HomeMy WebLinkAboutCT 2018-0002; AVIARA APARTMENTS EAST; RESPONSE TO PLAN REVIEW COMMENTS FOR TEMPORARY AND PERMANENT SHORING DESIGN; 2023-01-11SHORING DESIGN GROUP
January 11, 2023
Mr. Jeff Williams
Bridge Housing Phone (619) 814‐1281
4142 Adams Avenue, Suite 103‐627
San Diego, CA 92116
Re: Aviara Apartments JOB #22‐164
Carlsbad, California
Subject: Response to Plan Review Comments Prepared by True North, Dated 11‐20‐22
Response to Comments on Plans Prepared by Land Development Engineering
Dated 12‐9‐22
Dear Mr. Williams:
Shoring Design Group is in receipt of the 2nd review comments prepared by the City of Carlsbad,
regarding the above referenced project. In response, Shoring Design Group (SDG) offers the
following responses:
Response to Plan Review Comments, Prepared by True North, Dated 1‐5‐23
STRUCTURAL COMMENTS:
General
1. As requested, please see updated reference geotechnical report that now includes the
report/project number.
Structural Calculations
2. Shoring calculations are based on the temporary & permanent allowable passive
pressure values provided in the geotechnical report without limitation (see figures 7 &
9). For clarity, please see the attached geotechnical letter that verifies the use of the
passive earth pressures.
3. Please see page 75 of the shoring design calculations for the seismic earth pressure
added to the design, resulting in a net static + seismic pressure of 45pcf + 15pcf = 60pcf.
^ƚƌƵĐƚƵƌĂůĂůĐƵůĂƚŝŽŶƐ;ŽŶƚŝŶƵĞĚͿ
ϰ͘dŚĞĞĂƌƚŚƉƌĞƐƐƵƌĞŵŽĚĞůƵƐĞĚƚŽĚĞƐŝŐŶƚŚĞůĂŐŐŝŶŐ͕ŝƐĂǀĂƌŝĂƚŝŽŶŽĨdĞƌnjĂŐŚŝ͛ƐƚƌĂƉ
ĚŽŽƌ͕ƚŚĂƚŝƐƉƵďůŝƐŚĞĚĂŶĚƵƐĞĚŝŶƚŚĞŝŶĚƵƐƚƌLJĨŽƌLJĞĂƌƐ͘&ŽƌĐůĂƌŝƚLJ͕ƉůĞĂƐĞƐĞĞƚŚĞ
ĂƚƚĂĐŚĞĚŐĞŽƚĞĐŚŶŝĐĂůůĞƚƚĞƌƉƌŽǀŝĚŝŶŐĂƉƉƌŽǀĂůŽĨƚŚĞůŽĂĚƉƌĞƐƐƵƌĞŵĞƚŚŽĚŽůŽŐLJ͘
ZĞƐƉŽŶƐĞƚŽŽŵŵĞŶƚƐŽŶWůĂŶƐ͕WƌĞƉĂƌĞĚďLJ>ĂŶĚĞǀĞůŽƉŵĞŶƚ͕ĂƚĞĚϭϮͲϵͲϮϮ
ZĞƐƉŽŶƐĞƚŽŽƌƌĞĐƚŝŽŶƐŽŶ^ŚĞĞƚϭ
WůĞĂƐĞƐĞĞƵƉĚĂƚĞĚƐŚĞĞƚϭƚŚĂƚŶŽǁŵĂŬĞƐƌĞĨĞƌĞŶĐĞƚŽt'ϱϯϱͲϭ͕'ZϮϬϮϮͲϬϬϭϳ͘
ZĞƐƉŽŶƐĞƚŽŽƌƌĞĐƚŝŽŶƐŽŶ^ŚĞĞƚϰ
ͲWůĞĂƐĞƐĞĞƵƉĚĂƚĞĚĐĂůůŽƵƚƚŽƚŚĞϯ͟Ws^ĐŚ͘ϰϬƐƵďĚƌĂŝŶƉŝƉĞ;ĂƐƉƌŽǀŝĚĞĚͿ͘
ͲWůĞĂƐĞƐĞĞ͞^͟ŶŽƚĂƚŝŽŶĂůŽŶŐƚŚĞƉƌŽƉŽƐĞĚƐƵďͲĚƌĂŝŶƉŝƉĞ͘
ͲWůĞĂƐĞƐĞĞƵƉĚĂƚĞĚƌĞĨĞƌĞŶĐĞƚŽƐƵďĚƌĂŝŶʹĐĂƚĐŚďĂƐŝŶĐŽŶŶĞĐƚŝŽŶƉĞƌt'ϱϯϱͲϭ͘
ͲWůĞĂƐĞƐĞĞƵƉĚĂƚĞĚ͞ƌŝŐŚƚͲŽĨͲǁĂLJ͟ƚĞdžƚƚŚĂŶŚĂƐďĞĞŶŵŽǀĞĚƚŽƉŽŝŶƚƚŚĂƚƚŚĞZtůŝŶĞ͘
ZĞƐƉŽŶƐĞƚŽŽƌƌĞĐƚŝŽŶƐŽŶ^ŚĞĞƚϲ
ĞƚĂŝůϰͬ^,ϲ͗WůĞĂƐĞƐĞĞƵƉĚĂƚĞĚƌĞĨĞƌĞŶĐĞƚŽƚŚĞϯ͟Ws^ĐŚ͘ϰϬƐƵďĚƌĂŝŶ͘
^ŚŽƵůĚLJŽƵŚĂǀĞĂŶLJĂĚĚŝƚŝŽŶĂůƋƵĞƐƚŝŽŶƐŽƌĐŽŵŵĞŶƚƐƌĞŐĂƌĚŝŶŐƚŚŝƐŵĂƚƚĞƌ͕ƉůĞĂƐĞĂĚǀŝƐĞ͘
^ŝŶĐĞƌĞůLJ͕
^,KZ/E'^/'E'ZKhW͕
ZŽLJW͘ZĞĞĚ͕W͘͘
WƌŽũĞĐƚŶŐŝŶĞĞƌ
Retaining walls City of Carlsbad SECOND REVIEW
1205 Aviara Pkwy City Permit No.: PC2022-0053
January 5, 2023 True North No.: 22-018-401
Page 2
Plan Review Comments
RESUBMITTAL INSTRUCTIONS:
Please do not resubmit plans until all departments have completed their reviews. For status, please
contact building@carlsbadca.gov
Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of
Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, (442) 339-2719. The City will route the
plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued
review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions
for resubmittal review. The City will not route plans back to Dennis Grubb & Associates for continued Fire
Prevention review.
GENERAL INFORMATION:
A. The following comments are referred to the 2019 California Building, Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i.e., 2018 IBC, UMC, UPC, and 2017
NEC, as amended by the State of California).
B. There may be other comments generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of comments, then, is only a portion of the plan
review. Contact the City for other items.
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check.
D. amp and signature on all sheets of the drawings and
on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This item will be
verified prior to plan approval.
OCCUPANCY & BUILDING SUMMARY:
Occupancy Groups: N/A
Occupant Load: N/A
Type of Construction: N/A
Sprinklers: N/A
Stories: N/A
Area of Work (sq. ft.): N/A sq. ft.
ARCHITECTURAL COMMENTS:
No Comments.
Retaining walls City of Carlsbad SECOND REVIEW
1205 Aviara Pkwy City Permit No.: PC2022-0053
January 5, 2023 True North No.: 22-018-401
Page 3
STRUCTURAL COMMENTS:
General:
S1. On Sheet 3, in Design Criteria Note #1: Also list geotechnical report/project number: SD722.
Plans:
No comments.
Structural Calculations:
S2. Provide confirmation from the geotechnical engineer that it is acceptable to use passive pressure resistance
of (350 pcf)(H) without limit.
S3. Per Structural drawing, several soldier piles (SB #8 -#13) are permanent. In the design for those permanent
soldier piles, include seismic earth pressure 15H psf in addition to static active earth pressure (45H psf or
60H psf) as suggested in Figure 7 of geotechnical report.
S4. In timber lagging design, the lateral soil pressure distribution is based on certain "lagging soil wedge
function". Provide approval from the geotechnical engineer.
If you have any questions regarding the above comments, please contact Alex Wu via email
alexw@tncservices.com or telephone (562) 733-8030.
[END]
Shoring Design Group
7727 Caminito Liliana
San Diego, CA 92129
Aviara Apartments East
Eng: RPR Sheet____of____
Date: 10/26/2022
Lateral Live Load Surcharge
Uniform Loading
Full 72 psf= Uniform loading full soldier beam height
Partial 0 psf= Uniform loading partial soldier beam height
Hpar 0 ft= Height of partial uniform surcharge loading
Ps y( ) Full Partial0 ftyHparif
Full Hpar yHif
0 psfotherwise
Uniform surcharge profile per depth
Eccentric/Conncentric Axial & Lateral Point Loading
Pr 0 kip= Applied axial load per beam
e 0 in= Eccentricity of applied compressive load
Me Pr e
xt
= Eccentric bending moment
Ph 0 lb= lateral pont load at depth "zh"
zh 0 ft= Distance to lateral point load from top of wall
Seismic Lateral Load
EFP 15 pcf= Seismic force equivalent fluid pressure
Es EFP H= Maximum seismic force pressure
Eq y( ) EFP yyHif
0 psfotherwise
= Maximum seismic force pressure
Cantilever H = 10' sb 8-13 (P)_R1.xmcdz