HomeMy WebLinkAboutCUP 2020-0008; BMW ANCILLARY FACILITIES; Conditional Use Permit (CUP).City of
Carlstiad
LAND USE REVIEW
APPLICATION G P-1
--~evelopment Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
APPLICATIONS APPLIED FOR: (CHECK BOXES)
Develqomgnt Permits
i:z1 Coastal Development Permit D Minor
0 Conditional Use Permit
D Minor O Extension
D Day Care (Large)
D Environmental Impact Assessment
D Habitat Management Permit D Minor
D Hlflside Development Permit D Minor
D Nonconforming Construction Permit
D Planned Development Permit D Minor
D Residential D Non~Residential
D Planning Commission Oetennination
D Reasonable Accommodation
D Site Development Plan D Minor
D Special Use Permit
D Tentative Parcel Map (Minor Subdivision)
D Tentative Tract Map (Major Subdivision)
D Variance 0Minor
{FOR DEPT, USE ONI,, Y) Legislative Permits
CDPl020-a>31
~UPl02O ... 0006
D General Plan Amendment
D Local Coastal Program Amendment
D Master Plan
D Specific Plan
D Zone Change
□Amendment
□Amendment
D Zone Code Amendment
South kJlrl§bad Cga§tfl Review Nu
Permits
0 Review Permit
D Administrative D Minor O Major
Village Review Area Permits
D Review Permit
D Administrative D Minor O Major
(FOR DEPT USE ONLY)
NOTE: A PROPOSED PROJECT REQUIRING APPLICATION SUBMITTAL MUST BE SUBMITTED BY APPOINTMENT". PLEASE CONTACT THE APPOINTMENT SPECIALIST
AT (760) 602-2723 TO SCHEDUt.E AN APPOINTMENT.
•sAME DAY APPOINTMENTS ARE NOT AVAILABLE
ASSESSOR PARCEL NO(S): 211-080..12-00 & 211-080-13-00 RECEIVED
SEP Q 9 2020
CITY OF CARLSBAD
C?I ANNING DIVISION
LOCATION OF PROJECT: 5215 & 5245 Car Country Dr., Carlsbad CA 92008
{STREET ADDRESS)
NAME OF PROJECT: BMW Ancillary Facilities
BRIEF DESCRIPTION OF
PROJECT: Relocation of Collision Center from Encinitas and smog shop & Enterprise relocated from adjacent building
in Carlsbad to new location of projeQt site
PROJECT VALUE
(SITE IMPROVEMENTS)
FOR CITY USE ONLY
Development No. Qtv 2,0"}, 0 .. 0 2..2..,2
P-1
ESTIMATED COMPLETION DATE
CUP Z,02 0-0008
Lead Case No. C 'DP -Z.O2O -(!)0 3 7
Paqe 1 of S Revised 03/17
OWNER NAME
INDIVIDUAL NAME
( if applicable);
COMPANY NAME
(PLEASE PRINT)
(if applicable): Af4 MOTORS OF FT. LA.UOERO&& INC., a FIOl'ldaCOrp.
MAILING ADDRESS: 200 SW 1ST AVENUE, 14TH FL
CITY. STATE, ZIP: FORT LAUDERDALE. FL 33301
TELEPHONE: 954-769-4356 ------------EMAIL ADDRESS: POWELLC1@AUTONATION.COM
I CERTIFY THAT I AM THE LEGAL OWNER N-40 THAT ALL THE ABOVE
INFORMATION IS TRUE N-40 CORRECT TO THE BEST OF MY
KNOWLEDGE. I ;Qtiii'W'~ AL OWNER THAT THE APPLICANT AS
SET FORTH H UTHORIZED REPRESENTATIVE FOR
PURPOSES N,
·"""'-··-~
APPLICANT NAME (PLEASE PRINT)
INDIVIDUAL NAME
(if applicable):
COMPANY NAME
(if applieable): AN MOTORS OF FT. LAUOEROALE. INC., a Florida Corp
MAILINGADORESS:200 SW 1ST AVENUE, 14TH FL
CITY, STATE, ZIP; FORT LAUDERDALE. FL 33301
TELEPHONE: 954-769-4356
__, ............. .--...... ------E MAJ L ADDRESS: POWELLC1@AUTONATION.COM
I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER
ANO THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO
THE BEST OF E.
APPLICANT'S RePRESENTATIVE (Print): BILL HOFMAN: HOFMAN PLANNING AND ENGINEERING
MAILING ADDRESS; 3152 LIONSHEAO AVE.,
CITY, STATE.ZIP: CARLSBAD. CA 92010
TELEPHONE: 760-692-4100 -------------------------------EMAIL ADDRESS: bhofman@hofmanplanning.com/akooieng@Ohofmanplgnning.cgm .
I CERTIFY THAT I AM THE REPRESENTATIVE OF THE APPLICANT FOR
PURPOSES OF THIS APPLICATION AND THAT ALL THE ABOVE
INFORMATION IS TRUE ANO CORRECT TO THE BEST OF MY
Wth ~,~
IN THE PROCESS OF REVIEWING THIS APPUCA TION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF. PLANNING
COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT ANO ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS
APPLICATION. INvE CONSENT TO ENTRY FOR THIS PURPOSE.
NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES ANO CONSENTS TO A NOTICE OF RESTRICTION BEING
RECORDED ON THE TITL....-n-IF CONDITIONED FOR THE APPLICANT. NOTICE OF RESTRICTIONS RUN WITH
THE LAND ANO BIND ~'-"2''"". TEREST.
DATE STAMP APPLICATION RECEIVED
RECEIVED BY:
Indemnification and Insurance Requirement for Villa e Area Administrative Permit
Certification Statement:
I Certify that I am the Lt9al Businus Owner of the subject business and that all of the above information is true
and correct to the best of my knowledge. I agree to accept and abide by any conditions placed on the subject
project as a result of approval of this application. I agree to indemnify, hold harmless, and defend the City of
Carlsbad and its officers and employees from all claims, damage or liability to persons or property arising from or
caused directly or indirectly by the installation or placement of the subject property on the public sidewalk and/or
the operation of the subject business on the public sidewalk pursuant to this permit unless the damage or liability
was caused by the sole active negligence of the City of Carlsbad or its officers or employees. I have submitted a
Certificate of Insurance to the City of Carlsbad in the amount of one million dollars issued by a company which has
a rating in the latest "Best's Rating Guide" of "A-" or better and a financial size of $50-$100 (currently class VII) or
better which lists the City of Carlsbad as "additional insured" and provides primary coverage to the City. I also
agree to notify the City of Carlsbad thirty days prior to any cancellation or expiration of the policy. The notice shall
be delivered to:
City Planner
City of Carlsbad
1635 Faraday Avenue
Carlsbad
The insurance shall remain in effect for as long as the property is placed on the public sidewalk or the business is
operated on the public sidewalk. This agreement is a condition of the issuance of this administrative permit for the
subject of this permit on the public sidewalk. I understand that an approved administrative permit shall remain in
effect for as long as outdoor displays rmitted within the Village Review Area and the permittee remains in
compliance with the subject a
Certification Statement
I Certify that l am the Legal Property Owner for the subject business location and that all of the above information
is true and correct to the best of my knowledge. I support the applicant's request for a permit to place the subject
property on the public sidewalk. I understand that an approved administrative permit shalt remain in effect for as
long as outdoor displays are permitte,~~~1e Village Review Area and the permittee remains in compliance
with the subject approved perm .
P·1 Page 3 of 6 Revised 03/17
,r -.. r {.__C1fyo ·
Carlsbad
DISCLOSURE STATEMENT
P-1(A)
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
Applicant's statement or disclosure of certain ownership interests on all applications which will
require discretionary action on the part of the City Council or any appointed Board, Commission
or Committee.
The following information MUST be disclosed at the time of application submittal. Your project
cannot be reviewed until this information is completed. Please print.
1. APPLICANT (Not the applicant's agent)
Provide the COMPLETE. LEGAL names and addresses of ALL persons having a
financial interest in the application. If the applicant includes a corporation or partnership,
include the names, titles, addresses of all individuals owning more than 10% of the
shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE
INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW, If a publicly-owned
corporation, include the names, titles, and addresses of the corporate officers. (A
separate page may be attached if necessary.}
Person. __________ _ Corp/Part AN MOTORS OF FT, LAUOERDALE. INC. a l'lorida Colp
Title ___________ _ Title ____________ _
Address ----------Address 200 SW 1ST AVENUE. 14TH Ft. Fort l audemale, FL 33301
2. OWNER (Not the owner's agent)
P-t(A)
Provide the COMPLETE,. LEGAL names and addresses of ALL persons having any
ownership interest in the property involved. Also, provide the nature of the legal
ownership (i.e., partnership, tenants in common, non-profit, corporation, etc-). If the
ownership includes a corporation or partnership. include the names, titles, addresses of
all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE
THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (NIA) IN THE
SPACE BELOW. If a publicly-owned corporation, include the names, titles, and
addresses of the corporate officers. (A separate page may be attached if necessary.)
Person -----------Corp/Part AN MOTORS OF FT, l AUOEROALE. INC,, a Florida Corp
Title ___________ _ Title --------------
Address _________ _ Address ___________ _
200 SW 1ST AVENUE. 14TH FL, Fort Lauderdale, FL 33301
Page 1 of 2 Revised 07/10
3. NON-PROFIT ORGANIZATION OR TRUST
If any person identified pursuant to (1) or (2) above is~ ru;mPm,ffl m:mmizlti® QC a twa.
list the names and addresses of ANY person serving as an officer or director of the non-
profit organization or as trustee or beneficiary of the.
Non Profitrrrust...,_______ Non Profit/Trust _______ _
Title ·----------Title ....... __________ _
Address ________ _ Address. __________ _
4. Have you had more than $500 worth of business transacted with any member of City
staff, Boards, Commissions, Committees and/or Council within the past twelve (12}
months?
D Yes lv'I No If yes, please indicate person(s):. _________ _
NOTE: Attach additional sheets if necessary.
ei..rk,bl..s'J~~ ,4dMltl·trd-
Ptmt·or.-nam.of;~• ~19-..a.1'ry'
riiJZ~ ~~,g~ Signature ~ fapplicant's agent If ppl ble/date
BILL HOFMAN
Print or type name of owner/applicant's agent
Page2of2 Revleed 07/10
Ccicyof
Carlstiad
___________ ,. ----------
PROJECT DESCRIPTION
P-1(B)
Develop_ment Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
PROJECT NAME: BMW Ancillary Facilities
APPLICANT NAME: AN MOTORS OF FT. LAUDERDALE, INC., a Florida Corp
Please describe fully the proposed project by application type. Include any details necessary to
adequately explain the scope and/or operation of the proposed project. You may also include
any background information and supporting statements regarding the reasons for, or
appropriateness of, the application. Use an addendum sheet if necessary.
Description/Explanation:
A CUP will be needed for the relocation of the BMW Collision Center from the
Encinitas dealership located at 1302 Encinitas Blvd, Encinitas, CA 92024 to the
location of the former Audi dealership (adjacent to the BMW project site)
located at 5215 Car Country Drive, Carlsbad, CA 92008 (APN-211-080-12-00).
There will also be a relocation of tenants currently on the BMW project site to
the former Infiniti dealership (adjacent to project site) located at 5245 Car
Country Drive, Carlsbad, CA 92008 APN-211-080-13-00).
P-1(8) Page 1 of 1 Revlsed07/10
EP-2
VANILLIN, SEMI-GLOSS
SHERWIN-WILLIAMS
SW 6371
FIELD COLOR
IRT-1
l4LHAMBRA, CAPISTRANO
EAGLE ROOFING
3555
ROOF TILES
01 BMW of Carlsbad
Materi• Board
EP-3
INVITING IVORY,SEMI GLOSS
SHERWIN-WILLIAMS
SW 6372
DOORS, FRAMES & ARCH.
FEATURES
RT-1
ALHAMBRA, CAPISTRANO
EIFS
TEXTURE SAMPLE
WS-1
LIMESTONE, SAN MARINO
EL DORADO STONE
WAINSCOT
CLADDING
)SPARC+
PLl'.\.1 11l1 (.~1\/,....,..1...., •• A RC H ITECTURE
S T UDIOS
,,~-·~ ...... -------------t -------------~----------
Cicyof
Carlsbad
HAZARDOUS WASTE
AND SUBSTANCES
STATEMENT
P-1(C)
Develoement Services
Planning Division
1635 Faraday Avenue
(760) 602•4610
www.carlsbadca.gov
Consultation of Lists of Sites Related to Hazardous Wastes
(Certification of Compliance with Government Code Section 65962.5)
Pursuant to State of California Government Code Section 65962.5, I have consulted the
Hazardous Waste and Substances Sites List compiled by the California Environmental
Protection Agency and hereby certify that (check one):
Ii] The development project and any alternatives proposed in this application are not contained on the
lists compiled pursuant to Section 65962.5 of the State Government Code,
D The development project and any alternatives proposed in this application !£! contained on the lists
compiled pursuant to Section 65962.5 of the State Government Code.
APPUCANT PROPERTY OWNER
N AA MOTORS OF FT. LAUDERDALE, INC., a Florida Corp ame: ______________ _ AN MOTORS OF FT lAIJDf~OAI.£. INC, a Ftornla Carp Name: _________ _
Address:200 SW 1ST AVENUE, 14TH FL Address: 200 SW 1ST AVENUE, 14TH FL
Phone Number: 954-769-4356 Phone Number: 954-769-4356
AddressofSite:5215 & 5245 Car Country Dr., Carlsbad, CA 92008
Local Agency (City and County):_C_a_r_ls_b_a_d_,_S_a_n_D_i_e_g_o ___________ _
A r' b k d I be 5215 Car Country Dr. (APN:211-080-12) 5245 Car Country Or,(APN: 211-080-13) ssesso s oo , page, an parce num r: __________________ _
Specify list(s): ___________________________ _
Regulatory Identification Number: _____________________ _
Date of Ust: __ -;::=-::z---~:::--,---..:::-------------,-.;:::==:::=---
Pr,Qpetty awner s~~: ~. e,J. s,.,J,.J.t11. m;
A11t:~•r,)..L. S,~•"'Cu··y
The Hazardous Waste and Substances Sites List (Cortese List) is used by the State, local
agencies and developers to comply with the California Environmental Quality Act requirements
in providing information about the location of hazardous materials release sites.
P-1{C) Page 1 of2 Revised 02/13
ENVIRONMENTAL INFORMATION FORM
{To be Completed by Applicant)
Date Filed: __________ (To be completed by City)
Application Number(s): ______________________ _
General Information
1. Name of project: BMW Ancillary Facilities
2. Name of developer or project sponsor: AN MOTORS OF FT. LAUDERDALE, INC., a Florida Corp.
Address: 200 SW 1 ST AVENUE, 14TH FL
City, State, Zip Code: FORT LAUDERDALEt FL 33301
Phone Number: 954~ 769-4356
3. Name of person to be contacted concerning this project: Adam Kooienga
Address: 3152 Lionshead Ave.
City, State, Zip Code: Carlsbad, CA 92010
Phone Number: 760-692-4100
4. Address of Project 5215 & 5245 Car Country Dr., Carlsbad, CA 92008
Assessor's Parcel Number: 5215 (APN: 211-080-12) 5245 (APN: 211-080-13)
5. List and describe any other related permits and other public approvals required for this project,
including those required by city, regional, state and federal agencies:
6. Existing General Plan Land Use Designation: _R _____________ _
7. Existing zoning district _C_-_2_-_a _________________ _
8. Existing land use(s): 5215: Hoehn Audi 5245: Hoehn lnfiniti Auto Sales
9. Proposed use of site (Project for which this form is filed): __________ _
Relocation of collision center/smog shop/enterprise
Project Description
10. Site size: 5215: 2.9 acres 5245: 1.6 acres
11. Proposed Building square footage: ________________ _
12: Number of floors of construction: --------------------
13. Amount of off~street parking provided: ________________ _
14. Associated projects: _____________________ _
P-1(0) Page2 of4 Revised 07110
15. If residential, include the number of units and schedule of unit sizes: ________ _
16. If commercial. indicate the type, whether neighborhood, city or regionally oriented, square footage of sales area, and loading facilities: ___________________ _
Regionally oriented
17. If industrial, indicate type, estimated employment per shift, and loading facilities: ____ _
18. If institutional, indicate the major function, estimated employment per shift, estimated occupancy,
loading facilities, and community benefits to be derived from the project: _______ _
19. If the project involves a variance, conditional use or rezoning applications. state this and indicate
clearly why the application is required: __________________ _
CUP REQUIRED PER CONDITIONS AS LISTED IN THE CAR COUNTRY SP
P-1(0) Page3of4 Revised 07110
Are the following items applicable to the project or its effects? Discuss all items checked yes (attach
additional sheets as necessary).
Yes No
20. Change in existing features of any bays, tidelands, beaches, or hills, or substantial □ IZI
alteration of ground contours.
21. Change in scenic views or vistas from existing residential areas or public lands or □ IZI
roads.
22. Change in pattern, scale or character of general area of project. □ IZI
23. Significant amounts of solid waste or litter. □ IZI
24. Change in dust, ash, smoke, fumes or odors in vicinity. □ IZI
25. Change in ocean, bay, lake, stream or ground water quality or quantity, or □ IZI
alteration of existing drainage patterns.
26. Substantial change in existing noise or vibration levels in the vicinity. □ IZI
27. Site on filled land or on slope of 10 percent or more. □ IZI
28. Use of disposal of potentially hazardous materials, such as toxic substances, □ IZl
flammables or explosNes.
29. Substantial change in demand for municipal services (police, fire, water, sewage, □ IZI
etc.).
30. Substantially increase fossil fuel consumption (electricity, oil, natural gas. etc.). □ IZI
31. Relationship to a larger project or series of projects. □ 0
Environmental Setting
Attach sheets that include a response to the following questions:
32. Describe the project site as it exists before the project, including information on topography, soil
stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing
structures on the site, and the use of the structures. Attach photographs of the site. Snapshots
or Polaroid photos will be accepted.
33. Describe the surrounding properties, including information on plants and animals and any
cultural, historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.),
intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of
development (height, frontage, set-back, rear yard, etc.). Attach photographs of the vicinity.
Snapshots or polaroid photos will be accepted.
Certification
I hereby certify that the statements furnished above and in the attached exhibits present the data and
information required for this initial evaluation to the best of my ability. and that th ct.~lc.lQi:!•ments, and
information presented are true and correct to the best of my knowledge and beli
P-1(0) Page4of4 Revised 07/10
.
1
North Side of 5215 --
2
{I
3
W Side of 5215
S Side of 5215
1
4
E of 5245
NE Corner of 5245
N Side of 5245 -~ ..--,:___,--::::_
1
W Side of 5245 -
1
S Side of 5245
1
2
3
-
Pano
1
..
C ..
Ci:t)Tof
Carlsbad
TIME LIMITS ON
DISCRETIONARY
PROJECTS
P-1(E)
PLEASE NOTE:
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www .carlsbadca.gov
Time limits on the processing of discretionary projects established by state law do not start until a
project application is deemed complete by the City. The City has 30 calendar days from the date of
application submittal to determine whether an application is complete or incomplete. Within 30 days of
submittal of this application you will receive a letter stating whether this application is complete or
incomplete. If it is incomplete, the letter will state what is needed to make this application complete.
When the application is complete, the processing period will start upon the date of the completion letter.
If you have any questions regarding application submittal requirements (i.e., clarification
regarding a specific requirement or whethe.,,...~"'uirements are necessary for your particular
application) please call (760) 602-4610.
Aflpbnt $igoatur&: ~..,.14.. ;;. ::s~,..,4 .. .Lrzr
Staff Signature:
Date:
To be stapled with receipt to the application
P·1(E) Page 1 of 1 Revised 07110
AN MOTORS OF FT. LAUDERDALE, INC.
c/o AUTONATION, INC.
200 S.W. JST AVENUE, 14TH FLOOR
FORT LAUDERDALE, FLORIDA 33301
ATTENTION: REAL ESTATE/ LEGAL DEPARTMENT
July 2 I. 2020
LETTER OF Al[IftORIZATION
To Whom It May Concern:
Please let this Letter of Authorization serve as confirmation that I, C. Coleman Edmunds.
am the President of AN Motors of Ft. Lauderdale, Inc., a Florida corporation (the
"Company"), owner of the property located at 5215 and 5245 Car Country Drive,
Carlsbad, California (the .. Property").
I hereby certify that Charles W. Sabadash III. as Authorized Signatory of the Company, is
duly authorized, in the name of and on behalf of the Company, to execute and deliver the
City of Carlsbad Land Use Review Application, Development Permits, Disclosure
Statement, Hazardous Waste and Substances Statement, EIA Information Form, and Time
Limits on Discretionary Projects.
I further certify that Charles W. Sabadash UL as Authoriz.ed Signatory of the Company, is duly
authorized to act for and on behalf of the Company with respect to the execution of any and all
other documents associated with and related to all matters involving the conditional use permit any
improvements, zoning, easements, or additional permits for the development of the Property. and to
bind the Company with respect thereto.
Very truly yours.
STATE OF FLORIDA
COUNTY OF BROW ARD
"'l.sr The foregoing instrument was acknowledged before me this __ -"'_ .. , day of July, 2020, by
C. Coleman Edmunds, President of AN Motors of Ft. Lauderdale, Inc., a Florida
corporation, who is personally known to me.
(SEAL)
CttAII.ENE J. wtU..IAMSOH
Notary Mlle · SCatt of Flortdi
Colntms$ioll I GG 9107CM M'/ Colnm. bplm Apr 11, 1024
8ondtd thrqh Mlttonal Noury A»n.
. ....
( City of
Carlsbad
STORM WATER STANDARDS
QUESTIONNAIRE
Development Services
Land Development Engineering
1635 Faraday Avenue
(760) 602-2750
www.carlsbadca.gov
E-34
I 1NSTRUCTl?NS:
To address post-development pollutants that may be generated from development projects, the city requires that new
development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management
Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual,
refer to the Engineering Standards (Volume 5).
This questionnaire must be completed by the applicant in advance of submitting for a development application
(subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of
storm water standards that must be applied to a proposed development or redevelopment project. Depending on the
outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY
DEVELOPMENT PROJECT' (PDP) requirements.
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City
staff has responsibility for making the final assessment after submission of the development application . If staff
determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than
initially assessed by you, this will result in the return of the development application as incomplete. In this case, please
make the changes to the questionnaire and resubmit to the city.
If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the
questions, please seek assistance from Land Development Engineering staff.
A completed and signed questionnaire must be submitted with each development project application. Only one
completed and signed questionnaire is required when mu ltiple development applications for the same project are
submitted concurrently.
PROJECT INFORMATION
PROJECT NAME: BMW Ancillary Facilities PROJECT ID:
ADDRESS: 5215 & 5245 Car Country Dr., Carlsbad CA 92008 APN: 211-080-12-00 & 211-080-13-00
The project is (check one): D New Development 0 Redevelopment
The total proposed disturbed area is: ft2( 0 ) acres
The total proposed newly created and/or replaced impervious area is: ft2 ( ) acres
If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the
SWQMP # of the larger development project:
Project ID SWQMP#:
Then , go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your
application to the city.
E-34 Page 1 of 4 REV 02/16
STEP 1
TO BE COMPLETED FOR ALL PROJECTS
To determine if your project is a "development project", please answer the following question :
YES NO
Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building ~ □ or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)?
If you answered "yes" to the above question , provide justification below then go to Step 5, mark the third box stating "my
project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant
information.
Justification/discussion: (e.g. the project includes only interior remodels with in an existing building):
If you answered "no" to the above question, the project is a 'development project', go to Step 2.
STEP 2
TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS
To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer
the following questions:
Is your project LIMITED to one or more of the following:
YES NO
1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria:
a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-
erodible permeable areas; □ □ b) Designed and constructed to be hydraulically disconnected from paved streets or roads;
c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA
Green Streets guidance?
2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ □ accordance with the USEPA Green Streets guidance?
3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ □
If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark
the second box stating "my project is EXEMPT from PDP ... " and complete applicant information.
Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with
the USEPA Green Street guidance):
If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3.
E-34 Page 2 of 4 REV 04/1 7
STEP3
TO BE COMPLETED FOR ALL NEW OR REDEVELOPMENT PROJECTS
To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1)):
YES NO
1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces
collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, □ □ and public development projects on public or private land.
2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of
impervious surface collectively over the entire project site on an existing site of 10,000 square feet or □ □ more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public
development projects on public or private land.
3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is
a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and □ □ refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial
Classification (SIC) code 5812).
4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious
surface collectively over the entire project site and supports a hillside development project? A hillside □ □ development project includes development on any natural slope that is twenty-five percent or greater.
5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is □ □ a land area or facility for the temporary parking or storage of motor vehicles used personally for
business or for commerce.
6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more
of impervious street, road, highway, freeway or driveway surface collectively over the entire project □ □ site? A street, road, highway, freeway or driveway is any paved impervious surface used for the
transportation of automobiles, trucks, motorcycles, and other vehicles.
7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more
of impervious surface collectively over the entire site, and discharges directly to an Environmentally
Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of □ □ 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an
isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).*
8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square
feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ □ shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC)
codes: 5013, 5014, 5541, 7532-7534, or 7536-7539.
9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square
feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ □ RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily
Traffic (ADT) of 100 or more vehicles per day.
10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land □ □ and are expected to generate pollutants post construction?
11 . Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC □ □ 21 .203.040)
If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment
project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... "
and complete applicant infonnation.
If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the
second box statinQ "My project is a 'STANDARD PROJECT' ... " and complete applicant information.
E-34 Page 3 of 4 REV 04/17
STEP4
TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP)
ONLY
Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)).
YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount
of less than 50% of the surface area of the previously existing development? Complete the percent
impervious calculation below:
Existing impervious area (A) = sq. ft. □ □
Total proposed newly created or replaced impervious area (B) = sq. ft.
Percent impervious area created or replaced (B/A)*100 = %
If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious
surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP .. ." and complete
applicant information .
If you answered "no ," the structural BMP's required for PDP apply to the entire development. Go to step 5, check the
check th e first box stating "My project is a PDP ... • and complete aoolicant information.
STEP&
CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION
□ My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must
prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application.
□ My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT'
stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project
Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project.
Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations
and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply.
fi2') My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual.
Applicant Information and Signature Box
Applicant Name: Bill Hofman Applicant Title: Applicant Representative
Applicant s;gnature: B:12J) ~ GM Date: 9/9/20
• Env1ronrnentally Sensitive Areas 1ndude but are not limited to all Clean Water Act Seci1on 303(d) 1mpa1red water bodies: areas designated as Areas of Special
Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments). water bodies
designated with the RARE benefiaal use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and
amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program w1th1n the Cities and County of San Diego; Habitat
Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City.
This Box for City Use Ontv
YES NO
City Concurrence: □ □
By:
Date:
Project ID·
E-34 Page 4 of 4 REV 04/17
August 19, 2020
Project No. 19-07586
Bill Hofman
Hofman Planning & Engineering
3151 Lionshead Avenue
Carlsbad, California 92010
Rincon Consultants, Inc.
2215 Faraday Avenue, Suite A
Carlsbad, California 92008
760 918 9444 OFFICE AND FAX
i nfo@ri nconcon sultan ts .com
www. rinconconsu ltants .com
Subject: City of Carlsbad Climate Action Plan (CAP) Checklist Consistency for the
BMW Carlsbad Project
Dear Mr. Hofman:
Rincon Consultants, Inc. (Rincon) has reviewed the BMW Carlsbad Project's (Project's) consistency with
the City of Carlsbad (City) Climate Action Plan's (CAP's) Consistency Checklist (Checklist). This
memorandum summarizes the findings of the attached Checklist.
Project Description
The project is located at 5245 and 5215 Car County Drive. The project would relocate tenants to the
project and would make use of existing service building for a BMW collision center. Other buildings on-
site would be reused for a smog service center and Enterprise rental car location. Only alterations to
existing buildings would be performed; no buildings are proposed to be constructed or demolished. The
total building area would be the existing area of 33,109 square foot. The project would include 333
existing parking spaces.
CAP and Checklist Overview
In September 2015, the City adopted a CAP that outlines actions that the city will undertake to achieve
its proportional share of state greenhouse gas (GHG) emissions reductions. The Checklist for the CAP
contains measures that are required to be implemented on a project-by-project basis to ensure that the
specified emissions targets identified in the CAP are achieved. The Checklist was last updated in
February 2020. Implementation of these measures will ensure that new development is consistent with
the CAP's assumption for relevant CAP strategies toward achieving the identified GHG reduction targets.
Project Consistency with Checklist
Step 1: Land Use Consistency
The proposed project was analyzed for consistency with the CAP's Checklist (see Attachment A for the
Checklist). Step 1 of the Checklist is to determine land use consistency of a project. If a project is
consistent the existing General Plan land use and specific/master plan or zoning designations, then the
project proceeds to Step 2 of the Checklist.
Environmental Sc1ent1sls Planners Engineers
Hofman Planning & Engineering
BMW Carlsbad Project
The existing zoning designation of the site is C-2 (General Neighborhood Commercial); the existing land
use designation is R (Regional Commercial). The existing use on-site is a car dealership. As the project is
placing similar and allowed automobile-related uses (e.g., service building for a BMW collision center, a
smog service center and Enterprise rental car location) in the C-2 zone and R land use designation, it
would be consistent with zoning and land use.
Step 2: CAP Ordinance Compliance Requirements
After determining consistency with Step 1, Step 2 of the Checklist determines a project's consistency
with CAP ordinances, and in turn, demonstrate consistency with the applicable measures and actions of
the CAP. The ordinances applicable depend on if a project is a residential or nonresidential project, if the
project is new construction or alterations, and if the project is alterations, what the building permit
valuation of the permit is. As the project is a nonresidential project that involves alterations with an
estimated building permit valuation of between $200,000 and $1,000,000, Sections 18 and 5 of the
Checklist would be applicable to the project.
Section 18: Energy Efficiency for Nonresidential
AS.203.1.1.1-Outdoor Lighting: .90 Allowed Outdoor Lighting Power
AS.203.1.1.1 is included in Appendix AS -Nonresidential Voluntary Measures of the of the 2019
California Green (CALGreen) Building Standards Code (CCR, Title 24, Part 11-CALGreen). AS.203.1.1.1
states:
Newly installed outdoor lighting power shall be no greater than 90 percent of the Allowed
Outdoor Lighting Power. The Allowed Outdoor Lighting Power calculation is specified in Title 24,
Part 6, Section 140. 7 "Requirements For Outdoor Lighting."
As the project is in an urban area, it would fall under Lighting Zone 3 in Section 140.7, which has an area
wattage allowance of 0.025 watt per square foot for asphalt and 0.03 watt per square foot for concrete.
The project would achieve this through light emitting diode (LED) lighting in the outdoors areas of the
project site. Therefore, the project is consistent with this ordinance.
AS.203.1.1.2-Restaurant service water heating
The project would not have restaurant service; therefore, this ordinance is not applicable to the project.
AS.203.1.2.1-.95 Energy Budget or .90 Energy Budget
AS.203.1.2.1 is included in Appendix AS-Nonresidential Voluntary Measures of the of the 2019
CALGreen Building Standards Code (CCR, Title 24, Part 11-CALGreen). AS.203.1.2.1 states:
Buildings complying with the first level of advanced energy efficiency shall have an Energy
Budget that is no greater than indicated below, depending on the type of energy systems
included in the building project. If the newly constructed building or addition does not include
indoor lighting or mechanical systems, then no additional performance requirements above Title
24, Part 6 are required.
Page 2
Hofman Planning & Engineering
BMW Carlsbad Project
For building projects that include indoor lighting or mechanical systems, but not both: No greater
than 95 percent of the Title 24, Part 6, Energy Budget for the Standard Design Building as
calculated by compliance software certified by the Energy Commission.
For building projects that include indoor lighting and mechanical systems: No greater than 90
percent of the Title 24, Part 6 Energy Budget for the Standard Design Building as calculated by
compliance software certified by the Energy Commission.
As stated in the measure, this applies to newly constructed buildings or additions. The project would
only perform alterations to the existing buildings, and would not construct new buildings or add
additional square footage; therefore, this ordinance is not applicable to the project.
AS.211.1. ** -On-site renewable energy
The Checklist requires on-site renewable energy in the form of photovoltaic systems (Section 28) if the
project is new construction or, if alteration, has a building permit valuation of $1,000,000 or new roof of
addition of 2,000 square feet or greater. The project does not have a building permit valuation of
$1,000,000 and does not propose any new roof area. Therefore, this ordinance is not applicable to the
project.
AS.211.3. ** -Green power (if offered by local utility provider, SO percent minimum renewable
sources)
The project would receive energy from San Diego Gas & Electric (SDG&E). As an electric provider, SDG&E
must comply with the requirement of Senate Bill 100, which requires electricity providers to increase
procurement from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60
percent by 2030, and 100 percent by 2045. As of the end of 2018, SDG&E was already at 45 percent
renewable energy (SDG&E 2019). While more updated information is not available at the time of this
memorandum, SDG&E is expected to continue to obtain a greater share of its energy from renewable
sources and is at 50 percent renewable sources or would be in the near future. Therefore, the project
would achieve 50 percent renewable energy through SDG&E by operation or at a future date and would
achieve great than that number with up to 100 percent renewable by 2045. The City of Carlsbad is in the
process of setting up a Community Choice Energy program that would allow electricity customers to
obtain greater percentage of renewable sources (City of Carlsbad n.d.). However, this program is not
operational at the time of this submittal. Therefore, this ordinance is not applicable to the project.
AS.212.1-Elevators and escalators
The project does not propose new construction and would not build elevators or escalators; therefore,
this ordinance is not applicable to the project.
AS.213.1-Steel framing
The project does not propose new construction; therefore, this ordinance is not applicable to the
project.
Page3
Hofman Planning & Engineering
BMW Carlsbad Project
Section 5: Transportation Demand Management {TOM) Plan
The CAP Checklist lastly requires that a Transportation Demand Management (TDM) Plan be provided if
employee average daily trips (ADT) exceed 110 per 1,000 square feet of building area (per Ordinance CS-
350). The City's Employee ADT Table lists 8 ADT for the first 1,000 square feet of retail space, and 4.5
ADT per 1,000 square feet of retail space beyond the initial 1,000 square feet. Therefore, the project is
expected to generate 157 employee ADT and the project applicant must submit at TDM Plan following
the City TDM Handbook guidelines. The project would submit a TDM Plan, which is being prepared as of
the time of the writing of this memorandum, and therefore would be consistent with this ordinance.
Conclusion
As described above, the project would be consistent with the existing zoning and land use designations
of the project site. Furthermore, the project would implement and be consistent with applicable CAP
ordinances identified in Section 1B and 5 of the Checklist. Given the aforementioned, the proposed
project would be consistent with the Checklist and, therefore, the CAP.
Sincerely,
Rincon Consultants, Inc.
Bill Vosti, MESM Joe Power, AICP CEP
Senior Environmental Planner Senior Principal/Vice President
Attachment A: Climate Action Plan Consistency Checklist
Page 4
Hofman Planning & Engineering
BMW Carlsbad Project
References
California Department of General Services. 2020. CALGreen. Effective January 1. Available at:
https://www.dgs.ca.gov/BSC/Resources/Page-Content/Building-Standards-Commission-
Resources-List-Folder /CALGreen
Carlsbad, City of. 2015. Climate Action Plan. September.
__ . 2020. Climate Action Plan Consistency Checklist P-30. Revised February.
__ . n.d. Clean Energy Alliance. Available at:
https://www.carlsbadca.gov/residents/energy.asp#:~:text=The%20City%20of%20Carlsbad%20h
as.renewable%20sources%20starting%20in%202021.
San Diego Gas & Electric (SDG&E). 2019. A Look Back at 2018. Available at:
http://www.sdgenews.com/article/look-back-2018
Pages
Attachment A
Climate Action Plan Consistency Checklist
Hofman Planning & Engineering
BMW Carlsbad Project
Page 6
Development Services
Planning Division
1635 Faraday Avenue
760-602-4610
www.carlsbadca.gov
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
P-30
('cityof
Carlsbad
In September 2015, the City of Carlsbad adopted a Climate Action Plan (CAP) that outlines actions that
the city will undertake to achieve its proportional share of state greenhouse gas (GHG) emissions
reductions. This checklist contains measures that are required to be implemented on a project-by-project
basis to ensure that the specified emissions targets identified in the Climate Action Plan (CAP) are
achieved. Implementation of these measures will ensure that new development is consistent with the
CAP's assumption for relevant CAP strategies toward achieving the identified greenhouse gas (GHG)
reduction targets. In this manner, a project's incremental contribution to a cumulative GHG emissions
effect may be determined not to be cumulatively considerable if it complies with the requirements of the
CAP, in accordance with CEQA Guidelines Sections 15064(h)(3), 15130(d), and 15183(b). *
*City staff are currently not assessing the greenhouse gas impacts of California Environmental Quality Act
projects by using the Climate Action Plan as a qualified GHG reduction plan under CEQA section
15183.S(b). Please consult with the Planning Department for further guidance. Additional information
may be found on the Climate Action Plan Update and Vehicle Miles Traveled calculations staff report.
This checklist is intended to assist project applicants in identifying CAP ordinance requirements and
demonstrate how their project fulfills those requirements. This checklist is to be completed and included
in applications for new development projects that are subject to discretionary review or require a building
permit.
APPLICATION SUBMITTAL REQUIREMENTS
• The completed checklist must be included in the project submittal package or building permit
application. Application submittal procedures can be found on the City of Carlsbad website. This
checklist is designed to assist the applicant in identifying the minimum CAP-related requirements
specific to their project. However, it may be necessary to supplement the completed checklist with
supporting materials, calculations or certifications, to demonstrate full compliance with CAP
requirements. For example, projects that propose or require a performance approach to comply
with energy-related measures will need to attach to this checklist separate calculations and
documentation as specified by the ordinances.
• If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum
required by ordinance, an explanation must be provided to the satisfaction of the Planning Division
or building official.
• The requirements in the checklist will be included in the project's conditions of approval or issuance
of building permit.
• Details on CAP ordinance requirements are available on the city's website.
P-30 Page 1 of 7 Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
STEP 1: LAND USE CONSISTENCY
The first step in determining CAP consistency for discretionary development is to assess the project's consistency
with the growth projections used in the development of the CAP. This section allows the city to determine a
project's consistency with the land use assumptions used in the CAP. Projects found not to be consistent with the
CAP's land use assumptions and that are projected to emit at or above the CAP screening threshold of 900 metric
tons of CO2 equivalent (MTC02e) GHG will be subject to a project-specific analysis of GHG emissions' impact on the
environment in accordance wit h the requirements of the California Environmental Quality Act (CEQA). This may
result in GHG-reducing mitigation measures applied as a condition of project approval in addition to compliance
with the CAP ordinance requirements identified in Step 2 of this checklist.
Checklist Item
(Check the appropriate box and provide an explanation and supporting documentation for your answer)
A. Is the proposed project consistent with the existing General Plan land use and specific/master plan or zoning designations?
OR,
If the proposed project is not consistent with the existing land use plan and zoning designations, does the project include a
land use plan and/or specific plan, master plan or zoning designation amendment that would result in an equivalent or less
GHG-intensive project when compared to the existing designations?
Yes No
IBJ □
If "Yes", proceed to Step 2 of the checklist. For the second option under Question A above, provide estimated project-related GHG emissions under both existing and
proposed designation(s) for comparison. GHG emissions must be estimated in accordance with the City of Carlsbad Guidance to Demonstrating Consistency with the
Climate Action Plan.
If "No", proceed to Question B.
B. The CAP established a screening threshold of 900 MTC02e/year for new development projects to assist in determining
consistency with the CAP. The types and sizes of typical projects listed below have been determined to correspond to the CAP
screening threshold. Will the proposed land use change result in the construction of less than any one of the following?
• Single-Family Housing: 50 dwelling units
• Multi-Family Housing: 70 dwelling units
• Office: 35,000 square feet
• Retail Store: 11,000 square feet
• Grocery Store: 6,300 square feet
• Other: If the proposed project is not one of the above types, provide a project-specific GHG emissions analysis to
determine whether it is below the 900 MTCO2e/year screening threshold.
If "Yes", proceed to Step 2 of the checklist.
[R] □
If "No", the project's GHG impact is potentially significant and must be analyzed in accordance with CEOA Applicant must prepare a Self-developed GHG emissions
reduction program in accordance with the City of Carlsbad Guidance to Demonstrating Consistency with the Climate Action Plan to demonstrate how it would offset
the increase in emissions over the existing designations. The project must incorporate each of the applicable measures identified in Step 2 to mitigate cumulative
GHG emissions impacts unless the decision maker finds that a measure is infeasible in accordance with California Environmental Quality Act Guidelines Section
15091. Mitigation in lieu of or in addition to the measures in Step 2 may be required, depending on the results of the project-specific GHG impact analysis. Proceed
and complete a project-specific Self-developed GHG emissions reduction program and Step 2 of the Checklist.
P-30 Page 2 of 7 Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
STEP 2: CAP ORDINANCE COMPLIANCE REQUIREMENTS
Completion of this checklist will document a project's compliance with CAP ordinances, and in turn, demonstrate
consistency with the applicable measures and actions of the CAP. The compliance requirements in this Step 2 apply
to development projects that require a building permit. All other development projects shall implement all
emissions-related mitigation measures from the General Plan Update EIR.
Project No./Name: BMW Carlsbad
Property
Address/APN: 5245 & 5215 Car Country Dr., Carlsbad, CA 92008 211-080-12, -13
Applicant Name/Co.: Hofman Planning & Engineering
Applicant Address: 3151 Lionshead Ave., Carlsbad, CA 92010
Contact Phone: (760) 692-4100 Contact Email: Akooienga@Hofmanplanning.com
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
BillVosli
Rincon Consultants, Inc.
Contact Phone: 805-459-2142
Contact Email : bvosti@rinconconsultants.com
2215 Faraday Ave., Suite A, Carlsbad, CA 92008
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project. If
your project includes alterations or additions to an existing building, please contact the Carlsbad Building Division for
assistance in estimating building permit valuation, by phone at 760-602-2719 or by email at building@carlsbadca.gov.
Estimated Building Permit Valuation (BPV): $ Between $200,000 and $1,000,000
□ Alterations:
□ BPV ~ $60,000
□ BPV ~ $60,000
□ Electrical service panel upgrade
□ BPV ~ $200,000
□ New construction
Ix) Alterations:
P-30
lA
lA and 4A
4A
lA and 4A
Page 3 of 7
All residential alterations
1-2 family dwellings and townhouses with attached
garages only
Multi-family dwellings only where interior finishes are
removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing
systems are proposed
Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
Ii] BPV ~ $200,000 or additions~ 1B,S 1,000 square feet
D BPV ~ $1,000,000 1B, 2B and 5 Building alterations of~ 75% existing gross floor area
D ~ 2,000 sq . ft. new roof addition 2B and 5 1B also applies if BPV ~ $200,000
Please refer to carlsbad Ordinance No. CS-347 and the California Green Building Standards Code (CALGreen) for more information when completing this section.
A. 0 Residential addition or alteration i!: $60,000 building permit valuation.
See Ord. CS-347, Section 8.
Year Built Single-family Requirements
□ Before 1978 Select one:
□ Duct sealing □ Attic insulation □ Cool roof
□ 1978 and later Select one:
□ Lighting package □ Water heating package
□ Between 1978 and 1990
□ 1991 and later
B. [R] Nonresidential* new construction or alterations i!: $200,000 building permit valuation,
or additions i!: 1,000 square feet.
See CALGreen Appendix AS, Discussion AS.2, as amended in CS-347, Section 3.
AS.203.1.1.l
IKI Outdoor lighting: .90 Allowed Outdoor Lighting Power
AS.203.1.1.2
□ Restaurant service water heating (comply with California Energy Code Section 140.5, as amended)
AS.203.1.2.1
Choose one as applicable: □ .95 Energy budget □ .90 Energy budget
AS.211.l. **
□ On-site renewable energy
AS.211.3**
□ Green power (if offered by local utility provider, 50% minimum renewable sources)
AS.212.1
□ Elevators and escalators
AS.213.1
□ Steel framin
P-30 Page 4 of 7
□ N/A ________ _
□ Exception: Home energy score i!: 7
{attach certification)
Multi-family Requirements
□ Attic insulation
Select one:
□ Attic insulation □ Duct Sealing □ Cool roof
Select one:
□ Lighting package □ Water heating package
□ N/A _________ _
□ N/A
~ N/A Retail use
IKI N/A Applies to new construction
[!I! N/A Measure 28 N/A to project
pg N/A SDG&E Energy Mix
~ N/A Alteration, no new construction
x N/A Alteration, no new construction
Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
□ N/A
• Includes hotels/motels and high-rise residential buildings
•• For alterations 2: $1,000,000 BPV and affecting> 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply with California
Energy Code section 120.10 instead.
A. D Residential new construction (for building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.l(c) 14 for
requirements. Note: if project includes installation of an electric heat pump water heater pursuant to cartsbad ordinance CS-348, increase system size by
.3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
Exception
□
□
□
□
kWdc
B. D Nonresidential new construction or alterations 2:$1,000,000 BPV and affecting .!75% existing floor area, or addition that increases roof area by .!2,000
square feet. Please refer to carlsbad Ordinance CS-347, Section 6 when completing this section.
Choose one of the following methods:
D Gross Floor Area {GFA) Method
GFA:
0 If< 10,000s.f. Enter: 5 kWdc
Min. System Size: ___ kWdc
0 If 2: 10,000s.f. calculate: 15 kWdc x (GFA/10,000) **
**Round building size factor to nearest tenth, and round system size to nearest whole number.
□ Time-Dependent Valuation Method
Annual TDV Energy use:*** x .80= Min. system size: ____ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
P-30 Page 5 of 7 Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
A. D Residential and hotel/motel new construction
Please refer to Carlsbad Ordinance CS-347 and CS-348 when completing this section.
□ For systems serving individual dwelling units choose one:
□ Heat pump water heater AND compact hot water distribution AND drain water heat recovery (low-rise residential
only)
□ Heat pump water heater AND PV system .3 kWdc larger than required in CA Energy Code Section 120.10 (for high rise
residential hotel/motel) or 150.l(c) 14 (for low-rise residential)
□ Heat pump water heater meeting Tier 3 or higher NEEA Advanced Water Heating Specification
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with all of the following:
□ Gas or propane water heating system
□ Recirculation system per CS-347 (high-rise residential, hotel/motel) or CS-348 (low-rise residential)
□ Solar water heating system that is either:
□ .60 solar savings fraction or 40 s.f. solar collectors
□ .40 solar savings fraction, plus drain water heat recovery
D Exception:
B. 0 Nonresidential new construction
Please refer to Carlsbad Ordinance CS-347 when completing this section.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater(s)
□ Solar water heating system with .40 solar savings fraction
D Exception:
A. 0 Residential New construction and major alterations•
Please refer to Carlsbad Ordinance CS-349 when com letin this section.
□ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE ready parking space required □ Exception :
D Multi-family residential· □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable I Ready I
I I
Calculations: Total EVSE spaces= .10 xTotal parking (rounded up to nearest whole number)
EVSE Installed= Total EVSE Spaces x .SO (rounded up to nearest whole number)
EVSE other= Total EVSE spaces -EVSE Installed
(EVSE other may be "Capable," "Ready" or "Installed.")
Installed I
I
Total
P-30 Page 6 of 7 Revised 02/20
City of Carlsbad Climate Action Plan Consistency Checklist
*Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation~ $60,000 or
include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit
valuation~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems
are proposed.
B. D Nonresidential new construction (includes hotels/motels) □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable Ready Installed Total
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
□ 201 and over 10 percent of total 50 percent of Required EV Spaces
A. List each proposed nonresidential use and gross floor area (GFA) allocated to each use.
B. Employee ADT/1,000 square feet is selected from the City of Carlsbad Employee ADT Table.
Use GFA Employee ADT/1,000 S.F. Total Employee ADT
Retail 33,109 sf 8 for first 1,000 sf, 4.5 for rema hing 157
Total 157
If total employee ADT is greater than or equal to 110 employee ADT, a TDM plan is required.
*NOTE: Notwithstanding the 110 employee ADT threshold above, General Plan Mobility Element Policy 3-P.ll requires new development that adds vehicle traffic
to vehicle LOS-exempt street facilities to implement TDM and transportation system management strategies. Please consult with City of Carlsbad Land Development
Engineering {LOE) staff to determine whether this policy applies to your project.
TDM plan required: Yes Iii No D
LDE Staff Verification: □ ______ (staff initials)
P-30 Page 7 of 7 Revised 02/20
., 9/3/2020
RE : BM W CUP -Submittal
Sarah Cluff <Sarah.Cluff@carlsbadca.gov>
Wed 9/2/2020 2:41 PM
Mail -Monica Friedl -Outlook
To: Adam Kooienga <akooienga@hofmanplanning.com>
Cc: Monica Friedl <mfriedl@hofmanplanning.com>; Bill Hofman <bhofman@hofmanplanning.com>
Hi Adam,
The Appointment on the 8th has since been filled . I have placed a hold on calendar for our earliest
available appointment 9/9 at 11 am. Please confirm that this will work for you or provide another time on
9/1 0 that may be feasible.
Please do include a copy of my email of 12.20 pm today with my supervisor's determination about the
title report date with your submittal to ensure the counter staff that will be processing the submittal are
aware of her input.
Thank you,
Sarah Cluff
f' City of
Carlsbad
Sarah Cluff
Planning Technician II
Community Development
Planning Division
City of Carlsbad
1635 Faraday Ave.
Carlsbad, CA 92008
www.carlsbadca.gov
760-602-46191 760-720-8558 fax I sarah.cluff@carlsbadca.gov
DURING THE CURRENT PUBLIC HEALTH EMERGENCY:
FOR ONGOING PROJECTS, PLEASE CONTACT YOUR PROJECT PLANNER TO SCHEDULE A
RESUBMITTAL DROP-OFF APPOINTMENT.
FOR NEW PROJECT SUBMITTAL$ AND LANDSCAPE SUBMITTALS/RESUBMITTALS/AS-BUILTS,
PLEASE CALL OR EMAIL YOUR REQUEST FOR A SUBMITTAL DROP-OFF APPOINTMENT:
Phone: 760-602-461 o
Email: P-lanning@carlsbadca.gQY
Facebook I Twitter I You Tube I Flickr I Pinterest IEnews
From: Adam Kooienga [mailto:akooienga@hofmanplanning.com]
Sent: Wednesday, September 2, 2020 2:25 PM
To: Sarah Cluff <Sarah.Cluff@carlsbadca.goV>
Cc: Monica Friedl <mfriedl@hofmanplanning.com>; Bill Hofman <bhofman@hofmanplanning.com>
Subject: Re: BMW CUP -Submittal
Hi Sarah,
Thanks for following up on this. We will take the 8th at 2.
Adam
9/3/2020 Mail -Monica Friedl -Outlo k
From: Sarah Cluff <Sarah . r@carlsbadca.goV>
Sent: Wednesday, September 2, 2020 12:20:35 PM
To: Adam Kooienga <akooienga@hofmanplanning.com>
Cc: Monica Friedl <mfriedl@hofmanplanningm>; Bill Hofman <bhofman@hofmanplanning.com>
Subject: RE : BMW CUP -Submittal
Hi Adam,
I had the chance to confirm at our morning meeting with my supervisor that a few days past the 6 month
timeframe won't preclude you from submitting next week.
Please let me know your preferred time to drop off from the following options and I will confirm
availability:
9/8 at 2
9/9 at 11 , or 2
9/1 0 at 9, 11 , or 2
Thank you,
Sarah Cluff
City of
Carlsbad
Sarah Cluff
Planning Technician II
Community Development
Planning Division
City of Carlsbad
1635 Faraday Ave.
Carlsbad, CA 92008
www.carlsbadca.gov
760-602-46191 760-720-8558 fax I sarah .cluff@carlsbadca.gov
DURING THE CURRENT PUBLIC HEALTH EMERGENCY:
FOR ONGOING PROJECTS, PLEASE CONTACT YOUR PROJECT PLANNER TO SCHEDULE A
RESUBMITTAL DROP-OFF APPOINTMENT.
FOR NEW PROJECT SUBMITTAL$ AND LANDSCAPE SUBMITTALS/RESUBMITTALS/AS-BUILTS,
PLEASE CALL OR EMAIL YOUR REQUEST FOR A SUBMITTAL DROP-OFF APPOINTMENT:
Phone: 760-602-461 o
Email: planning@carlsbadca.gov
Facebook I Twitter I You Tube I Flickr I Pinterest IEnews
From: Adam Kooienga [mailto:akooienga@hofmanplanning.com]
Sent: Wednesday, September 2, 2020 9:51 AM
To: Sarah Cluff <Sarah.Cluff@carlsbadca.goV>
Cc: Monica Friedl <mfriedl@hofmanplanning.com>; Bill Hofman <bhofman@hofmanplanning.com>
Subject: Re: BMW CUP -Submittal
Hi Sarah,
I just wanted to follow up about this?
Adam Kooienga
9/3/2020 •
• -• 3152 Lionshead Avenue C
Carlsbad, CA 92010
760.692.4019 Tel
616.301.4618 Cell
akooienga@hofmanplanningm
C 1_:r1r~fl. t ..... n.-~1 rr.P i:.~i
Linked[m
From: Adam Kooienga
Sent: Tuesday, September 1, 2020 4:02 PM
To: Sarah Cluff <Sarah.Ctuff@carlsbadca.goV>
Mail -Monica Friedl -Outlo~
Cc: Monica Friedl <mfriedl@hofmanplanning.com>; Bill Hofman <bhofman@hofmanplanning.com>
Subject: BMW CUP -Submittal
Hi Sarah,
I hope this finds you doing well! Monica from our office just forwarded me the email regarding
our "BMW CUP" project and the times you have available for submittal to the City. Is there any
way at all that we can make that submittal happen this week? I ask because the Title Report we
will be submitting will be older than 6 months on September 6. If we need to get an updated
Title Report prior to submittal it would most likely delay our submittal for a couple weeks and our
client has a real time crunch on this project that if they miss their deadline could result in
significant financial impacts. If there is no way to make the submittal this week, would we still
be able to make the submittal next week with the Title Report we have (over the 6 month
window by 1 day) and then bring in an updated one during the review process? Any help with
this would be greatly appreciated!
Thanks,
Adam
Adam Kooienga
Senior Planner
Hofman Planning & Engineering
3152 Lionshead Avenue
Carlsbad, CA 92010
760.692.4019 Tel
616.301.4618 Cell
akooienga@hofmanplanningm
~ ,n· ~. I ~•,,.1! ", rr ,;.;i :, •
Linked[m
CAUTION: Do not o en attachments or click on links unless
content is safe.
CAUTION: Do not o en attachments or click on links unless nize the sender and know the
content is safe.
BILLING CONTACT
BILL HOFFMAN
HOFMAN PLANNING AND ENGINEERING
3152 Lionshead Ave
Carlsbad, Ca 92010
INVOICE NUMBER INVOICE DATE
00071489 09/09/2020
REFERENCE NUMBER FEE NAME
INVOICE DUE DATE
09/09/2020
CU P2020-0008 NOTICE FEE(PLN/ENG) (plus postage)
5215 Car Country Dr Carlsbad, CA 92008-4310
City of Carls~l!d {city Of
1635 Faraday Avenue ·c l b d
Carlsbad, CA 92b08:: 7314 . ar S a
INVOICE STATUS f INVOICE DESCRIPTION
Due ,J NONE ·, ·•1,
f
,,
'l ,. TOTAL
1 $345.00
,.,
SUBTOTAL $345.00 >'
TOTALj,_ _____ $3_45_.o_o~'
1111111111111111111111 m1 m1 111~ 1111111111111111111111111111
?I ~nn i "j '.
L i!AtrV--CoLA na,
September 09, 2020 2:54 pm Page 1 of 1
~ · .•.
Bll,.LING CONTACT
BILL HOFFMAN
HOFMAN PLANNING AND ENGINEERING
3152 Lionshead Ave
Carlsbad, Ca 92010
INVOICE NUMBER INVOICE DATE
00071487 09/09/2020
REFERENCE NUMBER FEE NAME
INVOICE (00071487)
INVOICE DUE DATE
09/09/2020
City of Carlsbad (City of
1635 Faraday Avenue C 1 h d
Carlsbad, CA 92008-7314 ar Sua
INVOICE STATUS INVOICE DESCRIPTION
Due NONE
TOTAL
CUP2020-0008 CONDITIONAL USE PERMIT (CUP): Regular $4,913.00
5215 Car Country Dr Carlsbad, CA 92008-4310
111111111111111II IIIII 11111 11111 111111111111111 IIIII IIIII IIII IIII
P /t,,wrv<Vt) :
SUBTOTAL $4,913.00
TOTAL_! ____ $4_,s_13_.oo ...... l
']3illina /1.,i~f
Ct)~ Wt-s}
A IA v-o--n A lbert-s~
l qq~ )35 l -S3J-S
~.Co11ry
('..\ o. I b,-+strn@ C OR. \-J~. ( 6)Y\
September 09, 2020 2:56 pm Page 1 of 1
-,.___, -
BILLING CONT ACT
BILL HOFFMAN
HOFMAN PLANNING AND ENGINEERING
3152 Lionshead Ave
Carlsbad, Ca 92010
INVOICE NUMBER INVOICE DATE
00071494 09/09/2020
REFERENCE NUMBER FEE NAME
INVOICE (00071494)
INVOICE DUE DATE
09/09/2020
City of Carlsbad ( City of
1635 Faraday Avenue C l b d
Carlsbad. CA 92008-7314 ar S a
INVOICE STATUS INVOICE DESCRIPTION
Due NONE
TOTAL
CDP2020-0037 COASTAL DEVELOPMENT PERMIT (PLN) Non-Residential $1,059.00
5215 Car Country Dr Carlsbad, CA 92008-4310 SUBTOTAL $1,059.00
TOTAL~' _____ $1_,o_s_s.o_o~I
11111111111111111 IIIII 1111111111 1111111111 111111111111111 IIII IIII
September 09, 2020 3:38 pm Page 1 of 1
*
REPUBLIC TITLE®
Commitment
ALTA Commitment fCJ'l"'Title Insurance
ISSUED BY
First American Title Insurance Company
File No: 1002-300676-RTT
COMMITMENT FOR TITLE INSURANCE
Issued By
FIRST AMERICAN TITLE INSURANCE COMPANY
NOTICE
IMPORTANT-READ CAREFULLY: THIS COMMITMENT IS AN OFFER TO ISSUE ONE OR MORE illLE INSURANCE
POLICIES. ALL CLAIMS OR REMEDIES SOUGHT AGAINST THE COMPANY INVOLVING THE CONTENT OF THIS
COMMITMENT OR THE POLICY MUST BE BASED SOLELY IN CONTRACT.
THIS COMMITMENT IS NOT AN ABSTRACT OF TITLE, REPORT OF THE CONDffiON OF TITLE, LEGAL OPINION,
OPINION OF illLE, OR OTHER REPRESENTATION OF THE STATUS OF illLE. THE PROCEDURES USED BY THE
COMPANY TO DETERMINE INSURABILITY OF THE illLE, INCLUDING ANY SEARCH AND EXAMINATION, ARE
PROPRIETARY TO THE COMPANY, WERE PERFORMED SOLELY FOR THE BENEFIT OF THE COMPANY, AND CREATE NO
EXTRACONTRACTUAL LIABILITY TO ANY PERSON, INCLUDING A PROPOSED INSURED.
THE COMPANY'S OBLIGATION UNDER THIS COMMITMENT IS TO ISSUE A POLICY TO A PROPOSED INSURED
IDENTIFIED IN SCHEDULE A IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THIS COMMITMENT. THE
COMPANY HAS NO LIABILITY OR OBLIGATION INVOLVING THE CONTENT OF THIS COMMITMENT TO ANY OTHER
PERSON.
COMMITMENT TO ISSUE POUCY
Subject to the Notice; Schedule B, Part I-Requirements; Schedule B, Part II-Exceptions; and the Commitment Conditions,
First American Title Insurance Company, a Nebraska Corporation (the "Company"), commits to issue the Policy
according to the terms and provisions of this Commitment. This Commitment is effective as of the Commitment Date
shown in Schedule A for each Policy described in Schedule A, only when the Company has entered in Schedule A both the
specified dollar amount as the Proposed Policy Amount and the name of the Proposed Insured.
If all of the Schedule B, Part I-Requirements have not been met within six months after the Commitment Date, this
Commitment terminates and the Company's liability and obligation end.
First American Title Insurance Company
fl/-t7<4' r,L
~nnis J Gilmore
Preostdent
~J~
,leffrey S Rol>tnson
Secretary
If this jacket was created electronically, it constitutes an original document.
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form ( or any derivative thereof) is restricted to AL TA licensees and AL TA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
rm 50003700 (8-23-18) age 1 of 15 ALTA Commitment for Title Insurance (8-1-16
califomi
COMMITMENT CONDffiONS
1. DEFINffiONS
(a) "Knowledge" or "Known": Actual or imputed knowledge, but not constructive notice imparted by the Public Records.
(b) "Land": The land described in Schedule A and affixed improvements that by law constitute real property. The term "Land"
does not indude any property beyond the lines of the area described in Schedule A, nor any right, title, interest, estate, or
easement in abutting streets, roads, avenues, alleys, lanes, ways, or waterways, but this does not modify or limit the extent
that a right of access to and from the Land is to be insured by the Policy.
(c) "Mortgage": A mortgage, deed of trust, or other security instrument, including one evidenced by electronic means authorized
bylaw.
(d) "Policy": Each contract of title insurance, in a form adopted by the American Land Title Association, issued or to be issued by
the Company pursuant to this Commitment.
(e) "Proposed Insured": Each person identified in Schedule A as the Proposed Insured of each Policy to be issued pursuant to this
Commitment.
(f) "Proposed Policy Amount": Each dollar amount specified in Schedule A as the Proposed Policy Amount of each Policy to be
issued pursuant to this Commitment.
(g) "Public Records": Records established under state statutes at the Commitment Date for the purpose of imparting constructive
notice of matters relating to real property to purchasers for value and without Knowledge.
(h) "Title": The estate or interest described in Schedule A.
2. If all of the Schedule B, Part I-Requirements have not been met within the time period specified in the Commitment to Issue
Policy, this Commitment terminates and the Company's liability and obligation end.
3. The Company's liability and obligation is limited by and this Commitment is not valid without:
(a) the Notice;
(b) the Commitment to Issue Policy;
(c) the Commitment Conditions;
( d) Schedule A;
(e) Schedule B, Part I-Requirements; and
(f) Schedule B, Part II-Exceptions.
4. COMPANY'S RIGHT TO AMEND
The Company may amend this Commitment at any time. If the Company amends this Commitment to add a defect, lien,
encumbrance, adverse claim, or other matter recorded in the Public Records prior to the Commitment Date, any liability of the
Company is limited by Commitment Condition 5. The Company shall not be liable for any other amendment to this Commitment.
S. LIMITATIONS OF LIABILITY
(a) The Company's liability under Commitment Condition 4 is limited to the Proposed lnsured's actual expense incurred in the
interval between the Company's delivery to the Proposed Insured of the Commitment and the delivery of the amended
Commitment, resulting from the Proposed Insured's good faith reliance to:
(i) comply with the Schedule B, Part I-Requirements;
(ii) eliminate, with the Company's written consent, any Schedule B, Part II-Exceptions; or
(iii) acquire the Title or create the Mortgage covered by this Commitment.
(b) The Company shall not be liable under Commitment Condition S(a) if the Proposed Insured requested the amendment or had
Knowledge of the matter and did not notify the Company about it in writing.
(c) The Company will only have liability under Commitment Condition 4 if the Proposed Insured would not have incurred the
expense had the Commitment included the added matter when the Commitment was first delivered to the Proposed Insured.
(d) The Company's liability shall not exceed the lesser of the Proposed lnsured's actual expense incurred in good faith and
described in Commitment Conditions S(a)(i) through S(a)(iii) or the Proposed Policy Amount.
(e) The Company shall not be liable for the content of the Transaction Identification Data, if any.
(f) In no event shall the Company be obligated to issue the Policy referred to in this Commitment unless all of the Schedule B,
Part I-Requirements have been met to the satisfaction of the Company.
(g) In any event, the Company's liability is limited by the terms and provisions of the Policy.
This page is only a part of a 2016 Al TA@ Commitment for Title Insurance issued by Ai-st American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
rm 50003700 (8-23-18) age 2 of 15 ALTA Commitment for Title Insurance (8-1-16
cautomi
6. LIABILITY OF THE COMPANY MuCsE BASED ON THIS COMMITMENT ~
{a) Only a Proposed Insured identified in Schedule A, and no other person, may make a claim under this Commitment.
(b) Any claim must be based in contract and must be restricted solely to the terms and provisions of this Commitment.
(c) Until the Policy is issued, this Commitment, as last revised, is the exclusive and entire agreement between the parties with
respect to the subject matter of this Commitment and supersedes all prior commitment negotiations, representations, and
proposals of any kind, whether written or oral, express or implied, relating to the subject matter of this Commitment.
{d) The deletion or modification of any Schedule B, Part II-Exception does not constitute an agreement or obligation to provide
coverage beyond the terms and provisions of this Commitment or the Policy.
(e) Any amendment or endorsement to this Commitment must be in writing and authenticated by a person authorized by the
Company.
(f) When the Policy is issued, all liability and obligation under this Commitment will end and the Company's only liability will be
under the Policy.
7. IF THIS COMMITMENT HAS BEEN ISSUED BY AN ISSUING AGENT
The issuing agent is the Company's agent only for the limited purpose of issuing title insurance commitments and policies. The
issuing agent is not the Company's agent for the purpose of providing closing or settlement services.
8. PRO-FORMA POLICY
The Company may provide, at the request of a Proposed Insured, a pro-forma policy illustrating the coverage that the Company
may provide. A pro-forma policy neither reflects the status of Title at the time that the pro-forma policy is delivered to a Proposed
Insured, nor is it a commitment to insure.
9. ARBITRATION
The Policy contains an arbitration clause. All arbitrable matters when the Proposed Policy Amount is $2,000,000 or less shall be
arbitrated at the option of either the Company or the Proposed Insured as the exclusive remedy of the parties. A Proposed Insured
may review a copy of the arbitration rules at http://www.alta.org/arbitration.
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by Rrst Ameriean Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule B, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
orm 50003700 (8-23-18) age 3 of 15 ALTA Commitment for ntte Insurance (8-1-16
cantomi
*===
REPUBLIC TITLEt>
Schedule A
AL TA Commitment for Title Insurance
ISSUED BY
First American Title Insurance Company
File No: 1002-300676-RTT
Transaction Identification Data for reference only:
Issuing Agent: Republic Title of Texas, Inc. Issuing Office: 2626 Howell Street, 10th Floor, Dallas,
TX 75204
Commitment No.: 1002-300676-RTT Issuing Office File No.: 1002-300676-RTT
Property Address: 5215 and 5245 Car Country Drive, Carlsbad, Underwriter/Assistant: Evangela Furnace/Alexandra
~ M~~
Revision No.: Phone: (214)855-8888/(214)855-8888
Email:
efurnace@republictitle.com/amielke@republictitle.com
SCHEDULE A
1. Commitment Date: March 06, 2020 8:00 AM
2. Policy to be issued:
(a) 181 2006 AL TA® Extended Owner Policy
Proposed Insured: To Be Determined
Proposed Policy Amount:$ To Be Determined
(b) □ ALTA® Policy
Proposed Insured:
Proposed Policy Amount: $
(c) □ ALTA® Policy
Proposed Insured:
Proposed Policy Amount: $
3. The estate or interest in the Land described or referred to in this Commitment is
Fee Simple
4. The Title is, at the Commitment Date, vested in:
AN MOTORS OF FT. LAUDERDALE, INC., A FLORIDA CORPORATION
5. The Land is described as follows:
See Exhibit "A" attached hereto and made a part hereof
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form ( or any derivative thereof) is restricted to AL TA licensees and AL TA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
rm 50003700 (8-23-18) age 4 of 15 ALTA Commitment for Title Insurance (8-1-16
cantorn·
*===
REPUBLIC TITLE*
Schedule BI & BIi
Commitment No.: 1002-300676-RTT
AL TA Commitment ffl'f Title Insurance
ISSUED BY
First American Title Insurance Company
File No: 1002-300676-RTT
SCHEDULE B, PART I
Requirements
All of the following Requirements must be met:
A. The Proposed Insured must notify the Company in writing of the name of any party not referred to in
this Commitment who will obtain an interest in the Land or who will make a loan on the Land. The
Company may then make additional Requirements or Exceptions.
B. Pay the agreed amount for the estate or interest to be insured.
C. Pay the premiums, fees, and charges for the Policy to the Company.
D. Documents satisfactory to the Company that convey the Title or create the Mortgage to be insured,
or both, must be properly authorized, executed, delivered, and recorded in the Public Records.
E. Releases(s) or Reconveyance(s) of Item(s): None
F. Other: None
G. You must give us the following information:
a. Any off record leases, surveys, etc.
b. Statement(s) of Identity, all parties.
c. Other:
Prior to closing, the Company must confirm whether the county recording office in which the Land is located has
changed its access policies due to the COVID-19 outbreak. If recording has been restricted, specific underwriting
approval is required; and, additional requirements or exceptions may be made.
The following additional requirements, as indicated by "X", must be met:
[X] H. Provide information regarding any off-record matters, which may include, but are not
limited to: leases, recent works of improvement, or commitment statements in effect
under the Environmental Responsibility Acceptance Act, Civil Code Section 850, et seq.
The Company's Owner's Affidavit form (as provided by the company) must be completed
and submitted prior to close in order to satisfy this requirement. This Commitment will
then be subject to such further exceptions and/or requirements as may be deemed
necessary.
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by Arst American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I-Requirements; Schedule B, Part
/I-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
rm 50003700 (8-23-18) age 5 of 15 ALTA Commitment for Title Insurance (8-1-16
calitomi
,.,
[X] I. An ALT A/NSPS survey of recent date, which complies with the current minimum standard
detail requirements for ALTA/NSPS land title surveys, must be submitted to the Company
for review. This Commitment will then be subject to such further exceptions and/or
requirements as may be deemed necessary.
[] J. The following LLC documentation is required from:
(i) a copy of the Articles of Organization
(ii) a copy of the Operating Agreement, if applicable
(iii) a Certificate of Good Standing and/or other evidence of current Authority to Conduct
Business within the State
(iv) express Company Consent to the current transaction
[] K. The following partnership documentation is required :
(i) a copy of the partnership agreement, including all applicable amendments thereto
(ii) a Certificate of Good Standing and/or other evidence of current Authority to Conduct
Business within the State
(iii) express Partnership Consent to the current transaction
[X] L. The following corporation documentation is required:
(i) a copy of the Articles of Incorporation
(ii) a copy of the Bylaws, including all applicable Amendments thereto
(iii) a Certificate of Good Standing and/or other evidence of current Authority to Conduct
Business within the State
(iv) express Corporate Resolution consenting to the current transaction
[] M. Based upon the Company's review of that certain partnership/operating agreement dated Not
disclosed for the proposed insured herein, the following requirements must be met:
Any further amendments to said agreement must be submitted to the Company, together
with an affidavit from one of the general partners or members stating that it is a true copy,
that said partnership or limited liability company is in full force and effect, and that there
have been no further amendments to the agreement. This Commitment will then be
subject to such further requirements as may be deemed necessary.
[] N. A copy of the complete lease, as referenced in Schedule A, #3 herein, together with any
amendments and/or assignments thereto, must be submitted to the Company for review,
along with an affidavit executed by the present lessee stating that it is a true copy, that the
lease is in full force and effect, and that there have been no further amendments to the
lease. This Commitment will then be subject to such further requirements as may be deemed
necessary.
[X] 0. Approval from the Company's Underwriting Department must be obtained for issuance of the
policy contemplated herein and any endorsements requested thereunder. This Commitment
will then be subject to such further requirements as may be required to obtain such approval.
This page is only a part of a 2016 Al TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule B, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form ( or any derivative thereof) is restricted to AL TA licensees and AL TA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
orm 50003700 (8-23-18) age 6 of 15 ALTA Commitment for Title Insurance (8-1-16
Califomi
[] P. Potential additional requirements, if ALTA Extended coverage is contemplated hereunder, and
work on the land has commenced prior to close, some or all of the following requirements,
and any other requirements which may be deemed necessary, may need to be met:
[] Q. The Company's "Indemnity Agreement I" must be executed by the appropriate parties.
[] R. Financial statements from the appropriate parties must be submitted to the Company for
review.
[] S. A copy of the construction contract must be submitted to the Company for review.
[] T. An inspection of the Land must be performed by the Company for verification of the phase of
construction.
[] U. The Company's "Mechanic's Lien Risk Addendum" form must be completed by a Company
employee, based upon information furnished by the appropriate parties involved.
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form ( or any derivative thereof) is restricted to AL TA licensees and AL TA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
orm 50003700 (8-23-18) age 7 of 15 ALTA Commitment for Title Insurance (8-1-16
califomi
*
REPUBLIC TITLE®
Schedule Bl & BIi (Cont.)
Commitment No.: 1002-300676-RTT
AL TA Commitmentror Title Insurance
ISSUED BY
First American Title Insurance Company
File No: 1002-300676-RTT
SCHEDULE B, PART II
Exceptions
THIS COMMITMENT DOES NOT REPUBLISH ANY COVENANT, CONDITION, RESTRICTION, OR LIMITATION
CONTAINED IN ANY DOCUMENT REFERRED TO IN THIS COMMITMENT TO THE EXTENT THAT THE
SPECIFIC COVENANT, CONDITION, RESTRICTION, OR LIMITATION VIOLATES STATE OR FEDERAL LAW
BASED ON RACE, COLOR, RELIGION, SEX, SEXUAL ORIENTATION, GENDER IDENTITY, HANDICAP,
FAMILIAL STATUS, OR NATIONAL ORIGIN.
The Policy will not insure against loss or damage resulting from the terms and provisions of any lease or
easement identified in Schedule A, and will include the following Exceptions unless cleared to the
satisfaction of the Company:
1. Any defect, lien, encumbrance, adverse claim, or other matter that appears for the first time in the
Public Records or is created, attaches, or is disclosed between the Commitment Date and the date on
which all of the Schedule B, Part I-Requirements are met.
2. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority
that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a
public agency that may result in taxes or assessments, or notices of such proceedings, whether or
not shown by the records of such agency or by the Public Records.
3. Any facts, rights, interests, or claims that are not shown by the Public Records but that could be
ascertained by an inspection of the Land or that may be asserted by persons in possession of the
Land.
4. Easements, liens or encumbrances, or claims thereof, not shown by the Public Records.
5. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that
would be disclosed by an accurate and complete land survey of the Land and not shown by the Public
Records.
6. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the
issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under
(a), (b), or (c) are shown by the Public Records.
7. General and special taxes and assessments for the fiscal year 2020-2021, a lien not yet due or
payable.
This page is only a part of a 2016 Al TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
orm 50003700 (8-23-18) age 8 of 15 ALTA Commitment for Title Insurance (8-1-16
Californi
8. General and special taxes\.71d assessments for the fiscal year 2019-2020► -
First Installment: $51.841.04, PAID
Penalty: $0.00
Second Installment: $51.841.04, OPEN
Penalty: $0.00
Tax Rate Area: 09000
A. P. No.: 211-080-12-00
(Affects Parcel One)
9. General and special taxes and assessments for the fiscal year 2019-2020.
First Installment: $34,502.40, PAID
Penalty: $0.00
Second Installment: $34,502.40, OPEN
Penalty: $0.00
Tax Rate Area: 09000
A. P. No.: 211-080-1300
(Affects Parcel Two)
10. The land lies within the boundaries of proposed community facilities District No. 98-01 (Police & Fire),
as disclosed by a map filed October 19, 2001 in Book 35, Page 44 of maps of assessment and
community facilities districts.
(Affects both Parcels)
11. The land lies within the boundaries of proposed community facilities District No. 2001-01, as
disclosed by a map filed October 19, 2001 in Book 35, Page 45 of maps of assessment and
community facilities districts.
Document(s) declaring modifications thereof recorded January 09, 2002 as Instrument No. 2002-
0019461 of Official Records.
(Affects both Parcels)
12. The lien of supplemental taxes, if any, assessed pursuant to Chapter 3.5 commencing with Section 75
of the California Revenue and Taxation Code.
13. Abutter's rights of ingress and egress to or from Car Country Drive have been dedicated or
relinquished on the map of Map No. 12242 of Tract Maps recorded October 18, 1988.
(Affects Parcel One)
14. Abutter's rights of ingress and egress to or from Car Country Drive, excepting those access openings
have been dedicated or relinquished on the map of Map No. 12242 of Tract Maps recorded October
18, 1988.
(Affects Parcel Two)
This page is only a part of a 2016 AL TA@ Commitment for 77tle Insurance issued by First American 77tle Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to AL TA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
orm 50003700 (8-23-18) age 9 of 15 ALTA Commitment for Title Insurance (8-1-16 cautom·
r-
15. An easement shown or d~~ated on the map filed or recorded October l'e;"'1988 as Map No. 12242
of Tract Maps.
For: general utility and incidental purposes.
(Affects Parcel Two)
16. An easement shown or dedicated on the map filed or recorded October 18, 1988 as Map No. 12242
of Tract Maps.
For: sewer, drainage, access and incidental purposes.
(Affects both Parcels)
17. Covenants, conditions, restrictions, easements, assessments, liens, charges, terms and provisions in
the document recorded December 02, 1988 as Instrument No. 88-619692 of Official Records, which
provide that a violation thereof shall not defeat or render invalid the lien of any first mortgage or
deed of trust made in good faith and for value, but deleting any covenant, condition or restriction
indicating a preference, limitation or discrimination based on race, color, religion, sex, handicap,
familial status, national origin, sexual orientation, marital status, ancestry, source of income or
disability, to the extent such covenants, conditions or restrictions violate Title 42, Section 3604(c), of
the United States Codes. Lawful restrictions under state and federal law on the age of occupants in
senior housing or housing for older persons shall not be construed as restrictions based on familial
status.
(Affects both Parcels)
18. An easement for maintenance and repair of the slope property and incidental purposes,
recorded February 02, 1989 as Instrument No. 89-058177 of Official Records.
In Favor of: Association of Car Country Expansion Owners, a California
nonprofit mutual benefit corporation
Affects: as described therein
The terms and provisions contained in the document entitled "Indemnity Agreement"
recorded October 12, 1989 as Instrument No. 89-553280 of Official Records.
(Affects both Parcels)
19. An easement for the construction, operation, repair, reconstruction and all activities necessary to
construct, reconstruct, operate, maintain and repair facilities designed for the general purpose of
collecting, storing, transporting, pumping and treating all water, including surface water, stream
water, flood water and ground water flowing into said facilities, and all natural artificial drainage
ditches and structures of any kind, whether above or below the surface of the ground and incidental
purposes, recorded October 27, 1989 as Instrument No. 89-585540 of Official Records.
In Favor of: Carlsbad Municipal Water District, a public agency organized in
the State of California
Affects: as described therein
(Affects Parcel Two)
20. The terms, provisions and easement(s) contained in the document entitled "Covenant for Easement"
recorded February 18, 2000 as Instrument No. 2000-0084965 of Official Records.
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
rm 50003700 (8-23-18) age 10 of 15 ALTA Commitment for Title Insurance (8-1-16
califomi
(Affects both Parcels)
21. The terms, provisions and easement(s) contained in the document entitled "Covenant for Easement"
recorded February 18, 2000 as Instrument No. 2000-0084966 of Official Records.
(Affects both Parcels)
22. The terms, provisions and easement(s) contained in the document entitled "Covenant for Easement"
recorded February 18, 2000 as Instrument No. 2000-0084967 of Official Records.
(Affects both Parcels)
23. The terms and provisions contained in the document entitled "Hold Harmless Agreement Drainage"
recorded February 29, 2000 as Instrument No. 2000-0101801 of Official Records.
(Affects both Parcels)
24. An easement for ingress, egress, parking and incidental purposes, recorded March 24, 2003 as
Instrument No. 2003-0321046 of Official Records.
In Favor of:
Affects:
(Affects Parcel Two)
Saitama Nissan (U.S.A) Corporation, a California corporation,
organized under the laws of the State of California
as described therein
25. The terms and provisions contained in the document entitled "Notice of Restriction on Real Property"
recorded April 01, 2003 as Instrument No. 2003-0362097 of Official Records.
(Affects both Parcels)
26. Any facts, rights, interests or claims that may exist or arise by reason of the following matters
disclosed by an ALTA/NSPS survey made by Daryn Bernard for Commercial Due Diligence Services on
August 26, 2016, last revised September 29, 2016, designated Job Number 16-08-0236:
a) The fact that utility vaults and an electric transformer exist outside of easement areas;
b) The fact that ingress and egress to and from adjoining property to the east of Parcel Two exists
without benefit of an easement; and
c) The fact that a construction trailer exists on a south westerly portion of Parcel One.
(Affects both Parcels)
27. An unrecorded lease dated January 6, 2017, executed by An Motors of Ft. Lauderdale, Inc., a Florida
corporation as lessor and Hoehn Group LLC, a California limited liability company as lessee, as
disclosed by a Memorandum of Lease recorded January 12, 2017 as Instrument No. 2017-0020041 of
Official Records.
Defects, liens, encumbrances or other matters affecting the leasehold estate, whether or not shown
by the public records are not shown herein.
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First Ameria,n Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule B, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
orm 50003700 (8-23-18) age 11 of 15 AL TA Commitment for Title Insurance (8-1-16
califomi
(Affects both Parcels)
Document(s) declaring modifications thereof recorded August 16, 2018 as Instrument No. 2018-
0337035 of Official Records.
28. An option in favor of Hoehn Group LLC, a california limited liability company as contained in or
disclosed by a document recorded January 12, 2017 as Instrument No. 2017-0020042 of Official
Records.
(Affects both Parcels)
29. We find no outstanding voluntary liens of record affecting subject property. An inquiry should be
made concerning the existence of any unrecorded lien or other indebtedness which could give rise to
any security interest in the subject property.
(Affects both Parcels)
30. Any facts, rights, interests or claims which would be disclosed by a correct ALTNNSPS survey.
31. Water rights, claims or title to water, whether or not shown by the public records.
32. Rights of parties in possession.
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
orm 50003700 (8-23-18) age 12 of 15 ALTA Commitment for Title Insurance (8-1-16
cantomi
INFORMATIONAL NOTES
ALERT -CA Senate Bill 2 imposes an additional fee of $75 up to $225 at the time of
recording on certain transactions effective January 1, 2018. Please contact your First
American Title representative for more information on how this may affect your closing.
1. According to the latest available equalized assessment roll in the office of the county tax assessor,
there is located on the land a(n) Commercial Structure known as 5215 and 5245 Car Country
Drive, Carlsbad, California.
2. According to the public records, there has been no conveyance of the land within a period of twenty-
four months prior to the date of this report, except as follows:
None
3. This preliminary report/commitment was prepared based upon an application for a policy of title
insurance that identified land by street address or assessor's parcel number only. It is the
responsibility of the applicant to determine whether the land referred to herein is in fact the land that
is to be described in the policy or policies to be issued.
The map attached, if any, may or may not be a survey of the land depicted thereon. First American Title
Insurance Company expressly disclaims any liability for loss or damage which may result from reliance on
this map except to the extent coverage for such loss or damage is expressly provided by the terms and
provisions of this Commitment or the Policy, if any, to which the map is attached.
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First Ameriean Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form ( or any derivative thereof) is restricted to AL TA licensees and AL TA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
rm 50003700 (8-23-18) age 13 of 15 ALTA Commitment for Title Insurance (8-1-16
Californi
,,,....., ~----------------~------....
ISSUED BY
First American Title Insurance Company
First American TitlerM File No: 1002-300676-RTT
Exhibit A
File No.: 1002-300676-RTT
The Land referred to herein below is situated in the City of Carlsbad, County of San Diego, State of California, and is
described as follows:
PARCEL ONE:
ALL OF THAT PORTION OF LOT 4 OF CARLSBAD TRACT NO. 87-3, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO,
STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 12242, FILED IN THE OFFICE OF THE COUNTY RECORDER
OF SAN DIEGO COUNTY ON OCTOBER 28, 1988, BEING PARCEL A AS DESCRIBED IN THAT CERTAIN CERTIFICATE OF
COMPLIANCE RECORDED FEBRUARY 24, 2000 AS FILE NO. 2000-0093922 OF OFFICIAL RECORDS, MORE
PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE MOST WESTERLY CORNER OF SAID LOT 4;
THENCE NORTHEASTERLY ALONG THE NORTHWESTERLY BOUNDARY LINE THEREOF, NORTH 67° 30' 23" EAST, 154.09
FEET (NORTH 67° 30' 38" EAST 154.03' -RECORD) TO A POINT IN A CURVE BEING CONCAVE NORTHEASTERLY AND
HAVING A RADIUS OF 50.00 FEET, SAID POINT ALSO BEING IN THE WESTERLY RIGHT-OF-WAY LINE OF AUTO CENTER
COURT, AS SHOWN ON SAID MAP NO. 12242;
THENCE SOUTHEASTERLY AND EASTERLY ALONG SAID CURVE AND SAID RIGHT-OF-WAY LINE, THROUGH A CENTRAL
ANGLE OF 63° 02' 17" AND AN ARC DISTANCE OF 55.01 FEET (63° 01' 58", ARC= 55.01' -RECORD);
THENCE TANGENT FROM SAID CURVE, SOUTH 85° 31' 54" EAST 49.95 FEET (NORTH 85° 31' 20" WEST 50.00' -
RECORD) TO THE BEGINNING OF A TANGENT CURVE CONCAVE SOUTHERLY AND HAVING A RADIUS OF 90.00 FEET;
THENCE EASTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 16° 31' 54" AND AN ARC DISTANCE OF 25.97
FEET (16° 31' 20", ARC= 25.95' -RECORD);
THENCE TANGENT FROM SAID CURVE, SOUTH 69° 00' 00" EAST 295.84 FEET (NORTH 69° 00' 00" WEST 295.78' -
RECORD) TO THE BEGINNING OF A TANGENT CURVE CONCAVE SOUTHWESTERLY AND HAVING A RADIUS OF 20.00
FEET;
THENCE EASTERLY , SOUTHEASTERLY AND SOUTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 81 ° 56'
12" AND AN ARC DISTANCE OF 28.60 FEET (81 ° 55' 34" ARC= 28.60' -RECORD) TO A POINT OF REVERSE CURVE
BEING CONCAVE EASTERLY AND HAVING A RADIUS OF 336.00 FEET, A RADIAL LINE TO SAID CURVE AT SAID POINT
BEARS SOUTH 77° 03' 48" EAST (NORTH 77° 04' 26" WEST -RECORD), SAID POINT ALSO BEING IN THE WESTERLY
RIGHT-OF-WAY LINE OF CAR COUNTRY DRIVE, 72.00 FEET IN WIDTH, AS SHOWN ON SAID MAP NO. 12242,
THENCE SOUTHERLY ALONG SAID CURVE AND RIGHT-OF-WAY LINE THROUGH A CENTRAL ANGLE OF 16° 37' 46" AND
AN ARC DISTANCE OF 97.52 FEET TO A POINT IN SAID CURVE WHICH BEARS A RADIAL LINE OF SOUTH 86° 18' 26"
WEST;
THENCE NON-TANGENT FROM SAID CURVE, SOUTH 86° 06' 31" WEST 59.67 FEET;
THENCE SOUTH 58° 17' 39" WEST 26.80 FEET;
THENCE SOUTH 08° 04' 53" EAST 21.44 FEET;
THENCE SOUTH 82° 11' 53" WEST 234.54 FEET;
THENCE SOUTH 22° 40' 01" EAST 15.82 FEET;
THENCE SOUTH 67° 20' 55" WEST 104.80 FEET TO A POINT IN THE SOUTHWESTERLY BOUNDARY LINE OF SAID LOT 4;
THENCE NORTHWESTERLY ALONG SAID SOUTHWESTERLY BOUNDARY LINE THEREOF, NORTH 22° 29' 25" WEST
361.01 FEET (NORTH 22° 29' 22" WEST-RECORD) TO THE POINT OF BEGINNING.
PARCEL TWO:
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
orm 50003700 (8-23-18) age 14 of 15 ALTA Commitment for Title Insurance (8-1-16
Califomi
ALL OF THAT PORTION OF LOT 4 OF CARLSBAD TRACT NO. 87-3, IN THE CITY OF CARLSBAD, COUNTY OF SAN DIEGO,
STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 12242, FILED IN THE OFFICE OF THE COUNTY RECORDER
OF SAN DIEGO COUNTY ON OCTOBER 28, 1988, BEING PARCEL BAS DESCRIBED IN THAT CERTAIN CERTIFICATE OF
COMPLIANCE RECORDED FEBRUARY 24, 2000 AS FILE NO. 2000-0093923 OF OFFICIAL RECORDS, MORE
PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE MOST SOUTHERLY CORNER OF SAID LOT 4;
THENCE NORTHWESTERLY ALONG THE SOUTHWESTERLY BOUNDARY LINE THEREOF, NORTH 22° 29' 25" WEST,
199.60 FEET (NORTH 22° 29' 22" WEST -RECORD);
THENCE DEPARTING SAID SOUTHWESTERLY BOUNDARY LINE, NORTH 67° 20' 55" EAST, 104.80 FEET;
THENCE NORTH 22° 40' 01" WEST 15.82 FEET;
THENCE NORTH 82° 11' 53" EAST 234.54 FEET;
THENCE NORTH 08° 04' 53" WEST 21.44 FEET;
THENCE NORTH 58° 17' 39" EAST 26.80 FEET;
THENCE NORTH 86° 06' 31" EAST 59.67 FEET TO A POINT IN A NON-TANGENT CURVE CONCAVE EASTERLY AND
HAVING A RADIUS OF 336.00 FEET, A RADIAL LINE TO SAID CURVE AT SAID POINT BEARS NORTH 86° 18' 26" EAST,
SAID POINT ALSO BEING IN THE WESTERLY RIGHT-OF-WAY LINE OF CAR COUNTRY DRIVE, 72.00 FEET IN WIDTH AS
SHOWN ON SAID MAP NO. 12242;
THENCE SOUTHERLY AND SOUTHEASTERLY ALONG SAID CURVE AND SAID WESTERLY RIGHT-OF-WAY LINE THROUGH
A CENTRAL ANGLE OF 18° 47' 24" AND AN ARC DISTANCE OF 110.19 FEET;
THENCE TANGENT FROM SAID CURVE, SOUTH 22° 28' 58" EAST, 54.07 FEET (NORTH 22° 29' 22" WEST 54.06' -
RECORD) TO THE MOST EASTERLY CORNER OF SAID LOT 4;
THENCE SOUTHWESTERLY ALONG THE SOUTHEASTERLY BOUNDARY LINE THEREOF, SOUTH 67° 30' 46" WEST, 402.03
FEET (NORTH 67° 30' 38" EAST 402.00' -RECORD) TO THE POINT OF BEGINNING.
For conveyancing purposes only: APN 211-080-12-00 (Affects Parcel One) and 211-080-13-00 (Affects Parcel Two)
This page is only a part of a 2016 AL TA@ Commitment for Title Insurance issued by First American Title Insurance Company. This Commitment is not
valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule 8, Part I-Requirements; Schedule 8, Part
II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form ( or any derivative thereof) is restricted to AL TA licensees and AL TA members in good standing as of the date of use. All other uses
are prohibited. Reprinted under license from the American Land Title Association.
rm 50003700 (8-23-18) age 15 of 15 ALTA Commitment for Title Insurance {8-1-16
califomi