Loading...
HomeMy WebLinkAboutCT 2018-0002; AVIARA APARTMENTS EAST; GEOTECHNICAL RESPONSE TO SHORING PLAN COMMENTS; 2023-01-12 9245 Activity Road, Suite 103, San Diego, CA 92126 TEL: (858) 536-1000 Anaheim – Irvine – Ontario – San Diego – Torrance www.GroupDelta.com BRIDGE Housing January 12, 2023 4142 Adams Avenue, Suite 103-627 Project No. SD722 San Diego, California 92116 Attention: Mr. Jeff Williams, Director of Development SUBJECT: RESPONSE TO COMMENTS ON SHORING PLANS Aviara Apartments – East Parcel 6145 Laurel Tree Lane Carlsbad, California 92009 References: Group Delta Consultants, Inc. (2022). Report of Geotechnical Investigation, Aviara Apartments – East Parcel, 6145 Laurel Tree Lane, Carlsbad, California 92009, Project No. SD722, October 24. Shoring Design (2023). Temporary and Permanent Shoring Design Submittal, Aviara Apartments East, Carlsbad, CA; January 11. Mr. Williams: Group Delta Consultants, Inc. (Group Delta) is providing responses to comments from the City of Carlsbad titled “Retaining walls, 1205 Aviara Pkwy, City of Carlsbad -SECOND REVIEW, City Permit No.: PC2022-0053, True North No.: 22-018-401” and dated January 5, 2023. Our responses follow the comments reproduced in italics below. S2. Provide confirmation from the geotechnical engineer that it is acceptable to use passive pressure resistance of (350 pcf)(H) without limit. The passive pressure resistance provided in the referenced geotechnical is factored. S3. Per Structural drawing, several soldier piles (SB #8 -#13) are permanent. In the design for those permanent soldier piles, include seismic earth pressure 15H psf in addition to static active earth pressure (45H psf or 60H psf) as suggested in Figure 7 of geotechnical report. The revised shoring design dated January 11, 2023 includes the seismic increment. S4. In timber lagging design, the lateral soil pressure distribution is based on certain "lagging soil wedge function". Provide approval from the geotechnical engineer. We agree with the response provided by the Shoring Design Group dated January 11, 2023. THESE PLANS/DOCUMENTS HAVE BEENREVIEWED FOR COMPLIANCE WITH THEAPPLICABLE CALIFORNIA BUILDING STANDARDSCODES AS ADOPTED BY THE STATE OFCALIFORNIA AND AMENDED BY THEJURISDICTION. PLAN REVIEW ACCEPTANCE OFDOCUMENTS DOES NOT AUTHORIZECONSTRUCTION TO PROCEED IN VIOLATION OFANY FEDERAL, STATE, NOR LOCAL REGULATION. BY: _________________ DATE: ________________ True North Compliance Services, Inc. THIS SET OF THE PLANS AND SPECIFICATIONSMUST BE KEPT ON THE JOB SITE AT ALL TIMESAND IT IS UNLAWFUL TO MAKE ANY CHANGES ORALTERATIONS WITHOUT PERMISSION FROM THECITY. OCCUPANCY OF STRUCTURE(S) IS NOTPERMITTED UNTIL FINAL APPROVAL IS GRANTEDBY ALL APPLICABLE DEPARTMENTS. Alaa Atassi 01/19/2023