HomeMy WebLinkAbout2800 WHIPTAIL LOOP; ; CBC2021-0317; PermitBuilding Permit Finaled
( City of
Carlsbad
Commercial Permit
Print Date: 08/12/2022 Permit No: CBC2021-0317
Job Address: 2800 WHIPTAIL LOOP, CARLSBAD, CA 92010-6751 Status: Closed -Finaled
Permit Type: BLDG-Commercial Work Class: Tenant Improvement
Parcel#:
Valuation: $1,345,069.20
Occupancy Group: S·l, F·l
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load: 208
Code Edition: 2019
Sprinkled: Yes
Project Title:
Track#:
Lot#:
Project #:
Plan#:
Construction Type:V-B
Orig. Plan Check#:
Plan Check#:
Applied: 08/24/2021
Issued: 10/15/2021
Finaled Close Out: 07/22/2022
Final Inspection: 07/22/2022
INSPECTOR: Alvarado, Tony
Kersch, Tim
Description: AETH ERCOMM: 28,920 SF SHELL TO 16,146 SF FACTORY & 12,774 SF WAREHOUSE
FEE
BUILDING PLAN CHECK FEE (BLDG)
BUILDING PLAN REVIEW -MINOR PROJECTS (LOE)
BUILDING PLAN REVIEW -MINOR PROJECTS (P LN)
COMM/IND Tl -STRUCTURAL
FIRES Occupancies< 50,000sq. ft. Tl
SB1473-GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMIP)
Total Fees: $7,111.40 Total Payments To Date: $7,111.40
Contractor:
RYAN COMPANIES US INC
533 S 3RD ST, # STE 100
MINNEAPOLIS, MN 55415-1101
(612) 492-4791
Balance Due:
AMOUNT
$2,955.78
$194.00
$98.00
$3,022.00
$411.00
$54.00
$376.62
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow t hat procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.ca rlsbadca.gov
( City of
Carlsbad
Job Address 2800 Whiptail Loop w.
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check C'5Q..202,,\--G3\
Est. Value \' 34:5 ,Oloq
PC Deposit
Date !.,-2'o-?J
Suite: C6 APN: 209-120-25·00 -----·
Tenant Name #:,_A_e_th_er_com_m _______________ Lot #: _____ Year Built: __________ _
Year Built:_20_1_9 __ Occupancy: s-1 & F-1 Construction Type:_v_-8 __ Fire sprlnklers@'ESQNO A/C:0YES0NO
BRIEF DESCRIPTION OF WORK: THIS PROJECT IS A 28,920 USF FIRST GENERATION TENANT IMPROVEMENT. DEMO AND RELOACTION OF A UTILITY ROOM.
NEW NON ·STRUCTURAL PARTITIONS ANO FINISHES, LIGHTING, ELECTRICAL, HVAC, PLUMBING, ANO STRUCTURAi. WAU..S. NO MOOIFICATIOI-IS TO SITE, PARKING, ANO LAtlOSCAPE. NO SIGHAOE SCOPE.
0 Addltion/New:, ____________ New SF and Use, __________ New SF and Use
______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
[{]renant Improvement: 28,920 usF SF,
_____ SF,
Existing Use: _w_a_re_ho_u_se ____ Proposed Use: _s_-1_a_nd-F_·_1 ----
Existing Use: Proposed Use: ______ _
□ Pool/Spa: _____ .SF Additional Gas or Electrical Features? _____________ _
D Solar: ___ K,W, ___ Modules, Mounted: 0Roof 0Ground
D Re roof: _____________________________________ _
D Plumbing/Mechanical/Electrical
Oother: ______________________________ _
PRIMARY APPLICANT
Name: Michael Beadle
Address: 4275 Executive Sq., Suite 370
PROPERTY OWNER
Name: Gateway Pacific View, LLC.
Address: 4275 Executive Sq., Suite 370
City: La Jolla State:_c_A __ .Zlp: 92037 City: La Jolla State:_c_A __ .Zlp: 92037
Phone: 858-812-7926
Email: Michaet.Beadle@RyanCompanies.com
DESIGN PROFESSIONAL
Name: Lori Johnson
Address: 50 S.10TH STREET, SUITE 300
Phone: 858·812-7960
Email: chris.wood@ryancompanies.com
CONTRACTOR OF RECORD
Business Name: Ryan Companies us, Inc,
Address: 4275 Executive Sq., Suite 370
City: Minneapolis State:_M_N __ .Zip: 55403 City: La Jolla State:_C_A __ Z.ip: 92037
Phone: (612) 492-4879 Phone: 858·812-7926
Email: LORI.JOHNSON@RYANCOMPANIES.COM Email: Michael.Beadle@RyanCompanies.com
Architect State License: c-28016 CSLB License#: 842487 Class: 8 ------------, _______ _
Carlsbad Business License# (Required): BLo soo1sss-10-2o11
APPLICANT CERT/FICA TION: I certify that/ have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): Michael Beadle SIGN: . ., ..... _ ~;;F.,~.:.--=,.,_-•~ DATE: 08/23/2021 -----.-:=:::.::::----
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Bulldlng@carisbadca.goy
REV. 07/21
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
lherebyaftirmunderpena/tyofperjurythatlamlicensedunderprovisionsofChapter 9(commencingwithSection7000)ofDivision3
of the Business and Prof essions Code, and my license Is In full force and effect. I alsoaffirm under penalty of perjury one of the
following dec/arations(CHOOSE ONE):
D1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the l abor Code, for the performance of the
work which this permit Is Issued. PollcyNo .. _____________________________________ _
-OR-IIl1 have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is Issued.
My workers' compensation Insurance carrier and policy number are: lnsuranceCompany Name: _...,._,,r_•_...,_.,_,._, .. _.,,._._eo_mpa-'-""--------------
Policy No. VIAS-<140-...sm-•21 lAO•i Expiration Date: _•_3·3_•·_2ou _____________ _
-OR-
Ocertificate of Exemption: I certify that In the performance of the work for which this permit Is issued, I shall not employ any person In any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage Is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compens~tlon, damages as provided for In Se_ction 3706 of the l abor Code,
Interest and attorney's fees. ·
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ____________________ Lender's Address: ___________________ _
CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that
the information on the plans ls accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
1
I . ~ ~
NAME {PRINT): Michael Beadle SIGNATURE:__;,_ti..;._JY_..;;;;....;J)J1/ _____ DATE: 10/08/2021
Note: If the person slgnln1 above Is an authorized agent for the contractor provide a letter of authorization on contractor letterhead.
-OR -
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not intended or offered for sale (Sec.
~44, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or Improves thereon, and who does such
work himself or through his own employees, provided that such Improvements are not Intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or Improve for the purpose of sale).
-OR-D1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
-OR-□, am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND,
D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit Issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if It has not been constructed in its entirety by licensed
contractors. I understand that a copy of the applicable law, Section 7044 of theBusinessand Professions Code, isavaflableupon request when this application is
submitted or at the following Web site: http:Ilwww.leg/nfo.ca.gov/ ca/aw.html.
OWNER CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the
Information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT):
Note: If the person signing above Is an authorized agent for the property owner Include form B-62 signed by property owner.
SIGN: DATE: ----------------------
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Bullding@carlsbadca.gov
2 REV. 07/21
(cicyof
Carlsbad
OWNERS
AUTHORIZED
AGENT FORM
B-62
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www .carlsbadca.gov
OWNER'SAUTHORIZED AGENT FORM
Only a property owner, contractor or their authorized agent may submit plans and applications for building
permits. To authorize a third-party agent to sign for a building permit, the owner's third party agent must bring
this signed form, which identifies the agent and the owner who s/he is representing, and for what jobs s/he
may obtain permits. The form must be completed in its entirety to be accepted by the City for each separate
permit application.
Note: The following Owner's Authorized Agent form is required to be completed by the
property owner only when designating an agent to apply for a construction permit
on his/her behalf.
AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF
Excluding the Property Owner Acknowledgement, the execution of which 1 understand is my personal responsibility,
I hereby authorize the following person(s) to act as my agent(s) to apply for, sign, and file the documents necessary
to obtain an Owner-Builder Permit for my project. DEMO AND RELOACTION OF A UTILITY ROOM. NEW
NON -STRUCTURAL PARTITIONS AND FINISHES, LIGHTING,
Scope of Construction Project (or Description of Work): ELECTRICAL, HVAC, PLUMBING, AND STRUCTURAL WALLS.
ProjectLocationorAddress: 2800 Whiptail Loop W. Suite C6
Michael Beadle 858.812. 7926 Name of Authorized Agent: -----------------~Tel No. _________ _
4275 Executive Square, Suite 370 La Jolla, CA 92037 Address of Authorized Agent: _____________________________ _
I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled
out the above information and certify its accuracy.
Digitally s1gn"d by Chns Wood
C h • w d DN C=US, E-chr1s.wood(&ryancompamcs, 0-Ryan . r Is O O £~~~antes, OU=Pra~1dem. We~I Region, CN=Chris
Property Owner's Signature: Date· 2021 can 14 o7.5H}7'oo
08/23/2021 Date: _______ _
1
PERMIT INSPECTION HISTORY for (CBC2021-0317)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 08/24/2021 Owner:
Issue Date: 10/15/2021 Subdivision:
Expiration Date: 09/20/2022
IVR Number: 35470
Address: 2800 WHIPTAIL LOOP
CARLSBAD, CA 92010-6751
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
Friday, August 12, 2022
Status
COMMENTS
Disabled accessibility, verified and
approved at final inspection review, for
new restrooms and warehouse interior
tenant improvements scope of work per
plan.
Passed
Yes
Page 8 of 8
PERMIT INSPECTION HISTORY for (CBC2021-0317)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 08/24/2021
Issue Date: 10/15/2021
Expiration Date: 09/20/2022
IVR Number: 35470
Owner:
Subdivision:
Address: 2800 WHIPTAIL LOOP
CARLSBAD, CA 92010-6751
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
June 14, 2022: TCO (Approved-only).
1. TCO-temporary certificate of occupancy
-approved.
Final inspection requirements PENDING:
a) waste management, B-59 form with
receipts required.
b) Form superintend it, contractors
representative at regarding B-59 waste
management form requirements.
c) rest of work OK, per plan.
d) TCO for employee training and stocking
shelves, and installing equipment -
(ONLY).
July 22, 2022: Final occupancy-approved
1. approved all Final inspection
requirements:
a) waste management, B-59 form with
receipts verified, filed, -approved.
b) Final title 24 energy report and final air
balance report -approved.
c) rest of work OK, per plan.
July 22, 2022: Final occupancy-approved
1. approved all Final inspection
requirements:
a) waste management, B-59 form with
receipts verified, filed, -approved.
b) Final title 24 energy report and final air
balance report -approved.
c) rest of work OK, per plan.
July 22, 2022: Final occupancy-approved
1. approved all Final inspection
requirements:
a) waste management, B-59 form with
receipts verified, filed, -approved.
b) Final title 24 energy report and final air
balance report -approved.
c) rest of work OK, per plan.
July 22, 2022: Final occupancy-approved
1. approved all Final inspection
requirements:
a) waste management, B-59 form with
receipts verified, filed, -approved.
b) Final title 24 energy report and final air
balance report -approved.
c) rest of work OK, per plan.
08/11/2022 08/11/2022 BLDG-97 Disabled
Accessibility
189065-2022 Passed Tony Alvarado
Friday, August 12, 2022
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Page 7 of 8
PERMIT INSPECTION HISTORY for (CBC2021-0317)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 08/24/2021 Owner:
Issue Date: 10/15/2021 Subdivision:
Expiration Date: 09/20/2022 Address: 2800 WHIPTAIL LOOP
CARLSBAD, CA 92010-6751 IVR Number: 35470
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
BLDG-Electrical Final
Status
June 14, 2022: TCO (Approved-only).
1. TCO-temporary certificate of occupancy
-approved.
Final inspection requirements PENDING:
a) waste management, B-59 form with
receipts required.
b) Form superintend it, contractors
representative at regarding B-59 waste
management form requirements.
c) rest of work OK, per plan.
d) TCO for employee training and stocking
shelves, and installing equipment -
(ONLY).
07/22/2022 07/22/2022 BLDG-Final Inspection 187435-2022 Passed Tony Alvarado
Friday, August 12, 2022
Yes
Complete
Page 6 of 8
PERMIT INSPECTION HISTORY for (CBC2021-0317)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 08/24/2021
Issue Date: 10/15/2021
Expiration Date: 09/20/2022
IVR Number: 35470
Owner:
Subdivision:
Address: 2800 WHIPTAIL LOOP
CARLSBAD, CA 92010-6751
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
Friday, August 12, 2022
COMMENTS
June 14, 2022: TCO (Approved-only).
1. TCO-temporary certificate of occupancy
-approved.
Final inspection requirements PENDING:
a) waste management, B-59 form with
receipts required.
b) Form superintend it, contractors
representative at regarding 8-59 waste
management form requirements.
c) rest of work OK, per plan.
d) TCO for employee training and stocking
shelves, and installing equipment -
(ONLY).
June 14, 2022: TCO (Approved-only).
1. TCO-temporary certificate of occupancy
-approved.
Final inspection requirements PENDING:
a) waste management, B-59 form with
receipts required.
b) Form superintend it, contractors
representative at regarding B-59 waste
management form requirements.
c) rest of work OK, per plan.
d) TCO for employee training and stocking
shelves, and installing equipment -
(ONLY).
June 14, 2022: TCO (Approved-only).
1. TCO-temporary certificate of occupancy
-approved.
Final inspection requirements PENDING:
a) waste management, B-59 form with
receipts required.
b) Form superintend it, contractors
representative at regarding 8-59 waste
management form requirements.
c) rest of work OK, per plan.
d) TCO for employee training and stocking
shelves, and installing equipment -
(ONLY).
June 14, 2022: TCO (Approved-only).
1. TCO-temporary certificate of occupancy
-approved.
Final inspection requirements PENDING:
a) waste management. B-59 form with
receipts required.
b) Form superintend it, contractors
representative at regarding B-59 waste
management form requirements.
c) rest of work OK, per plan.
d) TCO for employee training and stocking
shelves, and installing equipment -
(ONLY).
Passed
Yes
Yes
Yes
Yes
Paga 5 of 8
PERMIT INSPECTION HISTORY for (CBC2021-0317)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 08/24/2021
Issue Date: 10/15/2021
Expiration Date: 09/20/2022
IVR Number: 35470
Owner:
Subdivision:
Address: 2800 WHIPTAIL LOOP
CARLSBAD, CA 92010-6751
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
03/16/2022 03/16/2022 BLDG-44 178423-2022 Partial Pass Tony Alvarado Reinspection Incomplete
Rough/Ducts/Dampers
Checklist Item COMMENTS Passed
BLDG-Building Deficiency March 7, 2022: Yes
1. Partial pass mechanical duct sealant
product installed -partial pass.
2. Interior bathroom ceiling hard lids/drywall
Gypsum Board-Approved.
3. T-bar grid ceiling installed at bathroom
areas only-approved.
BLDG-Building Deficiency March 16, 2022: Yes
1. Phase 2: Partial pass mechanical duct
sealant product installed.
2. Energy-efficient thermal Insulation
wrapped mechanical ducting-partial pass.
03/24/2022 03/24/2022 BLDG-44 179005-2022 Partial Pass Tim Kersch Re inspection Incomplete
Rough/Ducts/Dampers
Checklist Item COMMENTS Passed
BLDG-Building Deficiency March 7, 2022: Yes
1. Partial pass mechanical duct sealant
product installed -partial pass.
2. Interior bathroom ceiling hard lids/drywall
Gypsum Board-Approved.
3. T-bar grid ceiling installed at bathroom
areas only -approved.
BLDG-Building Deficiency March 16, 2022: Yes
1. Phase 2: Partial pass mechanical duct
sealant product installed.
2. Energy-efficient thermal Insulation
wrapped mechanical ducting-partial pass.
06/14/2022 06/14/2022 BLDG-Final Inspection 184810-2022 Partial Pass Tony Alvarado Reinspection Incomplete
Friday, August 12, 2022 Page 4 of 8
PERMIT INSPECTION HISTORY for (CBC2021-0317)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 08/24/2021
Issue Date: 10/15/2021
Expiration Date: 09/20/2022
IVR Number: 35470
Owner:
Subdivision:
Address: 2800 WHIPTAIL LOOP
CARLSBAD, CA 92010-6751
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Friday, August 12, 2022
Checklist Item
BLDG-Building Deficiency
Status
COMMENTS
March 7. 2022:
1. Partial pass mechanical duct sealant
product installed -partial pass.
2. Interior bathroom ceiling hard lids/drywall
Gypsum Board-Approved.
3. T-bar grid ceiling installed at bathroom
areas only -approved.
BLDG-82 Drywall, 177915-2022 Passed Tony Alvarado
Exterior Lath, Gas Test,
Hot Mop
Checklist Item COMMENTS
BLDG-17 Interior Lath-Drywall March 7, 2022:
1. Partial pass mechanical duct sealant
product installed -partial pass.
2. Interior bathroom ceiling hard lids/drywall
Gypsum Board-Approved.
3. T-bar grid ceiling installed at bathroom
areas only -approved.
BLDG-85 T-Bar, Ceiling 177853-2022 Passed Tony Alvarado
Grids, Overhead
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
March 7, 2022:
1. Partial pass mechanical duct sealant
product installed -partial pass.
2. Interior bathroom ceiling hard lids/drywall
Gypsum Board-Approved.
3. T-bar grid ceiling installed at bathroom
areas only -approved.
March 7, 2022:
1. Partial pass mechanical duct sealant
product installed -partial pass.
2. Interior bathroom ceiling hard lids/drywall
Gypsum Board-Approved.
3. T-bar grid ceiling installed at bathroom
areas only -approved.
March 7, 2022:
1. Partial pass mechanical duct sealant
product installed -partial pass.
2. Interior bathroom ceiling hard lids/drywall
Gypsum Board-Approved.
3. T0bar grid ceiling installed at bathroom
areas only -approved.
March 7, 2022:
1. Partial pass mechanical duct sealant
product installed -partial pass.
2. Interior bathroom ceiling hard lids/drywall
Gypsum Board-Approved.
3. T-bar grid ceiling installed at bathroom
areas only -approved.
Passed
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Yes
Yes
Yes
Page 3 of 8
PERMIT INSPECTION HISTORY for (CBC2021-0317)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 08/24/2021
Issue Date: 10/15/2021
Owner:
Subdivision:
Status: Closed -Finaled Expiration Date: 09/20/2022
IVR Number: 35470
Address: 2800 WHIPTAIL LOOP
CARLSBAD, CA 92010-6751
Scheduled
Date
02/03/2022
02/14/2022
03/07/2022
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector
Status
Checklist Item
BLDG-Building Deficiency
COMMENTS
Restroom rough frame combination,
electrical, plumbing and mechanical scope
of work -approved per plan.
BLDG-34 Rough
Electrical
175522-2022 Partial Pass Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
Phase 2.
Restroom rough frame combination,
electrical, plumbing and mechanical scope
of work -approved per plan.
BLDG-84 Rough
Combo(14,24,34,44)
175595-2022 Partial Pass Tony Alvarado
Checklist Item
BLDG-14
Frame-Steel-Bolling-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
Restroom rough frame combination,
electrical, plumbing and mechanical scope
of work -approved per plan.
Restroom rough frame combination,
electrical, plumbing and mechanical scope
of work -approved per plan.
Restroom rough frame combination,
electrical, plumbing and mechanical scope
of work -approved per plan.
Restroom rough frame combination,
electrical, plumbing and mechanical scope
of work -approved per plan.
02/03/2022 BLDG-34 Rough
Electrical
175901-2022 Partial Pass Tony Alvarado
02/14/2022
03/07/2022
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
February 3, 2022:
1. Phase 2, scope of electrical work, rough
electrical work located at vertical wall
areas (only)-approved.
Phase 2.
Restroom rough frame combination,
electrical, plumbing and mechanical scope
of work -approved per plan.
BLDG-17 Interior 176568-2022 Passed Tim Kersch
Lath/Drywall
Checklist Item COMMENTS
BLDG-Building Deficiency
BLDG-44 177916-2022 Partial Pass Tony Alvarado
Rough/Ducts/Dampers
Friday, August 12, 2022
Reinspection Inspection
Passed
Yes
Reinspection Incomplete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Yes
Yes
Yes
Reinspection Incomplete
Passed
Yes
Yes
Complete
Passed
Yes
Re inspection Incomplete
Page 2 of 8
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2021-0317)
Permit Type: BLDG-Commercial Application Date: 08/24/2021 Owner:
Work Class: Tenant Improvement Issue Date: 10/15/2021 Subdivision:
Status: Closed -Finaled Expiration Date: 09/20/2022 Address: 2800 WHIPTAIL LOOP
IVR Number: 35470 CARLSBAD, CA 92010-6751
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
11/16/2021 11/16/2021 BLDG-21 170871-2021 Partial Pass Tony Alvarado Reinspection Incomplete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency November 16, 2021: Yes
No underground waste plumbing line
Deficiencies.
1. New 6 inch Plumbing Underground
waste lines. underwater leak test 1 0' feet
of water head pressure test, with clean
outs (Partial), scope of work per
engineered plans and detail specifications
-partial pass approval.
11/24/2021 11/24/2021 BLDG-21 171321-2021 Passed Tony Alvarado Complete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency November 16, 2021: Yes
No underground waste plumbing line
Deficiencies.
1. New 6 inch Plumbing Underground
waste lines, underwater leak test 1 0' feet
of water head pressure test, with clean
outs (Partial), scope of work per
engineered plans and detail specifications
-partial pass approval.
BLDG-Building Deficiency November 123. 2021: Yes
No underground waste plumbing line
Deficiencies.
1. New 6 inch Plumbing Underground
waste lines, underwater leak test 1 0' feet
of water head pressure test, with clean
outs (Completed), scope of work per
engineered plans and detail specifications
-pass and approved.
12/10/2021 12/10/2021 BLDG-17 Interior 172397-2021 Partial Pass Tim Kersch Re inspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/28/2022 01/28/2022 BLDG-24 Rough/Topout 175521 -2022 Passed Tony Alvarado Complete
Friday, August 12, 2022 Page 1 of 8
DATE: 9-10-2021
JURISDICTION: Carlsbad
PLAN CHECK#.: CBC2021-0317
• 1W
INTERWEST
SET: II
PROJECT ADDRESS: 2800 Whiptail Loop C6
PROJECT NAME: Aethercomm -28,920 sqft TI
□ APPLICANT
□ JURIS.
lz;J The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The check list transmitted herewith is for your information. The plans are being held at lnterwest
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
lz;J lnterwest staff did not advise the applicant that the plan check has been completed .
D lnterwest staff did advise the applicant that the plan check has been completed.
Person contacted: Michael Beadie Telephone#: 858-812-7926
Date contacted: (by: ) Email: michael.beadle@ryancompanies.com
Mail Telephone Fax In Person
0 REMARKS:
By: Steven Miller for (Erich A. Kuchar, P.E.)
lnterwest
8-26-2021
Enclosures:
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92 123 ♦ (858) 560-1 468 ♦ Fax (858) 560-1576
'
DATE: 9-10-2021
JURISDICTION: Carlsbad
PLAN CHECK#.: CBC2021-0317
• fflT
INTERWEST
A SAFtbudl COMPANY
SET: I
PROJECT ADDRESS: 2800 Whiptail Loop C6
PROJECT NAME: Aethercomm -28,920 sqft TI
□ APPLICANT
□ JURIS.
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
~ The check list transmitted herewith is for your information. The plans are being held at lnterwest
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D lnterwest staff did not advise the applicant that the plan check has been completed.
~ lnterwest staff did advise the applicant that the plan check has been completed.
Person contacted: Michael Beadie Telephone#: 858-812-7926
Date contacted : (by: ) Email: michael.beadle@ryancompanies.com
Mail Telephone Fax In Person
0 REMARKS:
By: Erich A. Kuchar, P.E.
lnterwest
8-26-2021
Enclosures:
9320 Chesapeake Drive, Suite 208 ♦ San Diego, Cali fornia 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
Carlsbad CBC2021-0317
9-10-2021
PLAN REVIEW CORRECTION LIST
COMMERCIAL
PLAN CHECK#.: CBC2021-0317
OCCUPANCY: S-1, F-1
TYPE OF CONSTRUCTION: V-8
SPRINKLERS?: Ye s
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 8-23-2021
DATE INITIAL PLAN REVIEW
COMPLETED: 9-10-2021
FOREWORD (PLEASE READ):
JURISDICTION: Carlsbad
USE: Warehouse
ACTUAL AREA: 28,920 sqft TI
STORIES: 1
HEIGHT: 35'-0"
OCCUPANT LOAD: 208
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 8-26-2021
PLAN REVIEWER: Erich A. Kuchar, P.E.
This plan review is limited to the technical requirements contained in the California version of
the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy conservation, noise attenuation and access for
the disabled. This plan review is based on regulations enforced by the Building Department.
You may have other corrections based on laws and ordinances enforced by the Planning
Department, Engineering Department, Fire Department or other departments. Clearance from
those departments may be required prior to the issuance of a building permit.
Code sections cited are based on the 2019 CBC, which adopts the 2018 IBC .
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2018 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
Carlsbad CBC2021-0317
9-10-2021
GENERAL
1. Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to lnterwest and the Carlsbad Planning,
Engineering and Fire Departments.
2. Bring TWO corrected set of plans and calculations/reports to lnterwest, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of plans and calculations/reports directly to the City of Carlsbad
Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to lnterwest only will not be reviewed by
the City Planning , Engineering and Fire Departments until review by lnterwest is
complete.
2. Plans may be submitted in electronic format, subject to the jurisdiction's
approval. If so, they must have restrictions removed from the security settings.
Electronic plans with restrictions to markups, printing, or stamping will not be
approved.
3. A reminder that due to Covid-19, the City will not permit counter corrections.
Please make sure all the items are satisfied; otherwise, another round of
corrections will be necessary.
4. Please provide a response list indicating where each correction item has been
addressed on the plans. I.e., specify the plan sheet, note, or detail number,
calculation page, etc., where the item is corrected on the plans.
5. Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans. Have changes been
made to the plans not resulting from this correction list?
Please indicate: □Yes □ No
6. The jurisdiction has contracted with lnterwest, located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact lnterwest. Thank
you .
Carlsbad CBC2021-0317
9-10-2021
BUILDING COMMENTS
Plan Check Engineer: Erich A. Kuchar, P.E.
EXITS
Set: I
7. On sheet A 101 there are a few doors showing Card Readers with no panic
hardware listed or shown that are part of exiting. Example door 133 at gridline
C.17 and C.B. This door is required to have panic hardware, yet it appears to not
be shown or listed. Please add notes stating all doors that lead to exits will have
panic hardware on sheet A 101 per comment below.
8. Note on the plans: "All egress doors shall be readily openable from the egress
side without the use of a key or special knowledge or effort." Section 1010.1.9.
In lieu of the above, in a Group F and S occupancies you may note on the plans
"Provide a sign on or near the exit door, reading THIS DOOR TO REMAIN
UNLOCKED WHEN THIS SPACE IS OCCUPIED." This signage is only allowed
at the main exit. Section 1010.1 .9.4.
DISABLED ACCESS REVIEW LIST
DEPARTMENT OF STATE ARCHITECT-TITLE 24
The following disabled access items are taken from the 2019 edition of California Building
Code, Title 24. Per Section 1.9.1, all publicly and privately funded public accommodations
and commercial facilities shall be accessible to persons with disabilities.
REMODELS, ADDITIONS AND REPAIRS
9. When alterations, structural repairs or additions are made to an existing building,
that building, or portion of the building affected, is required to comply with all of the
following requirements, per Section 11 B-202.4:
• Existing toilet and bathing facilities that serve the remodeled area must be
shown to comply with all accessibility features.
RESTROOM FIXTURES AND ACCESSORIES
' 10. On sheet A 150 the toilet seat cover dispenser, as shown on plans in elevation
B/A150, is not acceptable. The 1-½" clearance between the grab-bar and the wall
is absolute, not subject to construction tolerances to encroach into, as the
dispenser will. This is a new change effective July 1, 2018 in the CBC, Sec. 11 B-
609.3. Please move the dispenser below the grab bar as shown on sheet A 150 in
the bottom right corner under "Restroom Mounting Heights".
STRUCTURAL
Carlsbad CBC2021-0317
9-10-2021
11. Update detail 4/S1 .1 to show positive uplift connection between the mechanical
curb and structure below. Currently only A35s are shown but these have no uplift
value.
PLUMBING, ELECTRICAL, AND MECHANICAL
PLAN REVIEWER: Steven Miller , SET: I
PLUMBING
1. Page P2.2 the Urinals shown are missing the required CO above the fixture.
Cleanouts are required to be installed above all urinals. Please address on the
plans. CPC 707.4
2. Page P3.1 detail how the floor drain trap seal is to be maintained. CPC
1007.0
3. Floors shall slope to the floor drain locations. Please detail on the
architectural floor plans. CPC 418.5
ELECTRICAL
1. Page E6.1 Submit panels schedules. The submitted panels are missing the HP
existing and new please clarify.
2. Submit electrical load calculations.
3. Indicate new additional loads.
4 . Indicate wiring method, i.e. EMT, metal flex.
5. Page E4.1 This page is blank no roof top equipment has been shown on the
electrical roof plan. A GFCI protected receptacle outlet is required within 25
feet and on the same level as the mechanical equipment (heating, air-
conditioning, and refrigeration equipment). Please include on the plans. NEC
210.63.
MECHANICAL
6 . Page M201 The supply and return ducts locations are missing for HP-4b and HP-
5. Hp-4a is labeled for 3 different locations Please clarify and show the location
of HP-4b and HP-5.
7 . Page M501 Detail #5 please show compliance with CMC 603.4.1 & 603.5 for
length limitations for factory made flexible air ducts: (1) Cannot be greater than 5'
in length, (2) cannot be used as a replacement of rigid elbows (i.e. only an elbow
connect to a terminal device/ register is acceptable), (3) sag between supports
hangers shall not exceed ½" per foot of support spacing, and (4) the elbow
Carlsbad CBC2021-0317
9-10-2021
connection to the terminal device/ register is required to have a bend not radius
be less than one duct diameter.
8. Detail ladder access to roof mounted HVAC equipment.
Note: If you have any questions regarding this Building and Accessibility plan review list
please contact Steven Miller at stmiller@esgil.com . To speed the review process, note
on this list (or a copy) where the corrected items have been addressed on the plans.
END OF DOCUMENT
Carlsbad CBC2021-0317
9-10-2021
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: Erich A. Kuchar, P.E.
BUILDING ADDRESS: 2800 Whiptail Loop C6
BUILDING OCCUPANCY: S-1, F-1
PLAN CHECK#.: CBC2021-0317
DATE: 9-10-2021
BULDING AREA
PORTION (Sq.Fl)
Tl 28920
Air Conditioring
Fire Sprinklers
TOTAL VALUE
Jurisdiction C.Ode cb
I 1997 UBC Building P,rmit F" i]
I f'lt .;-.i;:
J 1997 UBC Plan Ch"k F"
l·:t\l,SI::
i.l
Valuation
~ier
46.51
By Ordinance
Type of Review: P Complete Review
r Repetitive fee °' ~ Repeats
,.
r Other
r Howly
EaGil Fee ,.
Reg. VALUE ($)
Mod.
1,345,069
...
1,345,069
] ,
r Structural Only
1------t @ • $2,744.33,
Sheet 1 of 1
MBO Inc.
4830 Viewridge Ave, Suite A
San Diego, CA 92123
(858) 751-5702
www.mbol.com
Prepared for:
Darrick DeWindt
Brian Cox Mechanical, Inc.
12155 Kirkham Road,
Poway, CA 92064
ddewindt@briancoxmechanical.com
Issued:
6.16.2022
CERTIFICATION#
3306
NEBB CERTIFIED TESTING, ADJUSTING & BALANCING REPORT
PROJECT NAME: Aethercomm Tl
PROJECT ADDRESS: 2800 Whiptail Loop W.,
Carlsbad, CA 92010
ENGINEER: Salas O'Brien
HVAC CONTRACTOR: Brian Cox Mechanical, Inc.
12155 Kirkham Road,
Poway, CA 92064
NEBB CONTRACTOR: MBO, Inc.
4619 Viewridge Ave. Suite C
San Diego, CA 92123
MBO JOB NUMBER: MBO.2654
NATIONAL ENVIRONMENTAL BALANCING BUREAU
NEBB CERTIFICATION PAGE
PROJECT: Aethercomm Tl
ADDRESS: 2800 Whiptail Loop w.,
Carlsbad CA 92010
MBO JOB NO.: MB0.2654
CERTIFICATION#
3306
-----------------------------
THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS
OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGN
QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED THROUGHOUT THIS REPORT.
THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN
MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, BALANCING OF
ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS.
NEBB TAB FIRM: MBO, Inc.
REG. NO.: 3306 CERTIFIED BY: Dawayne Trobaugh DATE: 06.16.2022
THE HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE
BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING, ADJUSTING,
BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS.
NEBB TAB FIRM: MBO, Inc.
REG. NO.: 3306 CERTIFIED BY: Dawayne Trobaugh DATE: N/A
SUBMITTED AND CERTIFIED BY:
NEBB TAB FIRM: MBO, Inc. -------
REG. NO.: 3306 -------TAB SUPERVISOR: Dawayne Trobaugh
DAWAYNE C. TROBAUGH
CERTIFICATION
3306
Exp. 3/31/24
-------
SIGNATURE/ DATE: .. I ____________________ _
NATIONAL ENVIRONMENTAL BALANCING BUREAU
G 0
~ , ~ ~ ~ e=
L=.. ='@ '
I i ri ~f'""I ® [' r" 1
=-~ t= i .. .. ' .
·~~ J ' ®
{p
~i ~ ~ . i .
{i) ffi ~ -fdu: ~-
·~ i I -rJ1
I
i i
i i
----! ~ I i
i i ''> i ,
Iii """"'
i;.
@ G @
b.i=i d. r • i ---0
i i
I --'-. -b:
j O -
@ '
R~
J
~, '-"'ef'.-
~
~"'~"~ ' t=e, -! @-------· '. i ? ·-·-·-·-·-·-··~ ..,, ______________ _
I
··-·-·-·-·-·-·-·-·-0
! I I ® Li
~
~· --+-____ : ______ L _ -------~~--+---"l =?~ -dt.---
1 • • 1 ·r , . ,;f7>1L _ .
·-·-·-0
' 11
@-···-·-·
€3-
~~(&)~.®! ~ :@~~T:
! . -
I ►' 1W ! ~JI® . ~1-.~.;;..; }':':-'--~, . -?.4"'!)]"' L I I ~\•·-'lf .. _, -' '.··.-.:~'·•·• ~' ! , . ·1-J, I,t.'. .. . r,
'@
I • 'al' I '. ·r~ tf.'f '• . -·-·-·-·-·-·-·-·-------
l®it~J ®lff= I II;
I
'® _.It,lrn la1 1~1''''1.l .t±!:! 1-~--i, . (
• I I I II
!
~HANICAL FIRST FLOOR PLAN
-r,-.
~ ..
I i
v p !
j!l!'!'J i i
' f ' ] ' ' ·-·-·-0
~
--0
GEtEBAL NOTES ... ~...,_l'Cl,lt...,.PS'IC~ ~tl'f'DIIO,~.ai,co-,,,a--. ~:.,~~~-=--. .OU.-IDll'W'II'.~--~ ~~~..,_co:-a,.a-
c. ~-=..:~~~IO'-
C -
RYAN
lft"MMC,._ an __ ....,..,,,. ._..,.._CAm11 _., --
(/,i,,,,roomn.
.L_-==.,.~.
C ,...,,
,,1y_iti_ng •
, __
AETtfERCOMM AT
PVCC
2800 WHIPTM. LOOP w_ CARLSBAD, CA
92010 1-·-------...-...------·-----•-•:,:,i=:---· .. -
I=-· Mft .. --_,. ------~ --
l.u!l::~I
r ~ii..l
PLAN CHECK
RESUBMITTAL 1 .......
MECHANICAL
FIRST FLOOR
PLAN e ~ M201 ~l =-I atltot ·-=-
TEST DATE: 6-Feb-2022
SYSTEM: FC-1
LOCATION: ESS 129
MANUFACTURER
MODEL
SERIAL
TOTAL CFM SUPPLY
TOTAL CFM SUPPLY (OUTLETS)
TOTAL CFM RETURN
TOTALCFM OSA
INLET S.P.
DISCHARGE S.P.
TOTALS.P.
MANUFACTURER
HP
PHASE
VOLTAGE
AMPERAGE
FRAME
RPM
SERVICE FACTOR
OPERATING HZ
CAC/BDP
40NBDQ24
3521V22999
AIR HANDLER DATA
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: BRIANT -------------ETH AN A
AIR HANDLER DATA
DESIGN ACTUAL
600 601
600 601
600 572
0 0
DESIGN ESP/ ACTUAL ESP DESIGN TSP/ ACTUAL TSP
Not Available -0.240 Not Available I -0.490
Not Available I 0.180 Not Available 0.180
0.500 I 0.420 Not Available 0.670
MOTOR DATA
DESIGN FINAL
NO ACCESS NO ACCESS
0.27 NO ACCESS
1 1
208/230 NO ACCESS
1.65 NO ACCESS
NO ACCESS NO ACCESS
NO ACCESS NO ACCESS
NO ACCESS NO ACCESS
60 60
COMMENTS
CERTIFIED MEMBER-NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE: 6-Feb-2022
SYSTEM: FC-1
LOCATION: ESS 129
TERMINAL NUMBER ROOM NUMBER
FC-1.Sl ESS 129
FC-l.S2 ESS 129
TOTAL
FC-1.Rl ESS 129
AIR DISTRIBUTION
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: BRIANT ---------------ETH AN A
TERMINAL K -DESIGN PRELIM FINAL CFM FINAL
TYPE SIZE FACTOR CFM CFM MIN MAX %
CD 12"0 1 300 415 298 99%
CD 12"0 1 300 387 303 101%
600 802 601 100%
1 600 565 572 95%
COMMENTS
Unit tested at speed. At high speed we have 802 of 600 cfm.
CERTIFIED MEMBER-NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE: 6-Jun-2022
SYSTEM: HP-1
LOCATION: Roof
TERMINAL NUMBER ROOM NUMBER
HP-1.Sl Storage 130
HP-l.S2 Storage 130
HP-l.S3 Storage 130
HP-l.S4 Storage 130
HP-l.S5 Storage 130
HP-l.S6 Storage 130
TOTAL
HP-1.Rl Storage 130
TOTAL
OSA
Room Pressure to Atmosphere -
AIR DISTRIBUTION
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH:_B--.T;...A_T __ E ___________ _
S.HUGHES
TERMINAL K-DESIGN PRELIM FINAL CFM FINAL
TYPE SIZE FACTOR CFM CFM MIN MAX %
RND 12"0 300 206 308 103%
RND 12"0 300 204 290 97%
RND 12"0 300 205 303 101%
RND 12"0 300 219 294 98%
RND 12"0 300 208 288 96%
RND 12"0 300 179 278 93%
1800 1221 1761 98%
20X18 1620 559 559 35%
180
COMMENTS
CERTIFIED MEMBER-NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE: 16-Jun-2022
AIR DISTRIBUTION
TEST SHEET
----------TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: Sam Hughes SYSTEM: HP-2
LOCATION: Roof
TERMINAL K-DESIGN PRELIM FINAL CFM FINAL
TERMINAL NUMBER ROOM NUMBER TYPE SIZE FACTOR CFM CFM MIN MAX %
HP-2.Sl Room 131 RND 12"0 375 227 303 81%
HP-2.S2 Room 131 RND 12"0 375 204 310 83%
HP-2.S3 Room 131 RND 12"0 350 205 313 89%
HP-2.S4 Room 131 RND 12"0 350 219 312 89%
HP-2.S5 Room 132 RND 12"0 350 206 313 89%
HP-2.S6 Room 132 RND 12"0 350 212 321 92%
HP-2.S7 Room 132 RND 12"0 350 220 325 93%
TOTAL 2500 1493 0 2197 88%
HP-2.Rl Room 131 / 132 2350
TOTAL 2350
OSA 150
COMMENTS
Room Pressure to Atmosphere -
CERTIFIED MEMBER· NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE: 16-Jun-2022
SYSTEM: HP-3A
LOCATION: Roof
TERMINAL NUMBER ROOM NUMBER
HP-3A.Sl Storage 133
HP-3A.S2 Storage 133
HP-3A.S3 Storage 133
HP-3A.S4 Storage 133
HP-3A.S5 Storage 133
HP-3A.S6 Storage 133
TOTAL
HP-3A.Rl Storage 133
TOTAL
OSA
Room Pressure to Atmosphere -
AIR DISTRIBUTION
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: Sam Hughes
TERMINAL K-DESIGN PRELIM FINALCFM FINAL
TYPE SIZE FACTOR CFM CFM MIN MAX %
RND 12"0 1 300 287 295 98%
RND 12"0 1 300 278 311 104%
RND 12"0 1 300 262 301 100%
RND 12"0 1 300 271 293 98%
RND 12"0 1 300 261 296 99%
RND 12"0 1 300 257 293 98%
1800 1616 0 1789 99%
1620
1620
180
COMMENTS
CERTIFIED MEMBER -NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE: 16-Jun-2022
SYSTEM: HP-3B
LOCATION: Roof
TERMINAL NUMBER ROOM NUMBER
HP-3B.Sl Storage 133
HP-3B.S2 Storage 133
HP-38.S3 Storage 133
HP-3B.S4 Storage 133
HP-3B.S5 Storage 133
HP-3B.S6 Storage 133
HP-3B.S7 Storage 133
TOTAL
HP-3B.Rl Storage 133
TOTAL
OSA
Room Pressure to Atmosphere -
AIR DISTRIBUTION
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: Sam Hughes
TERMINAL K-DESIGN PRELIM FINAL CFM FINAL
TYPE SIZE FACTOR CFM CFM MIN MAX %
RND 12"0 1 300 170 299 100%
RND 12"0 1 300 219 286 95%
RND 12"0 1 300 189 291 97%
RND 12"0 1 300 207 279 93%
RND 12"0 1 350 212 322 92%
RND 12"0 1 350 193 321 92%
RND 12"0 1 350 220 315 90%
2250 1410 0 2113 94%
2100
2100
150
4226 #DIV/0!
COMMENTS
CERTIFIED MEMBER -NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE: 6-Jun-2022
SYSTEM: HP-4A
LOCATION: Roof
TERMINAL NUMBER ROOM NUMBER
HP-4A.Sl Production 136
HP-4A.S2 Production 136
HP-4A.S3 Production 136
HP-4A.S4 Production 136
HP-4A.S5 Production 136
HP-4A.S6 Production 136
TOTAL
HP-4A.Rl Production 136
TOTAL
OSA
Room Pressure to Atmosphere -
AIR DISTRIBUTION
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: BRIANT. ---------------SAM H.
TERMINAL K-DESIGN PRELIM FINAL CFM FINAL
TYPE SIZE FACTOR CFM CFM MIN MAX %
RND 12"0 350 347 347 99%
RND 12"0 350 351 351 100%
RND 12"0 450 414 414 92%
RND 12"0 450 360 360 80%
RND 12"0 450 375 375 83%
RND 12"0 450 399 399 89%
2500 2246 2246 90%
2350
2350
150
COMMENTS
CERTIFIED MEMBER -NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE:
SYSTEM:
1
2
3
4
5
6
7
8
9
10
SUPPLY TRAVERSE
TEST SHEET
6-Jun-2022
HP-4ASUPPLYWEST(S1AND S4)
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: S.HUGHES
VELOCITY FPM
A-B X-Y
673 669
633 637
604 572
685 535
613 606
545 643
607 645
519 757
619 620
613
A-B
673 633
1 2
ROUND DUCT TRAVERSE (14" & UP)
~
~ ~iMiti4diii1)dii5=f1·1~
17368
1 669
X-Y
2 637
3 I 572
4 I 535
5 606
6 643
604 685 613 545 607
3 4 5 6 7
7 I 645
8 I 757
9 620
rn I 650
COMMENTS
CERTIFIED MEMBER -NA T/ONAL ENVIRONMENTAL BALANCING BUREAU
READ LOCATION
3/8
1 2/8
23/8
3 5/8
54/8
10 4/8
12 3/8
13 5/8
146/8
15 5/8
519 619
8 9
TEST DATE:
SYSTEM:
1
2
3
4
5
6
7
8
9
10
SUPPLY TRAVERSE
TEST SHEET
6-Jun-2022
HP-4A SUPPLY EAST
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: $.HUGHES
VELOCITY FPM
A-B X-Y
901 628
864 817
831 819
877 779
908 795
814 927
869 924
864
872
926
A-B
901 864
1 2
ROUND DUCT TRAVERSE (14" & UP)
~ liffiitiYdiHUMiidl=fJ•,■ L 30191 1
1 I 628
2 I 817
3 I 819
4 I 779
5 795
6 927
831 877 908 814 869
3 4 5 6 7
7 924
8 I 955
9 856
10 I 867
COMMENTS
CERTIFIED MEMBER-NATIONAL ENVIRONMENTAL BALANCING BUREAU
READ LOCATION
4/8
14/8
25/8
41/8
61/8
11 7/8
13 7/8
15 3/8
164/8
17 4/8
864 872
8 9
TEST DATE: 16-Jun-2022
SYSTEM: HP-4B
LOCATION: Roof
TERMINAL NUMBER ROOM NUMBER
HP-4B.Sl Production 136
HP-4B.S2 Production 136
HP-4B.S3 Production 136
HP-4B.S4 Production 136
HP-4B.S5 Production 136
HP-4B.S6 Production 136
TOTAL
HP-4B.Rl Production 136
TOTAL
OSA
Room Pressure to Atmosphere -
AIR DISTRIBUTION
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: Sam Hughes
TERMINAL K-DESIGN PRELIM FINAL CFM FINAL
TYPE SIZE FACTOR CFM CFM MIN MAX %
RND 12"0 450 370 370 82%
RND 12"0 450 369 369 82%
RND 12"0 450 395 395 88%
RND 12"0 400 366 366 92%
RND 12"0 400 392 392 98%
RND 12"0 350 346 346 99%
2500 2238 2238 90%
2350
2350
150
COMMENTS
CERTIFIED MEMBER-NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE:
SYSTEM:
1
2
3
4
5
6
7
8
9
10
SUPPLY TRAVERSE
TEST SHEET
6-Jun-2022
H P-4A SU PPL Y EAST
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: S.HUGHES
VELOCITY FPM
A-B X-Y
824 836
830 831
875 888
854 931
817 726
866 822
843 899
884 934
857
802
A-B
830
2
ROUND DUCT TRAVERSE (14" & UP)
~
iifJiti4d!i-l'idii5=fN~
1 30033
1 836
X-Y
2 831
3 I 888
4 I 931
5 726
6 822
875 854 817 866 843
3 4 5 6 7
7 I 899
8 934
9 822
10 I 863
COMMENTS
CERTIFIED MEMBER-NATIONAL ENVIRONMENTAL BALANCING BUREAU
READ LOCATION
4/8
14/8
25/8
41/8
61/8
11 7/8
13 7/8
15 3/8
164/8
17 4/8
884 857
8 9
TEST DATE: 6-Jun-2022
SYSTEM: HP-5
LOCATION: OPEN WAREHOUSE 124
TERMINAL NUMBER ROOM NUMBER
HP-5.Sl Room 124
HP-5.S2 Room 124
HP-5.S3 Room 124
HP-5.S4 Room 124
HP-5.S5 Room 124
HP-5.S6 Room 124
HP-5.S7 Room 124
HP-5.S8 Room 124
HP-5.S9 Room 124
TOTAL
HP-5.Rl Room 124
HP-5.R2 Room 124
HP-5.R3 Room 124
TOTAL
OSA
AIR DISTRIBUTION
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: S.HUGHES
B.TATE
TERMINAL K -DESIGN PRELIM FINAL CFM FINAL
TYPE SIZE FACTOR CFM CFM MIN MAX %
RND 12"0 300 342 305 102%
RND 12"0 300 194 303 101%
RND 12"0 300 189 316 105%
RND 12"0 350 205 321 92%
RND 12"0 350 211 306 87%
RND 12"0 350 221 325 93%
RND 12"0 350 224 303 87%
RND 12"0 350 228 315 90%
RND 12"0 350 231 320 91%
3000 2045 0 2814 94%
SW 300 263 291 97%
SW 600 788 599 100%
SW 2100 1900 1967 94%
3000 2951 2857 95%
250
COMMENTS
Tested unit in high speed (Carrier HP+shiv+high speed wire+VFD).
CERTIFIED MEMBER -NATIONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE:
SYSTEM:
1
2
3
4
5
6
SUPPLY TRAVERSE
TEST SHEET
6-Jun-2022
HP-5 TOTAL SUPPLY
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: S.HUGHES
VELOCITY FPM
A-B X-Y
828 875
931 997
1008 997
958 995
974 978
1057 992
956 991
A-B
828 931
2
ROUND DUCT TRAVERSE (14" & UP)
~
iii4Hi4diii1Mii5=H·i~
1 60062
1 875
2 997
3 I 997
4 I 995
5 978
6 992
1008 958 974 1057 956
3 4 5 6 7
7 991
8 926
9 913
io I 878
COMMENTS
CERTIFIED MEMBER-NATIONAL ENVIRONMENTAL BALANCING BUREAU
READ LOCATION
5/8
2
34/8
53/8
82/8
156/8
185/8
204/8
22
23 3/8
975 995
8 9
TEST DATE: 2-Jun-2022
SYSTEM: EF-1
LOCATION: ROOF
MANUFACTURER
MODEL
SERIAL
INLET S.P.
DISCHARGE S.P.
TOTALS.P.
MANUFACTURER
HP
PHASE
VOLTAGE
AMPERAGE
FRAME
RPM
SERVICE FACTOR
OPERATING HZ
FAN SPEED AT 81%
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: BRIANT
FAN DATA
TEST SHEET
--------------ETH AN A
FAN DATA
COOK
90ACEH90Cl 7DHVF
138SJ74154-00/0000701
DESIGN ACTUAL -DESIGN ESP ACTUAL ESP
MOTOR DATA
DESIGN FINAL
US MOTORS US MOTORS
1/2 1/2
1 1
115/208-230 119
6.4/4.0-4.3 4.8
48Y 48Y
300-1800 1423
NA NA
60 60
COMMENTS
CERTIFIED MEMBER -NA T/ONAL ENVIRONMENTAL BALANCING BUREAU
TEST DATE: 16-Jun-2022
SYSTEM: EF-1
LOCATION: Roof
TERMINAL NUMBER ROOM NUMBER
EF-1.El Janitor
EF-l.E2 Restroom
EF-l .E3 Restroom
EF-l.E4 Restroom
TOTAL
Room Pressure to Atmosphere -
AIR DISTRIBUTION
TEST SHEET
TAB SUPERVISOR: Dawayne Trobaugh
TAB TECH: Sam Hughes
Brian Tate
TERMINAL K-DESIGN PRELIM FINAL CFM FINAL
TYPE SIZE FACTOR CFM CFM MIN MAX %
CD 8"0 1 100 124 107 107%
CD 8"0 1 100 129 110 110%
CD 8"0 1 100 149 110 110%
CD 8"0 1 100 139 106 106%
300 417 0 326 109%
COMMENTS
CERTIFIEO MEMBER-NATIONAL ENVIRONMENTAL BALANCING BL/REALI
I ABBREVIATIONS PAGE
AC = Air Conditioning Unit
AH = Air Handler
AHU = Air Handling Unit
AMS = Air Monitoring Station
ATM = Atmosphere
AVG = Average
BHP = Brake Horsepower
BMS = Building Management System
CD = Ceiling Diffuser
CFM = Cubic Feet per Minute
DIFF = Differential
EA = Exhaust Air
EF = Exhaust Fan
EG = Exhaust Grill
FPM = Feet per Minute
GPM = Gallonsper Minute
HP = Horsepower
Hz = Hertz
MAU = Make-up Air
Misc. = Miscelaneous
NA = Not Accesible
NEBB = National Environmental Balancing Bureau
NS = Not Specified
NT = Not Tested
OSA = Outside Air
QTY = Quantity
RH = Reheat
RPM = Revolutions per Minute
SA = Supply Air
SWD = Side Wall Diffuser
TAB = Testing, Adjusting, and Balancing
VAV = Variable Air Volume
VFD = Variable Frequency Drive
CERTIFIED MEMBER-NATIONAL ENVIRONMENTAL BALANCING BUREAU
AIRDATA MULTIMETER CERTIFICATE OF RECALIBRATION Customer ID: OJ 85Q3 S/N: _ _.,M,..1:..:.7-=2"-'4.._7 __
Customer: MBO, INC·, Clty:.___.s_AN __ n_I=E-G..,..O ______ State:_...:,C..,A.__ __ _
As-Received Model #:,--=AD=M=---=8;..a:;6""'0""'C _______ Converted to Model#: Order #:_-=R..,,2...,1:.:2..,.~.,.0-=2-
PO #: Customer Eqpt ID#: Calibration Due Date: _____ _
Thia Instrument has been calibrated using Callbratlon Standards which are traceable to NIST (National Institute of Standards and Technology). Test accuta.::Y ratio Is 4: 1 for pressures and temperature. Qualllv Assurance Program and callbratlon procedures meet the requirements for ANSIINCSL 2540-T, ISO 17025, MU:-STD
45662A and manufacturer's a~tlona. Calibration accuracy Is certified when meters are used with properly functlonlnQ acceaaortea only. All Uncertainties are
eXP.reased In expanded terms (twice the calculated uncerlalfilY). Thia ~rt ahaU not be ,:eproduced, except In full, wfthout the wrttten approval of Shortridge Instruments, Inc. Results relate ~ to the Item caHbrated. For Hmltatlons on uae, see Shortridge lnatruments, Inc. Instruction Manual for the uae of AlrData
Mulllmeters. Procedure used: Procedure for Differential Pressure, Absolute Pressure and Temperature Recalibration of AlrData Multlrneters SIP-CP02 Revision: 30 Dated: 04/04/18 ·
Calibration Technlclan(a): tv).fuf<"\\.1/':3 ~ Calibration Date: 10/zo/-z:.~ Z-.I
Calibration Approved by: s-} r f¾o 'bo Title: CJJ> ~ \ ., r,=-· j O /:;...d / ~jJ--{
AS-Rece~ B_y~·~'vVt.~ OJ//rl: Test By: e(CJ:e:,f-Date\OW7tl.OZI ,Rh 7 % bate ~o/z..o/z.&J'Z../ Rh ~6 % Da Rh __ %
Ambient Temperature ~t'JC:C::--F Ambient Temperature 73 --_ °F Ambient Tem °F
Barometric~! "2$j'. "1_ In Hg Baromebic Pressure ~3 • Sil In Hg Baromebic Pressure In Hg
All within spec~ NO NA AD within spec C!E§>NO All wlthJn spec YES
ABSOLUTE PRESSURE TE~·(ln Hg) ~
Presaure Standard: Helsa #02-R SIN: ◄17◄1/◄2◄51 AI-Rcvd Test 2 Teat 3 Pl8Ssure Standard: Helae #1 : ◄5605/◄8491 Rcvd Test 2 Test 3
TEST METER TOLERANCE "'± 2.0 % :t .1 In Hg AS-RECEIVED TEST WITHIN SPEC ES NO NIA SeeS?o
Pressure Standard: Heise #04-R SIN: ◄1743/42◄53 As-Rcvd Test 2 Test 3 Pressure Standard: Helie #14-R SIN: ◄3◄ 12/45043-2 Ai-cvd Test 2 Test 3
Pressure Standard: Helle #08-R SIN: 41742/42◄52-1 Aa-Rcvd :rest 2 Teat 3
Pressure Standard: Heise #08-R SIN: 42186/43328 As-Rcvd Test 2 Test 3
Pressure Standard: Heise #10-R SIN: 42203/43352 AI-R~ Test 3
Preuure Standard: Heise #18-R SIN: ◄3413/45044 Aa-Rcvd Test 2 Test 3
Presaure Standard: Helae #18-R SIN: 44581/48845 As-Rcvd Teat 2 Test 3
Pressure Standard: Heise #20-R SIN: 44582/48847 AI-Rcvd Test 2 Teat 3 ',,
Approx Set Pl standard % Dlff Standard Test Meter ·,%D1ff Standard Test Meter % Dlff
14.0 14/.oP /:3•9 -:7I
28.4 28.58 "2 B, 5"" -;-ZS
◄0.0 3/0-tJ() ~fl./ .25
. DIFFERENTIAL PRES$URE TEST (In we)
TEST METER TOLERANCE • :I: 2.0 % :t 0.001 In we AS-RECEIVED TEST WITHIN SPEC /ve~ NO NIA See Notes
Pressure Standard: Heise #01-L SIN: 41739/42449 Aa-Rcvd Test 2 Test 3 Pressure Standard: Heise #11-P SIN: 43185/44551-1 ~R~ Test 2 Teat 3
Pressure Standard: Heise #01-R SIN: 41739/42448 AI-Rcvd Test 2 Test 3 Pressure Standard: Helae #11-R SIN: 43165/44730 ~ Test 2 Test 3
Pressure Standan:I: Heise #02-L SIN: 41741/42454 As-Rcvd Test 2 Test 3 Pressure standarcl: Heise t12A-l SIN: 45605/48490-1( AI-Rc:O'a) Test 2 Test 3
Pressure Standard: Heise #03A-L SIN: 45570/48461 AI-Rcvd Teat 2 Test 3 Pressure Standard: Heise #13-L SIN: 43415145041 J\l:Rl:vd Test 2 Teat 3
Pressure Standard: Heise #03A-R SIN: 45570/48◄80 AI-Rcvd Test 2 Test 3 Pressure Standard: Helae #13-R SIN: 43415/45039 AI-Rcvd Test 2 Test 3
Preasure Standard: Heise #04-l SJN: 41743/42456 Aa-Rcvd Teat2 Teat 3 Praasure Standard: Heise #14-L SIN: 43412/45045 Aa-Rcvd Tell 2 Teat 3
Pre11ure Standard: Heise #05•l SIN: 41740/42450 Al•Rcvd Test 2 Test 3 Pressure Standard: Helae #15-L SIN: 43416/45042 AI-Rcvd Taal 2 Teat 3
Pre111ure Standard: Heise #OS·R SIN: 417◄0/42447 Aa-Rcvd Teat 2 Test 3 Pressure Standard: Helle #15-R SIN: 43416/45040 AI-Rcvd Teal 2 Test 3
Pre11ure Standard: Heise #08-l SIN: 41742/42455 AI-Rcvd Test 2 Test 3 Pressure Slandarcl: Heise #18-l SIN: 43413/45046 AI-Rcvd Test 2 Test 3
Pressure Standard: Helsa #07-L SIN: 42185/42188 Aa-Rcvd Test 2 Teat 3 Preuure Standard: Heise #17-L SIN: 44579/488◄2 Aa-Rcvd Teat 2 Teat 3
Presaure Standard: Heise #07-R SIN: 42185/43328 Aa•Rcvd Test 2 Test 3 Pressure Standard: Heise #17-R SIN: 445711/488◄1 • AI-Rcvd Teat 2 Teat 3
Pressure Standard: Heise #08-L SIN: 42186/43329 Aa-Rcvd Teet 2 Teat 3 Pressure Standard: Ji811e #18-L SIN: 44581/46848 Aa-Rcvd Test 2 Teat 3
Pressure Standard: Heise 1'09·L SIN: 42202/43351 As-Rcv~iTest 3 Presaure Standard: Heise #19-L SIN: 44580/46844 As-Rcvd Teat2 Test 3
Pre11ure standard: Helae #09-R SIN: 42202/43350 As-Rev eat 3 Pressure Standard: Flelae ti 9-R SIN: 44580/46843 Aa-Rcvd Teat 2 Teat 3
Pre111t1re standard: Helle #10-L SIN: 42203/43353 As-Rev ea eat 3 Pressure, Standard: Heise #20-L ·SIN: 44582/488◄8 As-Revel Test 2 Teat 3
Annrnv Set pt -
0.0500 .t~l°'
0.1250 .\7S\o
0.2250 .?_. "2 c:;z_
1.000 \.o~~
2.000 '2.c39
3.600 :s.1osc...;
4.400 L{.L\rO
27.00 2.7.\'2
50.00 --,o. ~)?
OVerange NA
ADM Reclllbrallon Rev60,l05/03/21
Test U..t•r OJ, Dlff Stand•rrl Test U..t..r '!(, Olff
• l"""'h \ X -,\q ,OStl.2. • ·O'S"OO r;-4"0
,\7Sb ,CO ,/2~~ ./2 S-"3 -:-VI
· L2S-f -.d--1 .zzs-, , '2, Z-5-:] ,/)'f
\.D.,"S • 19 /.03'/ /,03¥ .tJO
7.,n'-{~ ,44 2 ,0l/3 Z-01./ I -;/tJ
<..'v,~7 -.n'-) 3.610 "3 ,61)7 -:-IJ8
LI. L\ ,c:; • ,...<[") #-1/1'2. ¥'117 .,//
27.\8 .7_7--Z.7-03 27-b9 , t,J,.
~o.43 . \R ~l),2.8 S-o,19 -:/S
✓ NA NA v NA
Shortrid~e Instruments, Inc. . 7855 East Redfielcf'Road Scottsdale, Arizona· 85280
{480) 891-6744' • Fax {480) 443-1267 • www.shortrtdge.com
1 of~
Standard TestM...,.r '!(,nlff
" "' " " "-t.JA
" " "' "' NA NA "-
05/11/21
AIRDATA MULTIMETER CERTIFICATE OF RECALIBRATION
LOW VELOCITY CONFIRMATION (FPM)
TEST ME-n:R TOLERANCE = :t 3.0% :t 7 FPM AS-RECEIVED TEST WITHIN SPEC @
Vet Eqv Trans Std: SIN: M02009 As-Rcyd Test 2 Test 3 Vet Eqv Trana Std: SIN: M10897
Vel Eqv Trans Sid: SIN: M02903 As-Rcvd ~ Test 3 Vel Eqv Trana Std: SIN: M10901
Vel Eqv Trans Std: SIN: M10839 As-Rcvd ~ Test 3 Val Eqv Trana Std: SIN: M13492
Vet Eqv Trans Std: SIN: M10840 As-Rcvd Test 2 Test 3 Vet Eqv Trans Std: SIN: M19325
Approx Set Point
100
500
TestMlllllr
I~ II
Dllf Standard Test Meler
S/N: M17247
Order#: R212602
NQ NIA See Notes
As·Rcvd Test 2 Test 3
As-Rcvd Test 2 Test 3
As-Rcvd Test 2 Test 3 ~ Test 2 Test 3
ADM-880C, ADM-870/870C and ADM-860/860C models are read In Airfoil Mode. ADM-850/850L models .are read In Pilot Tube Mode.
TEMPERATURE TEST -AIROATA MULTIMETER(° F)
AS-RECEIVED TEST WITHIN SPEC ~ NO TEST METER TOLERANCE = :t: 0.2° F
RTD Simulator: SIN 249
RTD Simulator: SIN 250
RTD Simulator. SIN 253
RTD Simulator: SIN 254
RTD Simulator: SIN 256
RTD Simulator: SIN 257
RTD Simulator: SIN 292
RTD Simulator: SIN 293
RTD Simulator: SIN 294
RTD Simulator: SIN'313
RTD Simulator: SIN 314
RTD Simulator: SIN 315
RTD Simulator: SIN 316
RTD Simulator: SIN 317
RTD Simulator: SIN 318
RTD Sfmulator Temperatire
E Iv I tS P I .au aen et o nt T tM te es e r
35.60 • "<_c;, l.,..
95.00 GY.9
154.40 \C..l..l.'-\
As-Rcvd Test2
As-Rcvd Test2
As-Rcvd Test2
As-Rcvd Test2
As:-Rcvd Test2
As-Rcvd Test2
As-Rcvd ~ As-Rcvd
As-Rcvd ~
~ Test2
~ Test2
~ Test2
As Test2
As-Rcvd Test2
As-Rcvd Test2
Diff erence
-0 -.,
.('")
NIA See Noles
Test3 Set Point: 35.6° F 95°F 154.4°F
Test3 Set Point 35.6° F 95°F 154.4°F
Test3 Set Point: .35.6" F 95°F 154.4" F
Test3 Set Point: 35.6° F 95°F 154.4° F
Test3 Set Point 35.6° F. e5°F 154.4°F'
Test3 Set Point: 35.6°'F 95° F 154.4°.F
.Test3 Set Po~ 95° F 154.4" F
Test3 Set Point: 35.6" F~154.4° F
Test3 Set Point: 35.6" F 95• F ~
Test3 Set Potn@!J) 95• F 154.4° F
Test3 Set Point: 35.6° F ~ 154.4° F
Test3 Set Point:. 35.6° F 9 F ~
Test3 Set Point: 35.6" F 95• F 154.4° F
Test3 Set Point: 35.6° F 95°-F 154.4" F
Test3 Set Point: 35.6° F 95°F 154.4° F
est e er T Mt erence est e er ~ Ml
~~-~ ,~ ----,J~
95.0 .o ---/5°'7• ll .o
There were no additions to or deVlatlons from the specified calibration procedure during the calibration process.
Any calibration due date shown Is specified by the customer.
Dlff erence
--------
The enclosed ADM Calibration Standards for Pressure and Temperature fonn(s} ls/are an-,lntegral part of this callbration and must remain with
this Certificate of Calibration. There may.be more than one such form Inducted that pertains to this calibration . . •
Any additional lnfonnatlon required pertaining to this calibration orto any repairs perfonned may be Included Ip other documentation. If appUcab!e,
these documents may Include, but not be llmlted to an AlrData Multimeter Recalibration Notes form, and/or a Repair Record Notes form. r ~ ~
)
NOTES~-------------------------------------------
ADM Recallbrallon Rev50/'05/03/21
Shortridge Instruments, Inc.
7855 East Redfield Road Scottsdale, Arizona 85260
(480) 991-6744 • Fax (480) 443-1267 • www.shortridge.com
2-of2 OS/11/21
co ID: o\ <l'::>o 3 MUL TITEMP AND/OR TEMPROBE RECALi BRA TION TEST REPORT Order#: @'2 \ Z\:::02
Customer. f"I Bo, ~~G,.. City: $Al'..) o,·e...sa State:_C-""""--_A __ _
Procedure used: Procedure for Callbratlon/Recallbratlon of MultiTemps and/or TemProbes SIP-CP14 Rev: 03 Dated: 07/31/14. There were
no additions to or deviations from the calibration procedure during this calibration process.
Equipment Being Tested: MulttTemp and TemProbes __ _ TemProbe(s) v
AS-RECEIVED TEMPERATURE TEST{° F)
MULTITEMP TOLERANCE (MUL TITEMP AND TEMPROBES TESTED AS A UNIT) = ± 0.5° F
TEMPROBE TOLERANCE=± 0.3° F
Thermome!er#1 SIN 8A089/ThennlatorS/N A410660 Set Point 35" F 95° F 155"F
Thermomeler#2 SIN 88104 /ThennlstorS/N 871507 Set Point; 35" F 95° F ®W
Thermometer IS SIN 811780 / Thermistor SIN 810505 Set Poln~ 95° F 155" F
Thermometer#6 SIN 811782 / Thermistor SIN 810509 Set Poln(: 35• F ~ 155" F
Thermometer #7 SIN 849938 I Thennlstor SIN 8482202 Set Point: 35° F 95° F 155° F
Temperature Standard AlrData Multimeter SIN M00136 Set Point:@ @ ~
Temperature Standard AlrData Multimeter SIN M96100 Set Point 35" F 95• F 155° F
Test By: M .(~:xvwftl.~ Date: '<?/01 f 'ZoZI Rh::!1_% AmbientTemperature~ °F Barometric Pressure;-z ~ .tjo In Hg
Test Test Test Test Test Test Test Test Probe#1 Probe#2 Probe#3 Probe#4 Probe#S Probe'/16 Probe#7 Probe#8
Approx Temp ADT-L\4'2.. ACT-__ ACT-__ Arrr-__ ACT-__ ADT· __ ACT-__ ADT-__
Set Point 5tlndlrd
,:l!WJ~~~I I I I I I I 14 I I I I 11
A check in the box to the right of a TemProbe reading Indicates that the reading i~ Out Of Specification.
If all As-Received readings were within specification, and no repairs were performed, no Final test Is required.
NOTES:~-"----------------------'-----'----------------
Test By:
~~ ~ ,:~ I
NOTES:
FINAL TEMPERATURE TEST(° F)
MULTITEMP TOLERANCE (MULTITEMP AND TEMPROBES TES1ED AS A UNIT)=± 0.5° F
TEMPROBE TOLERANCE= :t 0.3° F
Thennometer #1 SIN 8A089 / Thermistor SIN A410660 Set Point: 35" F 95° F 155° F
Thermometer#2 SIN 88104 /Thermistor SIN 871507 Set Point: 35° F 95°F 155" F
Thermometer #5 SIN B 11780 / Thennlstor SIN 810505 Set Point: 35° F 95°F 155" F
Thermometer #6 SIN 811782 / Thennlstor SIN 810509 Set Point: 35° F 95"F 155° F
Thermometer #7 SIN 849938 / Them,lstor SIN 8482202 Set Point 35• F 95"F 155° F
Temperature Standard AlrOata Multimeter SIN M00136 Set Point 35° F 95° F 155"F
Temperature Standard AlrOata Multimeter SIN M96100 Set Point 35° F 95° F 155"F
Date: Rh: __ % Ambient Temperature: __ °F Barometric Pressure:
Test Probe#1 pJg:t,2 Test Probe#3 Test Probe#4 Test Probe#5 Test Probe#6 Test Probe#7
ACT-__ AOT-__ ADT· __ AOT· __ ACT-__ ADT-__ AOT-__
I I I I I I I FD I I I I I
in Hg
p T~st ro e#8
AOT-__
I II
Calibration standards used by Shortridge Instruments, Inc. are traceable to NIST {National Institute of Standards and Technology). Calibration Is perfonned In
accordance with ANSIINCSL 2540-1, ISO 17025, MIL-STD 45662A and manufacturer's speclflcatlons. Csllbratlon accuracy Is certified when meters are used with
property functioning accessories only. This report shall not be reproduced, except In full, without the written approval of Shortridge Instruments, Inc. Reaults relate
only to the Item cal brated. Limitations on use: See Shortrfdge Instruments, Inc. Instruction Manual for the use of AlrOata Multlmeters.
The enclosed ADM or HOM Calibration standards form(s) la/are an Integral part of this calibration and must remain with this Certificate of CaDbratlon. Note: There
may be more than one such form Included that pertains to this caftbratlon. Any calibration due date shown Is specified by the customer.
Calibration Approved by: ~ • B e, b>o TllleL-e-0 gJ, '142::: Date: IQ J ;>..a) ?,a :::J..,.. I
Shortridge Instruments, Inc.• 7855 E Redfield Road, Scottsdale, AZ ~5280 • (480) 991-6744 • Fax (480) 443-1267 • www.shortridge.com
MultlTemp ReCal Rev12/06/11/21 1 of 1 06111/21
Shortridge Instruments, Inc. AirData Multimeter Calibration Equipment
i
Order Number: ,f21-z.6c;Z Serial Number: 11172-'17 Test Type: Initial~ ®
ABSOLUTE PRESSURE STANDARDS I
ADMI02•R SIN: 41741/42451 Heise Modet PPM-2 Mfgd by Dresser Industries Calibrated by Ashaoft Calbnlllon Dale; 04/30/21
ADM,O.C.R SIN; 41743/42453 Heise Model; PPM-2 Mfgd by Dresser lnduatiies caJlbrated by Ashcroft caJlbrallon Date: 11/08120
ADM'°8-R SIN: ◄17◄2/42452-1 Heise Model: PPM-2 Mfgd by Dresser Industries CaDbrated by Ashcrcft Cdbratlon p.te: 08/17/21
AOM#08-R SIN: 42188/43328 Helle Model: PPM-2 Mfgd by Dresser Industries Calibrated by Ashcroft Calbratlon Date: 04/10/21
ADM#10-R SIN: 42203/43352 Helae Model: PPM-2 Mfgd by Dresser Industries Calibrated by Asha'oft Calbnlllon Date: 01/27121
AOM#12A-R SIN: 45805148491 Helle Modet PPM-2 Mfgd by Dresser Industries Callbfated by Ashcroft Calbrallon Dale: 07/27/21
ADMl-14-R SIN: 43412/411043-2 Helle Model: PPM-2 Mfgd by Dresser Industries Catibrated by Ashcroft Cdbratlon Data: 10/13/20
ADM~16-R SIN: 43413/45044 Helle Model: PPM-2 Mfgd by Dresser Industries Calibrated by Ashcroft Cllbrallon Dale: 08117/21
ADM#18-R SIN: 44581/48845 Hel9e Model: PPM-2 Mfgd & Calibrated by Ashaolt. Inc. Callbrallon Date: 01/23121
ADM#20,R SIN: 441182/48847 Helle Model: PPM-2 Mfgd & Calibrated by Ashcroft, Inc. CaUbrallon Date: 08118/21
#02-R, 04-R, 06-R, 08-R. 10-R, 12A-R, 14-R, 16-R Raled Accuracy: 0.05% fs (0.0305 In Hg) Range: 0-30 PIia Reaolutlon: 0.01
#1S.R, 20-R Rated Accuracy: 0,05% fl (0.0305 In Hg) Range: o-eo In Hg Resolution: 0.001
DIFFERENTIAL PRESSURE STANDARDS
ADM,01-l SIN:41739/42449 Helle Model: PPM-1 Mfgd by Dresser lnd111trles Calibrated by Ashcroft caJlbration Date: 05/08121
ADM#01-R SIN: 4173a/42448 Heise Model: PPM-1 Mfgd by Dresser lnduatriel callbrated by Ashcroft Calft11a1lon Dale: OW7/21
ADM#02-L SIN: 41741/42454 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft Calibration Date: 05/05/21
ADMIO:!A•l SIN: 45570/48461 Heise Model: PPM-1 Mfgd by Dresser lnd~strlea Calibrated by Ashaoft Calibration Dal9: 11/11/20
ADMI03A•R SIN: 45570148480 Helle Model: PPM•1 Mfgd by Dresser lndiastrtes Calibrated by Ashcroft CaUbrallon Date: 11/11/20
ADM,O.C.L SIN: 41743/42458 Heise Model: PPM-1 Mfgd by Dresser l~es Calibrated by Ashcroft callbratlon Data: 111'011120
ADMIOS-L SIN: 41740/42450 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft C811bt'atlon Date: 09/08/21
ADM#05-R SIN: 41740/42447 Hel11eModel: PPM-1 Mfgd by Dresser lnduslrles Callltated by Ashcroft Calllratlon Date: 09/07121
ADMI06-L SIN: 417421424511 Heise Model: PPM-1 Mfgd by Dresser lndu11trles Call>rated by Ashcroft Cillll>ratlon Date: 09/07121
ADM#07-l SIN: 42185/42188 Helle Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft Callbrallon Data: 04/08/21
ADM,07-R SIN: 42185/43328 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft Calibration Date: 04/08121
ADM#08-l SIN; 42188/43329 Helle Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft C8llbnlllon Data: 04/08121
ADM#Oa.L SIN: 42202/43351 Heise Model: PPM-1 Mfgd by Drasser Industries CaDbrated by Ashcroft caJlbrallon Date: ·01128/21
ADM#09-R SIN: 42202/43360 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft Calllrallon Date: 01/26/21
ADMl-10-l SIN: 42203/43353 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft Callbrallon Date: 01/29/21
ADM#11-l SIN: 43165/445"1-1 Heise Model: PPM-1 Mfgd by Dresser lnduatlles Calibrated by Ashcroft Cllltntlon Date: 07/30/21
ADM#11-R SIN: 43165/44730 Heise Model: PPM-1 Mfgd by Dresser Industries C8Ubtated by Ashcroft C8lllnUon Date: 07/30/21
AOM#12A·l SIN: 45805'48491>-1 Heise Model: PPM-1 Mfgd by Dreuer Industries Calibrated by Ashcroft Callbretion Date: 011109/21
ADM#13-l SIN: 43415/45041 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft Calibration Dale: 10/21/20
AOMl13-R SIN: 434111/411039 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Asha'oft CaDbrallon Dete: 10/21/20
ADM#14-L SIN: 43412/46045 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft C8Dbrallon Dale: 10/21120
ADM#15-L SIN: 43416/45042 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by Ashcroft caJlbratlon Dale: 09/08/21
ADM#15-R SIN: 43416/46040 Heise Model: PPM-1 Mfgd by Dresser lndUWiel Calibrated by Ashcroft Callbrallon Dale: 09/07/21
ADM#18-l SIN: 43413/45046 Heise Model: PPM-1 Mfgd by Dresser Industries Calibrated by AshctOft Callbnlllon Date: 09/07/21
ADMl-17-L SIN: 4457Ql4"842 Heise Model: PPM•1 Mfgd & Calibrated by Ashcroft, Inc. Cllllbrallon Dale: 01/28/21
ADM#17-R SIN: 44157l11468◄ 1 Helle Model: PPM-1 Mfgd & Calibrated by Ashcroft. Inc. Callbrallon Date: 01/28/21
ADM#18-L 6/N: 44681/46846 Helaa Model: PPM-1 Mfgd & C8Ubrated by Ashcroft. Inc. Clllbrallon Date: 01/28/21
AOM#1a.L SIN: 4490/46844 Heise Model: PPM-1 Mfgd & Callbrated by Ashcroft. Inc. Calibration Date: 06123/21
ADM#19•R SIN: 44580/48843 Helle Model: PPM-1 Mfgd & Calibrated by Ashcroft. Inc.. Clllbndlon Date: 01!124/21
ADMl20-L SIN: 44582/48848 Heise Model: PPM-1 Mfgd & Calibrated by Ashcroft, Inc.. Callbratlon Date: 08/23/21
#01-l, 03A•l, 05-L, 07-t., 09-L, 11-l, 13-l, 15-L, 17-L, 1&-L Rated At:oJrao,: > 0.07'1, fa (0.000175 Jn 't!IC) Range; 0.0-0.25 In WC Ra.: 0,00001
#01-R, 03A-R, 05-R, 07-R, 09-R, 11-R, 13-R, 15-R, 17-R, 1~ Rated Aa:uracy. > 0,011% fa ( 0.003 In we) Range; 0 .. 0-5.0 In WC
#02-L. 04-L, 06-L, 08-L, 10-L, 12A-L, 14-L, 16-L, 18-l, 20-L Rated Al:.clJraof; > 0.06% fa (0.03 In we) Range; 0,0-50.0 In WC
ADM Cal Stnds Rev 16108124/20
Shortridge Instruments, Inc.
7855 East Redfield Road Scottsdale, Arizona 85260
(480) 991-6744 • Fax (480) 443-1267 • www.shortridge.com
1 of2
Ret.: 0,0001
Ret.: 0.001
Due Date: 04/2022
Due Date: 11/2021
Due Date: 08/2022
Due Date: 03/2022
Due Date: 01/2022
,Due Dete: 07/2022
Due Date: 09/2021
.Due Date: 08/2022
Due Date: 1012021
Due Date: 06/2022
Unce11111nty: < 0.0358
Uncertainty: < 0.0358
Due Date: 04/2022
Due Date: 04/2022
Due Date: 04/2022
Due Date: 1112021
Due Date: 11/2021
Due Dete: 1112021
Due Date: 08/2022
Due Dale: 08/2022
Due Date: 08/2022
Due Date~03/2022
Due Date: 03/2022
Due Date: 03/2022
Due Date: 0112022
Due Dale: 0112022
Due Date: 01/2022
Due Date: 07/2022
Due Date: 07/2022
Due Date: 07/2022
Dua Date: 09/2021
Due Date: 0912021
Due Date: 09/2021
Due Date: 08/2022
Due Dale: 08/2022
Due Data: 08/2022
Due Date: 10/2021
Due Date: 1012021
Due Date: 10/2021
Due Oele: 08/2022
Due Date: 06/2022
Due Date: oe/2022
Uncertelnty: < 0.00035
Uncertainty:< D.00348
Uncertainty: < 0.0346
09/20/21
Shortridge Instruments, Inc. AirData Multimeter Calib·r~tlon Equipment
Customer Order Number, Meter Serial Number, and Test TyJ>:8 are referenced on page 1 , "
LOW VELOCITY EQUIVALENT CONFIRMATION STANDARDS
Vel Eqv Transfer Standard SIN: MD2009 Model ADM-870C
Vel Eqv Transfer Standard SIN: M02903 Model ADM-870C
Vel Eqv Transfer standard SIN: M10839 Model ADM-870C
Vel Eqv Transfer Standard SIN: M10840 Model AQM.870C
Vet Eqv Transfer standard SIN: M108ll7 Model ADM-870C
Vet Eqv Tranaret Slandard SIN: M10901 Model ADM-870C
Vel Eqv Transfer Standard SIN: M13482 Model ADM-870C
Mfgd & CaObrated by Shortridge Instruments, Inc.
Mfgd & CaDbralad by Shol1rldga Instruments, Inc.
Mfgd & caDbrated by Shor111dge Instruments, Inc.
Mfgd & callbratad by Shortridge lns!rumentl, Inc.
Mfg'd & catlbl81ad by Shoftridge Instruments, Inc.
Mfg'd & Callbl81ad by Shonrldga Instruments, Inc.
Mfg'd & calibrated by Shor1ridge Instruments, Inc.
CaDbratlon Data: 08/20/21
Calibration Date: 12/18/20
Calibration Dall: 12/18120
Calibration Date: 12/18/20
CallbratlOn Date: 01/26.121
CalD>ratlon Date: 12/18/20
C&ID>rallon Dale: 08120/21
Due Date: 08/2022
Due Date: 12/2021
Due Date: 1212021
Due Date: 1212021
Due Date: 01/2022
Due Data: 12/2021
Due Data: 0812022
Vel Eqv Transfer standatd SIN: M111325 Model ADM-870C Mfgd & C811b181ad by Shor111dge Instruments, Inc. calibration Dale: 08/2Q/21 Due Date: 08/2022
Rated Al:;cufar:y:. Velocity :1: 1.5 % :t 3,5 fpm Range: 100-5000 fpm Ruolutlon: 0.1 Uncartalnty, <5.00 rpm at 100 fpm; <7.50 rpm at 600 fpm
TEMPERATURE STANDARDS
RTD Slmulator SIN: 240 Model RTD-1000/500 Mfgd by General Resistance C811bnd8d by IET Laba
RTD SlmUlator SIN: 250 Model RTD-1000/500 Mfgd by Gemiral Resistance C&libralad by IET Labs
RTD Simulator SIN: 253 Model RT0-1000/500 Mfgd by General Resistance C811braled by IET Labl
RTD Simulator SIN: 254 Model RTD-1000/500 Mfgd by General Resistance Callbratad by IET Laba
RTD Slmulator SIN: 258 Model RTD-1000/!00 Mfgd by General Resistance C&nbratad by IET Labs
RTD Simulator SIN: 257 Model RTD-1000/S00 Mfgd by General Resistance Calibrated by IET Laba
RTD Simulator SIN: 292 Model RTD-1000/600 Mfgd by General Resistance Calibrated by IET Laba
RTD Slmulat0r SIN: 293 Model RTD-1000.l500 Mfgd by General Reelstance Calibrated by IET Laba
RTD Slmulatt SIN: 294 Model RTD-1000/500 Mfgd by General Realltanca Calbra18d b>j IET Labs
RTD Simulator SIN: 313 Model RTD-1000/500 Mfgd by General Raslatance Calibrated by IET Labs
RTD Simulator SIN: 314 Model RTD-1000/500 Mfgd by General Reslatance CaQbratad by IET Labs
RTD Simulator SIN: 315 Model RTD-10001500 Mfgd by General Real8tance Calibrated by JET Labs
RTD Sbnulator SIN: 318 Model RTD-1000/500 Mfgd by General Res1atan08 Calibrated by IET Labs
RTD Simulator SIN: 317 Model RTD-10001500 Mfgd by General Rallatance Callbla!lld by IET Labs
RTD Simulator SIN: 318 Model RTD-1000/500 Mfgd by General Rellatance Calibrated by JET Labl
Ratad Accuracy: 0.025% of NIUng Range: 100,000 to 11111.10 0
Thermometer 11 SIN 8A089/Thermlator SIN M10880 Model 1504/5810 Mfgd by Hart Scientific Callbratad by Fluke
lhermometer'2 SIN 8B104fThermlstor SIN 871507 Model 1504/5810 Mfgd by Hart Scientific Callbratad by Flt.Ike
Thannometer#S SIN B11780/ThannlstorS/N 810505 Model 1504/M10 Mfgd by HartSdenlitlc C8Rbrated by Fluke
Thermometarte SIN 811782/Thetmlator SIN 810509 Model 1504/5610 Mfgd by Hart Scientific C8Dbrated by Fluke
Calibration Date: 04/02/20
Calibration Date: 04/02/20
Calltntlon Date: 04/02/20
Calibration Data: 05/04/20
Callbratlon Data: 05/04/20
CaQbratlon Date: 05J04/20
Callbration Date: 01/03rl0
Callbrallon Date: 01/03/20
Calbratlon Date: 01/113120
Calibration Date: 03118/18
Calibration Date: 03/18/18
Calibration Date: 03/18/18
Calibration Date: 04118118
callbratlon Data: 04116/18
Callbratlon Date: 04116/18
RHOlutlon: 0.01 0
Calibration Date: 08/26/21
Callbratlon Date: 11/04/20
Calibration Date: 11 /04/20
Callbra1lonDate:02/24f.20
Due Data: 03/2024
Due Date: 03/2024
Due Date: 03/2024
Due Date: 04/2024
Due Date: 04/2024
Due Dabt: 04/2024
Due Data; 01/2024
Due Date: 01/2024
Due Date: 01/2024
Due Date: 03/2022
Due Dallt: 03/2022
Due Date: 03/2022
Due Date: 04/2022
Due Date: 04/2022
Due Date: 04/2022
Uncertainty: ~ 32 ppm
Due Date: 08/2023
'oue Data: 11/2022
Due Date: 11/2022
Due Date: 02/2022
Toermomeler #7 SIN B411938/Thermla1or SIN 8482202 Model 1504/5810 Mfgd and Callbratad by Fluke Calibration Date: 09/2e/1 II Due Date: 00/2021
Rated Aix:uracy(comblned): 0.0324• F Range: 32• F to 178" F Resolution: 0.001 • F Combined uncertainty with Ba1hl: , 0.040-F
Temp Transfer Standald SIN M00138 Model ADM-870 Mfgd & CaDlnled by Shortlldge tnelrumenta, Inc.
Temp Transfer Standard SIN Mll8100 Model ADM-870 Mfgd & Callbraled by Sho1111dge Instruments, Inc.
Rated Aa:urac:y. 0.03" F Range: 33• F to 158° F Raaolutlon: 0.01 • F
Total combined Uncertainty for MultlTemp and TemPlobe teellng : s 0.048" F
callbnaUon Date: 1 Ol20l20
Calibration Date: 03/17/21
Uncertalnty: < 0.023° F
Due Date: 10/2021
Due Date: 03/2022
This fonn must remain with the Certificate of C8llbration corresponding to the Customer Order Number and Meter Serial Number
referenced on page 1.
ADM Cal Stnds Rev 16108124/20
Shortridge Instruments, Inc.
7855-East Redfield Road Scottsdale, Arizona 85260
(480) 991-6744 • Fax (480) 443-1267 • WWW.Shortridge.com
2of2 09/20/21
AIRDATA FLOWMETER CERTIFICATE OF RECALIBRATION
Customer ID: 018503 SIN: M17247
Customer: MBO INC. Clty:_S __ AN,=.;.._D __ I ___ E __ GO _________ State: CA
As-Received Model #:,___,AD...._.M.._-...,8""'6"""-0""'C _______ Converted to Model#: Order#: R2 l 2602
PO#: Customer Eqpt ID#: Calibration Due Date: _____ _
This Instrument has been calibrated using Calibration Standards which are traceable to NIST (National Institute of Standards and Technology).
Quality Assurance Program and caUbratlon procedures meet the requirements for ANSI/NCSL 2540-1, ISO 17025, MIL-STD 45662A and
manufacturers specifications.
Calibration accuracy is certified when meters are used with properly functioning accessories only. Test Accuracy RaUo Is 2:1 for air flow
calibration. All specified uncertainties are expressed In expanded terms (twice the calculated uncertainty). This report shall not be reproduced,
except In full, without the written approval of Shortridge Instruments, Inc. Results relate only to the Item caJlbrated. Limitations on use: See
Shortridge Instruments, Inc. Instruction Manuals for the use of AirData Multbneters and FlowMeters.
Procedure used for air flow: Procedure for Recalibration of AirData Multlmeters on a FlowHood SIP-CP06 Revision: 14 Dated: 12/10/15. There were
no additions to or deviations from the procedure during the calibration process. Any calibration due date shown Is specified by the customer.
AIR FLOW TEST (cfm}
TEST METER TOLERANCE: :t 3.0% of reading ± 7 cfm
Calibration Equipment: FlowHood Stand Calibration Transfer Standard AirData Multimeter Model ADM-870, Serial Number M99083 or M98543
and FlowHood Callbration Stand SIN 7401 caJlbrated as a system. Manufactured by Shortridge Instruments, Inc. System Callbrallon Date:
05/24-05/27/2021. System Calibration Due Date: 05/2023. FlowHood Stand Calibration Transfer Standard AirData Multimeter Model ADM-870,
Serial Number M99420 and M96452 and FlowHood Calibration Stand SIN 7401 calibrated as a system. Manufactured by Shortridge Instruments,
Inc. System Calibration Date: 04/24-04/30/2020. System Calibration Due Date: 04/2022.
Rated accuracy of system Is ± 1.5% of reading ± 3.5 cfm. Resolution Is 0.1 cfm. The uncertainty of the system Is as stated at each Set Point.
All readings are compensated for the density effects of barometric pressure and temperature.
AS-RECEIVED TEST CONDITIONS FINAL TEST CONDITIONS
Transfer Standard: M96452 M98543~~M99420
Relative Humidity: L( I %
Transfer Standard~8543 M99083 M99420
Relative Humidity: 3 Lf %
Ambient Temperature: 7 Y °F
Barometric Pressure: "2. ~ · '-'-0 In Hg
Calibrated By: VY'· ~ .... ✓c_ ~
Calibration Date : \ .:> \ o, \ ::z_.oZ.\
Within Spec: Yes No@)~
Ambient Temperature: 75 °F
Barometric Pressure: ?. 'VSo in Hg
Calibrated By:, __ M_-~ __ vr_~--,-2)+----
Callbrated Date : ----'-' ..... o"'"\.._-z_=o=-,.l....;-Z.0==2...;;..:.\_
A&-Recvd Test performed using: Customer's Base/ In-House Base Final Test performed using~/ In-House Base
Callbratlon Approved by:_\).....__ . .._6_.__._0:\..,.bb.-:.a"--------Title: ~ . ~ .
Approximate Set Point
Set Point Uncertainty
100 <5.0%
500 <1.5%
1000 <1.5%
1500 < 1.25%
2000 < 1.25%
Notes:
AS-RECEIVED TEST
Standard Test Meter Standard
CFM CFM Difference CFM
~ \0\a -..........._ ..... 5\9
~ 10-z.o .....
............... \SZ.Lf
~ ?...0\4
Shortridge Instruments, Inc.
7855 East Redfield Road Scottsdale, Arizona 85260
(480) 991~744 • Fax (480) 443-1267 • www.ahomidge.com
F1o1NMe1er Reca1bra11on 850-880-870 Rev14/1 ll/01/2021 1 of 1
FINAL TEST
Test Meter
CFM Difference
\C'l9 3
S-z..\ '2
\03\ \ \
\<SLS° \
c..02.1 ,3,
10/01/21
AirData Multimeter Recalibration Notes {Includes Accessories) ,
Co ID: O\Q5c 2 Order#: (2."2\21.c:o'L Model#: ADY\-'bt:ee.. SIN #:rl'\17'2.. Yr Date: \of 07j 202-(
As-Received readings could not be taken In any mode for the following reason(s): D
The battery compartment was corroded □
The meter could not be turned on D
The meter display read:
Recharge and then shuts down D
TooHot D
TooCold D
Missing segments o 88888888 D Nonsense o
As-Received readings could not be taken In the following mode(s): □
Differential pressure D
Differential pressure system Is leaking D
Meter will not zero for differential pressure D
Absolute pressure 14 In Hg o 40 in Hg o
Absolute pressure system is leaking o
Low Velocity Confirmation D
Differential pressure system Is leaking D
Meter wlll not zero for differential pressure □
As-received readings could not be taken In the temperature mode for the following reason(s): D
Broken pins In the temperature jack o
Meter reads •No Probe• o
TemProbe Is damaged D
As-received readings could not be taken in wind tunnel velocity mode with the customer's VelGrid for the following
reason(s): D
VelGrld was broken or leaking D
VelGrid readings were taken with an In-house VelGrid D
As-received readings could not be taken In the air flow mode with the customer's FlowHood for the following reason(s): lSI"'
FlowHood grid was broken or leaking D
Flaps control mechanism was damaged D
Base was cracked enough to leak or otherwise damaged D
AJr flow readings were taken with the In-house FlowHood □ ~ F\Q(.) ,Yoe~ ~ct 1r.J ~OJ. ~/''!::Ko\t..e..,..3 ~
Tltle:Ws\:C(S,.p.L
•
By: ()\ • OocY\::)
Shortridge Instruments, Inc.
Date: 19/07{20zj
7855 East Redfield Road Scottsdale, Arizona 85260
(480) 991-6744 • Fax (480) 443-1267 • www.shortridqe.com
ADM Recalibration Notes Page-1 of 1 07/12/2021
OFFICE USE ONLY SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
RECORD ID# __________________ _
PLAN CHECK# _________________ _
BP DATE
Business Contact Telephone#
Aethercomm Michael Vidal 760-208-6002 ext.
Project Address (include suite)
2800 Whiptail Loop W. Suite C6
City State Zip Code
Carlsbad CA 92010
APN#
209-120-25-00
Mailing Address (include suite)
4275 Executive Square, Suite 370
Project Contact
Michael Beadle
City State Zip Code Plan File#
La Jolla CA 92037
Applicant E-mail Telephone#
Michael.Beadle@RyanCompanies.com 612-239-5547
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San
Diego}: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled,
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These.
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATE~IALS DIVISION (HMO}: If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy:
1.
2.
3.
4.
5.
6.
7.
8.
YES NO (for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply). □ Iii □ Iii Will your business dispose of Hazardous Substances or Medical Waste in any amount?
□ ~ Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
□ □ □ □ □
Iii Will your business store or handle carcinogens/reproductive toxins in any quantity? Iii Will your business use an existing or install an underground storage tank?
Iii Will your business store or handle Regulated Substances (CalARP)? Iii Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
~ Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
0 CalARP Exempt
I
Date Initials
0 CalARP Required
I
Date Initials
0 CalARP Complete
I
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCDl: The following questions are intended to identify the majority of air pollution
issues at the planning stage. Your project may require additional measures not identified by these questions. Some residential projects may be exempt from APCD
requirements. If yes is answered for either questions 1, 2 or 5 or for more comprehensive requirements, please contact APCD at apcdcomp@sdcounty.ca.gov;
(858) 586-2650; or 10124 Old Grove Road, San Diego, CA 92131.
YES NO
1. D Iii Will the project disturb 100 square feet or more of existing building materials?
2. D ~ Will any load supporting structural members be removed?
3. D D (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPA-approved
building inspector course?
4. D D (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, a
notification may be required at least 10 working days prior to commencing asbestos removal. Additionally, a notification may be required prior to
the removal of a load supporting structural member(s) regardless of the presence of asbestos.
5. D Iii Will the project or associated construction equipment emit air contaminants? See the reverse side of this form for typical equipment requiring an
APCD permit. If yes, contact APCD prior to the issuance of a building permit.
6. D D (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda ?
Briefly describe business activities: Briefly describe proposed project:
Warehouse Tenant Improvement as an S-1 and F-1 NEW NON -STRUCTURAL PARTITIONS AND FINISHES, LIGHTING, ELECTRICAL, HVAC, PLUMBING, ANO STRUCTURAL WALLS.
I declare under penalty of perjury that to the best of my knowledge and belief t e responses made herein are true and correct.
UletlUIB-.wlt ~Bt-• ~~-E:--<---·---08 I 23 I 2021
Name of Owner or Authorized Agent Signature of Owner or Authorized Agent Date
FOR OF Fl CAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ________________________________ _
BY· DATE· I I
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMO• APCD COUNTY-HMO APCD COUNTY-HMO APCD
.. *A stamp in this box only exempts businesses from compleltng or updating a Hazardous Materials Business Plan. Other perm1tt1ng requirements may still apply
HM-9171 (9/18) County of San Diego -DEH -Hazardous Materials Division
ENCINA WASTEWATER AUTHORITY
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
6200 Avenida Encinas, Carlsbad, CA 92011
Phone: 760-438-3941 Fax: 760-476-9852
SourceControl@encinajpa.com
Date: 08/20/2021
Business Name: Aethercomm ---------------------
Street Address: 2800 Whiptail Loop W. Suite C6
Email Address: Michael.Beadle@RyanCompanies.com
PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT : (ON REVERSE SIDE CHECK TYPE OF BUSINESS) □
Check all below that are present at your facility:
D Acid Cleaning
D Assembly
D Automotive Repair
D Battery Manufacturing D Biofuel Manufacturing
D Biotech Laboratory
D Bulk Chemical Storage
D CarWash
D Chemical Manufacturing
D Chemical Purification
D Dental Offices D Dental Schools D Dental Clinics
D Dry Cleaning
D Electrical Component
D Manufacturing
D Fertilizer Manufacturing D Film/ X-ra y Processing
D Food Processing
D Glass Manufacturing
D Industrial Laundry
D Ink Manufacturing
D Laboratory
D Machining/Milling D Membrane manufacturing
D (i.e. waterfilter membranes)
D Metal Casting/Forming
D Metal Fabrication
D Metal Finishing
D Electroplating
D Electroless Plating
D Anodizing
D Coating (i.e. phosphating)
□ Chemical Etching/Milling
D Printed Circuit Board D Manufacturing
D Metal Powders Forming
D Nutritional Supplement/Vitamin
D Manufacturing
D Painting/Finishing
D Paint Manufacturing
D Personal Care Products
D Manufacturing
D Pesticide Manufacturing/ Packaging
D Pharmaceutical Manufacturing
D (including precursors)
D Porcelain Enameling
D Power Generation
D Print Shop
D Research and Development
D Rubber Manufacturing
D Semiconductor Manufacturing
D Soap/Detergent Manufacturing
D Waste Treatment/Storage
New Business? YesO NoE] SIC Code(s) if known: Date operation began/will begin: ______ _
Tenant Improvement? Yes [:]NoO If yes, briefly describe improvement: New 28,920 USF tenant improvement in existing warehouse.
With new restrooms and janitors closet.
Description of operations generating wastewater (discharged to sewer, hauled or evaporated):. __________ _
Estimated volume of industrial wastewater to be discharged (gal/ day) : _N_I_A ___________________ _
List hazardous wastes generated (type/volume):._N_I_A ___________________________ _
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? YesODate: _____ NoO
Page 1 of 2
l
ENCINA WASTEWATER AUTHORITY
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
6200 Avenida Encinas, Carlsbad, CA 92011
Phone: 760-438-3941 Fax: 760-476-9852
SourceControl@encinajpa.com
The commercial enterprises listed below are a partial listing of businesses that are exempt from industrial wastewater discharge
permitting under normal operating conditions. They are exempt because (a) they discharge no process wastewater (i. e., they
only discharge sanitary wastewater with no pollutants exceeding any local limits), and (b) they have no potential to negatively
impact the EWPCF or other wastewater treatment plants in the ESS. Any questions regarding exemptions should be referred
to EWA Source Control staff.
□ Automobile Detailer s
□ Barber/Beauty Shops
□ Business/Sales Offices
□ Cleaning Services
□ Carpet/Upholstery
□ Childcare Facilities
□ Churches
□ Community Centers
□ Consulting Services
□ Contractors
□ Counseling Services
□ Educational Services (no auto repair/film
□ Financial Institutions/Services
□ Fitness Centers
□ Gas Stations (no car wash/auto repair)
□ Grocery Stores (no film developing)
□ Residential based Businesses
developing)
D Hotels/ Motels (no laundry)
D Laundromats
D Libraries
D Medical Offices (no x-ray developing)
D Mortuaries
D Museums D Nail Salons
D Nursing Homes
D Office Buildings (no process flow)
D Optical Services
D Pest Control Services (no pesticide repackaging for sale)
D Pet Boarding/Grooming Facilities
D Postal Services (no car wash/auto repair)
D Public Storage Facilities
D Restaurants/Bars D Retail/Wholesale Stores (no autorepair/film
developing)
D Theaters (Movie/Live)
CERTIFICATION STATEMENT
I certify that the information above is true and correct to the best of my knowledge.
Michael Beadle Print Name: ____________ _
08/23/2021
Date: ____ _
Michael Vidal Facility Contact: __________ _ Title:_F_a_c_i l_ity_M_a_n_a_g_e_r __
ENCINA WASTEWATER AUTHORITY
6200 AVENI DA ENCi NAS, CARLSBAD, CA Phone: 760-438-3941 Fax: 760-4 76-9852
SourceControl@encinajpa.com
Page 2 of 2
C cityof
Carlsbad
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
8-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
PURPOSE
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) must be included with the building permit application. The Carlsbad
Municipal Code (CMC) can be referenced during completion of this document by clicking on the provided links to each
municipal code section.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
check NIA and provide an explanation or code section describing the exception.
Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The
project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections.
-• ·•, " -, -~ -: • -r ~ -• ,-r
~ -• ' ' -.. ' J
Project Name/Building
Permit No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone:
1115 ~unvG
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
Contact Phone: e<£f -811 -7}j'i
t Ar-J (ON\f'A;t-l1tS Contact Email: . a\~.;\:t~ ~Q . 1eS .(brt)
-'--1------'---------------~'----''-----=-'---+----'I-'-..:....:..._
92 75 E.><Et:v·r:;Vf
Applicant Signature'. : I :sa r -
I LF\ JD\.,\.,J;\
Da~:_rl_2)_/_~--
/ I
B-50 Page 1 of 7 Revised 04/21
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For
alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet.
Building Permit Valuation (BPV) $ breakdown _______ _
Conatruc:tlon Type
□ Residential
□ New construction
□ Additions and alterations:
□ BPV < $60,000
□ BPV ~ $60,000
□ Electrical service panel upgrade only
□ BPV ~ $200,000
B Nonresidential
□ New construction
□ Alterations:
□ BPV ~ $200,000 or additions ~ 1,000
square feet
X BPV ~ $1 ,000,000
□ ~ 2,000 sq. ft. new roof addition
Checkllat It.Ill
Complete Sectlon(s) Notes:
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area is residential use
2A*, 3A*, 1B, 2B, *Includes detached, newly constructed ADU 4A*, 3B,4A
N/A N/A All residential additions and alterations
1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
only.
*Multi-family dwellings only where interior finishes are removed
1A, 4A* 1B, 4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
1 B, 2B, 3B, 4B and 5
1B, 5
('B, 2B, 5) Building alterations of 2:! 75% existing gross floor area
2B,5 1 B also applies if BPV 2:! $200,000
Check 1h6 approsrlale boxes, e,cplairl al not applicable and exception Items, and powll caladalons and doa.menta1lon as necassay.
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) 18.21.155 and 18.30.190,and the California Green Building Standards Code (CALGreen) for more
information. Appropriate details and notes must be placed on the plans according to selections chosen in the design.
A D Residentialadditionoralteration~$60,000buildingpennitvaluation. D N/A _________ _
Details of selection chosen belowmustbe placed on the plans referencing CMC D Exception: Home energy score~ 7
(attach certification) 18.30.190.
Year Built Single-family Requirements Multi-family Requirements
D Before 1978 Select one option:
D Ductsealing D Attic insulation □Cool roof D Attic insulation
D 1978 and later Select one option:
D Lighting package D Water heating Package
D Between 1978and 1991 Select one option:
D Ductsealing D Attic insulation □Cool roof
D 1992 and later Select one option:
D Lighting package D Water heating package
Updated 4/16/202 1 3
8. b<:r". Nonresidential* new construction or alterations~ $200,000 building permit valuation, ~ or additions~ 1,000 square feet.See CMC 18.21 .155 and CALGreen Appendix A5 D N/A
A5.203.1.1 Choose one: D .10utdoorlighting □ .2 Restaurant service water heating (CEC 140.5)
D .3 Warehouse dock seal doors. D .4 Daylight design PAFs D .5 Exhaust air heat recovery j N/A
AS.203.1.2.1 Choose one:□ .95 Energy budget (Projects with indoor lighting OR mechanical)
□ .90 Energy budget (ProjectswithindoorlightingANDmechanical) ]&1 N/A
AS.211.1 •• □ On-site renewable energy:
'fJ N/A
A5.211.3** D Green power: (If offered by local utility provider, 50% minimum renewable sources)
~ N/A
AS.212.1 D Elevators and escalators: (Project with more than one elevatorortwo escalators)
N/A
AS.213.1 □ Steel framing: (Provide details on plans foroptions 1-4 chosen)
NIA'----------
• Includes hotels/motels and high-rise residential buildings
•• Foralterations2! $1,000,000 BPVand affecting> 7 5% existing gross floor area, OR alterations that add 2, OOOsquare feet of new roof addition: comply
with CMC 18.30.130 (section 28 below) instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to
CAP section 38 below(low-rise residential Water Heating), increase system size by .3kWdc if PVoffsetoption is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
kWdc
Exception
D
D
D
D
8. Nonresidential new construction or alterations ~$1 ,000,000 8PV AND affecting ~75% existing floor area, OR addition that increases
roof area by ~2,000 square feel Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
D Gross Floor Area (GFA)Method
GFA:
□ If< 10,000s.f. Enter: 5 kWdc
Min. System Size:
□ If 2: 10,000s.f. calculate: 15 kWdc x (GFA/10,000) **
,~~'t) -tr\Of\ 1 ~u{u o,
kWdc ~~1 \f\3 SD ICLf'
**Round building size factor to nearest tenth, and round system size to nearest whole number.
Updated 4/16/2021 4
D Time-Dependent Valuation Method
Annual TDV Energy use:*** ______ x .80= Min. system size: ______ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A. D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section.
Provide complete details on the plans.
□ For systems serving individual dwelling units choose one system:
□ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
□ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential)
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with ALL of the following:
□ Gas or propane water heating system
□ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
□ Solar water heating system that is either:
□ .20 solar savings fraction
□ .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide
complete details on the plans.
□ Water heating system derives at least 40% of its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
□ Exception:
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to
demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a
performance approach to comply with energy-related measures will need to attach to this checklist separate calculations
and documentation as specified by the ordinances.
Updated 4/16/21 5
Building Permit Finaled
Revision Permit
Print Date: 08/12/2022
Job Address:
{city of
Carlsbad
Permit No: PREV2022-0065
Status: Closed -Finaled
Permit Type:
2800 WHIPTAIL LOOP,
BLDG-Permit Revision
CARLSBAD, CA 92010-6751
Work Class: Commercial Permit Revision
Parcel#:
Valuation: $0.00
Occupancy Group: S-1, F-1
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load: 208
Code Edition: 2019
Sprinkled: Yes
Project Title:
Track#:
Lot#:
Project#:
Plan#:
Construction Type:V-B
Orig. Plan Check#: CBC2021-0317
Pl an Check#:
Description: AETHERCOMM: REVISIONS TO ELECTRICAL ROUTING, LIGHTING
FEE
BUILDING PLAN CHECK FEE (manual)
BUILDING PLAN REVIEW -Revisions
Total Fees: $154.50
Building Division
Total Payments To Date: $154.50
Applied: 06/06/2022
Issued: 06/30/2022
Finaled Close Out: 08/12/2022
Final Inspection:
INSPECTOR:
Contractor:
RYAN COMPANIES US INC
533 S 3RD ST, # STE 100
MINNEAPOLIS, MN 55415-1101
(612) 492-4791
Balance Due:
AMOUNT
$90.00
$64.50
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
PLAN CHECK REVISION OR
DEFERRED SUBMITTAL
APPLICATION
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov 8-15
. . CBC2021-0317 Original Plan Check Number ________ _ Plan Revision Number
Project Address 2800 Whiptail Loop C6
General scope of Revision/Deferred Submittal: Revisions to electrical routing, lighting.
No modifications to site, parking, and landscape.
CONTACT INFORMATION:
Name Dalia Tawil Phone 858-812-7994 Fax '-----------
Address 4275 Executive Square , Ste. 370 City La Jolla
Email Address dalia.tawil@ryancompanies.com
Z. 92037
'P -----
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 . Elements revised: [ii Plans D Calculations D Soils D Energy D Other
2. 3.
Describe revisions in detail List page(s) where each
revision is shown
New light fixture added. E2.1
Revised power layout in ESS (129). Equipment removed in shipping/receiving (127). Revised power layout in tooling/test (131) and engineering lab (132). E3.1
Cord drops removed in production (136). New panels added in production (136) and storage (133) E3.1
Revised panel schedules.
4.
5.
Does this revision, in any w ay, alter the exterior of the project?
Does this revision add ANY new floor area (s)? D Yes
6. Does this revision affect any fire related issues? Ii] Yes
7. Is this a complete set? Ii] Yes D No
D Yes
Ii] No
0 No
E6.1
[ii No
05/23/2022 Date ~Signature_~-=-~~~#}"---..:.!::. ___________ _
1635 Faraday Avenue, Carlsbad, CA 92008 fh: 760-602-2719 ~: 760-602-8558 Email: buildin g@carlsbadca.gov
www.carlsbadca.gov
• lW
INTERWEST
A t;AfEbuill COMPANY
DATE: 6-15-22
JURISDICTION: Carlsbad
PLAN CHECK#.: CB-PREV2022-0065
PROJECT ADDRESS: 2800 Whiptail Loop C6
PROJECT NAME: Aethercomm
SET: I
0 APPLICANT
0 JURIS.
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted tferewith is for your information. The plans are being held at lnterwest
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person .
D The applicant's copy of the check list has been sent to:
~ lnterwest staff did not advise the applicant that the plan check has been completed.
D lnterwest staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Date contacted: (by: ) Email:
Mail Telephone Fax In Person
0 REMARKS:
By: Scott Humphrey
lnterwest
6-13-22
Enclosures:
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
0065
PLAN CHECK#.: CB-PREV2022-
PREPARED BY: Scott Humphrey DATE: 6-15-22
BUILDING ADDRESS: 2800 Whiptail Loop C6
BUILDING OCCUPANCY :
BUILDING AREA
PORT ION ( Sq. Ft.)
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code
I 1997 UBC Building Permit Fee iJ
I 1997 UBC Plan Check Fee 3
Va luati on Reg.
Multiplier Mod.
#N/A
VALUE
Type of Review: r Complete Review r Structural Only
J Repetitive Fee
'-..... j Repeats
,,
• Based on hourly rate
,,
1 Other
f7 Hourly c==:=:]Hr.@ *
~nterwest Fee ~
Comments: In addition to the above fee, an additional fee of$
$ /hr.) for the CalGreen review.
($)
J
7
$90.00]
is due ( hour @
Sheet of
Building Permit Finaled
Revision Permit
Print Date: 08/12/2022
Job Address: 2800 WHIPTAIL LOOP, CARLSBAD, CA 92010-6751
(city of
Carlsbad
Permit No: PREV2022-0047
Status: Closed -Finaled
Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Revision
Parcel#:
Valuation: $0.00
Occupancy Group: S-1, F-1
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load: 208
Code Edition: 2019
Sprinkled: Yes
Project Title:
Track#:
Lot#:
Project#:
Plan#:
Construction Type:V-B
Orig. Plan Check#: CBC2021-0317
Plan Check#:
Applied: 04/11/2022
Issued: 05/18/2022
Finaled Close Out: 08/12/2022
Final Inspection:
INSPECTOR:
Description: AETHERCOMM: REVISION TO DOOR AND SECURITY HARDWARE/ELECTRICAL LIGHTING/DUCTWORK
FEE
BUILDING PLAN CHECK FEE (manual)
BUILDING PLAN REVIEW-Revisions
FIRE Plan Review (per hr -Regular Office Hours)
Total Fees: $498.00 Total Payments To Date:
Building Division
$498.00
Contractor:
RYAN COMPANIES US INC
533 S 3RD ST, # STE 100
MINNEAPOLIS, MN 55415-1101
(612) 492-4791
Balance Due:
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
AMOUNT
$210.00
$64.50
$223.50
$0.00
Page 1 of 1
{ City of
Carlsbad
PLAN CHECK REVISION OR
DEFERRED SUBMITTAL
APPLICATION
B-15
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Original Plan Check Number CBC2021 -0317
Project Address 2800 Whiptail Loop C6
Plan Revision Number AJl'e~ -
664'-=r
General Scope of Revision/Deferred Submittal: Revisions to door and security hardware, electrical
routing, lighting,ductwork and plumbing. No modifications to site, parking, and landscape.
CONTACT INFORMATION:
Name Dalia Tawil Phone 858-812-7994 Fax ~---------
Address 4275 Executive Square, Ste. 370 City La Jolla
Email Address dalia.tawil@ryancompanies.com
Z. 92037 'P -----
Original plans prepared by an architect or engineer. revisions must be signed & stamped by that person.
1 . Elements revised: [i] Plans D Calculations D Soils D Energy D Other
2. 3.
Describe revisions in detail List pagefs) where each
revision is shown
Revised Door Hardware and card reader locations. Revised egress path of travel from room 124 to exit from same space. G105, A101
Demo and infill existing non egress doors and side lite. G105, AD100, A101
Added chain hung light fixture. Added exhaust for Janitor's room. A102, E2.1 , M201
Card readers added. Updaled power in rooms/area 124, 125, 127, 129, 131, 132, and 136. New 120v/206y panels added in production. New 277v/480y panel added room 133 E3.1
Disconnects added to heat pump (HP) units for economizers. E4.1
New breaker space for future transformer and panel added for clean room. New panels added to singleline. Updated AIC calculations for new panels added. ES.1
New panels added to schedule. E6.1
Condensate drains added. P2.1
4. Does this revision. in any way. a lter the exterior of the project? D Yes [i] No
5. Does this revision add ANY new floor area(s)? D Yes [i] No
6. Does this revision affect any fire related issues? [i] Yes D No
7. Is this a complete set? D Yes [i] No
~Signature ________________ _ Date 04/08/2022
1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-27 19 Fax: 760-602-8558 Email: building@carlsbadca.gov
www.carlsbadca.gov
• lW
INTERWEST
A SAl'f:o 111 COMPANY
DATE: 04/26/2022
JURISDICTION: CARLSBAD
PLAN CHECK#.: CB-PREV2022-0047 REV# 1 SET: REVl SET 1
PROJECT ADDRESS: 2800 Whiptail Loop C6
PROJECT NAME: Revision #1 of Aethercom Com Tl
□ APPLICANT
□ JURIS.
[2J The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The check list transmitted herewith is for the applicant's information. The plans are being held at
lnterwest until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to the jurisdiction at:
[2J lnterwest staff did not advise the applicant that the plan check has been completed.
D lnterwest staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Date contacted: (by: ) Email:
Mail Telephone
0 REMARKS:
By: Steven Miller
lnterwest
Fax In Person
Enclosures:
04/13/2022
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92 123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
CARLSBAD CB-PREV2022-0047
04/26/2022
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: CARLSBAD
0047 REV#l
PREPARED BY: Steven Miller
BUILDING ADDRESS: 2800 Whiptail Loop C6
BUILDING OCCUPANCY: F-1, S-1
BUILDING
PORTION
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code
1 7 B B ii in 99 U C u d g Permit Fee
AREA
( Sq. Ft.)
...
Valuation
Multiplier
#N/A
1997 UBC Plan Check Fee """'
Type of Review: Complete Review
PLAN CHECK#.: CB-PREV2022-
DATE: 04/26/2022
Reg.
Mod.
VALUE ($)
I
D Structural Only
I
D Repetitive Fee
,.. ] Repeats
D Other
0 Hourly
EsGil Fee
----11Hr@•
#NtAj
Jp/0~
Comments: r Ta..11 oft