Loading...
HomeMy WebLinkAbout1060 HOOVER ST; ; CBR2022-2396; PermitPrint Date: 01/04/2023 Permit No: CBR2022-2396 Building Permit Finaled Residential Permit Job Address: Permit Type: Parcel #: Valuation: Occupancy Group: 1060 HOOVER ST, CARLSBAD, CA 92008-4287 BLDG-Residential 2061710700 $5,000.00 Work Class: Lot #: Project #: Reroof Status: Applied: Issued: 07/06/2022 07/13/2022 Finaled Close Out:01/04/2023 #of Dwelling Units: Track #: Plan #: Closed - Finaled Plan Check #: Orig. Plan Check #:Bathrooms: Final Inspection:11/18/2022Bedrooms:Construction Type: Occupant Load: Code Edition: Sprinkled: INSPECTOR:Dreibelbis, Peter Kersch, Tim PICTURE FRAME (PARTIAL RE-ROOF FOR SOLAR SECTION ONLY) (E-REVIEW)Description: Project Title: Applicant: LESLIE MINCHELLO 1805 JOHN TOWERS AVE EL CAJON, CA 92020 Contractor: SEMPER SOLARIS CONSTRUCTION INC 1805 JOHN TOWERS AVE EL CAJON, CA 92020-1116 (619) 807-1253 AMOUNTFEE REROOFING – RESIDENTIAL $89.00 SB1473 – GREEN BUILDING STATE STANDARDS FEE $1.00 STRONG MOTION – RESIDENTIAL (SMIP)$0.65 Total Fees:$90.65 Total Payments To Date:$90.65 Balance Due:$0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 442-339-2719 ï 760-602-8560 f ï www.carlsbadca.gov Building Division Page 1 of 1 {"Cityof Carlsbad RESIDENTIAL BUILDING PERMIT APPLICATION B-1 PlanCheck Est.Value PCDeposit Date JobAddressUnit:APN: CT/Project#:Lot#:YearBuilt: FireSprinklers:YES NOAirConditioning:YESNOElectricalPanelUpgrade:YESNO BRIEFDESCRIPTIONOFWORK: PRIMARYAPPLICANTPROPERTYOWNER Name:Name: Address:Address: City:State:Zip:City:State:Zip: Phone:Phone: Email:Email: DESIGNPROFESSIONAL CONTRACTOROFRECORD Name: BusinessName: Address: City:State:Zip: Phone: Email: ArchitectStateLicense: Address: City:State:Zip: Phone: Email: CSLBLicense#:Class: CarlsbadBusinessLicense#(Required): APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. NAME(PRINT):SIGN:DATE: 1635FaradayAveCarlsbad,CA92008Ph:760Ͳ602Ͳ2719Fax:760Ͳ602Ͳ8558Email:Building@carlsbadca.gov 1 REV. 07/21 Solar:  KW,Modules,Mounted:RoofGround,Tilt:YN,RMA:YN, Battery:YN,PanelUpgrade:YN Reroof: Plumbing/Mechanical/Electrical Only:Other: AdditionalGasorElectricalFeatures?Pool/Spa:SF Istheareaaconversionorchangeofuse?YNRemodel:SFofaffectedarea NewSF:_LivingSF,_DeckSF,PatioSF,GarageSF IsthistocreateanAccessoryDwellingUnit?YNNewFireplace?YN,ifyeshowmany? 1060 Hoover StCarlsbadCA92008 Picture frame (Partial re-roof for Solar section only) Picture frame (Partial re-roof for Solar section only) Estephany Arreola Elliott Laine 1805 John Towers Ave 1060 Hoover StCarlsbadCA92008 El Cajon CA 92020 Carlsbad CA 92008 619-807-1253 760-908-3379 permits.sandiego@sempersolaris.com randylainejetsurf@msn.com Semper Solaris 1805 John Towers Ave El Cajon CA 92020 619-807-1253 permits.sandiego@sempersolaris.com 978152 B/ C46/ C39 1240640 EAEstephany Arreola 06/07/22 □ □ □ □ Iii □ □ Cicyof Carlsbad 00 00 00 0 0 0 0 oo 00 00 @ 0 00 00 ˆ ˆ ˆ ˆ  THISPAGEREQUIREDATPERMITISSUANCE   PLANCHECKNUMBER:__________________ ABUILDINGPERMITCANBEISSUEDTOEITHERASTATELICENSEDCONTRACTORORAPROPERTYOWNER.IFTHEPERSON SIGNINGTHISFORMISANAGENTFOREITHERENTITYANAUTHORIZATIONFORMORLETTERISREQUIREDPRIORTO PERMITISSUANCE.  (OPTIONA):LICENSEDCONTRACTORDECLARATION: I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the following declarations (CHOOSEONE): IhaveandwillmaintainacertificateofconsenttoselfͲinsureforworkers’compensationprovidedbySection3700oftheLaborCode,fortheperformanceofthe workwhichthispermitisissued.PolicyNo. -OR- Ihaveandwillmaintainworker’scompensation,asrequiredbySection3700oftheLaborCode,fortheperformanceoftheworkforwhichthispermitisissued. Myworkers’compensationinsurancecarrierandpolicynumberare:InsuranceCompanyName: PolicyNo._____________________________________________________________ExpirationDate: -OR- CertificateofExemption:Icertifythatintheperformanceoftheworkforwhichthispermitisissued,Ishallnotemployanypersoninanymannersoastobecome subjecttotheworkers’compensationLawsofCalifornia.WARNING:Failuretosecureworkerscompensationcoverageisunlawfulandshallsubjectanemployerto criminalpenaltiesandcivilfinesupto$100,000.00,inadditionthetothecostofcompensation,damagesasprovidedforinSection3706oftheLaborCode, interestandattorney’sfees. CONSTRUCTIONLENDINGAGENCY,IFANY: Iherebyaffirmthatthereisaconstructionlendingagencyfortheperformanceoftheworkthispermitisissued(Sec.3097(i)CivilCode). Lender’sName:Lender’sAddress: CONTRACTOR CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. NAME(PRINT):SIGNATURE:   DATE: Note:Ifthepersonsigningaboveisanauthorizedagentforthecontractorprovidealetterofauthorizationoncontractorletterhead. ͲORͲ (OPTIONB):OWNERͲBUILDERDECLARATION: I hereby affirm that I am exempt from Contractor’s License Law for the following reason: I,asownerofthepropertyormyemployeeswithwagesastheirsolecompensation,willdotheworkandthestructureisnotintendedorofferedforsale(Sec. 7044,BusinessandProfessionsCode:TheContractor’sLicenseLawdoesnotapplytoanownerofpropertywhobuildsorimprovesthereon,andwhodoessuch workhimselforthroughhisownemployees,providedthatsuchimprovementsarenotintendedorofferedforsale.If,however,thebuildingorimprovementissold withinoneyearofcompletion,theownerͲbuilderwillhavetheburdenofprovingthathedidnotbuildorimproveforthepurposeofsale). -OR- I,asowneroftheproperty,amexclusivelycontractingwithlicensedcontractorstoconstructtheproject(Sec.7044,BusinessandProfessionsCode:The Contractor’sLicenseLawdoesnotapplytoanownerofpropertywhobuildsorimprovesthereon,andcontractsforsuchprojectswithcontractor(s)licensed pursuanttotheContractor’sLicenseLaw). -OR- IamexemptunderBusinessandProfessionsCodeDivision3,Chapter9,Article3forthisreason:  AND,  FORMBͲ61“OwnerBuilderAcknowledgementandVerificationForm”isrequiredforanypermitissuedtoapropertyowner.  BymysignaturebelowIacknowledgethat,exceptformypersonalresidenceinwhichImusthaveresidedforatleastoneyearpriortocompletionofthe improvementscoveredbythispermit,IcannotlegallysellastructurethatIhavebuiltasanownerͲbuilderifithasnotbeenconstructedinitsentiretybylicensed contractors.I understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is submitted or at the following Web site: http://www.leginfo.ca.gov/calaw.html. OWNER CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. NAME(PRINT):SIGN:DATE: Note:IfthepersonsigningaboveisanauthorizedagentforthepropertyownerincludeformBͲ62signedbypropertyowner. 1635FaradayAveCarlsbad,CA92008Ph:760Ͳ602Ͳ2719Fax:760Ͳ602Ͳ8558Email:Building@carlsbadca.gov  2 REV. 07/21 ˆ Midwest Employers Casualty Company BNUWC0155108 10/10/2022 EA EA 06/07/22 06/07/22Estephany Arreola Estephany Arreola □ 0 a 0 □ B-10 Page 6 of 6 Rev. 04/14 REROOFING SUPPLEMENTAL BUILDING PERMIT APPLICATION 1. JOB ADDRESS:_______________________________________________________ 2. TYPE OF BUILDING: RESIDENTIAL__________ COMMERCIAL_________ ** Please contact HCD for a permit if you will be doing work on a manufactured/mobile home. ** 3. ROOF SLOPE: RISE_______ INCHES IN 12 INCHES 4. NUMBER OF EXISTING ROOF COVERING (CIRCLE ONE) 1 2 3 5. TYPE OF EXISTING ROOF COVERING________________SHEATHING________ 6. NEW ROOF MATERIAL ________________CLASS_____ 7. NUMBER OF SQUARES________________ WEIGHT PER SQ.__________ 8. TRADE NAME__________________ MANUFACTURER______________________ 9. ROOF SYSTEM LISTING: UL NO. ______________ I.C.C.E.S. Report #_______________ ASTM ______________ 10.IS THE EXISTING STRUCTURAL DESIGN SUFFICIENT TO SUSTAIN THE WEIGHT OF THE PROPOSED ROOF? YES NO All roof coverings are required to be CLASS A. Combustible roof coverings of any type or classification are prohibited. I understand the following inspections are required: 1. Tear Off/Pre-Inspection prior to install new roof covering 2. Final Inspection I agree to provide a ladder extending at least 2 rungs above the roof for inspection. Name ___________________________________________ Signature ________________________________________Date______________________ (CIRCLE ONE) Contractor Owner *6. Rolled Roofing, Standard/Lite Tile, Asphalt/Comp fiberglass, Built Up, Other x Estephany Arreola EA 06/07/2022 XX xx No 5.81 200 1060 Hoover St Carlsbad CA 92008 4 Composition shingle Duration - Terra Cotta Building Permit Inspection History Finaled PERMIT INSPECTION HISTORY for (CBR2022-2396) BLDG-Residential 07/06/2022Application Date:Permit Type:Owner: Reroof 07/13/2022Work Class:Issue Date:Subdivision:PARCEL MAP NO 14772 02/13/2023Expiration Date:Status: IVR Number: 41786 Closed - Finaled 1060 HOOVER ST CARLSBAD, CA 92008-4287 Address: Scheduled Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection InspectionActual Start Date 08/16/2022 08/16/2022 BLDG-15 Roof/ReRoof (Patio) 189263-2022 Passed Tim Kersch Complete COMMENTS PassedChecklist Item BLDG-Building Deficiency Yes 11/18/2022 11/18/2022 BLDG-Final Inspection 196930-2022 Passed Peter Dreibelbis Complete COMMENTS PassedChecklist Item BLDG-Building Deficiency No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final Yes BLDG-Electrical Final No Friday, November 18, 2022 Page 1 of 1 {cityof Carlsbad