HomeMy WebLinkAbout2742 STATE ST; 103; CBC2020-0493; PermitBuilding Permit Finaled
Commercial Permit
Print Date: 09/10/2021
Job Address: 2742 STATE ST, # 103, CARLSBAD, CA 92008-1628
(city of
Carlsbad
Permit No: CBC2020-0493
Status: Closed -Finaled
Permit Type: BLDG-Commercial Work Class: Tenant Improvement
Parcel#: 2031811900
Valuation: $154,357.20
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title: STATE STREET COMMONS
Track#:
Lot#:
Project#: DEV2019-0048
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check#:
Applied:
Issued:
Finaled Close Out:
Inspector:
Final Inspection:
12/14/2020
01/26/2021
TAlva
09/10/2021
Description: LOFTY COFFEE CO: 2,385 SF Tl, RESTAURANT TO RESTAURANT// CREATE NEW SUITE 103
Property Owner:
STATE STREET COMMONS LLC
2659 STATE ST, # 100
CARLSBAD, CA 92008
FEE
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL
FIRE Plan Review Per Hour -Office Hours
MANUAL BLDG PLAN CHECK FEE
MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL
PLUMBING BLDG COMMERCIAL NEW/ADDITION/REMODEL
SB1473 GREEN BUILDING STATE STANDARDS FEE
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-COMMERCIAL
Total Fees: $5,543.01 Total Payments To Date: $5,543.01
Contractor:
NAYLOR CONSTRUCTION INC
2033 SAN ELIJO AVE, # STE 252
CARDIFF BY THE SEA, CA 92007-1726-SAN
DIEGO
(858) 356-4902
Balance Due:
AMOUNT
$821.25
$426.85
$89.00
$204.00
$148.03
$55.00
$86.00
$7.00
$3,662.66
$43,22
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-85601 I www.carlsbadca.gov
~ City of
Carlsbad
Job Address 2742 State Street
Tenant Name: Lofty Coffee Co. LLC
COMMERCIAL /1 °"> 0.ozo~df<f J BUILDING PERMIT Plan Check
Est. Value 1-,~ ~srt.,;'
APPLICATION PC Deposit '/f l.t,8~
B-2 Date 12...-/lf-2.olo
Suite:._1_oa ___ ~APN: 203-181-19-oo
Lot#:
Year Built: _2_02_0 ____ Occupancy:_" ____ _ VB EJD DEJ Construction Type;..•'--'-:;_ __ _,f;r,e Sprinklers: yes no A/C: yes no
BRIEF DESCRIPTION OF WORK Interior Tl build out of existing shell, including front kitchen POS, back of
house food prep, uni-sex restroom and patio seating area
D Addition/New: ___________ New SF and Use, ____________ New SF and Use,
____ Deck SF, Patio Cover SF (not including flatwork)
~ Tenant lmprovement:_1_.4_77 ____ SF, Existing Use Vacant Cate Space Proposed Use _c_a_fe _____ _
_____ SF, Existing Use _______ Proposed Use ______ _
D Pool/Spa:. _____ .SF Additional Gas or Electrical Features? ____________ _
DD DD DD D Solar:. ___ KW,. ___ Modules, ____ Mounted, Tilt: Yes/ No, RMA: Yes/ No, Panel Upgrade: Yes/ No
D Plumbing/Mechanical/Electrical Only: ----------------------------
□ Other:
This permit is to be issued in the name of the Property Owner as Owner-Builder, licensed contractor or Authorized Agent of the
owner or contractor. The person listed as the Applicant below will be the main point of contact throughout the permit process.
PROPERTY OWNER APPLICANT ii PROPERTY OWNERS AUTHORIZED AGENT APPLICANT 0
Name:_s._''-"'-"'_' ________________ ,Name: ____________________ _
Address:97 N. Coast Hwy 101 suite 101
City: Carlsbad
Phone: 760.212.8121
Email: eric@loftycoffee.com
DESIGN PROFESSIONAL
Name: Alex Stone
State:._c_• __ .Zip:9202•
APPLICANT ii
Address: 444 s. Cedros Ave Suite 235
City: Solana Beach
Phone: 858.704.4004
State:_c_A __ .Zip: 92075
Email: Alex@edingerarchitect.com
Architect State License: _c_2_03_6_3 ________ _
Address: __________________ _
City: ___________ .State:. ___ Zip: ____ _
Phone: ____________________ _
Email: eric@loftycoffee.com
CONTRACTOR BUSINESS
Name: Naylor Construction
Address: 2033 San Elijo Ave #252
APPLICANT 0
City: Card;ff State:_C_A __ Zip: 92007
Phone: 858.353.4902
Email: christian@naylorcon.com
State License:._8_10_7_61 ____ Bus. License:_2_6-_06_5_71_0_5 ___ _
1635 Faraday Ave Carlsbad, CA 92008
B-2
Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
Page 1 of 2 Rev. 08120
DocuSign Envelope ID: C8A0ED0C-984C-4827-A92B-D42A05C31182
IDENTIFY WHO WILL PERFORM THE WORK BY COMPLETING (OPTION A) OR (OPTION B) BELOW:
(OPTION A) L_IC:INSED CONTRACTOR DECLARATIQIII;
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commenc,ng with Section
7000) of Division 3 of the Business and Profess,ons Coae, and my license 1s in full force and effect. I also affirm under
penalty of perjury one af the follaw1ng declarations·
0 I have and will maintain a certificate of consent to self-insure for workers' :ompensation provided by Section 3700 of the Labor Code, for the performance of
the work which this permit is issued. Policy No.
II] I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: lnsuranceCompany Name: -"-"""'-'---•_0_•_'=_""-"-""-""-'"-'-----------
Policy No. FLM121!1<101 Expiration Date: -"-"'"-'-''"-"--------------------
0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, t shall not employ any person in any manner so as to
become subject to the workers' compensation laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an
employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the
Labor Code, Interest and attorney's fees.
C.ONSTR_UCTION LENDING AGENCY, lf..l\lllY.:.
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name:. ______________________ Lender's Address: _____________________ _
SIG0 lCki;:•,f:1 fJMJLb'r CONTRACTOR PRINT: Naylor Construction 1
L59FF2CFC666B458
DATE: 12/10/2020
(OPTION B) O\/VN_E_R:BUILDER_ DEqJ._RJ.T:ICll'<_:
I hereby affirm that I am exempt from Contractor's License law for the following reason:
0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's license law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s)
licensed pursuant to the Contractor's license law).
DI am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
D "Owner Builder acknowledgement and verification form" has been filled out, signed and attached to this appllcat1on. Proof of identification attached.
0 Owners "Authori2ed Agent Form" has bern filled out. s1gr1\cd ,ind ;:ittdched to this applrcat1on g1v1nq the agent authority to obtain the permit on the owner' behalf
Proof of identification attached.
8y my ~1gr1ature '."lelow I acknowledge th;)t, except tor rny per,onal residence m wh1cl1 I 'llU~t have.' rp-;1dt'd for at least one year· prior to completion of thP
improvement, rnvered by tfm per·rrnt, I u1nnot legally ·;ell J ,uucture thdt I haVP built 1~ dll owner buildN 111t ha'> not bf'en UJmtructPd 1n 1t<, (·•nt1retv by liCPrhPd
contr,1eto1-, I understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http://www.leginfo.co.gov/calaw.html.
OWNER PRINT: SIGN: _________ DATE: ______ _
APPUCA,NTCERTIFIC!.TIClN SIGNATLJREREQUIRED AT_THE TIME OF SUBMITTAL
By my signature below, I certify that: f am the property owner or State of California Licensed Contractor or authorized to act on the property
owner or contractor's behalf. I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. f ALSO AGREE TO SAVE,
INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY
ACCRUE AGAINST SAfD CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0'
deep and demolition or construction of structures over 3 stories in height.
APPLICANT PRINT: Alex Slone -------------SIGN: DATE: 12/10/2020 -----------
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Building@carlsbadca,gov
B-2 Page 2 of 2 Rev. 08120
(__ City of
Carlsbad
OWNERS
AUTHORIZED
AGENT FORM
B-62
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
OWNER'SAUTHORIZED AGENT FORM
Only a property owner, contractor or their authorized agent may submit plans and applications for building
permits. To authorize a third-party agent to sign for a building permit, the owner's third party agent must bring
this signed form, which identifies the agent and the owner who s/he is representing, and for what jobs s/he
moy obtain permits. The form must be completed in its entirety to be accepted by the City for each separate
permit application.
Note: The following Owner's Authorized Agent form is required to be completed by the
property owner only when designating an agent to apply for a construction permit
on his/her behalf.
AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF
Excluding the Property Owner Acknowledgement, the execution of which I understand is my personal responsibility,
I hereby authorize the following person(s) to act as my agent(s) to apply for, sign, and file the documents necessary
to obtain an Owner-Builder Permit for my project.
Scope of Construction Project (or Description of Work): Tl for Cafe space
27 42 State Street Suite 103 Project Location or Address: _____________________________ _
Name of Authorized Agent: _A_le_x_S_t_o_n_e ________ Tel No. _(_8_5_8_) 7_0_4_-4_0_0_4
AddressofAuthorizedAgent:444 S. Cedros Ave Suite 235
Solana Beach CA 92075
I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled
out the above information and certify its accuracy.
Property Owner's Signature: -~-"----· _____________ Date: _1_2_1_1_0_l2_0_2_0_
1
"y\,f,; , ,1 1 p ,,_' 1»,l ""2 t I fl 0 ' ; j, \ jk1'1/ , \
.,;:,; .• , ::: 'Iii'.· Pl;(lMIT INSR.CIJ<)N HISTORY fo~ ((;:B~2Q20·0493)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 12/14/2020 Owner: STATE STREET COMMONS LLC
Status: Closed -Finaled
Issue Date: 01/26/2021
Expiration Date: 10/25/2021
IVR Number: 30491
Subdivision: SEASIDE LANDS
Address: 2742 STATE ST, # 103
CARLSBAD, CA 92008-1628
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
04/16/2021 04/16/2021 BLDG-LDE Final 155107-2021 Cancelled Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-LOE Final No
04/28/2021 04/28/2021 BLDG-23 156087-2021 Passed Chris Renfro Complete
Gas/Test/Repairs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04/29/2021 04/29/2021 BLOG-Final Inspection 156242-2021 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency TCO Final ok to stock and train and health No
dept ok. Need main gas meter installed and
fire sign off pending minor item pick up.
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
09/10/2021 09/10/2021 BLOG-Final Inspection 166277-2021 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
Friday, September 10, 2021 Page 4 of 4
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 12/14/2020
Issue Date: 01/26/2021
Expiration Date: 10/25/2021
IVR Number: 30491
Owner: STATE STREET COMMONS LLC
Subdivision: SEASIDE LANDS
Address: 2742 STATE ST, # 103
CARLSBAD, CA 92008-1628
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Friday, September 10, 2021
Checklist Item
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
April 1, 2021:
1. No building/overhead T-bar grid
Deficiencies.
2. Above T-bar grid MEPS scope of
work-approved.
3. T-bar grid anchoring system, scope of
work per structural engineers plans and
detail specifications been approved.
4. Informed Eric contractor representative.
fire department approval and air balance
mechanical report required prior final
inspection.
5. Minor drywall ceiling lid patching
required.
6. Electrical overhead junction boxes
required to be labeled.
7. Rest stuff T-bar grid/overhead MEPS
scope of work-approved.
April 1, 2021:
1. No building/overhead T-bar grid
Deficiencies.
2. Above T-bar grid MEPS scope of
work-approved.
3. T-bar grid anchoring system, scope of
work per structural engineers plans and
detail specifications been approved.
4. Informed Eric contractor representative,
fire department approval and air balance
mechanical report required prior final
inspection.
5. Minor drywall ceiling lid patching
required.
6. Electrical overhead junction boxes
required to be labeled.
7. Rest stuff T-bar grid/overhead MEPS
scope of work-approved.
April 1, 2021:
1. No building/overhead T-bar grid
Deficiencies.
2. Above T-bar grid MEPS scope of
work-approved.
3. T-bar grid anchoring system, scope of
work per structural engineers plans and
detail specifications been approved.
4. Informed Eric contractor representative,
fire department approval and air balance
mechanical report required prior final
inspection.
5. Minor drywall ceiling lid patching
required.
6. Electrical overhead junction boxes
required to be labeled.
7. Rest stuff T-bar grid/overhead MEPS
scope of work-approved.
Passed
Yes
Yes
Yes
Page 3 of 4
' ~ j "' '{4',t '' ; ' '/' '
~it'"'' . ::;rr~~~ERMfT:lNS~&r;TlON~J~TORY for {CBC2020-0493)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date: 12/14/2020 Owner: STATE STREET COMMONS LLC
Status: Closed -Finaled
Issue Date: 01/26/2021
Expiration Date: 10/25/2021
IVR Number: 30491
Subdivision: SEASIDE LANDS
Address: 2742 STATE ST, # 103
CARLSBAD, CA 92008-1628
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
03/02/2021 03/0212021 BLDG-17 Interior 151736-2021 Passed Tony Alvarado
03111/2021
0410112021
Lath/Drywall
Checklist Item
BLDG-Building Deficiency
COMMENTS
March 2, 2021: (virtual inspection).
1. no building deficiencies.
2. Insulation size and type installed and
verified installation certificate-approved.
3. Interior drywall type and nailing pattern,
scope of work-approved.
03111/2021 BLDG-11 152533-2021 Cancelled Chris Renfro
F ou n datlon/Ftg/P iers
(Rebar)
Checklist Item COMMENTS
BLDG-Building Deficiency Cancel wrong inspection
BLDG-44
Rough/Ducts/Dampers
Checklist Item
152532-2021 Passed
COMMENTS
Chris Renfro
BLDG-Building Deficiency Smoke test on kitchen hood vent. Ok
04/0112021 BLDG-85 T-Bar, Celling 154059-2021 Passed Tony Alvarado
Grids, Overhead
Friday, September 10, 2021
Complete
Passed
No
Reinspection Incomplete
Passed
No
Complete
Passed
Yes
Complete
Page 2 of 4
Building Permit Inspection History Finaled
(cityof
Carlsbad
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Application Date:
Issue Date:
12/14/2020
01/26/2021
Owner: STATE STREET COMMONS LLC
Subdivision: SEASIDE LANDS
Status: Closed -Finaled Expiration Date: 10/25/2021 Address: 2742 STATE ST, # 103
CARLSBAD, CA 92008-1628
IVR Number: 30491
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
01/29/2021
02/25/2021
Status
BLDG-LDE Final
Checklist Item
158970-2021 Requested Chris Renfro
BLDG-LDE Final
NOTES Created By
Jennifer Horodyski
COMMENTS
SITE INSPECTION HAS OCCURRED AND
TOM PLAN IS APPROVED.
TEXT
TOM WILL BE CONFIRMED PER
CBC2020-0360.
01/29/2021 BLDG-21 149418-2021 Passed Tony Alvarado
Underground/Underflo
or Plumbing
Checklist Item
BLDG-Building Deficiency
COMMENTS
January 29, 2021:
1. Underground Plumbing tines-waste,
sewer, water, under a water leak pipe
head pressure test-approved.
2. Any vertical pipes going through
concrete slab have protected water,
copper lines wrapped for protection, trap
primer plumbing lines wrapped and
plumbed in, scope of underground
plumbing work -approved
02/25/2021 BLDG-82 Drywall, 151366-2021 Cancelled Chris Renfro
Exterior Lath, Gas Test,
Hot Mop
Checklist Item COMMENTS
BLDG-Building Deficiency Wrong inspection
BLDG-17 Interior Lath-Drywall
BLDG-18 Exterior Lath and
Drywall
BLDG-23 Gas-Test-Repairs
BLDG-84 Rough
Combo(14,24,34,44)
151365-2021
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
Partial Pass Chris Renfro
Friday, September 10, 2021
Passed
Yes
Created Date
06/03/2021
Passed
Yes
Reinspection
Passed
No
No
No
No
Re inspection
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Complete
Incomplete
Incomplete
Page 1 of 4
Lofty Coffee Co. 6.0
2752 State Street
Carlsbad, CA, 92008
Structural Calculations -20246
Qualls Engineering
Structural Engineering Services
CITY.fl--
Eric Meyers
Lofty Coffee Co, LLC
97 N. Coast Hwy 101 Suite 101
Encinitas, CA 92024
Phone: 760-212-8127
Qualls Engineering
Strucrural Engineering Services
Correction 15:
Project: Loftv Coffee 6.11
Engineer: CG ----"'"------------
Correction Responses
See revised calculation that states that ASCE 7-16 load combinations are used.
Note to the Engineering Reviewer:
Sheet: 0 -'-----
Job#: 20246
Oare:
Please feel free to reach out to me directly if there are any items that may require further consideration. \':'e
find it is simpler and clearer to coordinate with you directly and hope to avoid another round of formal
corrections. Thanks for your partnership in providing our client the most streamlined approach possible.
Chris Graham
chn~1e1 ljlLlll-.;...:nu.ci ,111
760-652-9257 X 3()5
Qualls Engineering
Structural Engineering Services Project: Lofty Coffee Co 6.0
Engineer: ..:C::.G=-._ _____ _
Project Scope:
Provide vertical and lateral design for new kitchen hood.
Governing code: 2019 CRC
Design Loads:
Roof: Floor:
Sheer: ---'l'-'/-"4 __ _
Job#: 20246
Date: 01 /06/21
Dead Load ( DL ): Dead Load (DI.):
Roofing
1 /2" Plywood
Framing
Insulation
I /2" Gyp. Bd.
Mcch./Elcc.
Misc.
S.11 psf
1.8 psf
4.11 psf
u.::; psf
2.2 psf
o_::; psf
_____ 1 ... 11 psf
DL I= IS.II psf
Live Load ( LL )
Flooring
1.5" LWC
4.11 psf
14.11 psf
2.1 psf
rn psf
O.S psf
.1.ll psf
I.S psf
3/ 4" Plywood
Framing
Insulation
5/8" Gyp. Bd.
Mech./Elec.
Misc. _..,.:,;l..;.7 psf
DL I= 30.ll psf
I.I.= ___ ..;azt,..1.;;.11 psf (Reducible) Live lmd (LL)
Seismic:
I DI.+ I.I.= 35.0 psf
Site Class: D
S5 = 1.081 s, = (l.191
F" = 1.200
F_. = -
S:,.rs = 1.298
S:,.11 = -
Mechanical Design Parameters (ASD)
~ 1.0 Component Amplification Factor
z
h
1.00
2.5
14.5
27
lmportann: Factor
Component Response i\lod. Factor
ft. (Ht. In Structun: at Point of Attachment), :z::::()@ Grade
ft. (A\x Roof Ht.)
.4*'¾, *S05,W,*(1 +2*z/h)/(R,,/lp), (13.3-1) Fl' Fr
1-\/max)
fp(min)
F,
1.6*Sos*IP*\'\'1,. (13.3-2) Fp(max)
0.3*S05* IP *\'v'p• (13.3-3) Fp(min)
0.2*Sos*\'v'r, (12.4-4) F,.
Project -Loading -Mech'I
Office
Partition
I.I.I= I DI.+ I.I.=
Sll.ll psf
IS.ii psf
65.0 psf (Reducible)
95.il psf
S05 = 0.865
S01 = -
= 0.20 \'\.p
= 0.97 \~-,
0.18 \\",
0.12 \X"p
Qualls E.mgiiml!eiri:llilg
Structural Engineering StU!Viaes Pro1ect: Lofty uffec w 0,tJ 7
Sheet: --=-2 __ _
Job #: W' 2/1 ,{
Engineer:_/'""-'"'----------Dare:
Vertical Design Level: F!oa,
D, = 36 psf LR = ___ _,psf LL = 65 ps f
Member: (£) El()(J r Jo, st
I.I, P,
t ~,;;?;::;¼
~ 2. 'L It ,, ,,
R1 = 1$3 lbs
RR= ~,OSt lbs
Member:
t t
~ 1 It ,,
R1 = lbs
RR= lbs
Member:
t t
~ 1 It ,,
R1 = lbs
RI{= lbs
Member:
t t
I, It 1 ,,
R, = lbs
Rn= lbs
\Vi= 65p~ 00 = 87p,~
\X,' 2=
P,= S00 1b5/'-t = l2 5Pl1'
P2=
Vma., = l,10»
~fmax = r r-r J -~, :>,J
l,c<f'd = (LJ
\'(,' -1-
\X:2=
P,=
P~=
V rruu =
t->Cmax =
ln>-i'd =
\X:',=
W2=
P1=
P~=
Vma., =
Mnu., =
I,"",J -
\'\"1=
\'\',=
P,=
P~=
\'nu_,=
Mm.u. -
l«~·.i =
Use: (E) 16 8C-f 11)
lbs v.11 = I, ilS lbs
f1-lbs M,u = 13,,tJSO ft-lbs
i.n4 I = __ ..:,;6...,.3"'"'8'--__ i.n4
Use:
lbs V,u = lbs
ft-lbs M..u= ft-lb-
in4 I = i.n4
Use:
lbs Ya11 -lbs
ft-lbs Mall= ft-lbs
in4 I = in4
Use:
lbs \' -..u-lbs
ft-lbs Ma11 = ft-lbs
in4 I = in4
Qu<!lls Engineering
4403 Manchester Ave, Suite 203
Project Title: Lofty Coffee 6.0
Engineer: CG
Project ID: 20246
Project Descr: 3
Pnnted 6 JAN 2021 3 03PM
ie: o o ee 6 .. Steel Beam Software c:opyriglt ENERCALC, INC. 1983-2020, Build:12.20.8.17
1.11· •
DESCRIPTION: Lofty Coffee Light Support
CODE REFERENCES
Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Load Resistance Factor Design
Beam Bracing : Completely Unbraced
Bending Axis: Major Axis Bending
( ) A HSS5x5x1/4
Span = 27. 170 ft
Fy : Steel Yield :
E: Modulus :
50.0 ksi
29,000.0 ksi
. .
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load(s) for Span Number 1
Point Load : L = 0.20 k @ 13.50 ft, (Lights)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
Mu : Applied
Mn * Phi : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.137: 1
HSS5x5x1/4
3.898k-ft
28.538k-ft
+1.20D+1.60L
13.507ft
Span# 1
Maximum Shear Stress Ratio =
Section used for this span
Vu : Applied
0.312 in Ratio=
0.000 in Ratio=
0.726 in Ratio=
0.000 in Ratio=
Vn * Phi : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
1,043 >=240.
0 <240.0
449 >=180.
0 <180.0
Load Combination Span Max.•-• Deft Location in Span Load Combination
+D+L 0.7262 13.585
Vertical Reactions Support notation : Far left is #1
Load Combination Support 1 Support2
Overall MAXimum 0.312 0.31 1
Overall MINimum 0.101 0.099
DOnly 0.212 0.212
+D+L 0.312 0.311
+D+0.750L 0.287 0.286
+0.60D 0.127 0.127
LOnly 0.101 0.099
Design OK
0.008 : 1
HSS5x5x1/4
0.4150 k
54.115 k
+ 1.20D+ 1.60L
0.000 ft
Span# 1
Max.•+• Defl Location in Span
0.0000 0.000
Values in KIPS
Qualls Engineering ~beer 4 ----
Structural Engineering ervices Proiecr Lofty Coffee Co 6.0 lob r:. 20246
Lng111ecr: CG --=-~-----Dare
,,J · -500 lbs
FP = 0.20\Xlr ~ Controls
2'-4"
\I I\
t
I ~·-o" _LLAX
Fp.m,n = 0.18\Xfr
F" = 0.1 2\Xlp
Fr= 0.20(37516s) = 75 lbs
F_. = 0.12(375lbs) = 45 lbs
T m,,= 75lbs(8ft)/2.33ft + (5001bs+45lbs)/4 = 394 lbs/rod
Use 1 /2" diameter A36 rod
T.,1.1. = (1/1.67)(36ksi)(0.142in2) = 3.1 kips
With L3x3x1/4
With (3) 1 / 4"x3" Simpson SDS screws
I V ,u. = 3( 420lbs) = 1,260 lbs
=F"
T"' .. ' = 394lbs * [2= 557 lbs
Use 1 /8" diameter 7-19 steel aircraft cable
I Ii T ,11 = 2,000 lbs
*
Lofty Coffee Co. 6.0
2752 State Street
Carlsbad, CA, 92008
Structural Calculations -20246
Qualls Engineering
Structural Engineering Services
CITY
Eric Meyers
Lofty Coffee Co, LLC
97 N. Coast Hwy 101 Suite 101
Encinitas, CA 92024
Phone: 760-212-8127
. Qualls Engineering Sheer.: 0 ----
Structural Engineering Services Project: Loftv Coffee 6.0 Job#: 20246
Engineer: _C_G ________ _ Date:
Correction Responses
Correction 15:
See revised calculation that states that ASCE 7-16 load combinations are used.
Note to the Engineering Reviewer:
Please feel free to reach out to me directly if there are any items that may require further consideration. We
find it is simpler and clearer to coordinate with you directly and ho pe to avoid another round of formal
corrections. Thanks for your partnership in providing our client the most streamlined approach possible.
Chris Graham
ch ris@quallscng.cc >rn
760-652-9257 X 305
· Qualls Engineering
Structural Engineering Services Project:
Engineer:
Project Scope:
Provide vertical and lateral design for new kitchen hood.
Governing code: 2019 CBC
Design Loads:
Roof:
Lofty Coffee Co 6.0
CG
Floor:
Sheet ~1~/~4 __ _
Job #: 20246
D ate: 01 /06/21
Dead Load ( DL ): Dead Load ( DL ):
Roofing 5.0 psf Flooring 4.0 psf
1 /2" Plywood 1.8 psf l.5''LWC 14.0 psf
Framing 4.0 psf 3/4" Plywood 2.3 psf
Insulation 0.5 psf Framing 3.0 psf
I /2" Gyp. Bd. 2.2 psf Insulation 0.5 psf
Mech./Elcc. 0.5 psf 5/8" Gyp. Bd. 3.0 psf
Misc. 1.0 psf Mech./Elec. 1.5 psf
DLI = 15.0 psf Misc. 1.7 psf
Live Load ( LL ) DLI = 30.0 psf
LL = 20.0 psf (Reducible) Live Load ( LL)
I DL + LL =
Seismic:
Site Class: D
Ss = 1.081
S1 = 0.391
35.0 psf
F. = 1.200
Fv = -
Mechanical Design Parameters (ASD)
¾ = 1.0 Component Amplification Factor
Ir = 1.00 I mport>ncc Factor
RP = 2.5 Component Response l\lod. Facror
S;\IS = 1.298
S:--11 = -
z = 14.5 ft. (He. In Structure at Point of Attachment), z=O@ Grade
h 27 ft. (A,·g. Roof Ht.)
FP = .4*~ *S05.W P *(1 +2*z/h)/(Rp/lp), (13.3-1) F"
Fp(max) = 1.6*S05*Ir *\~'i,, (13.3-2) Fp(max)
Fp(min) = 0.3*S0 5*IP *WP' (13.3-3) Fp(min)
Fv = 0.2*S0 5*Wp, (12.4--4) Fv
Project -Loading -Mech'I
Office 50.0 psf
Partition 15.0 psf
LLI = 65.0 psf (Reducible)
L DL +LL = 95.0 psf
S05 = 0.865
S01 = -
= 0.20 \~-p
= 0.97 W P
= 0.18 W P
= 0.12 WP
~ualls JEmgjia-eeiri.;ng
Structural E.ngineemng Sw;vices Project: Loft V u£fee la r{',{) 7
Engineer:,__."'--""'---------
Sheet: _2 __ _
Job#: WZt/t
Date:
Vertical Design Level: F/001
D1 = 3fJ psf LR =----lpsf LL= 65
Member: (£) [lmr Jo, st
V, p r ,,s· --t::¼
v 2Z 1t 1 1
R1 = 1$3 lbs
lbs
Membe~-------
t t
I,
1 It 1
R1 = lbs
RR= lbs
Member:
t t
v 1 It 1
R1.= lbs
Ra= lbs
Member:
t t
v It 1 1
R1 = lbs
R1t -lbs
W 1= 65ps-t-(~) = 8 ?p1.f
Wz=
P,= 5001b5/l.f = 12 SP11'
P2=
Vmax =
Mm""=
I,O<j'd =
W1=
\'<Ii=
P1=
P2=·
Vmax =
J\[rna.< =
[re~'<l =
W1 =
\V2=
P,=
P~=
/,tJ¼ I
1,553
(_.c,3
~c..<..-__ lbs
~-'=--ft-lbs
--==---i.n4
lbs
ft-lbs
in4
Vma., = ______ lbs
______ ft-lbs l'vfm.i., =
______ in4 l«9'J =
\X'1=
\,V,=
P1=
P2=
Vm.u = lbs
l'v[m-. -ft-lbs
[fL"<{"U = i_n4
psf
Use: (E) 16 8C,f 9tJ
Vall = /, rzs lbs
Ma11 = n,tJ5tJ ft-lbs
I =----"'6""""3'-'-'8'--__ in4
Use:
V,11 =
Ma11=
______ lbs
______ ft-lbs
_______ in4 I =
Use: _____ _
V ,u = ______ lbs
Ma11 = ______ ft-lbs
T = _______ in4
Use:
V'"= ______ lbs
______ ft-lbs M.i1=
l = _______ in4
Qualls Engineering Project Title: Lofty Coffee 6.0
4403 Manchester Ave, Suite 203 Engineer: CG
Project ID: 20246
Project Descr: 3
ile: L ee 6.0. 6 'Steel Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.17
I ,I I'.
DESCRIPTION: Lofty Coffee Light Support
CODE REFERENCES
Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method: Load Resistance Factor Design
Beam Bracing : Completely Unbraced
Bending Axis : Major Axis Bending
L(Q.2)
HSS5x5x1/4
Span= 27 170 ft
Fy : Steel Yield :
E: Modulus:
50.0 ksi
29,000.0 ksi
Applied Loads Service toads entered. Load Factors will be applied for calculations.
------------------
Beam self weight calculated and added to loading
Load(s) for Span Number 1
Point Load: L = 0.20 k@ 13.50 ft, (Lights)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
Mu: Applied
Mn " Phi : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.137: 1
HSS5x5x1/4
3.898 k-ft
28.538 k-ft
+1.200+1.60L
13.507ft
Span# 1
Maximum Shear Stress Ratio =
Section used for this span
Vu: Applied
0.312in Ratio=
0.000 in Ratio=
0.726 in Ratio=
0.000 in Ratio=
Vn * Phi : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
1.043 >=240.
0 <240.0
449 >=180.
0 <180.0
Load Combination Span Max."-" Oefl Location in Span load Combination
+D+L 0.7262 13.585
Vertical Reactions Support notation : Far left is #1
Load Combination Support 1 Support 2
.. Overall MAXimum 0.312 0.311
Overall MINimum 0.101 0.099
DOnly 0.212 0.212
+D+L 0.312 0.311
+D+0.750L 0.287 0.286
+0.60D 0.127 0.127
LOnly 0.101 0.099
Design OK
0.008 : 1
HSS5x5x1/4
0.4150 k
54.115 k
+1.200+1.60L
0.000 ft
Span# 1
Max."+" Defl Location in Span
0.0000 0000
Values in KIPS
Qualls Engineering
Structural Engineering Services
+ .
1S I
-1 '~t
\J "
f r
2'-4"
Pro1m Lofty Coffee Co 6.0
I .ngincc:r: CG _.:::..;c::.._ ______ _
~hect. 4
Job = 20246
Dace
1/'J , -500 lbs
2'-4"
8'-0"
NlAX
J_
Fr = 0.20Wr ~ Controls
F p.nm = Q.97\"X,'P
Fr = 0.20(3751bs) = 75 lbs
F, = 0.12(3751bs) = 45 lbs
T,,,"' = 751bs(8ft)/2.33ft + (500lbs+45lbs)/4 = 394 lbs/rod
Use 1/2" diameter A36 rod
T ,111. = (1/1.67)(36ksi)(0.142in 2) = 3.1 kips
\-X-'i th L3x3x 1 / 4
With (3) 1 /4"x3" Simpson SDS screws
1 V \LL= 3(420lbs) = 1,260 lbs
~
T,,,._, = 39416s *[2= 557 lbs
Use 1 /8" diameter 7-19 steel aircraft cable
T 11, = 2,000 lbs
I 11-
Lofty Coffee Co. 6.0
2752 State Street
Carlsbad, CA, 92008
Structural Calculations -20246
Qualls Engineering
Structural Engineering Services
RECEIVED
DEC 1 4 2020
CITY OF CARLSBAD
BUILDING DIVISION
Eric Meyers
Lofty Coffee Co, LLC
97 N. Coast Hwy 101 Suite 101
Encinitas, CA 92024
Phone: 760-212-8127
ac..wo-o'l'tJ
Qualls Engineering
Structural Engineering Services Project:
Engineer:
Project Scope:
Provide vertical and lateral design for new kitchen hood.
Governing code: 2019 CBC
Design Loads:
Roof:
Lofty Coffee Co 6.0
CG
Floor:
Sheer: _1..._/ __ 4 __ _
Job#: 20246
Date: 12/10/20
Dead Load ( DL ): Dead Load ( DL ):
Roofing 5.0 psf Flooring 4.0 psf
I /2" Plywood 1.8 psf 1.5" LWC 14.0 psf
Framing 4.0 psf 3/4" Plywood 2.3 psf
Insulation 0.5 psf Framing 3.0 psf
1 /2" Gyp. Bd. 2.2 psf Insulation 0.5 psf
Mech./Elec. 0.5 psf 5/8" Gyp. Bd. 3.0 psf
Misc. 1.0 psf Mech./Elec. 1.5 psf
DLI = 15.0 psf Misc. 1.7 psf
Llve Load ( LL ) DLI = 30.0 psf
LL = 20.0 psf (Reducible) Llve Load ( LL )
I DL + LL =
Seismic:
Site Class: D
Ss = 1.081
S1 = 0.391
35.0 psf
F, = 1.200
Fv = -
Mechanical Design Parameters (ASD)
3t, = 1.0 Component Amplification Factor
JP = 1.00 Importance Factor
~ Component Response i\lod. Factor
s~,s = 1.298
s~,1 = -
z =
h =
2.5
14.5
27
ft. (Ht. ln Structure at Point oi Attachmc11t), z=O@ Grade
ft. (A,•g. Roof Ht.)
= .4*3p *Sns-Wp *(1 +2*z/h)/(Rp/lp), (13.3-1) F" Fr
Fptma.~)
Fp(min)
Fv
= 1.6*S0 s*lp*W P' (13.3-2) Fp(max)
= 0.3*S05*Ir *WP' (13.3-3) Fp(min)
= 0.2*S05*W P' (12.4-4) F,.
Project -Loading -Mech'I
Office 50.0 psf
Partition 15.0 psf
LLI = 65.0 psf (Reducible)
I DL +LL = 95.0 psf
S05 = 0.865
Soi= -
= 0.20 \'\'p
= 0.97 WP
= 0.18 W P
= 0.12 w r
Qualls Emgiaeeri.img
Structural Enginee.mng,Seim_ces Proiect: Lot f 1 UJ{f c'C: U/ Q (} I
Sheer:
Job#:
2
l•:ngmeer:.__,f.......i.<e·---------Date:
Vertical Design Level: F/oo,
1£ 2. z
1
R, = 18.3
RR= ~OS6
Member:
t
1£ 1
R1 =
RR=
Member:
t
1£ 1
R1.=
RR=
Member:
t
I,
'I
R.1 =
R11. =
Dt. = 3rJ psf LR = ____ psf LL = 65
I, 'I
lbs
lbs
t
I, 'I
lbs
lbs
t
I, 'I
lbs
lbs
t
lbs
'l
lbs
\Xi' I = 6 5 p5'f ( .4 ) =:_ g 7 f 1~
WI:=
P, = 500 /_p:,/ '1 = It!-r; p1t1,
P2=
Vmax = )lt)-56
I lbs
Mmax= ~,553 ft-lbs
Irey'd = (t!!.3 in4
W,=
\Y/i=
P,=
P2=
V,na., = lbs
Mmax = ft-lbs
Irey'd = in➔
W,=
w -2-
P,=
P2=
Vma., = ______ lbs
______ ft-lbs Mm""=
ln:y J =
\X:1=
\X'~=
P,=
P2=
\rma., -lbs
Mm.,.= ft-lbs
lrc"'l'J = in4
psf
Use: CE ) /6 80: t/()
Vall = /,,YZS lbs
Man= /3,itJSO ft-lbs
I = __ ...:a:6 .... 3"'"8.__ __ in4
Use:
Van = ______ lbs
______ ft-lbs
_______ in4
Ma11=
I=
Use: _____ _
Va11 --______ lbs
fvl.11 = fr-lbs
I = _______ in4
L'se:
\',JI= lbs
Ma1, -fr-lbs
I = in4
Qualls Engineering
4403 ~anchester Ave, Suite 203
Project Title: Lofty Coffee 6.0
Engineer: CG
Project ID: 20246
Project Descr: 3
Printed 10 DEC 2020 10 04AM
Steel Beam Software copyright ENERCALC, INC. 1983-2020, Build:12.20.8.17
DESCRIPTION: Lofty Coffee Light Support
CODE REFERENCES
Calculations per AISC 360-10, IBC 2015, CBC 2016, ASCE 7-10
Load Combination Set : ASCE 7-10
Material Properties
Analysis Method : Load Resistance Factor Design
Beam Bracing : Completely Unbraced
Bending Axis : Major Axis Bending
Fy : Steel Yield :
E: Modulus :
50.0 ksi
29,000.0 ksi
..
.:!*·.,...)-,:::=================.:::;;::.::;;.:;;=:::~::;:==------L---_-;_-_-... --------_-:._---_-_---------------------------------_-_-_,-,~.
HSS5x5x1/4
Span = 27.170 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load(s) for Span Number 1
Point Load : L = 0.20 k @ 13.50 ft, (Lights)
DESIGN SUMMARY
Maximum Bending Stress Ratio =
Section used for this span
Mu : Applied
Mn * Phi : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections
0.137: 1
HSS5x5x1/4
3.898k-ft
28.538k-ft
+1.20D+1.60L
13.507ft
Span# 1
Maximum Shear Stress Ratio =
Section used for this span
Vu : Applied
0.312 in Ratio =
0.000 in Ratio=
0.726 in Ratio=
0.000 in Ratio=
Vn * Phi : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
1,043 >=240.
0 <240.0
449 >=180.
0 <180.0
Load Combination Span Max.•.• Defl Location in Span Load Combination
+D+L 1 0.7262 13.585
Vertical Reactions Support notation : Far left is #1
Load Combination Support 1 Support 2
Overall MAXimum 0.312 0.311
Overall MINimum 0.101 0.099
DOnly 0.212 0.21 2
+D+L 0.312 0.311
+D+0.750L 0.287 0.286
+0.60D 0.127 0.127
LOnly 0.101 0.099
Design OK
0.008: 1
HSS5x5x1/4
0.4150 k
54.115 k
+1.20D+1.60L
0.000 ft
Span# 1
Max.'+' Defl Location in Span
0.0000 0.000
Values in KIPS
Qualls Engineering ~hecr.
SlrUcrural Engineering Services Pro1ecr. Lofty Coffee Co 6.0 Job :::
Engmeer: CG Dare
~ioov 4,..JC 1,(/t A(. f t;J -500 lbs -
Fr = 0.20W" ~ Controls
\ FP·"'" = 0.97\'v'r
fp,mm = 0.1 8W1,
8'-0"
F,. = 0.12W"
' 1S i\tlAX
Fr
" \~
Fr = 0.20(375lbs) = 75 lbs
\J 1\ \J
F,. = 0.12(375lbs) = 45 lbs
" 2'-4" 2'-4" K
TEN src1-v ] /V iloi:i .
T ,,," = 75lbs(8ft)/2.33ft + (500lbs+451bs)/ 4 = 394 lbs/ rod
II
Use 1/2" diameter A36 rod
T ,11. = (1 /1.67)(36ksi)(0.142in2) = 3.1 kips
With L3x3x1 / 4
With (3) 1/4"x3" Simpson SDS screws
I v\[J.. = 3(420lbs) = 1,260 lbs
T"'" = 394lbs *[2= 557 lb s
Use 1 /8" diameter 7-19 steel ai rcraft cable
T 11.1 = 2,000 lbs
4
20246
OFFICE USE ONLY SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
RECORD ID # ___________________
1 PLAN CHECK# ___________________
1
Business Name
Lofty Calfee Co.
Project Address (include suite)
! 2742 State Street Suite 103
1 Mailing Address (include suite)
197 N Coas1 Hwy 101 Suite 101
Project Contact
Alex Stone
Business Contact
Eric Myers
City
Carlsbad
City
Applicant E-mail
State
oa
State
Telephone#
760.212.8127
Zip Code
92008
Zip Code
92024
Telephone#
Alex@edingerarchilects.com 858.704.4004
BP DATE
APN#
203-181-19-00
Plan File#
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for projects within the City of San
Diego}: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials_ If any of the items are circled,
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: B Facility's Square Footage (including proposed project): 1,477
1 Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives
2. Compressed Gases 6. Oxidizers 10. Cryogenics
3. Flammable/Combustible liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
13.
14.
15.
Corrosives
Other Health Hazards
None of These.
PART 11: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISION fHMD): If the answer lo any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit
FEES ARE REQUIRED Project Completion Date: 4/1/2021 Expected Dale of Occupancy: 4/1/2020
(for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply).
□ CalARP Exempt
I
1.
2.
3.
4.
5.
6.
7.
8.
YES NO
~ El
l:j (:I
~ ffl □ ~
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
Will your business store or handle carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 1 0)?
Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
Date Initials
□ CalARP Required
I
Date Initials
□ CalARP Complete
,2111)12020 /
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT {APCD): The following questions are intended to identify the majority of air pollution
issues at the planning stage. Your project may require additional measures not identified by these questions. Some residential projects may be exempt from APCD
requirements. If yes is answered for either questions 1, 2 or 5 or for more comprehensive requirements, please contact APCD at apcdcomp@sdcounty.ca.gov;
(858) 586-2650; or 10124 Old Grove Road, San Diego, CA 92131.
1.
2.
3.
4.
5.
6.
YES NO i::i IE!
t'.'.I l:i
□
□
□
□
IE!
□
Will the project disturb 100 square feet or more of existing building materials?
Will any load supporting structural members be removed?
(ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPA-approved
building inspector course?
(ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, a
notification may be required at least 10 working days prior to commencing asbestos removal. Additionally, a notification may be required prior to
the removal of a toad supporting structural member(s) regardless of the presence of asbestos.
Will the project or associated construction equipment emit air contaminants? See the reverse side of this form for typical equipment requiring an
APCD pemiit. If yes, contact APCD prior to the issuance of a building permit.
(ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda ?
Briefly describe business activities: Briefly describe proposed project:
Single serve cafe with patio seating Tl of existing shell structure, installation of kitchen and service cabinets, back kitchen wl hood, restoom
I declare under penalty of pe~ury that to the best of my knowledge and belief t herein are true and correct.
Name of Owner or Authorized Agent Date
FOR OFFICAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: _________________ -,-______________ _
BY DATE / /
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMD• APCD COUNTY-HMO APCD COUNTY-HMO APCD
"A stamp In this box only exempts businesses from completing or updating a Hazardous Matenals Business Plan. Other permIttIng requirements may still apply
HM-9171 (9/18) County of San Diego -DEH -Hazardous Materials Division
-
□ □ □ □ □ □ □ □ □ □ □
ENCINA WASTEWATER AUTHORITY
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
6200 Avenida Encinas, Carlsbad, CA 92011
Phone: 760-438-3941 Fax: 760-476-9852
SourceControl@encinajpa.com
Date: 12/1 0/2020
Business Name: Lofty ~off_ee Co.
Street Address: 2742 State Street Suite 103
Email Address: alex@edingerarchitects.com
PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT (ON REVERSE SIDE u •F ;K TYPE OF BUSINESS, l ✓I
Check all below that are present at your facility:
Acid Cleaning D Food Processing D Metal Powders Forming
Assembly D Glass Manufacturing D Nutritional SupplemenUVitam1n
Automotive Repair D Industrial Laundry D Manufacturing
Battery Manufacturing D Ink Manufacturing D Painting/Finishing
Biofuel Manufacturing D Laboratory D Paint Manufacturing
Biotech Laboratory D Machining/Milling D Personal Care Products
Bulk Chemical Storage D Membrane manufacturing D Manufacturing
Car Wash D (i.e waterfilter membranes) D Pest1c1de Manufacturing/ Packaging
Chemical Manufacturing D Metal Casting/Forming D Pharmaceutical Manufacturing
Chemical Purification D Metal Fabrication D (including precursors)
Dental Offices D Metal Finishing D Porcelain Enameling D Dental Schools D Electroplating D Power Generation
D Electroless Plating □ Print Shop D Dental Clinics
D Dry Cleaning D Anodizing D Research and Development
□ Electrical Component D Coating (i.e. phosphating) D Rubber Manufacturing
□ Manufacturing D Chemical Etching/Milling D Semiconductor Manufacturing
□ Fertilizer Manufacturing 0 Printed Circuit Board D Soap/Detergent Manufacturing
□ Film/ X • ra y Processing D Manufacturing D Waste Treatment/Storage
New Business? YesE]NoO SIC Code(s) if known Date operation began/will begin: 41112020
Tenant Improvement? Yes E]NoO If yes, briefly describe improvement install of counters, fixtures and appliances,
back kitchen with hood, floor sinks, dishwasher and restroom
Description of operations generating wastewater (discharged to sewer. hauled or evaporated): dishwashing,
Food prep and uni-sex restroom
Estimated volume of industrial wastewater to be discharged (gal/ day) n/a
List hazardous wastes generated (type/volume) _n_ia ____________________________ _
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? YesODate: ______ .No~
Page 1 of,
EN CINA WASTEWATER AUTHORITY
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
6200 Avenida Encinas, Carlsbad, CA 92011
Phone: 760-438-3941 Fax: 760·476-9852
SourceControl@encinajpa.com
The commercial enterprises listed below are a partial listing of businesses that are exempt from industrial wastewater discharge
permitting under normal operating cond1t1ons They are exempt because (a) they discharge no process wastewater (i. e they
only discharge..; mitary wastewater with no pollutants excReci111y any locnl limits) and (b) they have no potential to negatively
impact the EWPCF or other wastewater treatment plants in the ESS Any questions regarding ex8mptions should be referred
to EWA Source Control st;:iff
□ Automobile Detailer s
□ Barber/Beauty Shops
□ Business/Sales Offices
□ Cleaning Services
□ Carpet/Upholstery
□ Childcare Facilities
□ Churches
□ Community Centers
□ Consulting Services
□ Contractors
□ Counseling Services
□ Educational Services (no auto repair/film
□ Financial Institutions/Services
□ Fitness Centers
□ Gas Stations (no car wash/auto repair)
□ Grocery Stores (no film developing)
□ Residential based Businesses
developing)
D Hotels/ Motels (no laundry)
D Laundromats
D Libraries D Medical Offices (no x ray developing)
D Mortuaries
D Museums
D Nail Salons
D Nursing Homes
D Office Buildings (no process flow)
D Optical Services
D Pest Control Services (no pesticide repackaging for sale)
D Pet Boarding/Grooming Facilities
D Postal Services (no car wash/auto repair)
D Public Storage Facilities
00 Restaurants/Bars
D Retail/Wholesale Stores (no autorepair/film
developing)
D Theaters (Movie/Live)
CERTIFICATION STATEMENT
It crli/1· that the in/fHHWfio11 ahon' is true and co!'l'ecl to the hl!st o/"m_1· k11011-/cJK<'
I Cy>~ Alex Stone 12/10/2020
S1gnature:~/~~"'--'l"/A"':/,, __ /-,-i ~v._.14£+f ____ _ Print Name ____________ _ Date _____ _
Facility Contact: Eric Myers Owner Title: ______________ _
ENCINA WASTEWATER AUTHORITY
6200AVENIDAENCINAS, CARLSBAD, CA Phone: 760-438-3941 Fax: 760-476-9852
S,JUrf;eC011tr,,l1Wenc111c11pa com
Page 2 of;>
\..._ City of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. The completed checklist must be included in the building permit application. It may be
necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate
full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach
to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as
specified by the ordinances.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
.,,1 If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
an explanation must be provided to the satisfaction of the Building Official.
.,,1 Details on CAP ordinance requirements are available on the city's website .
.,,1 A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be
completed to demonstrate project compliance with the CAP ordinances. Refer to the building application webpage and
download the latest form.
_L_of_ty_C_o_ff_ee_C_o _6_.o _______ BP No. LB C 2.o2o -df,n
Property Address/APN: 27 42 State Street Suite 103 / 203-181-19-00
Applicant Name/Co.: Lofty Coffee Co. LLC
Applicant Address: 97 N. Coast Hwy 101 suite 101
Contact Phone: 760.212.8127 Contact Email: eric@loftycoffee.com
Contact information of person completing this checklist (if different than above):
Name: Alex Stone Contact Phone: 858. 704.4004
Company
name/address: edingerArchitects Contact Email: alex@edingerarchitects.com
444 S. Cedros Ave suite 235
' /
Applicant Signature: . llVc-jtt{A
/ f .
Date: 12/10/2020
B-50 Page 1 of 6 Revised 06/18
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project.
For alterations and additions to existing buildings, attach Building Permit Valuation worksheet.
Building Permit Valuation (BPV) from worksheet: $...,,09,zr -"( 5, 'f>"; / -
CanlllucliGlt Tp j Cemplell Sutaa(•I j Naell:
D Residential
□ New construction
D Additions and alterations:
D BPV < $60,000
D BPV 2: $60,000
D Electrical service panel upgrade only
D BPV 2: $200,000
[!] Nonresidential
□ New construction
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area is residential use
12A, 3A,
4A
N/A
1A,4A
1A, 4A'
3B,4A I18,2B,
N/A
4A
1B, 4A'
1 B, 2B, 3B, 4B and 5
All residential additions and alterations
1-2 family dwellings and townhouses with attached garages
only
'Multi-family dwellings only where interior finishes are removed
and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
.,1:K/llterations: C IV//\ _J
□ BPV 2: $200,000 or additions 2: 1,000 1B, 5 square feet
D BPV 2: $1,000,000 1B,2B,5 Building alterations of 2: 75% existing gross floor area
D 2: 2,000 sq. ft. new roof addition 2B,5 1 B also applies if BPV 2: $200,000
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMG) sections 18.21.155 and 18.30.190, and the Calfomia Green Building Standards Code (CAL Green) for
more information when completing this section.
A D Residential addition or alteration ~ $60,000 building pennlt valuation. 0 N/A ________ _
See CMC section 18.30.190. D Exception: Home energy sccre ~ 7
(attach certification)
Year Built Single-family Requirements Multi-family Requirements
□ Before 1978 Select one:
□ Duct sealinq □ Attic insulation □ Cool roof □ Attic insulation
□ 1978 and later Select one:
□ Lighting package □ Watar heating Package
□ Between 1978 and 1991 Select one:
□ Duct sealinq □Attic insulation □Cool roof
D 1992 and later Select one:
D Lighting package □Water heating package
B. D Nonresidential' new construction or alterations~ $200,000 building pennit valuation,
or additions~ 1,000 square feet l!l N/A
Updated 8/15/2019 2
City of Carlsbad Climate Action Plan Consistency Checklist
See CMC 18.21.155 and CALGreen Appendix AS, Division AS.2 -Energy Efficiency.
AS.203.1.1 Choose one: a .1 Outdoor lighting □.2 Warehouse dock seal doors
□ .3 Restaurant service water heating (comply with Calrromia Energy Code section 140.5, as amended) □ NIA ________ _
□ .4 Daylight design PAfs [] .5 Exhaust air heat recovery
AS.203.1.2.1
Choose one as applicable: 095 Energy budget 0.90 Energy budget □ N/A
AS.211.1 ..
D On-stte renewable energy □ N/A
AS.211.3"
D Green power (if offered by local utiltty provider, 50% minimum renewable sounces) □ N/A
AS.212.1
D Elevator.; and escalator.; □ N/A
AS.213.1
D Steel framing □ NIA
• lndudes hotels/motels and high-rise residential buildings
"For alterations" $1,000,000 BPV and affecting> 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply
wtth CMC 18.30.130 instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are subject to nonresidential photovoltaic
requirement (2B below) instead. 2) If project includes installation of an electric heat pump water heater pursuant to CMC 18.30.150(8)
(high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc'
sheets rr necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (115 x#d.u.)
'Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
Exception
□
□
□
□
kWdc
8. D Nonresidential new construction or alterations ~$1,000,000 8PV and affecting ~75% existing floor area, or addition that increases roof
area by ~.ooo square feet Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
□ Gross Floor Area (GFA) Method
GFA:
□If< 10,000s.f. Enter: 5 kWdc
Min. System Size:
□If" 10,000s.f. calculate: 15 kWdc x (GFN10,000)"
kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
□ Time-Dependent Valuation Method
Updated 8/15/2019 3
City of Carlsbad Climate Action Plan Consistency Checklist
Annual TDV Energy use:* .. ______ x .80= Min. system size: _____ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A D Residential and hotel/motel new construction
Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section.
D For systems serving individual dwelling units choose one:
D Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
D Heat pump water heater AND PV system .3 kWdc larger than required in CMG section 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1(c) 14 (low-rise residential) D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
D Exception:
D For systems serving multiple dwelling units, install a central water-heating system with all of the following:
D Gas or propane water heating system
D Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMG 18.30.170(8) (low-
rise residential) D Solar water heating system that is either:
D .20 solar savings fraction
D .15 solar savings fraction, plus drain water heat recovery
□Exception:
B. D Nonresidential new construction
Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section.
D Water heating system derives at least 40% of its energy from one of the following (attach documentation):
D Solar-thermal D Photovoltaics D Recovered energy
□Water heating system is (choose one):
D Heat pump water heater
□ Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
D Exception:
Updated 8/15/2019 4
City of Carlsbad Climate Action Plan Consistency Checklist
4. Electric Vehicle Charging
A D Residential New construction and major alterations*
Please refer to Carlsbad Ordinance CMC section 18.21.140 when com
One and two-family residential dwelling or townhouse with attached garage:
D One EVSE Ready parking space required D Exception :
□Multi-family residential· D Exception ·
Total Parking Spaces EVSESpaces
Proposed Caoable Readv Installed
Calculations: Total EVSE spaces = .10 x Total parking (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces -EVSE Installed
(EVSE other may be "Capable," "Ready" or "Installed.")
Total
'Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permtt valuation~ $60,000
or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit
valuation ~ $200,000, interior finishes are removed and ~gnificant site work and upgrades to structural and mechanical, electrical, and/or plumbing
systems are proposed.
B D Nonresidential new construction (includes hotels/motels) D Exception ·
Total Parking Spaces EVSE Soaces
Proposed Capable I Ready I Installed I Total
I I I
Calculation· Refer to the table below·
Total Number of Parkinq Spaces provided Number of reouired EV Soaoes Number of reouired EVSE Installed Soaoes
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
I I 201 and over 10 oercent of total 50 oeroent of Reauired EV Soaoes
Updated 8/15/2019 5
' City-of Carlsbad Climate Action Plan Consistency Checklist
5. D Transportation Demand Management (TOM): Nonresidential ONLY
An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TDM plan. If TDM is applicable to your
permit, staff will contact the applicant to develop a site-specific TDM plan based on the permit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Use
EmpADTfor
first 1,000 s.f.
EmpADTI
1000 s.f.1
Office (all)2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousin 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1 O'"Edition
13
11
4.5
3.5
3
2 For all office uses, use SAN DAG rate of 20 ADTl1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TDM p11¥1 and understand that an approved TDM plan is a condition of permit issuance. , / /' -k'/: )'{1 Applicant Signature: 1 ,L le 'Jl 1 /' Date: 12/10/2020
Person other than Applicant to be contacted for TDM compliance (if applicable):
Name(Printed): __________________ _ Phone Number: _____ _
Email Address: ___________________ _
Updated 8/15/2019 6