panel 186785-2022 Passed Tony Alvarado Complete
Wednesday, July 13, 2022 Page 1 of 2
{cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBR2022-0532)
BLDG-Residential 02/22/2022Application Date:Permit Type:Owner:
Cogen 03/11/2022Work Class:Issue Date:Subdivision:CARLSBAD TCT#74-04
01/09/2023Expiration Date:Status:
IVR Number: 38832
Closed - Finaled 2766 OLYMPIA DR
CARLSBAD, CA 92010-2143
Address:
Scheduled
Date
Inspection Type Inspection No.Inspection
Status
Primary Inspector Reinspection InspectionActual
Start Date
COMMENTS PassedChecklist Item
BLDG-Building Deficiency April 7, 2022:
1. Failed.
2. Called left message three times for
technician, called main solar company
office two times no response. Left
message with the PV solar company
coordinator reschedule at their
convenience
No
BLDG-Electric Meter
Release
186848-2022 Requested Tony Alvarado Incomplete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency No
BLDG-Final Inspection 186786-2022 Passed Tony Alvarado Complete
COMMENTS PassedChecklist Item
BLDG-Building Deficiency April 7, 2022:
1. Failed.
2. Called left message three times for
technician, called main solar company
office two times no response. Left
message with the PV solar company
coordinator reschedule at their
convenience
No
BLDG-Structural Final PV solar approved July 13, 2022.Yes
BLDG-Electrical Final PV solar approved July 13, 2022.Yes
Wednesday, July 13, 2022 Page 2 of 2