HomeMy WebLinkAbout1950 CAMINO VIDA ROBLE; 100; CBC2022-0268; PermitBuilding Permit Finaled
(City of
Carlsbad
Commercial Permit
Print Date: 03/06/2023
Job Address: 1950 CAMINO VIDA ROBLE, # 100, CARLSBAD, CA 92008-6599
Permit No:
Status:
CBC2022-0268
Closed -Finaled
Permit Type: BLDG-Commercial Work Class: Tenant Improvement
Parcel#: 2120931200 Track#:
Valuation: $375,985.72 Lot#:
Occupancy Group: Project#:
#of Dwelling Units: Plan#:
Bedrooms: Construction Type:
Bathrooms: Orig. Plan Check#:
Occupant Load: Plan Check#:
Code Edition:
Sprinkled:
Project Title:
Description: ALPHATEC: 6,523 SF OFFICE TO OFFICE Tl
Applicant: Property Owner:
SCA ARCHITECTURE
ANDREW TARANGO
RAF PACIFICA GROUP REAL ESTATE FUND IV
LLC
13280 EVENING CREEK DRS, # 125
SAN DIEGO, CA 92128-4101
(858) 793-4777
FEE
BUILDING PLAN CHECK
111 CST, # 200
ENCINITAS, CA 92024-3514
BUILDING PLAN REVIEW-MINOR PROJECTS (LDE)
BUILDING PLAN REVIEW-MINOR PROJECTS (PLN)
CERTIFICATE OF OCCUPANCY
COMM/IND Tl -STRUCTURAL
FIRE F Occupancies Tl
S81473-GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMIP)
Total Fees: $4,037.60 Total Payments To Date: $4,037.60
Applied: 07/29/2022
Issued: 10/13/2022
Finaled Close Out: 03/06/2023
Final Inspection: 03/02/2023
INSPECTOR: Dreibelbis, Peter
Renfro, Chris
de Roggenbuke, Dirk
Contractor:
SPW CONSTRUCTION INC
1808 ASTON AVE, # STE 100
CARLSBAD, CA 92008-7369
(760) 931-1130
Balance Due:
AMOUNT
$1,149.25
$194.00
$98.00
$16.00
$1,768.07
$691.00
$16.00
$105.28
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY ta any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
( City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APP LI CATION
8·2
PI an Check ~ZJJ2.l_ 7"" f\?iO
Est. Value t7~q~
PC Deposit l ,cq~
Date 1-29-·ZZ..
Job Address 1950 Camino Vida Roble Suite:. _____ APN:212-093-05 and 212-093-12
Tenant Name#: Alphatec Spine Lot#: Year Built: 1997 --'------'-------------·--------------
Year Built: 1997 Occupancy: 6 F 1· s-, Construction Type: V-B Fire sprinklers0YES0NO A/C:C:)YEs0No
BRIEF DESCRIPTION OF WORK: 6,523 S.F. office tenant improvement with an existing 121,541 S.F. building. Structural
mechanical, plumbing and elecatrical are included
0 Addition/New: ____________ New SF and Use, __________ New SF and Use
______ SF Deck, _______ SF Patio Cover, ________ SF Other (Specify) ___ _
~Tenant Improvement: _____ SF, Existing Use: _______ Proposed Use: ______ _
6,523 SF, Existing Use: B-office Proposed Use: _B_-o_ffi_ce ____ _
D Other: __________________________________ _
PRIMARY APPLICANT PROPERTY OWNER
Name:Andrew Tarango, SCA Architecture Name: RAF Group Bressi Ranch LLC
Address: 13280 Evening Creek Drive, Suite 125 Address:315 S. Coast Hwy, Suite U-12
City: San Diego State: CA Zip: 82128 City: Encinitas State:_C_A __ Zip: 92024
Phone: (858) 793-4777 Phone: (760) 473-8838
Email: andrewt@sca-sd.com Email: ___________________ _
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name: Cheryl D. Smith, SCA Architecture Business Name: White Construction
Address: 13280 Evening Creek Dr. , Suite 125 Address: 2524 Gateway Road
City: San Diego State: CA Zip:,_9_2_12_8 ___ City: Carlsbad State:,_C_A __ Zip: 92009
Phone:(858) 793-4777 Phone:(760) 931-1130
Email:. _________________ Email: sean@whiteconstruction.com
Architect State License: C11 ,70 1 CSLB License#: 1023856 Class: 8 ·-------
Carlsbad Business License# {Required): BLNRooo4J1-02-2017
APPLICANT CERT/FICA T/ON: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): Andrew R. Tarango SIGN:---------DATE: 07/27/2022
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719
REV 04122
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ------------A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I hereby affirm underpenaltyof perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3
of the Business and Professions Code, and my license isin full force and effect. I a/so affirm under penalty of perjury one of the
following declarations (CHOOSE ONE):
DI have and will maintain a certificate of consent to self-insure for worker,' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. PolicyNo. _____________________________________________ _
-OR-
01 have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name; _s_ .. _,._c_,m_•_•_"_"_"'_' '_"_"_"_"_e_"_"•----------------
Policy No. 9243036-22 Expiration Date: _,J_, _□,_z,_i,_, _____________ _
-OR-
D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person ,n any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work th15 permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ________________________ Lender's Address: ________________________ _
CONTRACTOR CERTIFICATION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and
uti!ities/utilrty easements_ Ali propos.ed modifications and/or additions are clearly !abeled on the 5/te plan. Any potentially existing deta1f w1thm these plans mcons1ste-nt wrth rhe !-ite plan are not
approved for camtruction ond may be required to be altered or removed The city's approval of the opp/1cotion i5 based on the prem1Sf? that the wbmmed documents and plans ~how the .correi:;:r
dimens10m of,-the property, buildings., s.tructures and their 5etbad:s fmm pmpertv fine.'. and from one another; access mads/easements, and utilities,. The e)(Jstmg and proposed use of each building
os stoted is true r:rnd .r:orn:ct,: oil ea~emenr5 ond other encumbrances to development have been accurately .shown and labeled as well as all on-s:1te gradmg/'itte preparatwn .. 411 rmprovemenrs
exi!>tmg on the property were tompleted in accordance with t1U regulations m existence at the time of their constructwn, unless otherwise noted
NAME (PRINT): Leah Norman Project <n SIGNATURE:l@.Liv-if VV\;V)t)v DATE: 07/28/2022
Note: If the person signing above is an authorized agent for the contractor provide a letter of authorization on contractor letterhead.
(OPTION B): OWNER~BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec,
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement 1s sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
DI, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code· The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such proJects with contractorls) licensed
pursuant to the Contractor's License Law).
~OR-
D I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit ,ssued to a property owner
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors./ understand that a copy of the applicable law, Section 7044of the Business and Professions Code, is available upon request when this application is
submitted or at the following Website: http:l lwww,/eginfo.ca.govlcalaw.html.
OWNER CERT/Ff CA T/QN: The applicant cert1fie., that all documents and plans c/earfy and accurately show all ex,sting and proposed buildings, structures, access roads, and ut,lities/ultlity
easements. A}! proposed modification.sand/or additian5 are clearly labeled on the .site plan. Any potetlttal!y existing detail within these plans incansistent with the site pla" are not approved for
construction and may be requ;red ta be altered or removed. The city's approval of the application 15 based on the premise that the submitted documents and plans shaw the correct dimensions of-
the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities, The e,<isting and proposed use of each building as stated ,s true
and correct, all ease men ts and other encumbronces ro development hove been accurately shown and labeled as well as all an-site grading/site preparation. All improvements existing on the property
were completed 1n accordance with a/f regulations in existence or the time of their canstruc£ion, unless otherwise noted.
NAME (PRINT): SIGN: _________ DATE: _____ _
Note: lf the person signing above is an authorized agent for the property owner include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719
2 REV 04/22
Building Permit Inspection History Finaled
(city of
Carlsbad
PERMIT INSPECTION Hl~TORV for {CBC2022-0268)
Permit Type: BLDG-Commercial Application Date: 07/29/2022 Owner: RAF PACIFICA GROUP REAL ESTATE
FUND IV LLC
Work Class: Tenant Improvement Issue Date: 10/13/2022 Subdivision: CARLSBAD TCT#81-46 UNIT#02
Status:
Scheduled
Date
11/09/2022
11/18/2022
11/29/2022
12/12/2022
01/13/2023
03/02/2023
Closed -Finaled Expiration Date: 07/12/2023
IVR Number: 42294
Actual Inspection Type
Start Date
11/09/2022 BLDG-14
Frame/Steel/Bolting/We
lding (Decks}
Checklist Item
Inspection No.
196214-2022
COMMENTS
BLDG-Building Deficiency
BLDG-34 Rough
Electrical
196215-2022
Checklist Item COMMENTS
BLDG-Building Deficiency
11/18/2022 BLDG-17 Interior
Lath/Drywall
196962-2022
Checklist Item COMMENTS
BLDG-Building Deficiency
11/29/2022 BLDG-24 Rough/Topout 197479-2022
Checklist Item COMMENTS
BLDG-Building Deficiency
12/12/2022 BLDG-44 198622-2022
Rough/Ducts/Dampers
Checklist Item COMMENTS
BLDG-Building Deficiency
01/13/2023 BLDG-85 T-Bar, Ceiling 200657-2023
Grids, Overhead
Checklist Item COMMENTS
Inspection
Status
Passed
Passed
Passed
Passed
Passed
Passed
BLDG-Building Deficiency 01 /13123 Mezz. Level T Bar ok
03/02/2023 BLDG-Final Inspection
Checklist Item
204527-2023
COMMENTS
Passed
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
NOTES Created By
Angie Teanio
TEXT
619-994-6656 Tyler
Monday, March 6, 2023
Address: 1950 CAMINO VIDA ROBLE, # 100
CARLSBAD, CA 92008-6599
Primary Inspector
Chris Renfro
Chris Renfro
Peter Dreibelbis
Chris Renfro
Chris Renfro
Dirk de Roggenbuke
Chris Renfro
Reinspection Inspection
Passed
Yes
Passed
Yes
Passed
No
Passed
Yes
Passed
Yes
Passed
Yes
Passed
Yes
Yes
Yes
Yes
Yes
Created Date
03/01/2023
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Page 1 of 1
Structural Inspections LLC
*SPECIAL JNSPEcrroN sEnncAffv of Cart~bad
P.O. Box 2415 El Ca. o 920if
-9
UILOING DIVISION
Project Name:_/J-----'7'-·-(.._C. ___ ---rl'------------=--r-----
Project Address: _/_Y_~_tJ __ ~(-~_rn __ ;.,,~,~>-~V~• O~ ___ K_(._· _/;_(, __ _
Page: ____ of ___ Report#: _____ _
Permit#: _______________ _
Architect: ___ $<_<_~ ____________________ _ File#: _________________ _
~ ,v•C-Engineer: ----'L'------------------------
/ )'i 7 Contractor: ________________________ _
DSA #: ___ -==--------------
Other: __ .j2_3 __ w' __________ _
INSPECTION MATERIAL SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST .,.
,--Plans/Specs L_ Structural Steel --H.S. Bolts --H.S. Bolts
--Masonry --Prisms --Cone. PSI --Clearances
--Concrete --Mortar/Grout --Grout PSI --Positions
--Fireproofing --Cone. Cylinders --Mortar PSI _,,.-Sizes
Epoxy r!J Fireproof ~ Steel (..., (j Laps ------
/ Other: fr Other: Elect./Wire Consolidation --------
--Other: --Other: --Fireproof --Torque Ft. Lbs:
--Other: --Other: --Other: --Other:
--Other: --Other: --Other: --Other:
)/1) (;. (" I I ..........t,,. ,.. pt. _ r ·,n r ').-/ lfY\ / ,2
':J'>-2 'I ., /J ... l .,.. \ r-1.J y <../ //2, .,...,
//\J .. 6 ./ /1(1 • /J, /ii {V I
/2 /'. /
I' ~Or'· /i, .,,,7
~.J'.
c -/ I _,_....,&-(:"~-s .J /' />,--/....,/"7 Ii/
CERTIFICATION OF COMPLIANCE: All reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections
of the building codes. This report covers the locations of the work inspected and does not constitute opinion or project control.
I hereby certify chat I have observed to the best of my knowledge all of the above reported work unless otherwise noted. I have found this work to
comply with the approved plans, specifications, and applicable sections of the governing building laws. _
Inspector: MARIO BATTAGLIA Cert: 350 1-
; __ l_~SP.:.'?a~~-: ....
! Time Start:
. Time Stop:
Approved By: ___________________ _
Project Superintendent
Signature
. ,Day 5: ..
I -A ( IC -5
Structural Inspections LLC
•sPECIALJNsPEcr,oNsERvrcEs* City o-r Carlsbad
2
Cell~ • ..,..,., 9 RUIIClfh MAR fl 'ii "~·· i
Inspection Report BUILDll,_,.u ul v !.::,ION
Project Name: '1 I E C.. ,,
/ ~ S ;:-. (/ ;".-vi .,. ., , ✓,·_/\,a I > I /
Page:. ___ /_of __ f __ Report #: _____ _
Project Address: __ ,, __ ._,_.,, ______ ''_ ,_,_'V ___ v_ '_rv ____ ,_o_v __ Permit#: ________________ _
....
Architect: ___ ->_< ______________________ _
Pl fY'( Engineer: __________________________ _
File#: _________________ _
DSA #: ________________ _
Contractor: __ ~ __ A _____________________ _ '<""'{3 'v Other: __ .J ________________ _
INSPECTION MATERIAL SAMPLING QTY MATERIAL DESCRIPTION INSPECTION CHECKLIST -Structural Steel H.S. Bolts H.S. Boles ~ Plans/Specs ------
--Masonry --Prisms --Cone.PSI --Clearances
--Concrete --Mortar/Grout --Grout PSI --Positions
--Fireproofing --Cone. Cylinders --Mortar PSI ~ Sizes
--Epoxy --Fireproof ~ Steel /J!:., --Laps -Other: =,· #' 1LO Other: __ ......-Elect./Wire ,, , r 8: Consolidation ------
--Other: --Other: --Fireproof --Torque Ft. Lbs:
--Other: --Other: --Other: --Other:
--Other: --Other: --Other: --Other:
·,ac-,:, ~ I ...I. • •. c-< /'\ ,...., 11")'1 7~ ~-/l,-/...1....._ /,I /' /✓ ,-..,./ 1/i/
/)'] (p 2.' ;,""\ s:-,,;r'c rs ~2 u/~ ./
Iv"'-I, /1'7 .}~ J?T /1,"' IV
✓
f/ /), QC' /.., , ,, ,,_D C,.., fl /1 I }2,-;-v,.., r, ~ ,4 r-I f "'J tr: 'i { [ (
I 1 / SI,
/ 6-. -'A-c. l l, ,,, s v,. /'2'. ~ r .
U.) r '1 ,, /I" rey-,,,/J( r I'/' ~1 r/ 5 ~. ,,
CERTIFICATION OF COMPLIANCE: All reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections
of the building codes. This report covers the locations of the work inspected and does not constitute opinion or project control.
I hereby certify that I have observed to the best of my knowledge all of the above reported work unless otherwise noted. I have found this work to
comply with the approved plans, specifications, and applicable sections of the governing building laws-I'
I Inspector: MARIO BATTAGLIA Cert:~_3_5_0 __ I I I
Signature Date
,Day 3:
Approved By: ____________________ _
Project Superintendent
PRIME STRUCTURAL ENGINEERS
13272 Jacaranda Blossom Dr.
Valley Center, California 92082
Tel (760) 519-5206
STRUCTURAL
CALCULATIONS
Atec Phase Ill
Tenant Improvement
Structural Calculations
Carlsbad, CA
2K22-80
Pages 1 thru 4
CBC2022-0268
1950 CAMINO VIDA ROBLE
ALPHATEC: 6,523 SF OFFICE TO OFFICE Tl
r\
> t--0
#100
2120931200
9/16/2022
CBC2022-0268
L\TC Hazards by Locatiop
Search Information
Address: 1950 Camino Vida ~oble, Carlsbad.CA 92008, ·
.USA
Coordinates: 33:1228816, -117.2832261
' Elevation: 254 ft
Timestamp: 2022-01-19T18:42:54.2392
Hazard Type: Seismic
Reference ASC~?-1 6
.... .,..,..,
•.tr,._ :'l ' • e; ..... _!!e ~a~~q~~~6-':!9!e1 JNEGI; Re111prta :map error
·. •'·
Document:
•,
Risk Category: • · U . ' ' . ~· . . . '· .
Site Class: . i i-defauh . >' ... .. ,·,.{.
Basic Parameters
• ,. '"" • •• • •• • • I•" : ,' • • • •,•, • ; • o ••• •' • •, ~ : I •• • ;
Nallie Value
Ss 0,997.
S1 0.363
SMS 1.196
SM1 * null
Sos 0.798
S01 * null .
* See Section 11 .4'.8 ..
Description ·
MCER ground motion (period=0.2s)
M_CER ground motion (peric:>d=1 .0s) .
Site-moqlfie~ spebtr~I acceleration value
S\te-modlfiea sp~ctral acceleration value
Numeric seismic design value at 02s SA
Nume~ic se.ismic· ~~sign value' at 11.0s SA .
• I l
' ' :·
: •''
'
.. ___ ,.,_.;. .......... ..:.:,._..,-, ........... ·•.·• .. ~ .. -..-.~~·: ....... , ... : ... ·~-... ~ .. ·•·· ·-·-" -· ... ~ .. •·••····"· ..... i'
•Aclditional Information .
. . ... . .
Name Value Descripti~n ·
·soc .. null' Seismic design_ e:ategory
Fa 1.2· . ·Site ampliflca_tion factor at 0.2s
F . V *null sit~ ~tripuri~t1tm' tact~,: ~t: t os ·
• • i ~ ~. • • r
CRs 0.898 Coefficient of risk (0.2s)
C:R1 0.908 Coefficient of risk (1 .0$) .. ·,'
'• ·:•. ';. •,
PGA 0.436 MCEG peak ground_ acceleration
FPGA 1.2 Site amplification factor at PGA . . ·. ·••, .. .' .
-~.C-'l
' .,
I •,
~
! I !
/
' I
' I i '
'
' I
I I
• I
~//AJ4 .
½, I,\ fl>//,(),()t:>
Zx_ <;t1tJ, P.
J £1$,ucflo"1
--1>I {;f"S {!_ o'.
HtG
~~ft.~
Ml~? ..
;?.. 2-,
/. <"
b, 7
~K''.
.f..i>
(o
/.b
~>
/rr~,
\ f 16~ ~ 11r'jz ~ 1111' . ,
. A_ PRIME JOB: 2K22-80 . &_ STRUCTURAL DATK: 01122
6£~ ENGINEERS SHT: 2
I
7:,1-_ .c <S I )t tj,o ,-' S ~--o #
. LJ,.-:-/7..t,.p;.t:=-
t./f t:Pt:Pc:;) X /'2-~
I '2-t. µ
~ 2-'Z~ 1< fl-I
J , 1 I I ?11~ ,-.:: :57_ ~q ,.fe-.:= 6(!i-g,~/I+ ' ' I
I !
1 e-. ht lrl.-~ t I I ff I) '1 1---..-z? $"~ 3 # ·
U" . .
' '
' 1,. 1f/~ol c;~.s ~
' I
I
I I i ,
•' • r
28K JOISTS
A.. . PRIM.E JOB: 2K22-80 a STRUCTlJRAL DATE: 01122
la!~~ ENGINEERS SHT: 3
07/19/22
2K21-200
(8U(s1p12v1s0b4148TBEAM ANALYSIS PROGRAM(slp9v1s0b4148T (6 . 43) (SU (sOp
SPAN LENGTH = 40.00 ft
(Simple Span)
UNIFORM LOADS
wd wl
0 .1'04 0 .141
POINT 'LOADS (k
Pd Pl
0.199 0 .000
REACTIONS . (k)
LOAD
Dead
Live
Totq.l
MAXIMUM FORCES
·(k/ft & ·ft)
·Xl
0.00
& 'ft)
X
20.00
LEFT
2.180
2.820
5.000
X2
· 40 : 00
RIGHT ·
2.180
2.820
5.000
v max = s . o·o k @ o . o o ft
M max = 50.99 kft@ 20.00 ft
DEFLECTIONS (EI ·= kin "'2)
LOAD Defl (in) .X (ft).
·Total 1·4570498/EI 20.00
Live 8121600/EI 20 .00
Dead 16448896/EJ: midspan
TOTAL Defl EI ..
L / 180 5463937
L / 240. 120·5249
L /· 360 10927874
LIVE Defl EI
L / 24.0 4060800
L I 360 6091200
L I 480 8121600
I .••.• , •.•.
' I
' ' ·•, ·•· -...
~ ..... :
I
.; ;
·,
I -'
' 'j I .:: .. ~>-~ j ; . .
.l !
. J
!
I
I I I I
I I I
. . !
!
i
I I i·
• \ n
I ···, ... ·,.
. i
!
\
,-I
i
!
..
!
'.
r I
i ; j . : : )
~~ (4JP#· wdf1r:)
1· .
I , -1-~---
i .
l
i .
' . !
· 1.
' • , I ;
ft~f{ ; I tl~ffll,11?<7
1~-i) : ~fMt4 ~
: %~ I" ;~P. . i.5,('.!
I ; I
P3000 & P3001 Channels
P3000 • BEAM LOADING
Max Deft. at Uniform Loading at Detlectlon Allowable Uniform
Span Uniform Load Load Span/180 Span/240 Span/380
In Lba In Lbs Lbs Lba
24 1,280 0.07 1,280 1,280 1,280
36 850 0.15 850 850 580
48 640 0.26 640 490 330
60 510 0.41 420 310 210
72 430 0.59 290 220 150
84 370 0.81 210 160 110
96 320 1.05 160 120 80
108 280 1.30 130 100 60
120 260 1.66 100 80 50
144 210 2.32 70 50 40
168 180 3.15 50 40 30
192 160 4.18 40 30 NR
216 140 5.21 NR NR NR
240 130 6.64 NR NR NR
P3000 • COLUMN LOADING
Maximum
Allowable Maximum Column Load Applled at C.G. Unbraced Load
Height at Slot Face K•0.85 K•0.80 K•U K• 1.2
In Lbs Lbs Lbs Lbs Lbs
24 3,180 9,690 8,980 8,050 7,210
36 2,920 8,160 7,210 6,130 5,240
48 2,590 6,820 5,810 4,730 3,860
60 2,300 5,740 4,730 3,690 2,990
72 2,040 4,850 3,860 2,990 2,270
84 1,830 4,100 3,240 2,400 ..
96 1,650 3,530 2,770 1,840 ..
108 1,450 3,080 2,270 .. ..
120 1,250 2,710 1,840 .. ..
P3000/P3001 • ELEMENTS OF SECTION
Parameter P3000 P3001
Area of Section 0.500 ln2 1.000 ln2
Axis 1-1
Moment of Inertia (I) 0.120 In' 0.591 ln4
Section Modulus (S) 0.153 ln1 0.430 ln1
Radius of Gyration (r) 0.489 In 0.769 In
Axis 2-2
Moment of Inertia (I) 0.203 ln4 0.407 ln4
Section Modulus (S) 0.250 ln1 0.501 ln1
Radius of Gyration (r) 0.638 In 0.638 In
1%" Framing System
I
UNI STRUT"
P3001 • BEAM LOADING
Max Deft. at Uniform Loading at Detlectlon Allowable Uniform
Span Uniform Load Load Span/180 Spanl240 Span/380
In Lbs In Lbs Lbs Lbs
24 2,960· 0.03 2,960* 2,960* 2,960*
36 2,400 0.08 2,400 2,400 2,400
48 1,800 0.15 1,800 1,800 1,610
60 1,440 0.23 1,440 1,440 1,030
72 1,200 0.33 1,200 1,080 720
84 1,030 0.46 1,030 790 530
96 900 0.59 810 610 400
108 BOO 0.75 640 480 320
120 720 0.93 520 390 260
144 600 1.34 360 270 180
168 510 1.81 260 200 130
192 450 2.38 200 150 100
216 400 3.01 160 120 80
240 360 3.72 130 100 NR
P3001 • COLUMN LOADING
Maximum
Allowable Maximum Collffll Load Applled at C.G. Unbraced Load
Height at Slot Face
In Lba
24 5,740
36 5,620
48 5,520
60 5,330
72 5,030
84 4,630
96 4,190
108 3,720
120 3,300
144 2,620
Notes:
• Load limited by spot weld shear.
**Kl/r >200
NR = Not Recommended.
K•0.85
Lbs
21,780
20,520
19,400
18,510
16,850
14,990
13,090
11,230
9,460
6,590
K•0.80 K ■1.0 K•1.2
Lbs Lbs Lbs
21,200 20,430 19,720
19,720 18,830 17,680
18,570 16,570 14,260
16,570 13,670 10,810
14,260 10,810 7,730
11,930 8,180 5,680
9,720 6,260 4,350
7,730 4,950 ..
6,260 4,010 ..
4,350 .. ..
1. Beam loads are given in fQ1al uniform load c,t-J Lbs) not uniform load (w lbs/ft or
w lbs/in).
2. Beam loads are based on a simple span and assumed to be adequately laterally
braced. Unbraced spans can reduce beam load carrying capacity. Refer to Page 56
for reduction factors for unbraced lengths.
3. For pierced channel, multiply beam loads by the following factor:
"KO" Serlea ....... 95% "T" Serles .......... 85%
"HS" Serles ....... 90% "SL" Serlea ........ 85%
"H3" Serlea ........ 90% "OS" Serlea ........ 70%
4. Deduct channel weight from the beam loads.
5. For concentrated midspan point loads, multiply beam loads by 50% and the
corresponding deflection by 80%. For other load conditions refer to page 18.
6. All beam loads are for bending about Axis 1-1.
I
t;. =· "0' 0, ... ,
CL"
Reference Material
General Data
Table 6. Mo_dels GEH006-024 (0.5 to 2 tonsl
ModelGEH 006 009 ·012 015 018 024
Unit Size Depth XL x·H (in) 40 X 20 X 15 40x20x15 40 X 20 X 15 40 X 20X 15 . 4·5 X 23 X 18 4q X 23 X 18
Com'pressor Type Rotary Rotary _Rotary , Rotary Rotary Scroll
Net Weight (lbs.) 165 165 '' · '173 173 ,, 248 2's3
•'
Ship Weight (lbs.) 195 195 203 203' 268 285
Filter Size Nominal (In.) 15x20 15 x20 15x20 1Sx20 18 X 24 . 18x24
Water In/out size (FPT) 0.50 : . o.so ·0.50 0.50 3/4 "3/4
~~ndensa'te size (NPTI) 3/4 3/4 3/4 3/4 3/4 3/4
Blower Wheel Size (In.) -"Direct Drive 9x4 9x4 ·9 x4 9x4 9x4 •' 10 X 6
. Table 7. Models GEH030·060 (2.5 to 5 tons)
Model.GEti 030 035 (~AQJ
Unit Size Depth';'-L:x H (in) 461( 23 X 18 50 X 25 X 19 SOX25x19 58 X 33 l( 21 S8x33x21
Compressor Type Scroll Scroll Scroll Scroll Scroll
Net Weight (lbs.) 2S3 313 ' --~~:
Ship Weight (lbs.) 28S ., 343 . 318 ' .. 4_28_', : 428 .,
FHter Size Nominal (In.) 18x24 19 x26 19x26 21 X 30 21X30
Water In/out size (FPT) 3/4 3/4 . 1.00 1:00 '
Cond~nsate size (NPTI) 3/4 ,3/4 3/4 3/4 . ' 3/4
Blower Wheel Size (in.) -Direct Drive 1-0 X 6 ', 1'1X8 11x8 10 x 10 Std. Static 12 X 11 12 x 11 High Static
Table 8. Models GEH072-~80 (6 to 15 tons) . ' ·,. ... ,,_ ' . ' 1'•. •.· l •,, I :Y•. :•· : ~ .
MoclelGEl:I ' 072 ' 090 120 ·: 150 '• 180
Unit ~lze Depth XL x H (in) 41x79X21 4.1 x79x21 41 x79x2l:' '47x85x 28 '• 47x85 x28
. CompressorType · ·' Scroll (2) Scroll (2) .. Scroll (2) . Stroll (2) ·scroll (2)
Net Weight (l_bs.) 665 676 785 857 955 ..
Ship Weight (lbs.) · 714 724 827 899 997
Filter Size Nomlhal (In.) _20 X 25 (3) 20 X 25 (3) 20 X 25 (3) 20 x25 (3) : 20x25(3)
Water ln/out_size (FPT) '• .. ', ,1,2~. · .. , .. 1.2~ ", ·i.so_: :.,1 .po . ' 1.SQ
Conde·nsate size (NPTI) :a.so .0.50 o;so o:·50 0.50
Blower Wheel Size (tn.j -Direct Drive 13 x 13' 13x13 -13X13 15 x 15 · 15 X 15 •,•
Table 9. Models GEV00S-018 (0.5:to 1.5 tons)
ModelGEV 006 009 012 015 018
Unit Size Depth XL X H (in) 22 X 19 X 31 22x19x31 22x19x31 . 22 X 19 X 31 22 x21 x39
Compressor Type · Rota!'Y . Rotary Ro1/,lry ·, Rotary .·• Rotary ' .. , . ...
Net w_elgtit (lbs,) ' .16$ 16S· 173 ' 173-· 248
Ship Weight (lbs.) 195 195 203 203 268
Filt~~ 512!:! Nominal (in:) 15ic20 16x20 i6 )( 20 16 X 20 , 2o·x 20 .,
Water In/out size (FPT) 0,50 o.sp . a.so • 0.50 3/4_
30 WSHP-PRC017f'-EN
• 'fflANE'
Un•it Dimensions
-Figure 46. Left return/back suppl.Y (GEH)
1·,,'
•ir'\·.1.Jll 11.:
y
TC•P ·
I.
14" 0
( c:= R
N -'
A
IJ --------
1
-1 -s
f
l=o-----~---~
Table 196. Dimensional data left return/back supply (GEH)
u,;n "'"'" L . M Unit Unit A B C D<•l E FxG H . l K N
(60 Hz) (50 Hz) NPTI NPTI
006,009 006 40 20 15 20 15 6-7/8 X 8 11-1/2 '4-1/2 1~3/4 1/2 1/2 38-3/4
012,015 009,012 40 20 15 20 ·: 15 -o-11ox-,,-. 11-1/2 _ 4-1/4 3/4 1/2 1/-2 38-3/4 -· 7/8
018 015 46 23 18 23 18 8-l/4 X ':J-13-1/2 4-3/4 l,-3/8 3/4 3/4 . 44-3/4 3/4
024,030 018,024 46 23. 18 23 18 ts-l/4X ll-13-1/2 •4-3/4 1-3/8 3/4 3/4 44-3/4 3/8
035,042 030,036 50 25 19 25 20 lU-1/L X 17 4 1 3/4 3/4 . 48-3/4 13-1/2
Std-048 Std-042 58 33 21 IZ!l-1/ 23-1/2 1..:1-1/ts X 18 5-1/4 1-1/2 ·1 1 56-3/4 2 11-3/8
Ht-u"to, n1-u4L1 60 58 33 iL'J·l / 23-1/2 1..:1-,,ox 18 5-1/4 1-1/2 1 1 56-3/4 060 048,060 . 2 13-7/8 ..
Notes: ..
r·
I-' ~
p
18-3/4
18-3/4
21-3/4
21-3/4
23-3/4
31-3/4
31-3/4
:riMrJ; :1)1 ITJ.."'?OL
f.,\ l-F;"";~\
Ff.>O\T
Q R(b)
13-5/8 18-1/2
13-5/8 18-1/2
16-5/8 18-1/2
16-5/8 18-1/2
lz-5/~ 23-1/2
19-5/8 23-1/2
19-5/8 23-1/2
s
3-1/4
3-1/4
4-1/4
4-1/4
3-1/4
5-1/2
5-1/2
·-· 1. When a horlzohtal model ls.ordered with the same side return and supply in a ducted application, bottom filter removal Is required due to limited
access on either side" of the 'filter." · · · · · ' , · · --
2. Equipment containing a same'slde supply/return combination requires a 3 In. clearance on one side. Access to.th~TXV may not be possible with this 3
In. dearance. · · · · ·
<•> Return air opening dimension •.
lbl FIiter ~ack dimension. ·
228 WSHP-PRC017P-EN
.-~
AIR-SOUND-HYDRONIC PROFESSIONALS
HVAC Test and Balance Report
PROJECT:
CONTRACTOR:
ARCHITECT:
ENGINEER:
Atek-Mezzanine
1950 Camino Vida Roble
Carlsbad, CA
MSC
N/A
Plum Engineering
REPORT CERTIFICATION NO: 41986
REPORT CERTIFICATION DATE: February 28, 2023
REVIEWED AND APPROVED BY:
Michael Conboy
ICB / TABB Certified Contractor
457 E. Arrow Hwy, Ste. D, Azusa, CA 91702
TEL: 626-915-8117 FAX: 626-915-8112
E-MA TL: associatedairbalance@gmail.com
c>.~rr,
,. ; . -... --=~-~-. -~ ... :~,
Associated Air Balance
STATE OF CALIFORNIA
qcontrartors ~tate JLtcttme ~oarb
13l-24(REV.12-U7) e OSP0710546D
Pursuant to Chapter 9 of Division 3 of the Business and Professions Code
and the Rules and Regulations of tbe Contractors State License Board,
the Registrar of Contractors does hereby issue this license to:
MICHAEL CONBOY INC d6a. ASSOCIATED AIR
BALANCE
to engage in the business or act in the capacity of a contractor
in the fotlowing classification(s):
D62 -A1R AND WATER BALA:NONG
B -GENERAL BUILDING CONTRACTOR
Witness my hand-and seal this day,
May 9, 2008
Issued December 21.. 2004
REPLACEMENT
/41±~µ
Registrar of Contractors
This license is the property of the Registrar of Contractors,
is not transferrable, and shall be returned to the Registrar
upon demand when suspended, revoked, or invalidated
for any reason. It becomes void if not renewed.
851730
License Number
AUDI,.. NC: 4407.U.
Atec-Mezzanine-Carlsbad
Table of Contents
System
HP-1 & 2
HP-1 DIFFUSER
HP-2 DIFFUSER
HP-3 & 4
HP-3 DIFFUSER
HP-4 DIFFUSER
HP-5 & 6
HP-5 DIFFUSER
HP-6 DIFFUSER
SF-11
SF-11 DIFFUSER
Circuit Setter Flow Sheet
Page Number
1
2
3
4
5
6
7
8
9
10
11
12
Fan Test Data
Job Name: Atec-Mezzanine
System: HP-1 HP-2
UNIT INFORMATION
Unit Number
Location
Area Served
Manufacturer
Model Number
Serial Number
AIR MEASUREMENTS
Total Fan CFM
Total Outlet CFM
Total Return CFM
Total OSA CFM
External Fan Static Pressure
Suction Static Pressure
Discharge Static Pressure
Fan RPM
MOTOR MEASUREMENTS
Motor Manufacturer
Motor HP
Motor Frame
Motor Voltage -Leg 1/Leg2/Leg3
Motor Phase
Motor Amperage -Leg11Leg2/Leg3
Motor Service Factor
Motor RPM
VFD Hz. Setting
PULLEY & BELT DATA
Motor Pulley
Fan Pulley
Belt -Quantity/Size
Center Distance
% Sheave Adjusted Closed
Motor Travel In/Out
Remarks:
03+032
HP-1
Above ceiling 2-119
2-119, 2-122
Carrier
50PCH048ZCC6ECEB
0822V51792
1,600 1,640
1,600 1,640
1,330 1,365
270 275
0.90 0.81"
-0.44"
-0.37"
H/ M / L HIGH SPEED
Design Actual
GENTEQ
0.75 0.75
N/S N/S
460 482/483/480
3 3
2.8 1.9/1.8/1.9
N/S E.P.
1,550 1,550
NIA N/A
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
Date: 2/27/2023
Technician:
HP-2
Above ceiling 2-132
2-132, 2-129, 2-130, 2-131
Carrier
50PCH048ZCC6ECE8
0822V51796
1,600 1,634
1,600 1,634
1,609 1,325
300 309
0.90 0.87"
-0.49"
-0.38"
Page 1
H/ M / L HIGH SPEED
Design Actual
GENTEQ
0.75 0.75
N/S N/S
460 483/480/483
3 3
2.8 2.2 /2.1/ 2.0
N/S EP.
1,550 1,550
NIA NIA
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DR IVE
Diffuser And Grille Test Data
Job Name: Atec-Mezzanine
System: HP-1
Room Number
HP-1
S/A
2-119 1
2-119 2
2-119 3
2-119 4
2-119 5
2-119 6
2-119 7
2-122 8
HP-1
R/A
2-119 R-1
2-119 R-2
HP-1
OSA
UNIT 1
Remarks:
Size
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
10"
03+032
Type
CD
CD
CD
CD
CD
CD
CD
CD
RG
RG
DUCT
Page 2
Date: 2/27/2023
Technician: M.C.
Ak Design Actual
FPM CFM FPM CFM
1.00 220 225
1.00 220 230
1.00 220 227
1.00 220 215
1.00 220 230
1.00 220 225
1.00 140 146
1.00 140 142
TOTAL 1,600 1,640
1.00 665 690
1.00 665 675
TOTAL 1,330 1,365
0.55 491 270 500 275
Diffuser And Grille Test Data
Job Name: Atec-Mezzanine
System: HP-2
Room Number
HP-2
SIA
2-132 1
2-126 2
2-126 3
2-126 4
2-131 5
2-126 6
2-130 7
2-129 8
2-126 9
HP-2
RIA
2-132 R-1
2-132 R-2
2-131 R-3
2-130 R-4
2-129 R-5
HP-2
OSA
UNIT 1
Remarks:
Size
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
10"
03+032
Type
CD
CD
CD
CD
CD
CD
CD
CD
CD
RG
RG
RG
RG
RG
DUCT
Page 3
Date: 2/27/2023
Technician: M.C.
Ak Design Actual
FPM CFM FPM CFM
1.00 205 215
1.00 205 211
1.00 205 206
1.00 205 205
1.00 100 101
1.00 205 213
1.00 100 98
1.00 170 176
1.00 205 209
TOTAL 1,600 1,634
1.00 627 530
1.00 627 515
1.00 85 70
1.00 85 70
1.00 185 140
TOTAL 1,609 1,325
0.55 545 300 562 309
Fan Test Data
Job Name: Atec-Mezzanine
System: HP-3 HP-4
UNIT INFORMATION
Unit Number
Location
Area Served
Manufacturer
Model Number
Serial Number
AIR MEASUREMENTS
Tota! Fan CFM
Total Outlet CFM
Total Return CFM
Total OSA CFM
External Fan Static Pressure
Suction Static Pressure
Discharge Static Pressure
Fan RPM
MOTOR MEASUREMENTS
Motor Manufacturer
Motor HP
Motor Frame
Motor Voltage -Leg 1/Leg2/Leg3
Motor Phase
Motor Amperage -Leg1/Leg2/Leg3
Motor Service Factor
Motor RPM
VFD Hz. Setting
PULLEY & BELT DATA
Motor Pulley
Fan Pulley
Belt -Quantity/Size
Center Distance
% Sheave Adjusted Closed
Motor Travel In/Out
Remarks:
03+032
HP-3
Above ceiling 2-126
2-127, 2-125, 2-126
Carrier
50PCH042ZCC6ECEB
2422V57433
1,400 1,428
1,400 1,428
1,300 1,323
100 105
0.90 0.78"
-0.45"
. 0.33"
H/ M f L HIGH SPEED
Design Actual
GENTEQ
0.50 0.50
N/S N/S
460 482/483/480
3 3
1.8 1.6 /1.5 /1.6
N/S E.P.
1,550 1,550
NIA N/A
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
Page 4
Date: 2/27/2023
Technician: M.C.
HP-4
Above ceiling 2-119
2-119
Carrier
50PCH048ZCC6ECEB
0822V51795
1,600 1,631
1,600 1,631
1,490 1,518
110 113
0.90 0.81"
-0.46"
-0.35"
Hf M / l HIGH SPEED
Design Actual
GENTEQ
0.75 0.75
N/S N/S
460 483/480/483
3 3
2.8 2.412.0 I 2.2
N/S E.P.
1,550 1,550
NIA NIA
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
Diffuser And Grille Test Data
Job Name: Atec-Mezzanine
System: HP-3
Room Number
Mt'-;j
SIA
2-127 1
2-126 2
2-126 3
2-126 4
2-125 5
HP-3
R/A
2-126 R-1
2-126 R-2
2-125 R-3
HP-3
OSA
UNIT 1
Remarks:
Size
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
8"
03+032
Type
CD
CD
CD
CD
CD
RG
RG
RG
DUCT
Page 5
Date; 2/27/2023
Technician: M.C.
Ak Design Actual
FPM CFM FPM CFM
1.00 305 311
1 OD 305 305
1.00 305 310
1.00 305 315
1.00 180 187
TOTAL 1,400 1,428
1.00 635 599
1.00 635 581
1.00 150 143
TOTAL 1,420 1,323
0.35 286 100 300 105
Diffuser And Grille Test Data
Job Name: Atec-Mezzanine
System: H P-4
Room Number
Ht-'-4
SIA
2-119 1
2-119 2
2-119 3
2-119 4
2-119 5
HP-4
RIA
2-119 R-1
2-119 R-2
HP-4
OSA
UNIT 1
Remarks:
Size
24X24
24X24
24X24
24X24
24X24
24X24
24X24
8"
03+032
Type
CD
CD
CD
CD
CD
RG
RG
DUCT
Page 6
Date: 2/27/2023
Technician: M.C.
Ak Design Actual
FPM CFM FPM CFM
1.00 320 336
1.00 320 330
1.00 320 325
1.00 320 320
1.00 320 320
TOTAL 1,600 1,631
1.00 745 765
1.00 745 753
TOTAL 1,490 1,518
0.35 314 110 323 113
Fan Test Data
Job Name: Atec-Mezzanine
System: HP-5 HP-6
UNIT INFORMATION
Unit Number
Location
Area Served
Manufacturer
Model Number
Serial Number
AIR MEASUREMENTS
Total Fan CFM
Total Outlet CFM
Total Return CFM
Total OSA CFM
External Fan Static Pressure
Suction Static Pressure
Discharge Static Pressure
Fan RPM
MOTOR MEASUREMENTS
Motor Manufacturer
Motor HP
Motor Frame
Motor Voltage -Leg 1 /Leg2/Leg3
Motor Phase
Motor Amperage -Leg1/Leg2/Leg3
Motor Service Factor
Motor RPM
VFD Hz. Setting
PULLEY & BELT DATA
Motor Pulley
Fan Pulley
Belt -Quantity/Size
Center Distance
% Sheave Adjusted Closed
Motor Travel In/Out
Remarks:
03+032
HP-5
Above ceiling 2-119
2-119, 2-123
Carrier
50PCH048ZCC6ECE8
0822V51797
1,600 1,621
1,600 1,621
1,400 1,421
200 200
0.90 0-78"
-0.45"
-0.33"
H/ M / L HIGH SPEED
Design I Actual
GENTEQ
0.75 0.75
N/S N/S
460 482/483/481
3 3
2.8 2.1/ 2.2 I 2.0
N/S E.P.
1,550 1,550
N/A N/A
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
Page 7
Date: 2/27/2023
Technician: M.C.
HP-6
Above ceiling 2-119
2-120
Carrier
50PCH012ZCC4ECEA8
0422V50661
400 426
400 426
250 269
150 157
0.60 0.53"
-0.33"
-0.20"
H/ M / L HIGH SPEED
Design Actual
GENTEQ
0.10 0.10
N/S N/8
277 277
1 1
0.85 0.66
NJS E.P.
1,550 1,550
NIA N/A
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
DIRECT DRIVE
Diffuser And Grille Test Data
Job Name: Alec-Mezzanine
System: HP-5
Room Number
HP-5
SIA
2-119 1
2-119 2
2-119 3
2-119 4
2-119 5
2-123 6
HP-5
R/A
2-119 R-1
2-119 R-2
2-123 R-3
HP-5
OSA
UNIT 1
Remarks:
Size
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
24X24
8"
03+032
Type
CD co
co
CD
CD
CD
RG
RG
RG
DUCT
Page 8
Date: 2/27/2023
Technician: M.C.
Ak Design Actual
FPM CFM FPM CFM
1.00 320 330
1.00 320 324
1.00 105 108
1.00 320 312
1.00 320 330
1.00 215 217
TOTAL 1,600 1,621
1.00 623 628
1.00 623 628
1.00 155 165
TOTAL 1,401 1,421
0.35 571 200 571 200
Diffuser And Grille Test Data
Job Name: Alec-Mezzanine
System: H P-6
Room Number
HP-6
S/A
2-120 1
2-120 2
HP-6
RIA
2-120 R-1
HP-6
OSA
UNIT 1
Remarks:
Size
24X24
24X24
24X24
8"
03+032 Page 9
Date: 2/27/2023
Technician: M.C.
Type Ak Design Actual
FPM CFM FPM CFM
CD 1.00 200 211
CD 1.00 200 215
TOTAL 400 426
RG 1.00 250 269
DUCT 0.35 429 150 449 157
Fan Test Data
Job Name: Atec-Mezzanine
System:
UNIT INFORMATION
Unit Number
Location
Area Served
Manufacturer
Model Number
Serial Number
AIR MEASUREMENTS
Total Fan CFM
Total Outlet CFM
Total Return CFM
Total OSA CFM
Externaf Fan Static Pressure
Suction Static Pressure
Discharge Static Pressure
Fan RPM
MOTOR MEASUREMENTS
Motor Manufacturer
Motor HP
Motor Frame
Motor Voltage -Leg1/Leg2/Leg3
Motor Phase
Motor Amperage -Leg1/Leg2/Leg3
Motor Service Factor
Motor RPM
VFD Hz. Setting
PULLEY & BELT DATA
Motor Pulley
Fan Pulley
Belt -Quantity/Size
Center Distance
% Sheave Adjusted Closed
Motor Travel In/Out
Remarks:
03+032 Page 10
Date: 2/27/2023
Technician: M.C
SF-11
ROOF
OSA for HP-1 THUR 6
COOK
'150KSP
138SJ56198-1701
1,130 1,159
1,130 1,159
0 0
1,130 1,159
0.75 N/A . N/A
-N/A
618 630
Design Actual Design Actual
Baldor
0.75 0.75
56.0 56.0
230 230/230/230
3 3
3.6 2.3/2.2/2.3
1.25 1.25
1,730 1,745
N/A NIA
1VL40X7/8"
AK69X1"
(1)-AX48
17.5
100%
2"1N/2"OUT
Diffuser And Grille Test Data
Job Name; Atech-Mezzanine
System: SF-11
Room Number
SF-11
SIA
HP-5 1
HP-6 2
HP-1 3
HP-4 4
HP-2 5
HP-3 6
Size
8"
8"
8"
8'
10"
8"
03+032
Type
DUCT
DUCT
DUCT
DUCT
DUCT
DUCT
Page 11
Date: 2/27/2023
Technician: M.C.
Ak Design Actual
FPM CFM FPM CFM
0.35 200 200
0.35 150 157
0.35 270 275
0.35 110 113
0.55 300 309
0.35 100 105
TOTAL 1,130 1,159
Remarks: NOTE ON FAN COIL FC-2 THERES A MISSING 20X10 SAR AT THE END OF THE SUPPLY
DUCT. DIVIDED 2000 CFM FOR 3 SARS INSTEAD OF THE 4 SARS.
Flow Meter Test Data
Job Name: Atec-Mezzanine
System:
Location Size Manufacturer
HP-1 1" HAYES
HP-2 1" HAYES
HP-3 1" HAYES
HP-4 1" HAYES
HP-5 1' HAYES
HP-6 3/4' HAYES
Remarks:
03+032
Model
L!>LU
2520
2520
2520
2520
252EO
Valve
Setting
N/A
NIA
N/A
N/A
N/A
N/A
Date: 2/27/2023
Technician: M.C.
Design Actual
L':,.p GPM L':,._p
2-32 12.U J.U
2-32 12.0 3.0
2-32 10.5 3.0
2-32 12 0 3.0
2-32 12.0 3.0
2-32 3.0 6.0
Page 12
GPM
12.0
12.0
10.5
12 0
12 0
3.0
HAZARDOUS MATERIALS
QUESTIONNAIRE
RECORDID# _________________ 1
PLAN CHECK# _________________ 1 ... .
•~ceec'-'•
BU$inass Name
Alphatec Spine
Project Address (include suite)
1950 Camino Vida Roble
Malling Address (include suite)
same
Business Contact
Robert Tribb~
City
Carlsbad
City
State
CA
State
Telephone#
(760) 494-6868
Zip Code
92008
Zip Code
Project Contact Applicant E-f!!,&JI ~ ~ Telephone#
Andrew Tarango, SCA Architecture andrewt@aca~ 2 2022 {858} 793-4m
BP DATE
APN#
212-093--05 and 12
Pl.an File#
Th• following quutlons napreaent the facfllty'• ■ctMtlN, NOT the specific project ducnptlon.
applicant must contact e Flre Protection ncy una on p or o p an su .
Occupancy Rating: B, F·1, S-1 Faclllty'• Square Footage (including proposed project): Building Total: 121, 541 s.f., T.I. total: 6,523 s.f.
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11, Highly Toxic or Toxic Materials 15. None of These.
4. Flammable Solids 8. Unstable Reactlves 12. Radioactlves
• If the answer t.o any of the
quea 1$ yes, applicant must contact the n an Diego, CA 92123. cen {858) 505-6700 prior to the issuance of a bul Ing permit
FEES ARE REQUIRED Project Completion Oate:December 30, 2022 Expected Date of Occupancy: January 6, 2023 0 CalARP Exempt
YES NO (for new construction or remodeling projects)
1. 0 [El Is your business listed on the reverae side of this form? (check all that apply). Date lnltlala
2. D [El WUI your business dispose of Huardous Substances or Medical Wate In any amount?
3. D [El Win your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 D CalARP Required
pounds and/or 200 cubic feet?
4. 0 [El WIii your business store or handle carcinogens/reproductive toxins in any quantity? Dale lnltlala
5. D [El WIii your business use an existing or Install an underground storage tank?
6. D (E) Will your business store or handle Regulated Substances (C&IARP)? D CelARP Complete
7. D [El W~I your business uae or Install a Hazardous Waste Tank System (Title 22, Article 1 O)?
8. D [EJ WHI your business store petroleum In tanks or containers at your facility with a total facility storage capacity equal to Date tnltlms
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
PART 111: SAN DIEGO COUNTY AIR POLLUTION CONTROL ffl,STRICT ~); The following questions are Intended to Identify the majority of air pollution Issues at the planning stage. Your project may requ additiona measures not Identified by these questions. Residences are· typically
exempt, except• single building with more than four dwelling units and those with more than one detached residential bulldings
on the property-e.g. granny ftats [+Excludes garages & small outbuUdlngs not used as dwelling units]. If yes Is answered for the questions below
please see link for further instructions: here or for more comprehenSMI requirements, please contact apcdcomp@sdapcd.org or call (858) 58&-2650.
YES NO
1.(2] □
2.0 0
3. □
4.□
Will the project dislllb 100 1quare feet or more of exldng buldlng malllrlllll? If yea, submit an aabestol 1urvay lo apcdcomp@ldllpcd.org.
Will any load supporting llllldural membllrg be removed? If yes, IUbmlt an aabeltol IUMIY and demolltlon nollflcation to
apcdc::amp@sdapcd.org at lent 1 0 WOl1dng days prior to atar11ng the demolltlon fA a load baerlng lll'Udure. A notification Is reqund ewn If no asbeatae ii prwent
in the structure.
(ANSWER ONLY IF QUESTION 1 IS YES) WIii 100 ■quare feet or mare of frlable ubeltol material be disturbed? If yes, IUbmll II notlll<:a1!on of llllbesto.
nlfflO'IIII to ~p@ldapcd.org at INet 10 wm.lng days prior ID llarllng abeltoa removal.
WIii any equipment or operetlons be lnlltaled lhllt may require an APCD Permit to Openste? Pl-"9 1h11 ,._ ■Ide of this form for typical equlpmen1
requiring an APCO permit. If yes, c:ontact APCD prior to the lsluaoce of a building permit
Briefly describe business activities:
Biotechnica1 Research and Development (spinal implants)
I declare under penalty of petjury that to the best of my knowledge a
Andrew Tarango, SCA Architecture
Name of Owner or Authorized ant
true and correct.
USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:. ______________________________ _
BY· DATE· J I
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASE!> FOR BUILDING PSU,111' BUT NOT FOR OCCUPANCY RELEAIEO FOA OCCUPANCY
COUNTY-HMO• APCO COUNTY-HMO APCD COUNTY-HMO APCD
-·---!l\on CoQt. ~"' <te; ... q ..
~ Reviewed Qi
q 10/11/2022 MF ~'
011te/lnit1iJIS
scJ,, <'.::.\ o* . D,eqo C
' •A stamp in this box smJx exempts busmesses from completing or updating a Hazardous Materials Business Plan. other permitting requirements may still apply
HM-9171 (01122) County of San Diego • OEH • Hazardous Materials Division
( City of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Bulldlftl Division
163S Faraday Avenue
442-339-2719
www.carlsbadca.1ov
This checklist Is Intended to help building pennlt applicants Identify which Climate Action Pian (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) and summary (B-55) must be Included with the building pennlt
application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by dicking on
the provided links to each municipal code section.
NOTE: The following type of pennlta are not required to fl out this form
♦ Pelia I ♦ Decks I ♦ PME (w/o panel upgrade) I ♦ Pool
Consultation with a certified Energy Consultant Is encouraged to assist In filling out this document. Appropriate
certlftcation lndudes, but Is not limited to: Licensed, practicing Architect. Engineer, or Contractor famlllar with Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater certtfled, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CAL.green
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an Item in the checklist Is deemed to be not appllcable to a project, or Is less than the minimum required by ordinance,
check NIA and provide an explanation or code section describing the exception.
Details on CAP ordinance requirements are available at each section by clicking on the munldpal code link provided. The
project plans must show all details as stated In the applicable Cerlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections.
Project Name/BUIiding
Permit No.: BP No.:
Property Addre&SIAPN: 1950 camlno Vida Roble / APN 212-093-05 & 12
Applicant Name/Co.: Andrew Tarango -SCA
Applicant Address: 13280 Evening Creek Drive South, #125
Contact Phone: (858) 793«4777 Contaet Emafl: andrewt@sca-sd.com
Contact Information of person completing this checklist (If different than above):
Name:
Company
name/address:
SAME Contact Phone: (858) 793-4777
Contact Email:
Applicant Signature:___,;.R_X;,:;.__ _________ Date: 4 · \ ~ · zozz_
B--50 Page 1 of 7 Reviled 04121
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For
alterations and additions to existing buildings, attach a Pennlt Valuation breakdown on a separate sheet
Building Pennlt Valuation (BPV) S breakdown $ 3 7 S , 9 8 5 • 12
D New conatrudlon 2A*, 3A*, 18,28, *lndudes detached, newly construclad ADU 4A*, 3B,4A
D Adcllone and allntlons:
D BPV < $60,000 NIA NIA All residential additions and alterations
D BPV :i!: $60,000 1A,4A 4A 1·2 family dwellings and townhouses with attached garages
D Electrical aeNice panel upgrade only only.
*Multi-family dweDings only where Interior finishes are removed
D BPV:i!: $200,000 1A,4A* 1B, 4A* and significant sita wort< and upgrades to struc.1ural and
mechanical, electrical, andlor plumbing systems are proposed
D New conatn.don I 18, 28, 3B, 4B and 5 I
Ill Mntlons: (THIS PHASE)
Kl BPV it $200,000 or additions it 1,000 1B, 5 square feet
□ BPV it $1,000,000 1B,2B,5 Building alterations of it. 75% existing gross floor area
D it. 2,000 sq. fl new roof addition 2B,5 1 B also applies if BPV it $200,000
Please refer to Carisbad Moolclpal Code (CMC) 18.21.155 and 18.30.190,and the Calorria Green Btildilg Standards Code (CAl.Green}b' more
information. Appropriate details and notes must be placed on the plans according to selections dlosen In lhe design.
A O Rnldentlaladdltlonoralttndlon~$60,000bulldlngpennltvaluatlon. a NIA ________ _
DetlilsofselKtlonchosenbelowmustbeplacedonlhepllnarnrenclngCMC □ Exception: Home energy score :i!: 7
18.30.190. (attach certification)
Year Bullt Slngle.famlly Requirements Multl.famlly Requirements
D Before 1978 Select one option:
□Ductseaing □Attic insulation □Coolroof □ Attic insulation
□ 1978 andlater Select one option:
D Lighting package D water heating Package
□ Between1978and1991 Select one option:
D Ductseallng □Attic insulation □Coolroof
D 1992 and later Select one option:
D Ughtingpackage □Walerheating pad<age
Updated 4/16/2021 3
B. I] Non'9lklentllr new CGl'lllndon or lltntlons ~ $200,000 bulcllng pennltvalultlon,
or lddllom~1,0001q1m1feet.SeeCMC18.21.1551ndCAI.Green AppendlxAS □ NIA
AS.203.1.1 Chooleone: □.1 OUtdoorlightlng □ .2 Restaurant service water heating (CEC 140.5)
□.3Warehou&edoc:ksealdoors. 11.4DaylifttdesignPAFs □.5Exhaustalrhaat1'8ClOY81)' □ NIA
AS.203.1.2.1 Choose one: □ .95 Energy budget (Projeds with indoor Ughtlng OR mechanical)
II .90 Energybudgat (PmjedswlthlncborlightingANDmec:hanical) D NIA
AS.211.1" □ On-site renewable energy:
Ill NIA
AS.211.3 .. □Green power: (If offered by local ulity pmvider. 50% nttrun mnewable SOllalS}
Ill NIA
AS.212.1 □Bevatorsandescalators: (Projec:twlthmorelhanoneelMtorortwoescalatrn}
II NIA
AS.213.1 □ Steel framing: (PRMda details on plansforop1klns 1-4 d1Dlen)
II NIA
• Includes hotels/motels and high-rise residential buildings
--------
.. Foraltarationsi$1,000,000BPVandatfeding>75%8ldstinggrosstoorarea,ORmterallonslhatadd2,000squarefeetofnewroofaddition:COl11Jly
with CMC 18.30.130 {sedlon 28 below) Instead.
A. D Relldenlal new conatrudlon (for IOVHlle ntllclentlal bullclng permit appllcallonl IUbmlttld lfllr 'IMO), Rn-to 2019 CalKamla
Energy Code IIC1lon 150.1(c)14 for requllWMllll. If praJed lncludel lnlflllllon of• llectrlc hlllt pmnpwaflr,__ pllllllllltto
CAPsectlon3Bbelow(low-riltl'llldentlalWatarHeatlng),IIICl'llllsysllmllzeby .3kWdctf PVoffletaptlon llleleclld.
Floor Plan ID (u&e addlloual CFA #d.u. Calcutated kWdc•
sheets If necessary)
Total System Size:
kWdc= (CFAx.572)/ 1,000 + {1.15 x#d.u.)
-J=ormula calaJatian v.tiere CFA = oondilional floor araa, #du= runber of dwalings per plan type
If proposed system size Is less than calaJlatad size, please 8llplain.
kWdc
Exception
□
□
0
0
B. 0 NonrNldenllll new construcllon or attntlons 2$1,000.000 BPV AND dec:llng ~5% ullllng floor 1191, OR ldcltlon that lncrwes
roof na by ~,000 square feet. PlealennrtoCMC 1U0.130whln complelng 1111 l8Cllon. 1lftolr.Thllwlon1llo111P111 to
high-rise NSklentlal and hotel/motel bulldlngs.
Choose one of the following methods:
□ Gross Floor Area (GFA)Method
GFA:
□If< 10,000s.f. Enter: 5 kWdc
Min. SystemSize:
D lfit 10,000s.f. calculate: 15 kWdcx (GFA/10,000)-
_kWdc
-Round building size factor to nearest tenth, and round system size to nearest whole number.
Updated 4/16/2021 4
□ Time-Dependent Valuation Method
AnnualTDVEnergyuse:,.... ______ x .. BO= Min. system size:.__ ____ .kWdc
,._Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Watar Heating
A. D Ruldentlal and hotel/motel new construction. Refer to CMC 18.30.170 when completlng this section.
Provide complete details on the plans.
□ For systems serving lndlvldual dwelllng units choose one system:
D Heat pump water heater AND Compact hot water distribution ANO Drain water heat recovery (low-rise
residential only)
D Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential)
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
D Exception:
D For systems serving multiple dwelllng units, Install a central water-heating system with ALL of the following:
D Gas or propane water heating system
□ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
□ Solar water heating system that Is either:
D .20 solar savings fraction
□ .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. D Nonresldentlal new construction. Refer to CMC 18.30.150 when completing this section. Provide
complete details on the plans.
□ Water heating system derives at least 40% of Its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
D Heat pump water heater
D Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
D Exception:
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to
demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a
performance approach to comply with energy-related measures will need to attach to this checklist separate calculations
and documentation as specified by the ordinances.
Updated 4/16/21 5
4. Electric Vehlcle Charting
A. D Resldentlal New construction and major alterations*
Please refer to CMC 18.21.140 when completing this section.
D One and two-family residential dwelling or townhouse with attached garage:
D One EVSE Ready parking space required D Exception :
D Multi-familyresldential· □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready" Other •capable"
Celculations: TotalEVSEspaces=.10xTotalparldng spaces proposed(roundeduptonearestwholenumber) EVSE lnslalled= Tola! EVSE
Spaces x .50 (munded up to nearest whole ruroer) EVSE other maybe "Ready" or "Capable"
*Majoralterationsare:(1)foroneandtwo-familydweRingsandtOYmhouseswithattachedgarages,alterationshaveabulldingpermit
valuation~$60,000 or indude an electrical service panel upgrade; (2) for mullifamiy dwelings (three units or more 'M1hout attached
garages), alterations have a building permit valuation~ $200,000, interiorfinishes are removed and significant site work and upgrades to
structural and mechanical, elecbical, and/or plumbing systems are proposed.
•ADU exceptions for EV Ready space (no EV ready space required when):
( 1) The accessory dwelling unit is located within one-half mile of public transit.
(2) The accessory dwelling unit is located within an architecturally and historically significant historic district.
(3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure.
(4) When on-street parking permits are required but not offered to the occupant of the accessory dwelllng unit.
(5) When there is a car share vehicle located within one block of the accessory dwelling unit.
B. D Nonrnldentlll new constructlon~ncludes hcblslmolll1) D Exception : __________ _
Plea1e refer to CMC 18.21.150 when completing thl8 section (EXISTING)
Total Parking Spaces --• EVSE (10% of total) I lnslalled (50% of EVSE) I Other "Ready" I Other "Capable" r1 •
I I I
Celculation· Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
D 0-9 1 1
D 10-25 2 1
D 26-50 4 2
D 51-75 6 3
D 76-100 9 5
D 101-150 12 6
D 151-200 17 9
D 201 and over 1 O percent of total 50 percent of Required EV Spaces
Calcuations; TotalEVSEspaces=.10xTotalpari<ing spaces proposed (roundeduptonearestwholenumber) EVSE lnstaled= Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
Updated 4/16/2021 6
5. QTranspoltallon Demand 11..........-{TOIi): Nornsldenllll ONLY
M Bllfl'Oved Transportation Demand Management (TOM) Plan is reqt.ired for al nonresidential projects 1hat meet a tlnshold of employee-genera ADT.
CitystaffwillusethetablebelowbasedonyourBUbmittedplanstodeteminewhetherornoryourpemitrequiresaTDMplan.lfTDMlsapplicabletoyour
pemit, staff will oontad: the applicant to develop a site-spedfic TOM plan based on the permit details.
Acknowledgment
Employee ADT Estimation for Various Commercial Usea
Use
Emp ADTfor
first 1,000 s.f.
EmpADTI
1000 s.f.1
Office (all)2 20
Restaurant 11
Retails 8
Industrial 4
Manufacturing 4
Warehousin 4
1 Unless otherwise noted, rates estimated from ITE Trip
Generation Manual, f(lhEdition
13
11
4.5
3.5
3
1
2 For all office uses, use SANOAG rate of 20 ADT/1,000 sf to
calculate employee AOT
3 Retail uses include shopping center, variety store, supermarket,
gyms, phannacy, etc.
Other commercial uses may be subject to special
consideration
sample cafcy1at1ona;
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf = 8 ADT
2. 9,334 sf -1,000 sf = 8,334 sf
3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT
I adcnowtedge that 1he plans Slbmitted may be subject to the City of Cel1sbad's Transportation Demand Management Ordinance. I agree to be contacted should
mypennitrequireaTDMplanandunderstandthatanapprovedTOMplanisaconditionofpermltissuance.
AppicantSignature: N\.D . Date: 9/14/2022
Person other than Applicant to be contacted for TDM compliance (ff applicable):
Name(Printed): Michael Dendinger -Atec, VP of Operations PhoneNumber: 858-209-0850
Email Address: __ M_D_e_n_di_ng_e_r_@_a_te_cs_p_i_ne_._co_m ______ _
Updated 4/16/2021 7
ATEC
RPG -RAF PACIFICA GROUP "FUSION"
1950 CAMINO VIDA ROBLE, CARLSBAD, CA. 92008
EMPLOYEE ADT ESTIMATION CALCULATION:
OFFICE/ R&D: 115,681 SF.
115,681 SF./ 1000 x 20 = 2,314 Employee ADT
INDUSTRIAL: 6,546 SF
First 1,000 SF. = 4 ADT
6,546 SF -1000 SF= 5,546 SF.
(5,546 SF/ 1,000 SF. x 3.5) + 4 = 19 Employee ADT
WAREHOUSE: 5,837 SF.
First 1,000 SF. = 4 ADT
5,837 SF-1000 SF= 4,837 SF.
(4,837 SF/ 1,000 SF. x 1) + 4 = 5 Employee ADT
TOTAL 2,338 Employee ADT
Alphatec Spine -19SO Camino Vida Roble, Carlsbad, CA
DGA #: C0143 Carlsbad Pennit #: CBC2020-0156
June 5, 2020
Page 2 of2
FOR REFERENCE ONLl
Belpw is a list of all of Alphatec Spine's Flammable liquids and Class lli"A liquids along with
the individual container size and type of container.
lndlvldual
CAS#or Flammabllly Container Type of
ldentlfvlnt No, Product Name Class Size Container
ELMERS·E141 Eimers Rubber Cement Oassl•B 8 oz. Glass
64-17-S Ethvl Alcohol 190 Proof Classl-8 1 11111 Glass
MANN-2831 Mann Ease Release 2831 Mold Release Amnt Classl-B 1 lbs Tncan
PSC-CROWN·STRIP Crown Handl-Str1P Classl-B 1 auart Tin can
00-01-693 Paint Thinner Classl-8 1 auart Tin can
JM-05-974S-O 3M Scotch-Weld SUrface Activator ciass 1-8 2 oz. DlastfcHDPE
POWER-TB-400 Gardner Bender Llauld £1ectrkal Tace Class 1-B 4 oz. nlastlc HDPE
DVKEM-80300 Dukem Steel Blue {803001 Oassl-B 8 oz. plastic HOPE
WEPAK-WC-021 21 1lass deaner Oassl-B 18 oz. nlastlc:HDPE
67-63-0 7°" lsoPl'OPYI Alcohol Class l•B 1 nl nlastlc: HOPE
67-63-0 lsopropyl ~ohol Class 1-B 1 tal DlastlcHDPE
67-64·1 Acetone Classl-B 1 pl plastic HDPE
HENKa-702304 Locttte Fbcmaster Puttv Hardener ClasslU-A 2 OZ, plastic HDPE
RECTORSEAL-31300 RectorSeal Tru-Blu Ploe Thread Sealant Classlll-A 4 OZ. dastlc:HDPE
14-RUST-60 Goo Gone Classlll•A 12 DL Dlastk: HOPE
14-RUSf-79 Wtndex Cius Ill-A 1 al Dlastlc HOPE
EXXON-600643 Mobll Veloclte Oii 13 Class Ill-A s gal plastlc HDPE
If you have any questions, or need additional information, please call at 619-677-2004.
Sincerely, ~_:-Y
Marissa Miyao
Klausbruckner & Associates Inc.
By way of my signature, Atpbatec Spine agrees
to the occupancy and use conditions specified in
« d 6-~-~0 ~e £_,_c(Slgn Namc& Dale)
FOR REFERENCE ONLY
Cai>,19'12020 NeUQnal Are Pralediorl AslCICildcn (liFf'Mll. l.lllllnHd bf IIIJllamenl IO E11111111 l<!lullllUdUW FCIR INDIVIDUAi. US£ ONL 'I and IIDWnlDadldcn ~-NII llllplDCIJDliol tit .,_1!111llan ill q bin JIit~
.•. • •.... .. . . . wllhoulwi!ltanperpnslDnClfJIFPAe. FarltlqutlKot-• -~-•lonpo,1 unuhollad,.., -~-.
STORACE OF UQUIDS IN CONTAINERS-OENERAL REQUIREMENTS
A Table 0.4.!I Mulmuan Allowable Size -Conlalnen, Intermediate Bulk Containera (IBCa), and Portable Tanka
lllammable Uqukla Combosdble Uquida
Container Type Cass IA :miss. • · :,-~. < -~ ·· _'.7·~-: ·-xiitto:u .. 1. ··,~: _ i ~di r.,..,..~:-· ··
:M-~~_(olih~ Jhan:i!nunal. ·_, ,-~a·ga1 (fq :... 5.~ gal (!OL:} ,
,. 9t:!lpproveci plas~t: ::,.'. . · --·· _ :;: _ · -·
Safety cans 2.6 gal (10 L) 5.8 gal (20 L)
Metal drum. (e.g., UN 119 gal (450 L) 119 gal (450 L)
1Al/1A2)
Approved metal portable
1anks and I801
Rigid phlstlc mo, (UN
!llHl or !11H2) and
composite mes with
• rigid inner receptacle
(UN81HZl)t
Compoaitc mec with
flexible inner receptacle
(UNS1HZ2), DOT/
UN-approved Oexlble mes, and NMFC/
ISTA-complianl IB0st
'19!1 gal (9000 L) 798 gal (SOOD L)
NP NP
NP
: ~~~!~~,r~fan4._:'.:-· -~_._.8._ <ia"Pi'.'_T_·:_f•·_:·:··.·.:·:~g-".'Tii_m1F_1 -~----.. ,j~tb)(I, ... J!I_, ........ , , 0 ,-: 1-i1 tl\ll..., ~-. · .. :·UN1R2"lli.011SlUitb6med . ,. . • .. •i . ' .. ·.. . ·-: . >
• ·.,· .• ~--,: · ... ,---•;;c-· ·'.:"·~-:.,·.· ... :':·•' .•·,-'-" .", ; -btDOl':exemptiori _·_. ::..... . . -~-, ... ·, .. ~.-...... ·.'.:C:,s,< _., .. ·, .-... , ....
Fiberdn.un
NMFC or UFC 1ype 2A;
'l)pes SA, SB-H, OT SB-L;
Ot' eil
NP NP
a-IC a.an a-DIA
----is--1-,i:-~,f .. ·_ ---'it"w-;;.;..-;iin"F -. . a.aw.r. . __ . ·_,.-:: ~"6P-I .'V"..';' .. _.,~.
5.5 gal (20 L)
119 gal (450 L)
799 gal (9000 L)
NP
NP
&;&.~J3ou ~:t i.:,s_p1 (!OL1,
--:--:-:.._ : • :_•'!
5.S pl {20 L) 5.S gal (20 L)
119 gal (450 L) 119 gal (450 L)
79!1 gal (9000 L} '193 gal (SOO0 L)
'19B gal (SOOI) L) 798 gal (SIJ00 L)
SB] gal (ISOOL) !51 gal (1500 L)
NP: Not permitted £or the conlalner categories so cblulftecl unlas a ftre pmtecdon ll)'Slem ii pnmdtid that is devdoped In ac:cotdance with J 6.!1.6 and
bi approved Cor the &ped6c (Oftialner and protection agalnat. stat.ic electrlcit.y la provided.
•See9.4.!tl,
tSeeM.!1.2.
4 9.4,8,4.1 To be considered protected storage u delmed in
9.2, l and in accordance with Chap&er 16, an overpack
conialner shall be comlrucled of the aame materlal aa the leak-
ing or damaged container. ·
lt.4.1.4,! Metal mmpack containcnc mall be considered non-n.:!!1ie,Tng sl)'le conta.inen:. -.
9.5"' J.llammable Liquids Storage Cabinets,
9.5.l Tbe volume of Class I, Class D, and Class llIA liquid&
stored in an Individual storage cabi11et &hall not exceed 120 gal
(460L),
9Ji.2 The tolal aggregate volume of Cass I, Clasa II, and
Class IllA liquid& in a group of 110:rage cabinets shall not
exceed the maximum allowable quantity of flammable and
combustible liquids per control area based on the occupancy
where the cabinets are loeated.
9,5,S Storage cabinela that meet at least one of the following
seu of requiremenls shall be acceptable for sLOrage of liquids;
(1) Storage cabinets designed and co11Stnu:1ed lo limit the
internal temperature al the cenLer of t11e cabinel and
1 in. (25 mm) from the top of 1.be cabinet to not more
than 325"F (U;!J"C), when subjected to a l.0-nrlnut.e fire
test tbal .simitlat.es I.be fire exposure of the standard time-
temperature cune specified in ASTM E119, Stondmrl n,1
MttduH/& for Rn ntt.s of BwtlJ.t,g o,un11:1fati •ntl Matmals,
shall be acceptable. All joinll and 1eama ahall remain
light at1d the door shall remain securely cl0&ed during
the teat.
(2) Metal storage cabinets consttucted in the following
manner shall be acceptable:
(a) The bottom, top, door, and &ides of the cabinelahall
be at least No. 18 gauge sheet steel and shall be
double-walled, wfth 1 ij in. (!18 mm) air ,pace.
(b) Joinia &hall be ri,eted, welded, or made tight by
some equally e&ca.hie means.
(c) The door shall be proYidcd with a three-point latch
ammgement. lllld lhe door Bill shall be raiacd at
leut 2 in. (60 mm) above the botlmn of the cabinet
to retain. spilled liquid within the cabinet.
(S) ~odeo cabinecs constructed In lhe following manner
shall be acceptable:
(a) The bouom, sides, 1md lop shall be constructed of
exlerioT pde plywood that b at least 1 in. (25 mm)
thick and of a type that wm not bi-ealt dO\m or
delamlnale wKler fire conditions.
(b) All joints shall be rabbetted and shall be fastened in
two directions with wood at.Tews.
Shad<.-d tt!l.:I • Reviillons. 1:1,. = Text dele1io11111md lig11re/111hle reYlsions. •., Section dclelions. N c Nrw m1111erial. 2018 Edltloo