HomeMy WebLinkAbout2023-03-21; City Council; ; Rejection of Bids Received and Authorization to Re-advertise for Bids for the Public Parking Lots Americans with Disabilities Act Improvements ProjectCA Review GH
Meeting Date: March 21, 2023
To: Mayor and City Council
From: Scott Chadwick, City Manager
Staff Contact: Scott Lyle, Senior Engineer
scott.lyle@carlsbadca.gov, 442-339-2505
Hossein Ajideh, Engineering Manager
hossein.ajideh@carlsbadca.gov, 442-339-2756
Subject:
Districts:
Rejection of Bids Received and Authorization to Re-advertise for Bids
for the Public Parking Lots Americans with Disabilities Act
Improvements Project
1, 2 & 3
Recommended Action
Adopt a resolution rejecting the bids received and authorizing the City Clerk to re-advertise for
bids for the Public Parking Lots Americans with Disabilities Act Improvements, Capital
Improvement Program project nos. 6049, 6052 and 4090.
Executive Summary
The project will construct improvements to seven city parking lots in the Village and the parking
lots in three city parks to comply with the Americans with Disabilities Act, or ADA,
requirements, as shown in Exhibit 2.
Staff received six bids for construction of the project on Feb. 9, 2023. Staff determined
the bids to be non-responsive because there was an error in the quantity listed for Item
No. 5, Construct Class II Aggregate Base, on the contractors’ proposal bid item list in the
contract bid documents.
Considering that all bids received were determined to be non-responsive, staff recommend that
the City Council reject the bids received for the project, consistent with Carlsbad Municipal
Code Section 3.28.080(I)(3) and authorize the City Clerk to re-advertise for construction bids for
the project with the revised quantity in the proposal bid item listed.
Explanation & Analysis
The project includes:
•ADA-compliant parking stalls
•Curb ramps
•Accessible pathways
•Signage
•Pavement resurfacing and repair to address existing maintenance needs
March 21, 2023 Item #5 Page 1 of 6
The proposed improvements will be constructed at the following city-owned and city-
maintained parking lots, which are shown on the location map, Exhibit 2.
Carlsbad Village public parking lots
• Village Arts Lot, 2728 State Street
• Lot A, 2992 Roosevelt Street
• Lot B, 2938 Roosevelt Street
• Lot C, 3077 State Street
• Lot D, 3044 State Street
• Lots F and G, 400 Carlsbad Village Drive - adjacent to Carlsbad Village Center site
• Lot I, 2898 State Street
Park sites
• Holiday Park, 1055 Chestnut Avenue (north and east perimeter parking)
• Calavera Hills Community Park, 2997 Glasgow Drive
• Poinsettia Park, 6600 Hidden Valley Road (four parking lots)
The City Council approved the project plans and specifications and authorizing advertising for
construction bids for the project on Jan. 10, 2023 (Resolution No. 2023-001). The project was
then advertised using the city’s formal bidding procedures.
Staff received six bids for construction of the project on Feb. 9, 2023. Staff determined
the bids to be non-responsive because of the error in the quantity listed for Item No. 5
Construct Class II Aggregate Base on the bid item list in the contractors’ proposal.
Fiscal Analysis
Sufficient funding is available to complete the project. Funding for the projects has been
appropriated from infrastructure replacement, public facilities and TransNet1 local funds.
ADA Improvement Program
Capital Improvement Program Project No. 6049
Total appropriation to date $3,155,000
Total expenditures/encumbrances to date -$2,043,153
Total available balance $1,111,847
Parking Lot Maintenance Program
Capital Improvement Program Project No. 6052
Total appropriation to date $1,590,000
Total expenditures/encumbrances to date -$599,877
Total available balance $990,123
State Street Parking Lot Electric Vehicle Charging Stations
Capital Improvement Program Project No. 4090
Total appropriation to date $300,000
Total expenditures/encumbrances to date -$41,741
Total available balance $258,259
1 TransNet is a countywide sales tax collected to fund regional transportation projects.
March 21, 2023 Item #5 Page 2 of 6
Options
Staff provide the following options for the City Council’s consideration:
1. Adopt a resolution rejecting the bids received and authorizing the City Clerk to re-advertise
for bids for the project
Pros
• Provides an opportunity to solicit additional bids
• Avoids the likelihood of bid protests
• Construction costs could be reduced with quantity correction
• Improves accessibility and walking conditions for all users
• Provides better and safer pedestrian mobility
• Brings ADA ramps and accessibility up to current standards
Cons
• None identified
2. Do not reject the bids received, and do not authorize re-advertisement for construction
bids for the project
Pros
• None identified
Cons
• Potential for a bid protest
• Delays start of construction
• ADA ramp and pedestrian accessibility issues will continue to exist
• Potential increase in construction costs due to delay and potential change order
Staff recommend Option 1 for the City Council’s approval.
Next Steps
With the City Council’s approval, staff will revise the bid provisions for the project and the City
Clerk will re-advertise the project with a new bid solicitation. Staff will evaluate the bids
received and identify the lowest responsive and responsible bidder.
Staff will then return to the City Council with a recommendation to award a construction
contract, which is expected to be in late spring 2023.
The construction contract for the project will provide for four months to construct the
improvements. Construction is expected to begin in summer 2023 and be completed by
October 2023.
Environmental Evaluation
The recommended action to reject the bids has been determined by the City Planner to be
exempt from environmental review under California Environmental Quality Act Guidelines
Section 15270(a), which states that CEQA does not apply to projects that a public agency rejects
or disapproves.
Exhibits
1. City Council resolution
2. Location map
March 21, 2023 Item #5 Page 3 of 6
RESOLUTION NO. 2023-087
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, REJECTING THE BIDS RECEIVED AND AUTHORIZING THE CITY
CLERK TO RE-ADVERTISE FOR BIDS FOR THE PUBLIC PARKING LOTS
AMERICANS WITH DISABILITIES ACT IMPROVEMENTS, CAPITAL
IMPROVEMENT PROGRAM PROJECT NOS. 6049, 6052 AND 4090
WHEREAS, the City Council of the City of Carlsbad, California has determined it necessary,
desirable and in the public interest to construct accessibility improvements including those identified
in the city's Accessibility Survey Transition Plan; and
WHEREAS, on Jan. 10, 2023, the City Council adopted Resolution No. 2023-001, approving the
plans and specifications and authorizing advertisement for construction bids for the Public Parking Lots
Americans with Disabilities Act Improvements, Capital Improvement Program Project nos. 6049, 6052
and 4090; and
WHEREAS, sufficient funding is available to complete the project, which is funded with
Infrastructure Replacement, Public Facilities and TransNet local funds; and
WHEREAS, on Feb. 9, 2023, staff received six bids for construction of the project; and
WHEREAS, the bids received for the project were deemed non-responsive because
there was an error in the quantity listed for Item No. 5, Construct Class II Aggregate Base, on
the contractors' proposal bid item list in the contract bid documents; and
WHEREAS, it is desirable and in the public interest for the City Council to follow the provisions
in Carlsbad Municipal Code Section 3.28.080(1)(3), whereby the City Council, at its discretion, may reject
all bids received; and
WHEREAS, staff recommend rejecting all bids received and re-advertising the Project for
construction bids with revised bid provisions; and
WHEREAS, the City Planner has determined that rejecting all bids is exempt from environmental
review per California Environmental Quality Act, or CEQA, Guidelines Section 15270 (a); which states
that CEQA does not apply to projects which a public agency rejects or disapproves.
Exhibit 1
March 21, 2023 Item #5 Page 4 of 6
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as
follows:
1.That the above recitations are true and correct.
2.That the bids received on Feb. 9, 2023, for the Public Parking Lots ADA Improvements
Project are rejected in accordance with CMC Section 3.28.080(1)(3).
3. That the City Clerk is hereby authorized and directed to re-advertise and re-publish with
revised bid provisions, in accordance with state law, a notice to contractors inviting bids
for construction of the Project, in accordance with the approved plans, specifications
and contract documents.
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of
Carlsbad on the 21st day of March, 2023, by the following vote, to wit:
AYES:
NAYS:
ABSTAIN:
ABSENT:
Blackburn, Bhat-Patel, Acosta, Burkholder, Luna.
None.
None.
None.
KEITH BLACKBURN, Mayor
L _,,SHERRY FREISINGER, City Clerk0 -(SEAL)
March 21, 2023 Item #5 Page 5 of 6
t!ev
!P
!P
!P
!P
**#5$
**#5$·|}þ78
VISTA
ENCINITAS
SANMARCOS
S.D.COUNTY
OCEANSIDE
PACIFICOCEAN
LAKECALAVERA
MAERKLERESERVOIR
BUENAVISTALAGOON
AGUAHEDIONDALAGOON
BATIQUITOSLAGOON
O CEA NSIDE B L
PALOMARAIR P O R T R D
TA M A R A C K AV
S
C
O
A
S
T
H
Y
E
L
C
A
M
R
E
A
L
E
L
CAMINO
R
E
A
L
L A COSTAAV
S
MELROSEDR
P O I N S E T T I A L N
S
SANTAFE
A
V
C
A
R
L
S
B
A
D
B
L
C A R L S B A D VILLAGEDR
RANCHO S A N T AFERD
MELROSE
D
R
AVIARA
P
Y
L E U C A D I A BL
FA RA D AY AV
CO
LL
EGE
B
L
ALGA R D
CANNON R D
LOCATION MAP
EXHIBIT2PUBLIC PARKING LOTS ADA IMPROVEMENTS
$!Å
Created By: Sara Jadhav 3/13/2023 J:\SaraJadhav_Customers\Scott Lyle\LocationMap\ProjectNumber6049&6052&4090\LocationMapCIP_6049-6052-4090.mxd
CARLSBAD VILLAGEPUBLIC PARKING LOTS
CALAVERA HILLS PARK
HOLIDAY PARK
POINSETTIA PARK
PROJECTNUMBER6049/6052/4090
Exhibit 2
March 21, 2023 Item #5 Page 6 of 6