HYDROLOGY/DRAINAGE STUDY
For
St. Elizabeth Seton Catholic Church
New Rectory
Applicant/Developer:
St. Elizabeth Ann Catholic Church
6628 Santa Isabel Street
Carlsbad, CA 92009
Snipes-Dye Associates
8348 Center Drive, Suite G
La Mesa, CA 91942-2910
619/697-9234
Job CA1591
Dated: March 8, 2021
Revised: May 20, 2021
DECLARATION OF RESPONSIBLE CHARGE
I, HEREBY DECLARE THAT I AM THE CIVIL ENGINEER OF WORK FOR THIS PROJECT, THAT I
HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED
IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS
CONSISTENT WITH CURRENT STANDARDS.
I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE
CITY OF CARLSBAD IS CONFINED TO A REVIEW ONLY AND DOES NOT RELIEVE ME, AS
ENGINEER OF WORK, OF MY RESPONSIBILITY FOR PROJECT DESIGN.
MATTHEW P. KURTZ Date
R.C.E. 79546
EXP. 09-30-2022
11-15-2022
546
TABLE OF CONTENTS
Page
Project Information 1
Pre-development Calculations 4
Post-development Calculations 10
Drainage Maps 14
Appendix 17
PRELIMINARY HYDROLOGY
FOR
St. Elizabeth Seton Catholic Church
New Rectory
The project is located at 6628 Santa Isabel Street, Carlsbad, CA 92009, with Acessor’s
Parcel No. 215-330-01, in Carlsbad, California. The project proposes the addition of a
new one-story building with an attached two car garage, concrete sidewalk, landscape
areas, a 16’ access DG access road and the removal and replacement of a portion of
an A.C. pavement parking lot.
PRE-DEVELOPMENT CONDITIONS: The existing site consists of a fully developed
Catholic Church with a church sanctuary building, conference center building, two
parking lots and a concrete courtyard and is known as St. Elizabeth Seton Catholic
Church. The site is landscaped with trees, shrubs and grass. The site is bounded by El
Fuerte Street to the East, Alga Road to the north and Santa Isabel Street to the south
and west. The 5.04 acre site topography slopes downward westerly toward Santa
Isabel Street. Current site storm water drainage runoff flows generally in the
southwesterly directions to an existing curb inlet located along Santa Isabel Street. The
existing curb inlet is connected to a public underground storm drain system which
ultimately discharges to San Marcos Creek approximately 1.5 miles southwesterly of the
project site. The easterly portion of the site drainage runoff flows to catch basins
connected to a private underground drainage system discharging to the existing curb
inlet. The westerly portion of the site sheet flows to a curb outlet along Santa Isabel
Street. The runoff then flows, southeasterly approximately 75 feet, within the gutter to
the existing curb inlet conveying with the drainage runoff from the easterly portion of the
site. The drainage runoff from the westerly parking lot flows through a small grass
swale prior to discharging through the existing curb outlet. The drainage runoff from the
easterly parking lot flows through a vegetated bio-swale prior to discharging into a catch
basin connected to the private underground storm drain system. Runoff from the
existing sanctuary and a portion of the conference center building roofs flow through
adjacent landscaped areas prior to entering the private underground storm drain
system.
POST-DEVELOPMENT CONDITIONS: The proposed development consists of the
construction of a one-story building with an attached two car garage, concrete
sidewalks, landscape areas, a 16-foot decomposed granite access road and the
removal and replacement of a portion of an A.C. paved parking lot. The proposed
development will drain in a similar manner as the existing conditions, and consists of 3
drainage basins. Drainage basin A, will drain in a general south direction into a
proposed private catch basin that discharges into an existing private 18” RCP storm
drain line which connects into a public 24” RCP storm drain line at a location southwest
of the site and ultimately discharges to San Marcos Creek. Drainage basin B1 consists
of an area of approximately 0.01 acre and sheet flows in a general south direction until
reaching an existing concrete ribbon gutter which discharges into an existing landscape
area at a location southwest of the site. Lastly, drainage basin C1, consists of a new
Page 1 of 21
decomposed granite SDG&E access road and the removal and replacement of an
existing concrete sidewalk, which drains in a general northwest direction until reaching
its discharge location at the northwestern corner of the site. This flow travels west along
the northern parking lot and is collected by an existing trench drain, located northwest of
the site, and discharges into a private 12” PVC storm drain line which ultimately
discharges into the same public 24” RCP storm drain previously mentioned. The
following table is a summary of the 100-year peak discharges for the pre- and post-
development conditions:
CONCLUSION:
· The increase of 0.16 cfs is negligible as it will not impact any downstream and
adjacent properties due to the construction of the proposed development.
Page 2 of 21
PRE-DEVELOPMENT
DRAINAGE CALCULATIONS
Page 4 of 21
St. Elizabeth Seton Rectory - Basin A
Pre-Development
Coefficient ( C )
0.90 778 SF 0.02 AC
0.35 3,618 SF 0.08 AC
18%
Revised C ==0.45
P 6 =2.8 inches
= 4.03 Feet
= 59 Feet
= 6.8 %
= 4.8 Minutes
T = Total Time of Concentration = 5.0 Minutes
= 8.50 Inches/Hour
PEAK DISCHARGES (Q):
A = Area of the basin = 0.10 Acres
Q = CIA = 0.38 ft 3 /sec
Figure 3-4 Nomograph for Determination of Time of Concentration
Basin A: Q 100
FAA Rational Formula - County of San Diego
Hydrology Manual Figure 3-3
Pervious- Soil D
Soil Group D for Undisturbed Natural Terrain in Table 3-1
0.90(% IMP) + Cp(1 - % IMP)
% IMP = Percent of impervious surface =
Intensity = Intensity-Duration-Design Chart
County of San Diego- Hydrology Manual, Figure 3-1
RAINFALL INTENSITY (I):
∆Ε = Change in elevation along the Effective Slope
D= Water Course Distance
S= Slope = (∆E/D) X 100%
Tc = Initial Time of Concentration
100 Year-6 Hour Precipitation (See attached isopluvial map)
T C= [1.8(1.1-C)(D^1/2)]/[S^(1/3)] =
Equation 3.1.2 Estimating Runoff Factor for Area
PRE-DEVELOPMENT PEAK 100-YEAR DISCHARGE (Q)
RUNOFF FACTOR (C):
Land Use
Impervious Surface
Area
CA1591
Pre-Development - Basin A Prepared by:
Snipes-Dye Associates
Page 5 of 21
St Elizabeth Seton Rectory - Basin B1
Pre-Development
Coefficient ( C )
0.90 401 SF 0.01 AC
0.35 0 SF 0.00 AC
100%
Revised C ==0.90
P 6 =2.8 inches
= 1.46 Feet
= 37 Feet
= 3.9 %
= 1.4 Minutes
T = Total Time of Concentration = 5.0 Minutes
= 7.38 Inches/Hour
PEAK DISCHARGES (Q):
A = Area of the basin = 0.01 Acres
Q = CIA = 0.06 ft 3/sec
PRE-DEVELOPMENT PEAK 100-YEAR DISCHARGE (Q)
Basin B1: Q100
RUNOFF FACTOR (C):
Land Use Area
Impervious Surface
Pervious- Soil D
% IMP = Percent of impervious surface =
Soil Group D for Undisturbed Natural Terrain in Table 3-1
Equation 3.1.2 Estimating Runoff Factor for Area
0.90(% IMP) + Cp(1 - % IMP)
RAINFALL INTENSITY (I):
100 Year-6 Hour Precipitation (See attached isopluvial map)
∆Ε = Change in elevation along the Effective Slope
D= Water Course Distance
S= Slope = (∆E/D) X 100%
Tc = Initial Time of Concentration
TC = [1.8(1.1-C)(D^1/2)]/[S^(1/3)] =
Intensity = Intensity-Duration-Design Chart
County of San Diego- Hydrology Manual, Figure 3-1
FAA Rational Formula - County of San Diego
Hydrology Manual Figure 3-3
Figure 3-4 Nomograph for Determination of Time of Concentration
CA1591
Pre-Development - Basin B1 Prepared by:
Snipes-Dye Associates
Page 6 of 21
St. Elizabeth Seton Rectory - Basin B2
Pre-Development
Coefficient ( C )
0.90 968 SF 0.02 AC
0.35 0 SF 0.00 AC
100%
Revised C ==0.90
P 6 =2.8 inches
= 2.44 Feet
= 65 Feet
= 3.8 %
= 1.9 Minutes
T = Total Time of Concentration = 5.0 Minutes
= 8.50 Inches/Hour
PEAK DISCHARGES (Q):
A = Area of the basin = 0.02 Acres
Q = CIA = 0.17 ft 3 /sec
PRE-DEVELOPMENT PEAK 100-YEAR DISCHARGE (Q)
Basin B2: Q 100
RUNOFF FACTOR (C):
Land Use Area
Impervious Surface
Pervious- Soil D
% IMP = Percent of impervious surface =
Soil Group D for Undisturbed Natural Terrain in Table 3-1
Equation 3.1.2 Estimating Runoff Factor for Area
0.90(% IMP) + Cp(1 - % IMP)
RAINFALL INTENSITY (I):
100 Year-6 Hour Precipitation (See attached isopluvial map)
∆Ε = Change in elevation along the Effective Slope
D= Water Course Distance
S= Slope = (∆E/D) X 100%
Tc = Initial Time of Concentration
T C= [1.8(1.1-C)(D^1/2)]/[S^(1/3)] =
Intensity = Intensity-Duration-Design Chart
County of San Diego- Hydrology Manual, Figure 3-1
FAA Rational Formula - County of San Diego
Hydrology Manual Figure 3-3
Figure 3-4 Nomograph for Determination of Time of Concentration
CA1591
Pre-Development - Basin B2 Prepared by:
Snipes-Dye Associates
Page 7 of 21
St. Elizabeth Seton Rectory - Basin C1
Pre-Development
Coefficient ( C )
0.90 107 SF 0.00 AC
0.35 1,568 SF 0.04 AC
6%
Revised C ==0.39
P 6 =2.8 inches
= 3.65 Feet
= 51 Feet
= 7.2 %
= 4.8 Minutes
T = Total Time of Concentration = 5.0 Minutes
= 8.50 Inches/Hour
PEAK DISCHARGES (Q):
A = Area of the basin = 0.04 Acres
Q = CIA = 0.13 ft 3/sec
PRE-DEVELOPMENT PEAK 100-YEAR DISCHARGE (Q)
Basin C1: Q100
RUNOFF FACTOR (C):
Land Use Area
Impervious Surface
Pervious- Soil D
% IMP = Percent of impervious surface =
Soil Group D for Undisturbed Natural Terrain in Table 3-1
Equation 3.1.2 Estimating Runoff Factor for Area
0.90(% IMP) + Cp(1 - % IMP)
RAINFALL INTENSITY (I):
100 Year-6 Hour Precipitation (See attached isopluvial map)
∆Ε = Change in elevation along the Effective Slope
D= Water Course Distance
S= Slope = (∆E/D) X 100%
Tc = Initial Time of Concentration
TC = [1.8(1.1-C)(D^1/2)]/[S^(1/3)] =
Intensity = Intensity-Duration-Design Chart
County of San Diego- Hydrology Manual, Figure 3-1
FAA Rational Formula - County of San Diego
Hydrology Manual Figure 3-3
Figure 3-4 Nomograph for Determination of Time of Concentration
CA1591
Pre-Development - Basin C1 Prepared by:
Snipes-Dye Associates
Page 8 of 21
St. Elizabeth Seton Rectory - Basin C2
Pre-Development
Coefficient ( C )
0.90 309 SF 0.01 AC
0.35 0 SF 0.00 AC
100%
Revised C ==0.90
P 6 =2.8 inches
= 1.67 Feet
= 70 Feet
= 2.4 %
= 2.3 Minutes
T = Total Time of Concentration = 5.0 Minutes
= 8.50 Inches/Hour
PEAK DISCHARGES (Q):
A = Area of the basin = 0.01 Acres
Q = CIA = 0.05 ft 3/sec
PRE-DEVELOPMENT PEAK 100-YEAR DISCHARGE (Q)
Basin C2: Q100
RUNOFF FACTOR (C):
Land Use Area
Impervious Surface
Pervious- Soil D
% IMP = Percent of impervious surface =
Soil Group D for Undisturbed Natural Terrain in Table 3-1
Equation 3.1.2 Estimating Runoff Factor for Area
0.90(% IMP) + Cp(1 - % IMP)
RAINFALL INTENSITY (I):
100 Year-6 Hour Precipitation (See attached isopluvial map)
∆Ε = Change in elevation along the Effective Slope
D= Water Course Distance
S= Slope = (∆E/D) X 100%
Tc = Initial Time of Concentration
TC = [1.8(1.1-C)(D^1/2)]/[S^(1/3)] =
Intensity = Intensity-Duration-Design Chart
County of San Diego- Hydrology Manual, Figure 3-1
FAA Rational Formula - County of San Diego
Hydrology Manual Figure 3-3
Figure 3-4 Nomograph for Determination of Time of Concentration
CA1591
Pre-Development - Basin C2 Prepared by:
Snipes-Dye Associates
Page 9 of 21
POST-DEVELOPMENT
DRAINAGE CALCULATIONS
Page 10 of 21
St Elizabeth Seton Rectory - Basin A
Post-Development
Coefficient ( C )
0.90 3,984 SF 0.09 AC
0.35 602 SF 0.01 AC
87%
Revised C ==0.83
P 6 =2.8 inches
= 2.38 Feet
= 74 Feet
= 3.2 %
= 2.9 Minutes
T = Total Time of Concentration = 5.0 Minutes
= 7.38 Inches/Hour
PEAK DISCHARGES (Q):
A = Area of the basin = 0.11 Acres
Q = CIA = 0.64 ft 3/sec
Intensity = Intensity-Duration-Design Chart
County of San Diego- Hydrology Manual, Figure 3-1
FAA Rational Formula - County of San Diego
Hydrology Manual Figure 3-3
Figure 3-4 Nomograph for Determination of Time of Concentration
100 Year-6 Hour Precipitation (See attached isopluvial map)
∆Ε = Change in elevation along the Effective Slope
D= Water Course Distance
S= Slope = (∆E/D) X 100%
Tc = Initial Time of Concentration
TC = [1.8(1.1-C)(D^1/2)]/[S^(1/3)] =
Pervious- Soil D
% IMP = Percent of impervious surface =
Soil Group D for Undisturbed Natural Terrain in Table 3-1
Equation 3.1.2 Estimating Runoff Factor for Area
0.90(% IMP) + Cp(1 - % IMP)
RAINFALL INTENSITY (I):
POST-DEVELOPMENT PEAK 100-YEAR DISCHARGE (Q)
Basin A: Q 100
RUNOFF FACTOR (C):
Land Use Area
Impervious Surface
CA1591
Post-Development - Basin A Prepared by:
Snipes-Dye Associates
Page 11 of 21
St Elizabeth Seton Rectory - Basin B1
Post-Development
Coefficient ( C )
0.90 401 SF 0.01 AC
0.35 0 SF 0.00 AC
100%
Revised C ==0.90
P 6 =2.8 inches
= 1.46 Feet
= 37 Feet
= 3.9 %
= 1.4 Minutes
T = Total Time of Concentration = 5.0 Minutes
= 7.38 Inches/Hour
PEAK DISCHARGES (Q):
A = Area of the basin = 0.01 Acres
Q = CIA = 0.06 ft 3/sec
Intensity = Intensity-Duration-Design Chart
County of San Diego- Hydrology Manual, Figure 3-1
FAA Rational Formula - County of San Diego
Hydrology Manual Figure 3-3
Figure 3-4 Nomograph for Determination of Time of Concentration
100 Year-6 Hour Precipitation (See attached isopluvial map)
∆Ε = Change in elevation along the Effective Slope
D= Water Course Distance
S= Slope = (∆E/D) X 100%
Tc = Initial Time of Concentration
TC = [1.8(1.1-C)(D^1/2)]/[S^(1/3)] =
Pervious- Soil D
% IMP = Percent of impervious surface =
Soil Group D for Undisturbed Natural Terrain in Table 3-1
Equation 3.1.2 Estimating Runoff Factor for Area
0.90(% IMP) + Cp(1 - % IMP)
RAINFALL INTENSITY (I):
POST-DEVELOPMENT PEAK 100-YEAR DISCHARGE (Q)
Basin B1: Q100
RUNOFF FACTOR (C):
Land Use Area
Impervious Surface
CA1591
Post-Development - Basin B1 Prepared by:
Snipes-Dye Associates
Page 12 of 21
St Elizabeth Seton Rectory - Basin C1
Post-Development
Coefficient ( C )
0.90 1,410 SF 0.03 AC
0.35 574 SF 0.01 AC
71%
Revised C ==0.74
P 6 =2.8 inches
= 3.42 Feet
= 72 Feet
= 4.8 %
= 3.3 Minutes
T = Total Time of Concentration = 5.0 Minutes
= 7.38 Inches/Hour
PEAK DISCHARGES (Q):
A = Area of the basin = 0.05 Acres
Q = CIA = 0.25 ft 3/sec
POST-DEVELOPMENT PEAK 100-YEAR DISCHARGE (Q)
Basin C1: Q100
RUNOFF FACTOR (C):
Land Use Area
Impervious Surface
Pervious- Soil D
% IMP = Percent of impervious surface =
Soil Group D for Undisturbed Natural Terrain in Table 3-1
Equation 3.1.2 Estimating Runoff Factor for Area
0.90(% IMP) + Cp(1 - % IMP)
RAINFALL INTENSITY (I):
100 Year-6 Hour Precipitation (See attached isopluvial map)
∆Ε = Change in elevation along the Effective Slope
D= Water Course Distance
S= Slope = (∆E/D) X 100%
Tc = Initial Time of Concentration
TC = [1.8(1.1-C)(D^1/2)]/[S^(1/3)] =
Intensity = Intensity-Duration-Design Chart
County of San Diego- Hydrology Manual, Figure 3-1
FAA Rational Formula - County of San Diego
Hydrology Manual Figure 3-3
Figure 3-4 Nomograph for Determination of Time of Concentration
CA1591
Post-Development - Basin C1 Prepared by:
Snipes-Dye Associates
Page 13 of 21
DRAINAGE MAPS
Page 14 of 21
8348 CENTER DRIVE, SUITE G, LA MESA, CA 91942-2910 (619) 697-9234, FAX (619) 460-2033SNIPES-DYE ASSOCIATES
SDSD
SD
SD
SD
SD
SD
SDSD8348 CENTER DRIVE, SUITE G, LA MESA, CA 91942-2910 (619) 697-9234, FAX (619) 460-2033SNIPES-DYE ASSOCIATES
APPENDIX
Page 16 of 21
Page 17 of 21
SITE P6 = 2.8
Page 18 of 21
Page 19 of 21
Page 20 of 21
Page 21 of 21