HomeMy WebLinkAbout2023-02-07; City Council; ; Acceptance of Bids, Award of Contract to Dick Miller, Inc. and Waiving Minor Irregularities in Dick Miller, Inc.’s Bid for the 2021 Sidewalk Construction ProjectCA Review GH
Meeting Date: Feb. 7, 2023
To: Mayor and City Council
From: Scott Chadwick, City Manager
Staff Contact: Kevin Moghadasi, Associate Engineer
kevin.moghadasi@carlsbadca.gov, 442-339-2174
Hossein Ajideh, Engineering Manager
hossein.ajideh@carlsbadca.gov, 442-339-2756
Subject:
District:
Acceptance of Bids, Award of Contract to Dick Miller, Inc. and Waiving
Minor Irregularities in Dick Miller, Inc.’s Bid for the 2021 Sidewalk
Construction Project
1
Recommended Action
Adopt a resolution accepting bids and awarding a contract to Dick Miller, Inc. for the 2021
Sidewalk Construction Project as part of the Sidewalk/Street Construction Program, Capital
Improvement Program Project No. 6002-21, in an amount not to exceed $448,879 and waiving
minor irregularities in Dick Miller, Inc.’s bid in accordance with Carlsbad Municipal Code Section
3.28.080(I)(3).
Executive Summary
This project will build new sidewalks at the following three locations:
1. The east side of Garfield Street, between Tamarack Avenue and Redwood Avenue
2. The west side of Tamarack Avenue, from approximately 700 feet south of Kirkwall
Avenue to 550 feet north of Edinburgh Drive
3.The east side of Monroe Street, between Marron Road and the driveway entrance to
The Shoppes at Carlsbad
The project – the 2021 Sidewalk Construction Project as part of the Sidewalk/Street
Construction Program, Capital Improvement Program Project No. 6002-21 – addresses sidewalk
gaps in an area identified in the city’s Sustainable Mobility Plan, provides better and safer
pedestrian mobility and brings sidewalks in the project area up to current city design standards.
Staff have determined Dick Miller, Inc. is the lowest responsive and responsible bidder with a
bid in an amount of $448,879, as detailed below.
Carlsbad Municipal Code Sections 3.28.080I and 3.28.080(I)(6), which cover purchasing for
construction contracts, require the City Council’s approval for all formally bid contracts when
the value exceeds $200,000, making the project subject to this requirement.
Feb. 7, 2023 Item #5 Page 1 of 7
Explanation & Analysis
The City Council approved the project’s plans and specifications and authorized advertising for
construction bids on Nov. 15, 2022 (Resolution No. 2022-261). The project was then advertised
using the city’s formal bidding procedures.
Staff received six bids for construction of the project on Jan. 17, 2023. Staff completed review
of the bid documents and found three minor waivable irregularities in Dick Miller, Inc.’s bid:
1. The company did not submit the signature page of the two-page Disclosure of
Discipline Record Form, though it did submit the questionnaire portion of the
form
2. The contractor license number entered for one of the subcontractors was
actually the license number for the prime contractor, Dick Miller, Inc.
3. The Department of Industrial Relations registration number listed for a different
subcontractor was expired
However, staff confirmed that the subcontractor does have a valid Department of Industrial
Relations registration number. Because Dick Miller, Inc. and all of the listed subcontractors are
all properly licensed and registered with the Department of Industrial Relations, the minor
irregularities in the contractor’s bid did not confer a material advantage to Dick Miller, Inc. and
are waivable in accordance with to Carlsbad Municipal Code Section 3.28.080(I)(3).
Dick Miller, Inc. was deemed responsive because its bid met the requirements of the bidding
documents and deemed responsible because it submitted a list of similar projects to show its
capability and qualifications to perform the specified work.
The construction contract contains general performance standards and references technical
specifications, which if not met, allow the city to withhold payment. The contract also includes
a one-year warranty period that begins when the notice of completion is issued.
Staff recommend accepting the bids and awarding the construction contract to Dick Miller, Inc.
for the project for an amount not to exceed $448,879, and waiving minor irregularities in Dick
Miller, Inc.’s bid.
Feb. 7, 2023 Item #5 Page 2 of 7
Fiscal Analysis
Sufficient funding for this project has been appropriated from the traffic impact fees paid by
developers.
SUMMARY OF ESTIMATED COSTS AND AVAILABLE FUNDS
Sidewalk/Street Construction Program
Capital Improvement Program Project No. 6002
Total appropriation to date $3,800,000
Total expenditures and encumbrances to date $775,025
Total available funding $3,024,975
2021 Sidewalk Construction Project
Capital Improvement Program Project No. 6002-21
Construction contract – Dick Miller, Inc. $448,879
Construction contingency (estimated) $90,000
Construction management, inspection, testing and outreach
(estimated) $135,000
Total estimated construction costs $673,879
Remaining balance $2,351,096
Additional appropriation requested $0
Carlsbad Municipal Code (CMC) Sections 3.28.040(c)(5) and 3.28.090(B) authorize the City
Manager or designee to approve change orders in an amount equal to the contingency set at
the time of project award, which for this project is $90,000.
Options
Staff provide the following options for the City Council’s consideration:
1.Accept bids, award a contract to Dick Miller, Inc. and waive minor irregularities in Dick
Miller, Inc.’s bid for construction of the project in an amount not to exceed $448,879
Pros
•Fills gaps in sidewalks, allows for better and safer pedestrian mobility and brings
sidewalks in the project area in compliance with city design standards
•Dick Miller, Inc. has been determined to be the lowest responsive and
responsible bidder
•Award of the contract complies with applicable all CMC sections, including
Sections 3.28.080(C) and 3.28.080(I)(6)
•Construction can start upon award of the contract and issuance of the notice to
proceed
•Sufficient funding is available for the contract
Cons
•None identified
Feb. 7, 2023 Item #5 Page 3 of 7
2.Do not accept the bids and do not award the contract to Dick Miller, Inc.
Pros
• None identified
Cons
•Delays start of construction
•Sidewalk gaps will continue to hinder pedestrian mobility
•Delays implementation of sidewalk construction improvements
•Potential increase in construction costs due to delay in award
Staff recommend Option 1 for the City Council’s approval.
Next Steps
Once the City Council accepts bids and awards the construction contract to Dick Miller, Inc.,
staff will issue a purchase order, schedule a pre-construction meeting with the company and
issue a notice to proceed for construction of the project, which is expected to commence in
spring 2023.
The duration of the construction contract is 90 working days, not including rainy days and
delays from change orders that may extend the contract duration. Upon successful completion
of the project, which is expected to be in fall 2023, a notice of completion will be recorded to
release bonds issued for the project.
Environmental Evaluation
The City Planner has determined this project is exempt from the California Environmental
Quality Act under Guidelines Section 15301(c), which applies to the minor alternation of
existing facilities including streets, sidewalks, gutters and similar facilities involving negligible or
no expansion.
Exhibits
1.City Council resolution
2.Location map
Feb. 7, 2023 Item #5 Page 4 of 7
RESOLUTION NO. 2023-044
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ACCEPTING BIDS, AWARDING A CONTRACT TO DICK MILLER,
INC. AND WAIVING MINOR IRREGULARITIES IN DICK MILLER, INC'S BID FOR
THE 2021 SIDEWALK CONSTRUCTION PROJECT
WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary,
desirable and in the public interest to construct the 2021 Sidewalk Construction Project as part of the
Sidewalk/Street Construction Program, Capital Improvement Program, or CIP, Project No. 6002-21, or
Project; and
WHEREAS, on Nov. 15, 2022, the City Council adopted Resolution No. 2022-261, approving the
plans and specifications and authorizing advertisement of the Project for construction bids; and
WHEREAS, on Jan. 17, 2023, staff received six bids for construction of the Project; and
WHEREAS, Dick Miller, Inc. submitted the lowest responsive and responsible bid to construct
the Project, in an amount of $448,879; and
WHEREAS, staff recommend that pursuant to Carlsbad Municipal Code Section 3.28.080(1)(3),
the City Council waive the minor irregularities in the bid from Dick Miller, Inc.; and
WHEREAS, sufficient funding from the Traffic Impact Fees is available to complete the Project;
and
WHEREAS, Carlsbad Municipal Code Sections 3.28.080(C) and 3.28080(1)(6) require the City
Council award all formally bid contracts when the value exceeds $200,000; therefore, the Project is
subject to this requirement; and
WHEREAS, Carlsbad Municipal Code Sections 3.28.040(C}(S) and 3.28.090(B) authorize the
City Manager or designee to approve change orders in an amount equal to the contingency set at the
time of project award, which is $90,000 for the Project; and
WHEREAS, the City Planner has determined that the Project is exempt from the California
Environmental Quality Act, or CEQA, under CEQA Guidelines Section 15301(c) -minor alteration of
existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no
expansion.
Exhibit 1
Feb. 7, 2023 Item #5 Page 5 of 7
=---------------------------------------
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1.That the above recitations are true and correct.
2.That the irregularities in the bid submitted by Dick Miller, Inc. are minor and hereby
waived under Carlsbad Municipal Code Section 3.28.080(1)(3).
3.That the low bid of $448,789 submitted by Dick Miller, Inc. for construction of the 2021
Sidewalk Construction Project is accepted, and the Mayor is hereby authorized to
execute the contract for the Project.
4.That the City Manager or designee is hereby authorized to approve construction change
orders up to $90,000 for this Project.
5.That the award of this contract is contingent upon Dick Miller, Inc. executing the
required contract and submitting the required bonds and insurance policies, as
described in the contract, within 20 calendar days after adoption of this Resolution. The
City Manager may grant reasonable extensions of time to execute the contract and
assemble the required bonds and insurance policies.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 7th day of February, 2023, by the following vote, to wit:
AYES:
NAYS:
ABSTAIN:
ABSENT:
Blackburn, Bhat-Patel, Acosta, Burkholder.
None.
None.
None.
KEITH BLACKBURN, Mayor
LsHERRY FREISINGER, City Clerk (J (SEAL)
Feb. 7, 2023 Item #5 Page 6 of 7
MARRON ROAD AND
MONROE STREET
GARFIELD
STREET
TAMARACK AVENUE
GA
R
F
I
E
L
D
S
T
CANNONRDMARRON R D
CARLSBADVILLAGED R
ELCAMI
NOREALTAMARACKAVC
A
R
L
S
B
A
D
B
L MONROE STCARCOUNTRYDRPASEODELN
O
R
T
E ARMADADRA
V
E
NID
A
EN
CINAS
OCEANSIDE
PACIFICOCEAN
BUENAVISTALAGOON
AGUAHEDIONDALAGOON
LOCATION MAP
PROJECT NAME PROJECT NUMBER 6002-21
EXHIBIT22021 SIDEWALK CONSTRUCTION PROJECT
$!Å
Created By: Sara Jadhav 10/20/2022 S:\Sara_Jadhav\Projects\LocationMap\CIP6002\ChangeRequest\LocationMap_CIP_6002.mxd
Exhibit 2
Feb. 7, 2023 Item #5 Page 7 of 7