HomeMy WebLinkAbout148 TAMARACK AVE; ; CBRA2019-0114; PermitPERMIT REPORT
(city of
Carlsbad
Residential Associated Permit
Print Date: 04/01/2022
Job Address: 148 TAMARACK AVE, CARLSBAD, CA 92008-4059
Permit Type:
Parcel #:
BLDG-Associated Permit Residential
2042530700
Valuation: $356,400.01
Work Class:
Track#:
Lot#:
Permit No: CBRA2019-0114
Status: Closed -Finaled
Single Family Detached
Applied: 04/16/2019
Issued: 04/30/2020
Occupancy Group: Project#: DEV2016-0047 Finaled Close Out: 04/01/2022
Plan#: #of Dwelling Units: 1
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check#: PC2019-0009
Plan Check#:
Project Title: 148 TAMARACK AVENUE
Description: PINPOKINTR: 2,152 SF LIV SFO WITH 200 SF DECK, 100 SF PATIO, & 631 SF GARAGE
Applicant:
JEFF PARSHALLE ARCHITECT
JEFF PARSHALLE
PO BOX 230132
ENCINITAS, 92023
(619) 985-4099
FEE
DRAINAGE FEE PLDA B Medium Runoff
WATER METER FEE 1" Displacement (P)
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
SB1473 GREEN BUILDING STATE STANDARDS FEE
BUILDING PLAN CHECK FEE (BLDG)
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
SWPPP INSPECTION FEE TIER 1-Medium BLDG
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
STRONG MOTION-RESIDENTIAL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
BUILDING PERMIT FEE ($2000+)
PUBLIC FACILITIES FEES -outside CFO
Total Fees: $11,588.64 Total Payments To Date: $11,588.64
Inspector:
Final Inspection:
Balance Due:
PDrei
02/08/2022
AMOUNT
$589.80
$54.00
$175.00
$15.00
$1,076.84
$55.00
$246.00
$66.00
$46.33
$182.00
$92.00
$1,538.35
$7,452.32
$0.00
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY for (CBRA2019-0114)
Permit Type: BLDG-Associated Permit Residenti;
Work Class: Single Family Detached
Status:
Scheduled
Date
Closed -Finaled
Actual Inspection Type
Start Date
Checklist Item
BLDG-Structural Final
BLDG-Electrical Final
Friday, April 1, 2022
Application Date: 04/16/2019 Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Issue Date: 04/30/2020 Subdivision: PALISADES
Expiration Date: 08/08/2022
IVR Number: 18445
Address: 148 TAMARACK AVE
CARLSBAD, CA 92008-4059
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
COMMENTS
February 8. 2022:
PV solar electrical rneter release to SDGE,
electrical meter nurnber (6821387)
-approved.
February 8, 2022:
PV solar electrical meter release to SDGE,
electrical rneter number (6821387)
-approved.
Passed
Yes
Yes
Page 10 of 10
Permit Type:
Work Class:
Status;
Scheduled
Date
08/23/2021
08/24/2021
02/03/2022
02/08/2022
PERMIT INSPECTION HISTORY for (CBRA2019-0114)
BLDG-Associated Permit Residenti, Application Date: 04/16/2019 Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Single Family Detached Issue Date: 04/30/2020 Subdivision: PALISADES
Closed -Finaled Expiration Date: 08/08/2022 Address: 148 TAMARACK AVE
IVR Number: 18445 CARLSBAD, CA 92008-4059
Actual
Start Date
Inspection Type Inspection No. Inspection Primary Inspector
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
Status
COMMENTS
March 12, 2021:
(inspection canceled by Steve Blackman
contractor).
June 1, 2021:
1. No electrical Deficiencies.
2. Temporary power pole service removed,
electrical modified to permanent Electr·ical
Service basis, for new dwelling and new
ADU electrical-approved.
08/23/2021 BLDG-81 Underground
Combo(11, 12,21,31)
164942-2021 Passed Tony Alvarado
08/24/2021
02/03/2022
02/08/2022
Checklist Item
BLDG-21
Un d ergrou nd-U nderfloor
Plumbing
COMMENTS
August 23, 2021: (Virtual inspection).
1. Underground plumbing domestic water
and underground electrical conduit scope
of work -approved.
2. Underground plumbing lines and
underground electrical conduit, verified
construction installation methods, per
virtual inspection -approved.
BLDG-31
Underground-Conduit Wiring
August 23, 2021 (Virtual inspection).
1. Underground plumbing domestic water
and underground electrical conduit scope
of work -approved.
BLDG-22 Sewer/Water
Service
Checklist Item
2. Underground plumbing lines and
underground electrical conduit, verified
construction installation methods. per
virtual inspection -approved.
164927-2021 Cancelled Chris Renfro
COMMENTS
BLDG-Building Deficiency Cancelled TA completed on 8/23/2021
BLDG-Final Inspection 175929-2022 Partial Pass Tony Alvarado
Checklist Item COMMENTS
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
BLDG-35 Solar Panel 176208-2022 Passed Tony Alvarado
BLDG-Final Inspection 176209-2022 Passed Tony Alvarado
Reinspection
Passed
No
Yes
Passed
Yes
Yes
Reinspection
Passed
No
Reinspection
Passed
Yes
Yes
Yes
Yes
Inspection
Complete
Incomplete
Incomplete
Complete
Complete
Friday, April 1, 2022 Page 9 of 10
PERMIT INSPECTION HISTORY for (CBRA2019-0114)
Permit Type: BLDG-Associated Permit Residenti; Application Date: 04/16/2019 Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Work Class: Single Family Detached Issue Date: 04/30/2020 Subdivision: PALISADES
Status:
Scheduled
Date
03/11/2021
03/12/2021
03/15/2021
03/16/2021
06101/2021
Closed -Finaled Expiration Date: 08/08/2022
lVR Number: 18445
Address: 148 TAMARACK AVE
CARLSBAD, CA 92008-4059
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector
Status
03/11/2021 BLDG-34 Rough
Electrical
152538-2021 Cancelled Tony Alvarado
Checklist Item COMMENTS
BLDG-Building Deficiency
03/12/2021 BLDG-34 Rough
Electrical
152647-2021 Cancelled Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
March 12, 2021:
(inspection canceled by Steve Blackman
contractor).
03/15/2021 BLDG-18 Exterior
Lath/Drywall
152759-2021 Passed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
March 15, 2021: (virtual inspection).
No building Deficiencies.
1. Exterior stucco lath paper type of lath
and stucco lath nailing pattern, and all
penetrations sealed with silicone chaulking,
scope of work-approved.
03/1612021 BLDG-84 Rough
Combo(14,24,34,44)
152780-2021 Passed Tony Alvarado
Checklist Item
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
06/01/2021 BLDG-32 Const. 158596-2021 Passed Tony Alvarado
Service/ Ag ri cultura l(Te
mp)
Checklist Item
BLDG-Building Deficiency
COMMENTS
June1,2021·
1. No electrical Deficiencies-(TSPB).
2. Temporary power pole service removed,
electrical modified to per111anent Electrical
Service basis, for new dwelling and new
ADU electrical-approved.
BLDG-34 Rough
Electrical
158595-2021 Passed Tony Alvarado
Reinspection Inspection
Reinspection Incomplete
Passed
No
Reinspection Incomplete
Passed
No
Complete
Passed
Yes
Complete
Passed
Yes
Yes
Yes
Yes
Complete
Passed
Yes
Complete
Friday, April 1, 2022 Page 8 of 10
PERMIT INSPECTION HISTORY for (CBRA2019 ... 0114)
Permit Type: BLDG-Associated Permit Residenti,
Work Class: Single Family Detached
Status: Closed -Finaled
Application Date: 04/16/2019
Issue Date: 04/30/2020
Expiration Date: 08/08/2022
IVR Number: 18445
Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Subdivision: PALISADES
Address: 148 TAMARACK AVE
CARLSBAD, CA 92008-4059
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
February 8, 2021: (virtual inspection)
(Building Deficiencies).
1. Underground electrical, and low voltage
data conduit, from p.o.c. Dwelling location
to p_o_c_ to garage location, scope of
work-not ready.
February 9, 2021: (virtual inspection)
(No Building Deficiencies). Approved.
1. Underground electrical, and (low voltage
data) conduit, from p.o.c. Dwelling location
to p.o.c. to garage location, scope of
work-approved.
2. Informed Ryan contractor
representative, electrical sub-panel and
main electrical panel locations, must be
verified and reflect SDGE Planner work
order specifications.
03/05/2021 03/05/2021 BLDG-14 152074-2021 Failed Tony Alvarado
Friday, April 1, 2022
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item
BLDG-Building Def1ciency
COMMENTS
March 5, 2020: (corrections).
"building deficiencies".
Stucco lath inspection needs to be
conducted first. prior to rough frame
combination inspection. Inform Steve
general contractor.
1. Interior shear-wall does not connect or
drag to existing perpendicular floor Joist.
Structural engineer needs to provide a
solution for missing drag strap connection
of interior shear wall to upper area floor
Joist blocking_
2. Smoke detectors and carbon monoxide
detectors missing at main dwelling unit and
appropriate shed ceilings/sloped bedroom
ceilings and secondary dwelling unit ADU
smoke detectors needs to be relocated and
(1) added.
3. Rough combination framing. electrical.
mechanical, and plumbing scope of work,
per plan-approved.
4. Electrical receptacles more than 12 feet
distance in some areas in main dwelling
unit and secondary ADU room areas.
5. Nail plates and window header beam
and king post needs LPT4 metal connector
for a positive connection.
6. Hot mop in bathroom shower enclosures
knee to be under water leak proof test.
7. More corrections may follow.
Passed
No
Yes
Reinspection Incomplete
Passed
No
Page 7 of 10
Permit Type:
Work Class:
Status:
Scheduled
Date
11/03/2020
02/08/2021
02/09/2021
PERMIT INSPECTION HISTORY for (CBRA2019-0114)
BLDG-Associated Permit Residenti; Application Date: 04/16/2019 Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Single Family Detached Issue Date: 04/30/2020 Subdivision: PALISADES
Closed -Finaled Expiration Date: 08/08/2022 Address: 148 TAMARACK AVE
IVR Number: 18445 CARLSBAD, CA 92008-4059
Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection
Start Date
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
Status
COMMENTS
October 20, 2020:
1. partial pass sheer wall nailing pa!tern,
type, holddowns, and metal connector
clips -still need to be verified per framing
contractor.
2. Holddowns and metal connectors
appear to be missing in lo shearwall
locations.
October 19, 2020:
1. Partial pass -shearwall type/nailing
pattern -partial pass.
2. Pending deputy inspectors report.
11/03/2020 BLDG-83 RoofSheating, 142771-2020
Exterior Shear (13, 15)
Passed Tony Alvarado
Checklist Item COMMENTS
BLDG-13 Shear Panels-HD (ok November 3, 2020:
to wrap)
BLDG-15 Roof
Sheathing-Re roof
1. Final shear wall inspection completed
and approved.
2. Cesar/contractor will provide deputy
inspectors report for shearwall type and
shearwall nailing pattern.
October 15, 2020: (Virtual inspection).
1. Roof sheathing for garage roof
diaphragm area only.
2. Roof sheathing type/nailing pattern, per
structural plans-approved.
Passed
Yes
Yes
Passed
Yes
Yes
Inspection
Complete
02/08/2021 BLDG-31 150061-2021 Failed Tony Alvarado Reinspection Incomplete
Underground/Conduit •
Wiring
Checklist Item
BLDG-Building Deficiency
COMMENTS
February 8, 2021: (virtual inspection)
(No Building Deficiencies).
1. Underground electrical, and low voltage
data conduit, from p.o.c. Dwelling location
to p.o.c. to garage location, scope of
work-not ready.
02/09/2021 BLDG-31 150135-2021 Partial Pass Tony Alvarado
Underground/Conduit -
Wiring
Passed
No
Reinspection Incomplete
Friday, April 1, 2022 Page 6 of 10
, PERMIT INSPECTION HISTORY for (CBRA2019-0114)
Permit Type: BLDG-Associated Permit Residenti. Application Date: 04/16/2019 Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Work Class: Single Family Detached Issue Date: 04/30/2020 Subdivision: PALISADES
Status: Closed -Finaled Expiration Date: 08/08/2022 Address: 148 TAMARACK AVE
IVR Number: 18445 CARLSBAD, CA 92008-4059
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency July 6, 2020: Yes
1. Slab steel reinforcement rebar per
engineered plans-approved.
2. Approved to pour concre1e.
08/19/2020 08/19/2020 BLDG-66 Grout 135992-2020 Failed Peter Dreibelbis Re inspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Reds special inspection No
08/25/2020 08/25/2020 BLDG-66 Grout 136564-2020 Passed Peter Dreibelbis Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Reds special inspection Yes
08/2712020 08/27/2020 BLDG-66 Grout 136808-2020 Passed Peter Dreibelbis Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
09/04/2020 09/04/2020 BLDG-15 Roof/ReRoof 137592-2020 Passed Tony Alvarado Complete
(Patio)
10/1412020 10/14/2020 BLDG-15 Roof/ReRoof 140958-2020 Cancelled Tony Alvarado Reinspection Incomplete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Cancelled No
1011512020 10/15/2020 BLDG-83 Roof Sheating, 141068-2020 Partial Pass Tony Alvarado Reinspection Incomplete
Exterior Shear (13,15)
Checklist Item COMMENTS Passed
BLDG-15 Roof October 15. 2020: (Virtual inspection). Yes
Sheathing-Reroof 1. Roof sheathing for garage roof
diaphragm area only.
2. Roof sheathing type/nailing pattern, per
structu ra I plans-approved.
10/19/2020 10/19/2020 BLDG-13 Shear 141286-2020 Partial Pass Tony Alvarado Re inspection Incomplete
Panels/HD (ok to wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency October 19, 2020: Yes
1. Partial pass -shearwall type/nailing
pattern -partial pass.
2. Pending deputy inspectors report.
10/20/2020 10/20/2020 BLDG-13 Shear 141439-2020 Partial Pass Tony Alvarado Reinspection Incomplete
Panels/HD (ok to wrap)
Friday, April 1, 2022 Page 5 of 10
PERMIT INSPECTION HISTORY for (CBRA2019-0114)
Permit Type: BLDG-Associated Permit_ Residenli,
Work Class: Single Family Detached
Status: Closed -Finaled
Application Date: 04/16/2019
Issue Date: 04/30/2020
Expiration Date: 08/08/2022
IVR Number: 18445
Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Subdivision: PALISADES
Address: 148 TAMARACK AVE
CARLSBAD, CA 92008-4059
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
June 25, 2020:
1. Verified compaction repot/letter of
civil/geologist footing foundation bottoms
for new Single family dwelling structure.
2. Foundation footing structural steel
reinforcement rebar's approved for
garage/structure -only.
3. Detached garage and ADU
foundation/footing reinforcement steel
re bar not per structural engineers footing
detail-(failed footing steel inspection).
June 10, 2020·
1. Footings reinforcement steel for new
single-family dwelling not approved.
2. Footings Height and footing-form set
backs to property lines certification from
civil/surveyor required prior to footing
inspection completed.
3. Civil engineer requires reinforcement
steel rebar tight, size, and placement
structural observation required prior to
concrete pour and city footing inspection
completion.
June 23, 2020:
1. Verified compaction repotlletter of
civil/geologist footing foundation bottoms
for new Single family dwelling structure.
2. Foundation footing structural steel
reinforcement rebar's approved for
dwelling/structure -only.
3. Detached garage and ADU
foundation/footing reinforcement steel
rebar not per structural engineers footing
detail-(failed footing steel inspection).
June 16, 2020:
1. Foundation/slab footing reinforcement
steel inspection-failed.
2. Soils engineer footing bottoms/slab
compaction certification report required.
3. Surveyor setbacks to property lines, and
concrete footing forms finished floor height
certification required.
4. Structural observation report or
third-party special inspector/deputy
inspectors report for steel in footings type
and placement required-(typical).
5. Structural engineers foundation footing
details #3 and #5, on sheet SD-6, do not
match as-built conditions.
07/06/2020 07/06/2020 BLDG-91 Complaints
Inspection
131879-2020 Passed Tony Alvarado
Friday, April 1, 2022
Passed
Yes
No
Yes
No
Complete
Page 4 of 10
PERMIT INSPECTION HISTORY for (CBRA2019-0114)
Permit Type: BLDG-Associated Permit Residenti. Application Date: 04/16/2019
Work Class: Single Family Detached Issue Date: 04/30/2020
Status: Closed -Finaled Expiration Date: 08/08/2022
IVR Number: 18445
Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Subdivision: PALISADES
Address: 148 TAMARACK AVE
CARLSBAD, CA 92008-4059
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
BLDG-Building Deficiency
COMMENTS
June 16, 2020:
1. Foundation/slab footing reinforcement
steel inspection-failed.
2. Soils engineer footing bottoms/slab
compaction certification report required.
3. Surveyor setbacks to property lines, and
concrete footing forms finished floor height
certification required.
4. Structural observation report or
third-party special inspector/deputy
inspectors report for steel in footings type
and placement required-(typical).
5. Structural engineers foundation footing
details #3 and #5, on sheet SD-6, do not
match as-built conditions.
June 23, 2020:
1. Verified compaction repotlletter of
civil/geologist footing foundation bottoms
for new Single family dwelling structure.
2. Foundation footing structural steel
reinforcement re bar's approved for
dwelling/structure -only.
3. Detached garage and ADU
foundation/footing reinforcement steel
rebar not per structural engineers footing
detail-(failed footing steel inspection).
June 10, 2020:
1. Footings reinforcement steel for new
single-family dwelling not approved.
2. Footings Height and fooling-form set
backs lo property lines certification from
civil/surveyor required prior to footing
inspection completed.
3. Civil engineer requires reinforcement
steel rebar tight, size, and placement
structural observation required prior to
concrete pour and city footing inspection
completion.
06/25/2020 06/25/2020 BLDG-11 131084-2020 Passed Tony Alvarado
Friday, April 1, 2022
Foundation/Ftg/Piers
(Rebar)
Passed
No
Yes
No
Complete
Page 3 of 10
Permit Type:
Work Class:
Status:
Scheduled
Date
06/23/2020
PERMIT INSPECTION HISTORY for (CBRA2019-0114)
BLDG"Associated Permit Residenti: Application Date: 04/16/2019 Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Single Family Detached Issue Date: 04/30/2020 Subdivision: PALISADES
Closed -Finaled Expiration Date: 08/08/2022 Address: 148 TAMARACK AVE
IVR Number: 18445 CARLSBAD, CA 92008-4059
Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection
Start Date
Checklist Item
BLDG-Building Deficiency
BLDG-Building Deficiency
Status
COMMENTS
June 10, 2020:
1. Footings reinforcement steel for new
single-family dwelling not approved.
2. Footings Height and footing-form set
backs to property lines certification from
civil/surveyor required prior to footing
inspection completed.
3. Civil engineer requires reinforcement
steel rebar light, size, and placement
structural observation required prior to
concrete pour and city fooling inspection
completion.
June 16, 2020:
1. Foundation/slab footing reinforcement
steel inspection-failed.
2. Soils engineer footing bottoms/slab
compaction certification report required.
3. Surveyor setbacks to property lines, and
concrete footing forms finished floor height
certification required.
4. Structural observation report or
third-party special inspector/deputy
inspectors report for steel in footings type
and placement required-(typical).
5. Structural engineers foundation footing
details #3 and #5, on shee1 SD-6, do not
match as-built conditions.
Passed
No
No
Inspection
06/23/2020 BLDG-11 130847-2020 Partial Pass Tony Alvarado Reinspection Incomplete
Foundation/Ftg/Piers
{Rebar)
Friday, April 1, 2022 Page 2 of 10
Building Permit Inspection History Finaled
(city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBRA2019-0114)
Permit Type: BLDG-Associated Permit Residenti; Application Date: 04/16/2019 Owner: COOWNER PINPOKINTR PAISAN AND
CHIEM MIKO
Work Class: Single Family Detached Issue Date: 04/30/2020 Subdivision: PALISADES
Status: Closed -Finaled Expiration Date: 08/08/2022 Address: 148 TAMARACK AVE
CARLSBAD, CA 92008-4059 IVR Number: 18445
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection
Date Start Date Status
05/22/2020 05/22/2020 BLDG.21 128333·2020 Partial Pass Peter Dreibelbis Reinspection
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/09/2020 06/09/2020 BLDG•11 129637 ·2020 Cancelled Peter Dreibelbis Re inspection
F oun dation/Ftg/Piers
{Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/10/2020 06/10/2020 BLDG•11 129721 ·2020 Failed Tony Alvarado Re inspection
Foundation/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency June 10, 2020: No
1. Footings reinforcement steel for new
single-family dwelling not approved.
2. Footings Height and footing-form set
backs to property lines certification from
civil/surveyor required prior to footing
inspection completed.
3. Civil engineer requires reinforcement
steel rebar tight, size, and placement
structural observation required prior to
concrete pour and city footing inspection
completion.
06/16/2020 06/16/2020 BLDG-11 130218·2020 Failed Tony Alvarado Reinspection
Foundation/Ftg/Plers
(Rebar)
Friday, April 1, 2022
Inspection
Incomplete
Incomplete
Incomplete
Incomplete
Page 1 of 10