Loading...
HomeMy WebLinkAboutLFMP 03; LOCAL FACILITIES MANAGEMENT PLAN ZONE 03; LOCAL FACILITIES MANAGEMENT PLAN ZONE 3; 1987-03-04Number 1 2 CITY OF CARLSBAD GROWTH MANAGEMENT PROGRAM LOCAL FACILITIES MANAGEMENT PLAN ZONE 3 City Council Resolution No. 9084 Dated May 19, 1987 Planning Commission Resolution No. 2650 Dated April 15, 1987 AMENDMENTS Date Reso. Mo. Subfect(s) Boundary adjustment 8/14/87 CC/9185 Country expansion. for 12/15/87 CC/9326 Car Country expansion. Car 0 UJ > 0 a:: 0.. ~ z 0 ~ ... u z ::> 8 AMENDMENT # 1 CIT. )F CARLSBAD -AGEND/ 11LL 4 pages I I"' AB# 9//Y MTG. 8/4/87 DEPT. PLN TITLE: ZONE 3 BOUNDARY ADJUSTMENT FOR CAR COUNTRY EXPANSION DEPT-~ CITY A ~ . CITY MGR. RECOMMENDED ACTION: ADOPT Resolution No. 9//S-adjusting the boundary of Local Facilities Management Zone 3 to incorporate an area for the expansion of Car Country. ITEM EXPLANATION The expansion of Car Country to the east on the Carltas (Ecke) property has been discussed at length for some time. Two major requirements have kept the expansion from proceeding forward: 1) The area planned for expansion was in a Williamson Act Agricultural Preserve; and 2) In order to develop the Carltas property, the Local Coastal Program (LCP) required a Master Plan which would place an agricultural restriction on all the property not subject to development. Last year the State Assembly passed a bill which would allow the Car Country expansion in exchange for placing an equal amount of alternative land in a Williamson Act Preserve. In addition, the Ecke's have prepared a Master Plan which places an agricultural restriction over all of their property, after expansion of Car Country, except for approximately 90 acres per the requirements ~f the Carlsbad LCP. Now that these two requirements have been addressed, the Carltas Company is anxious to move forward on the expansion of Car Country. In order to expedite the process, it ls necessary for the City to amend the boundaries of Local Facilities Management Zone 3. The Car Country expansion area is currently located in Zone 13 which ls just in the preliminary stages of preparing a Local Facilities Management Plan. The boundary of Zone 3 was approved by the City Council on September 23, 1986. Had there been more active interest and progress on the Car Country expansion at that time, staff would have proposed that the expansion area be included in Zone 3 for the following reasons: 1) Development of the expansion area would use the same facilities as existing Car Country particularly with respect to access and circulation; 2) Existing Car Country is covered by a Specific Plan (SP- 19) which provides the development standards for the automotive park. Any expansion of Car Country would require incorporation into the existing Specific Plan. For these reasons, staff would support an adjustment of the boundaries of Zone 3 to include the Car Country expansion area as shown on the attached Zone Boundary Adjustment Map, Exhibit "A". -1- Page Two of Agenda Bill No. It should be pointed out that if the City Council approves the boundary change for Zone 3, the Carltas Co. would be responsible for processing an amendment to the Local Facilities Management Plan for Zone 3 which has already been approved by the City Council on Hay 19, 1987. The amendment to the Local Facilities Management Plan could be processed concurrently with the other applications which would have to be approved in order to permit the Car Country expansion. These other applications include a General Plan amendment, a zone change, a specific plan amendment a tract map, LCP implementation action, and approval of the Williamson Act Preserve Exchange. ENVIRONMENTAL REVIEW None required at this time. FISCAL IMPACT None. The Carltas Co. will be responsible for all expenses associated with the processing of any applications necessary to permit the Car Country expansion. EXHIBITS 1) City Council Res·olution No. ?a.1 2) Zone Boundary Adjustment Map -Exhibit II A. II 3 ) lone 3 Location Map -Exhibit II B II 4) Preliminary Concept Plan for Car Country Expansion -Exhibit "C" -2- 1 2 3 4 5. 6 7 8 9 10 11 12 1:5 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 9185 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA APPROVING AN ADJUSTMENT TO THE BOUNDARY OF LOCAL FACILITIES MANAGEMENT ZONE 3. The Clty Council of the City of Carlsbad, California does hereby resolve as follows: 1. 2. 3. 4. That the boundary of Local Facilities Management Zone 3 was originally approved on September 23, 1986. That in order to allow and expedite the processing of a plan to expand Car Country, it is necessary to approve an adjustment to the boundary of Zone 3 to include within the boundaries of the zone the Car Country expansion area. That from a facilitle~ planning and development standpoint, it is logical to have the expansion area included in the same Local Facilities Management Zone as existing Car Country. That the City Council hereby approves an amendment to the boundary of Zone 3 to incorporate the Car Country expansion area. Said amendment is shown on the attached Zone Boundary Adjustment Map labeled Exhibit "A". PASSED, APPROVED ANO ADOPTED at a regular meeting of the City Council of the City of Carlsbad held the 4th day of __ A_u_g~u_s_t ___ , 1987 by the following vote, to wit: ATTEST: (SEAL) AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None CLAUDE A. LEWIS, Mayor -3- ..... 11 l -, I -I I -I I -I . I . 1 ' -I -I -I -I I -\ . N 0 ~ -I I . •-I -·-... ,., -ll- I I I I -I I . I I I -I I •• ••••• '\ •• I ., - BOUNDARY ADJUSTMENT MAP Area to be added to ZONE 3 (Approx 3 5 acres) iJ -..... ! ~ ! .... ,, 1 I "' . -' ....... . I N EXHIBIT A i .. z 0 fi ,c _. u z ::) 0 (,) AMENDMENT # 2 · 10 p!Sf'~ .. Sw.,,~1r,-.& .. ?-, 1 c, .. ~ OF CARLSBAD -AGENr , BILL 1-: Q ,_ _ _..~-,~,•-,'71 AB#f!ilv/2Uf/f.11/7 GENERAL PLAN AND LOCAL COASTAL PLAN AMENDMENT: 0 p 0 -TITLE; CAR COUNTRY, HOSP GROVE. CHINQUAPIN, LAUREL E T. H • r. MTG.12/22/_87 ntEB, SAVAGE/LYMAN AND SEAPOINTE CITY ATTY\JA , DEPT. CA CITY MGR. __ RECOMMENDED ACTION: If council concurs your action is to: Adopt Resolution No. CJ.JefY approving GPA/LU 87-1 (Car Country),GPA/LU 87-2 (Hosp Grove), GPA/LU 87-3 (Chinquapin), GPA/LU 87-4 (Laurel Tree), GPA/LU 87-5 (Savage/Lyman), and GPA/LU 85-9 (Seapointe) Adopt Resolution No. ~3~.r approving LCPA 87-l (LCPA 87-2G) (Chinquapin), LCPA 87-2 (LCPA 87-2F) (Car Country), LCPA 87-3 (LCPA 87-2E) (Laurel Tree), LCPA 87-6 (LCPA 87-2C) (Savage/Lyman), and LCPA 86-2 (LCPA 87-2D) (Seapointe). Adopt Resolution No. 9JJ~ approving CT 87-3 and LFMP 87-3(2) ( Car Country) • Adopt Ordinance No. 9841 approving ZC 87-4 (Hosp Grove) Adopt Ordinance No. 9843 approving zc 87-2 (Car Country) Adopt Ordinance· No. 9842 approving SP 19(c) (Car Country) Adopt Ordinance No. 9844 approving ZC-338 (Seapointe) Adopt Ordinance No. 9840 approving zc 87-3 (Chinquapin) ITEM EXPLAHATI(?N The city Council at your meeting of December 15, 1987 directed the City Attorney to prepare documents approving various amendments to the Land Use Element of the General Plan. The Council approved five negative declarations issued by the Planning Director, introduced four ordinances making related zone changes, and introduced an ordinance amending the car country Specific Plan. .. As directed we have prepared a resolution approving the general plan amendments, a resolution approving the local coastal plan amendments, and a resolution approving the tentative map and local facilities management plan amendment for car country. If the council concurs, your action is outlined above. EXHIBITS Resolution No. 93,;i 'I Resolution No. 9J~£ Resolution No. '132 {;, Ordinance No. 9841 Ordinance No. 9842 Ordinance No. 9843 Ordinance No. 9844 Ordinance No. 9840 l 2 RESOLUTION NO. 9326 A RBSOLOTION OP THE CITY COONCIL OP THE CITY 3 OP CARLSBAD, CALIPORNll APPROvrNG A TENTATIVE DP AND LOCAL FACILITIES IIAHAGEMEMT PLAN 4 AKBIIDMEN'1' FOR TBB CAR COOMTRY EXPANSION APPLICANT: CARLTAS DEVELOPMENT COMPANY 5 CASE HQ; CT 87-3 AND LPMP 87-Jl2) 6 WHEREAS, on November 12, 1987 the Carlsbad Planning 7 Commission adopted Resolution No. 2693 recommending to the City 8 Council that Tentative Map CT 87-3 and Local Facilities Management 9 Plan Amendment 87-3(2) be approved: and 10 WHEREAS, the City Council of the City of Carlsbad, on ll Oecemb~r 15, 1987 held a public hearing to consider the 12 recommendations and heard all persons interested in or opposed to Tentative Map CT 87-3: and WHEREAS, the Planning Commission has determined that CT· 87-3 and CFMP 87-3(2) will not have a significant impact on the environment and the City Council has concurred and a Negative Declaration was issued and approved in satisfaction of the requirements of the City of Carlsbad Environmental Protection 19 Ordinance of 1980 and the California Environmental Quality Act; 20 and 21 NOW, THEREFORE, BE IT RESOLVED by the City Council of 22 the City of Carlsbad, California, as follows: 23 24 1. That the above recitations are true and correct. 2. That the findings and conditions of the Planning 25 Commission in Resolution No. 2693 constitute the findings of the 26 City Council in this matter except that Condition No. 45-G has 27 been deleted. 28 l 3. That the Local Facilities Management Plan for Zone J 2 (LFMP 87-3(2)) is amended as shown in Planning Commission 3 Resolution No. 2701 on file with the City Clerk and incorporated 4 herein by reference. 5 PASSED, APPROVED AND ADOPl'ED at a Regular Meeting of the 6 City Council of the City of Carlsbad on the 22nd day of December 7 8 9 10 ll 12 19 20 21 22 23 24 25 26 27 28 ___ , 1987, by the following vote, to wit: ATTEST: AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None ALETHA L. RAUTENKRANZ, Cit1' Clerk (SEAL) 1 ORDINANCE NO. 9842 2 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING SPECIFIC 3 PLAN AMENDMENT SP-19(C) FOR THE CAR COUNTRY EXPANSION GENERALLY LOCATED EAST OF THE 4 EXISTING CAR COUNTRY. APPLICANT: CARLTAS DEVELOPMENT COMPANY 5 CASE No; SP-19CC} 6 WHEREAS, the City Council of the City of Carlsbad, 7 California has reviewed and considered a Specific Plan Amendment 8 for future development of the site: and 9 WHEREAS, after procedures in accordance with the 10 requirements of law, the City council has determined that the 11 public interest indicates that said plan be approved. 12 NOW, THEREFORE, the City Council of the City of Carlsbad 13 14 15 16 17 18 does ordain as follows: SECTION I: That the Car country Expansion Specific Plan Amendment, SP-19(C), as revised dated December 15, 1987, on file with the Planning Director and incorporated by reference herein, is approved. The Specific Plan Amendment shall constitute the zoning for this property and all development of the property shall 19 conform to the plan. 20 SECTION 2: That the findings and conditions of the 21 Planning Commission in Planning Commission Resolution No. 2692 22 shall also constitute the findings and conditions of the City 23 council. 24 EFFECTIVE DATE: This ordinance shall be effective 25 thirty days after its adoption, and the City Clerk shall certify 26 to the adoption of this ordinance and cause it to be published at 27 least once in the Carlsbad Journal within fifteen days after its 28 adoption. l INTRODUCED AND FIRST READ at a regular meeting of the 2 Carlsbad City council on the 3 1987, and thereafter __ 1_5t_h __ day of December 4 PASSED AND ADOPTED at a regular meeting of the City 5 Council of the City of Carlsbad on the 22nd day of December 6 1987, by the following vote, to wit: 7 8 9 AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None 10 APPROVED AS TO FORM AND LEGALITY 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 City Attorney C ATTEST: a1;-tb. l R(J.A/4 . -L ~ . ALETHA L. RAUTENICRANZ, citillerk QRDilfMCI IQ, . 9843 l AN ORDINANCE OP THE CITY COUNCIL OP THE CITY OF 2 CARLSBAD, CALIFORNIA, AMENDING TITLE 21 OF THE CARLSBAD MUNICIPAL CODE BY AMENDING THE ZONING 3 MAP FOR A ZONE CHANGE FROM E-A AND R-A-10,000 TO C-2-Q OH PROPER'l'Y GENERALLY LOCATED EAST OF 4 THE EXISTING CAR COUNTRY. APPLICANT: THE CARLTAS DEVELOPMENT COMPANY 5 CASE No,; zc 87-2 6 The City Council of the City of Carlsbad, California, 7 does ordain as follows: 8 SECTION 1: Title 21 of the Carlsbad Municipal Code is 9 amended by the amendment of a zoning map for a zone change from 10 E-A and R-A-10, ooo to C-2-Q on property as shown on the map 11 marked ZC 87-2, Exhibit "B", attached hereto and made a part 12 hereof. 13 EFFECTIVE DATE: This ordinance shall be effective 14 thirty days after its adoption, and the City Clerk shall certify 15 to the adoption of this ordinance and cause it to be published at 16 least once in the Carlsbad Journal within fifteen days. after its 17 adoption. 18 INTRODUCED AND FIRST READ at a regular meeting of the I 19 I Carlsbad City Council held on the _1_5_t_h_ day of __ o_e_c_em_b_e_r ___ , 20 21 22 23 24 25 26 27 28 1987, and thereafter . . . . • • • • . . . . . . . . . . . . . . . . . . . . J. 2 3 4 5 6 7 8 PASSED AND ADOPTED at a regular meeting of said City Council held on the __ 2_2n_d __ day of __ D_e_c_e_mb_e_r ___ , 1987, by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None LEWIS, Mayor 9 ATTEST: 10 ~ d P tG::1i;; 1: a 11 ALETHA L. RAUTENKRANZ, City\Clerk 12 (SEAL) 13 14 15 16 17 18 19 I 20 21 22 23 24 25 26 27 28 N i GENERAL PLAN IISIDINTIAL •l ft-"& nr-••tn ,11 1 •• \ a1 '4 ll "& .. 11\ll >t Oll'«ln 10-U ••• ,,,01t "n,,.,,n, • 11 ll .. tt '4lllll"'4 lflt;II DL ..... "1•1,i IUI 1111 ;11 o, ... ,n 111-l II COMMHCIAl HI. r,tt'<\l\lHt.lO"&LQTAlll .. -C--1 Ill l'Hf,..<t~f •tGl(V,oi4LQTAILIII C.,~~-U ur.m,..,L •111, ICI <.: , v,,,.u·,,n cu•-••·• .. L " "llt.llllO■IKJUU l"U .. \tflr.LA&. n TM\ll •lll'll'IH"IINllllr.LA&. " ,., ,,r .. 11 ,,._.,_ ■IL'1 ID I Ml f ,,. 11 ... IN <!Nf<< 111•1■M;T Pt Pl_..,,_,., !SIN ll■"L f, (,,-l\ ,."'"'"' , ... II fflf.~ I' _, llttf· I 111.Jtll' Ill: ■,, 1r 11 It,,. CUMMIIIC':IAL ICMOOLI I r!F'4l,-llff 1 11 '<U•■nmn II lllt:11"( HOIIL ,. ,. ..... ,, , " , 1r,"" 4,.lf , N■• """" U911111fT1,U 11~1~ I EXISTING E•A Zoning EXHIBIT B 11/4/87 PROPOSED j R•A•t0,000 > c-20 ZONING ...... NTIAt. • C f\NONID CO"NL 'Nin •r,o,• I-A Ullt1flf'1AL 411;■1C\:lfl. lL\I. l:L'NI 1-1 R'■." ll!IIDl.._nM. UTA,W l:UNI 1-1 Ofill M.•IILY IIUll>VOTL4L lOttl ■ J 1"Sn f'l.'lllf IISIDr.tTIAL l:UNI ■• t 'II lTI,U ''-"llY U."Dl""1AL l:ONI ■·" UlltlffD '4l lTI·M. ... LY IIL'IDIIITIAL Z~ ID-M WIOll"TI.Ol DINtin· Mt.LnPU """' ·" IIIJIUlr,n.,L DC!'t'ln-Hir.N ,, ... , Utllf IUIDl,.n,11 MOIIU IIUMI M■ll ZOl'II 1-• ■UIDl~n.u ,-QIIUN,1L 10Nt If ■UIDl~L lot. Mr ZUl'OI ■-■UIDl''"14L W,11"IIIWIII' &ONI COMMIICIAL n url'ft.1 ,., .. , CI ... 1r;,•11t• .. 11.•,nl"f,..._M IALZOl'II C I Ga,.fllM, f <-• 1A1 lU.,l CT COM!IOl•:LAL TIii UT ZU.-1 C M II~'\ CL' .. "IIICL\I. WQffU ll'lll'ISTIIIAI. Zo,ol "" Ml:SftW. l:UfOI P•llt P\NINID ..._~ZONI OfNle p • P\UQOf'IAIN O''lll;IY &ONI LC UMlnOL.Ul'fflllll. °' °""~· .. u 1'1.'IUC unun Z01111 -- GPA/LU 87-1 zc 87-2 SP-19(C) CT 87-3 LCPA 87-2 WILLIAMSON CONTRACT AMEND. LFMP 87-3(2) -Ill cu ,U :, C: •.-1 a cu cu ... Ill C: -0 •.-1 "Cl ,U cu ('(I "Cl ,.. C: ('(I cu '""' a u ('(I cu Q C/l ('(I cu >'""' ..,-f ('(I ,U > ('(I 0 00,.. cu 0. :z 0. ('(I cu .c:16,..j ,U 0 "Cl Ill cu .,U ,U c:: 0. cu o a 'ti :, ('(I u 0 ... "Cl N ..,t cu 00 ,.. O'\ ('(I 0. 'ti cu c:: ,.. ('(I 0. C"'\0 ..,t ,U 00 a, >, cu • c:: U) ,.. 0 0 :z ,U ,U ·< "Cl ,.. >, 0 ,U ..,-f "CIU cu u cu :, .c: "0 ,U 0 ,.. "Cl .,U cu C: ,U •.-1 u cu .-1 1-1 •,-I ..,-f u "Cl C: :, "0 0 C: u ('(I ,-.. 00 I in '""' I N '""' .. z 0 ti c( ~ 0 z :::, 0 CJ AB# C/At./S MTG. 12/15/87 DEPT., ........... PL=N ____ _ CITV OF CARLSBAD -AGENr" BILL TITLE· Car Country Expansion -GPA/LU 87-1, ZC • 87-2, SP-19(C), CT 87-3, LCPA 87-2 (LCPA 87-2F), LFMP 87-3(2), Agricultural Preserve No. 76-1 Contract. Amendment RECOMMENDED ACTION: Both the Planning Commission and staff are recommending that the City Council adopt the Negative Declaration issued by the Planning Director and direct the City Attorney's Office to prepare documents APPROVING GPA/LU 87-1, CT 87-3, LFMP 87-3(2), prepare documents introducing Ordinance No.~ APPROVING zc 87- 2, Ordinance N9.~~ APPROVING SP-19(C), and approve LCPA 87-2 (LCPA 87-2F) and Agricultural Preserve No. 76-1 contract amendment according to Planning Commission Resolutions No.•s 2689 and 2694, and direct staff to forward Council's action to the California Coastal Commission for consideration. ITEM EXPLANATION: The proposed project is a 35 acre eastwardly expansion to the existing Car Country. The proposed expansion would create 13 lots which would back up to the existing dealerships. Although the proposed development is relatively straightforward, there are seven complex discretionary actions which must be approved prior to development occurring. These include the following: l. General Plan Amendment 2. zone Change 3. Local coastal Plan Amendment 4. Agricultural Preserve No. 76-1 Contract Amendment 5. Specific Plan Amendment 6. Tentative Tract Map · 7. Amendment to Local Facilities Management Plan for Zo_ne 3 The General Plan Amendment will change the site's General Plan designation from RM, Residential Medium, 4-8 du/ac to RRE, Extensive Regional Retail. The Zone Change will change the site's zoning from E-A to R-A-10,000 to C-2-Q. The Local Coastal Plan Amendment revises the development options on the Ecke property. These amendments allow the landowner, City and Coastal Commission to more clearly fulfill the intent of the Coastal Act and Carlsbad's Local Coastal Plan by more consistently and comprehensively outlining the development potential of the area. The amendment to the Agricultural Preserve Contract modifies the boundaries of the land subject to the contract and allows for a wider variety of agricultural related uses subject to approval of a conditional use permit. The Specific Plan Amendment establishes development standards for the expansion of Car Country. The Tentative Tract Map creates 13 developable parcels adjacent to the existing car Country and leaves the rest of the EcM property as a remainder parcel. The Local Facilities Plan for Zone 3 has been amended to take into account the impact on public facilities created by the proposed expansion of Car AGENDA BILL NO.~£ PAGE TWO Country. At the Planning Commission meeting, the applicant requested that the Specific Plan for the Car Country Expansion be modified to allow auto related uses, banks, and restaurants on the lots facing Cannon Road. The Specific Plan did not allow banks or restaurants and limited accessory uses to lots 11 -13, the three southernmost lots. Staff was especially concerned abput the appearance of.the Car Country Expansion from Cannon Road and the possibility of establishing the precedent for strip commercial along Cannon Road. After discussing the matter, the Commission voted to limit accessory uses to lots 11 -13 and to permit a restaurant to locate on lots 11, 12, or 13 upon approval of a conditional use permit. Some members of the Planning Commission also felt that building height should be limited to 25 feet rather than the 30 feet allowed by the Specific Plan. The Commission voted 6-1 to approve actions necessary for the expansion of Car Country. For more details, see the attached staff report. ENVIRONMENTAL REVIEW: The Planning Director has determined that this project will not cause any significant environmental impacts and, therefore, has issued a Negative Declaration, dated September 11, 1987, which was approved by the Planning Commission on November 14, 1987. A copy of the environmental documents is on file in the Planning Department. FISCAL IMPACT: The proposed expansion of Car Country will be required to pay all applicable public facilities fees, traffic impact fees, bridge and thoroughfare fees, and any fees identified by the Zone 3 Local Facilities Management Plan. Development of the additional automobile dealerships should generate substantial sales tax revenue for the City of Carlsbad. EXHIBITS: 1. Location Map 2 • Ordinance No. 's ~~ and 'JLJ.:J 3. Planning Commission Resolutions No. 's 2689, 2690, 2691, 2692, 2693, 2694, and 2701 4. Staff Report, dated November 4, 1987, with attachments 5. Local Facilities Management Plan Zone 3 (2) (previously distributed) · MH:dm CITY OF CARLSBAD GROWTH MANAGEMENT PR-OCRAN LOCAL FACILITIES MANAGEMENT PLAN ZONE 3 Plan Sponsor: City of Carlsbad 1200 Elm Avenue Carlsbad, CA 92008 {619) 438-5621 Preparer: Planning Department City of Carlsbad 2075 Las Palmas Drive Carlsbad, CA 92009 (619) 438-1161 March 4, 1987 I• II. III. IV. V. VI. TABLE OF CONTENTS Executive Summary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction •••••• . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Buildout Projections. . . . . . . . . . . . . . . . . . . . . . . . . . . . Phasing .........•.••. . ......................... . Zone and Requirements for Public Facilities Services .......................... . ........ Analysis of Public Facilities and Improvements 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. City Administrative Facilities •• Adequacy Findings ••••••••• . . . . . . Library •••••••••••••••••••••••.••• Adequacy Findings ••••••••.•••• Wastewater Treatment Capacity. . .... Adequacy Findings ••.•••••. Parks ••••••••.••••••••••• Adequacy Findings •• Drainage ........•....... Adequacy Findings ••• Circulation •••••••••••••• Adequacy Findings •• .. .. Fire ..•.•..••••.•.•..••• Adequacy Findings •• . . Open Space •••• . ......... . . . . Adequacy Findings •• . . . . Schools ............... . Adequacy Findings •• . . . Collection System •• Sewer Adequacy Findings ••• Water Distribution System ••• Adequacy Findings •••••• i . .. ... . . . . . . . .... . . . . . . ............. . . . . . . . . . . . . ......... ....... ........ ...... . . . . . . . ..... . Page No. 1 10 16 27 32 35 42 44 51 53 57 60 68 70 74 75 80 96 99 100 103 105 109 111 117 119 123 TABLE OF CONTENTS Page No. VII. Append ices •......••....•••••.....•.•.....••..... 125 Appendix 1. -Glossary......................... 126 Appendix 2. -Growth Management Ordinance...... 132 Appendix 3. -Sources.......................... 151 Appendix 4. -Planning Commission Resolution No. ?.650. ••.•..• ••••. 152 -City Council Resolution No. 9084...... ....... 155 ii Charts, Maps, Tables and EXHIBITS Local Facilities Management Plan Map •••••••••••••••••••• Public Facilities Summary Sheet ••••••••••••••••••••••••• Local Facilities Management Plan Map/Zone 3 ••••••••••••• General Plan -Land Use Map ••••••••••••••••••••••••••.•• Zoning Map ••••••••••••••••••••••••••••••••••••••.••••••• Existing Land Use Categories, Exhibit A ••••••••••••••••• Existing Commercial Square Footage, Exhibit B ••••••••••• Existing Industrial Square Footage, Exhibit C ••••••••••• Approved Development Projects by Land Use Categories, Exhibit D ••••••••••••••••••••••• Approved Projects, Exhibl,t E •••••••••••••••••••••••••••• Vacant Land Use Categories, E~hlbit F ••••••••••••••••••• Buildout Population Projections •••••••••••••• !••·•· ••••• Re slden t !al Ph a sing ......••...•.........••.........•.... Non-Residential Phasing ••••••••••••••••••••••••••••••••• City Administrative Facilities Page 2 6 13 14 15 20 21 22 23 24 25 26 29 30 Map............................................ 36 Library Summary Sheet.................................. 37 Facility Planning and Adequacy Analysis........ 38 Five-Year CIP.................................. 39 Dwelling Unit and Population Projections, Exhibit G................................... 40 City . Adm 1 n is tr at 1 v e Fa c i 11 ties, Ex h 1 b 1 t H. • • • • • 41 Zone 3 Demand Comparison, Exhibit I............ 43 Map •••••••••••••••••••••••••••••••••••••••••••• Summary Sheet ••••••.••••.•••••••••••••••••••••• Facility Planning and Adeauacy Analysis •••••••• Planning Projections, Exhibit J •••••••••••••••• Zone 3 Demand Comparison, Exhibit K •••••••••••• iii 45 46 47 50 52 No. 11/87 Charts, Maps, Tables and EXHIBITS (Continued) Page No. Wastewater Treatment Parks Drainage Map •••••••••..••••••••••..••••.••••.••••••...•. Summary Sheet •••••••••••.••••••••••••••••••••• Facility Planning and Adequacy Analysis ••..••• Phasing ..........................•............ Demand/Capacity ••••..••••••••••••••••••••••••• Park District Boundary Map •••••...•••••.•••••• Map ••.•..•....••••••••.........•••••••••...... Sum1nary Sheet ................................ . Facility Planning and Adequacy Analysis •.•.•.. Park Demand Park District 1, Exhibit L ....... . Park Demand, Zone 3, Park District 1, Exhibit M ••.........••.•................... 54 55 56 57 58 61 62 63 64 66 67 Map............................................ 71 Sum1nary Sheet.................................. 72 Facility Planning and Adequacy Analysis........ 73 Circulation Fire Map ••••.••••..•••..•••...••••.••••• ·•••••...•.. 76 Summary Sheet................................. 77 Facility Planning and Adequacy Analysis....... 78 Proposed Improvements Palomar Airport Road at I-5, Northbounct, E x h i b i t ~l • . • • . • • • • • • • • • • • • • . . . . • . . • • • • • • • . 8 7 Interim Off-Ramp Improvements, Exhibit 0.... 88 Palomar Airport Road at I-5, Southbound, Ex h lb l t P. . . . • . . • . . . . . . . . . • . . • • • . . • . . . . . . . 89 Palomar Airport Road at Paseo del Norte, Exhlb it Q. . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . 90 Interim Mitigation Within Existing Curbs, Exhibit R................................. 91 Trip Generations, Zone 3, Exhibit S. .. .. ..... .. 92 Existing and Proposed Street Improvements - Map......................................... 93 Buildout Improvements, Table 1........ ......... 94 Map ••••••••••••••••••.••••••••••••••....•••••• Sun11nary Sheet-................................ . Facility Planning and Adequacy Analysis •...... iv 97 98 99 11/87 Charts, Maps, Tables and EXHIBITS (Continued) Page No. Open Space Map ••••••••••• ~ •••••••••••••••••••••••••••. • • • • • 1 0 1 Summary Sheet. . . . . . . • . . . . . . . . . • . . . . . . . . . . . . . . • . 102 Facility Planning and Adequacy Analysis........ 103 Schools School District Boundary Map................... 106 Map............................................ 107 Summary Sheet.................................. 108 Facility Planning and Adequacy Analysis........ 109 Sewer Collection System Sewer District Boundary Map..................... 112 Map............................................ 113 Summary Sheet.................................. 114 facility Planning and Adequacy Analysis........ 115 Sewer Demand, Exhibit T........................ 118 Water Distribution System Water Service Boundary Map..................... 120 Map............................................ 121 Summary Sheet_.................................. 122 facility Planning and Adequacy Analysis........ 123 Glossary Bridge and Thoroughfare District, Exhibit U..................................... 130 Traffic Impact Fee, Exhibit V.. •. . ..••••• •• •••• 131 V 11/87 1 EXECUTIVE SUMMARY ZONE 3 LOCAL FACILITIES MANAGEMENT PLAN 2 City of Carl1bad Growth Management Program NOVEMBEFI 1987 11/87 EXECUTIVE SUMMARY The Local Facilities Management Plan for Zone 3 was prepared pursuant to the City's Growth Management Program, Title 21, Chapter 21.90 of the Carlsbad Municipal Code. The contents of the plan follow the outline established by Section 21.90.110 of the Growth Management Ordinance. The Zone 3 plan is consistent with the Citywide Facilities and Improvements Plan, and it implements the Citywide plan adopted September 23, 1986. The original plan was approved May 19, 1987 by City Council Resolution No. 9084. The plan was subsequently amended to allow for the expansion of Car Country and a boundary adjustment for Zones 3 and 13. This boundary change increased the acreage in Zone 3 by 35 acres and reduced Zone 13 by the samP. amount. The Zone 3 plan begins with the assumptions used to generate the buildout p~ojections for residential and non- residential development within the Zone. The plan then phases or estimates the Zone's development on a yearly basis until buildout. The phasing is done to predict future facility demands. Each facility that is required to be addressed ls then analyzed. The analysis includes an inventory of existing and proposed facilities, a phasing schedule that establishes the timing for the provision of facilities in relationship to demand, and a financing plan that establishes various methods of funding facilities and improvements that are identified by the plan as needed. Since this Zone plan is a regulatory document, each facility section also contains conditions to ensure that public facilities will conform to the adopted performance standards. The conditions will be adopted as part of the Zone 3 approval, and mandatory compliance will regulate future development within the zone. The purpose of the summary chart shown below is to provide a brief synopsis of the Local Facilities Management Plan for Zone 3 • City Ad ■lnistratlve SUMMARY CHART Existing facilities meet the adopted performance standard until the year 2005. 3 11/87 Library Wastewater Treatment Capacity Parks Drainage Circulation Fire Open Space Existing and programm~d facilities meet the adopted performance stand- ards until the year 2003. Existing facilities performance standard Zone 3. meet the adopted to buildout of Park District 1 conforms with the adopted performance standard until 1990. Existing facilities meet the adopted performance standard to buildout of Zone 3. The existing road seqments and intersections in Zone 3 currently meet the adopted performance stan- dard. However, when the demand from Citywide approved projects is added then three intersections in Zone 3 will not meet the performance stan- dard. These include: 1 ) Northbound I-5 at Palomar Airport Road 2) Southbound I-5 at Palomar Airport Road 3 ) Palomar Airport Ro i'IO at Paseo del Norte These improvements will have to be installed within one to three years. Existing facilities meet the adoptect performance standard to buildout of the Zone. The Citywide Improvements Plan, as adopted on 9/23/86, indicated that Zone 3 as well as Zones 1-10 and 16 are already developed and meet or exceed open space requirements and do not have to address Open Space in the Local Facilities Management Plan. 4 11/87 Schools Sewer Collection Syste11 Water Distribution Existing school facilities currently have the capacity to meet the the demand generated by Zone 3. Because future demand ls minimal, the school district will be able to to provide capacity to buildout of the Zone. The City of Carlsbad Sewer Service District will meet the adopted per- formance standard to bulldout. Water service to Zone 3 meets the adopted performance standard to the buildout of the Zone. 5 11/87 PUBLIC FACILITIES SUMMARY SHEET Conformance with Adopted Standard Cit~wide Quadrant Zone 3 1) City Administrative Facilities Until 2005 N/A N/A 2) Library* Yes,until 2003 M/A NA 3) Waste Water Treatment Capacity Yes With Phase IV expansion 4) Parks N/A Until 1992 N/A To Buildout 5) Drainage N/A N/A Yes 6) Circulation N/A N/A Yes* To Buildout 7) Fire N/A N/A Yes To Buildout 8) Open Space N/A N/A Yes To Buildout 9) Schools N/A N/A Yes To Buildout 10) Sewer Collection System N/A M/A YES To Buildout 11) Water Oistribution System N/A N/A YES N/A = Not Applicable * See Page 81, which .fully describes the circulation conditions and proposed mitigation. 6 11/87 1. CENERAL CONDITIONS All development within Zone provisiorys of Section 21.90 of and to the provisions and Facilities Management Plan. 3 shall conform to the the Carlsbad Municipal Code conditions of this Local 2. All development within Zone 3 shall be required to pay a public facility fee pursuant to the standards adopted by the City Council on July 28, 1987, and as amended from time to time and all other applicable fees. Development in Zone 3 shall also be responsible for any additional fees to be incorporated into this plan that are found to be necessary to enable facilities to meet the adopted performance standard. 3. The City of Carlsbad shall monitor all facilities in Zone 3 pursuant to Subsections 21.90.130{c), {d) and {e) of the Carlsbad Municipal Code. 4. All development in Zone 3 shall be in conformance with the adopted Citywide Facilities and Improvements Plan as adopted by City Council Resolution 8797 on September 23, 1986. 5. Periodic amendment to the Zone 3 Local Facilities Management Plan is anticipated to incorporate newly acquired data, to add conditions and upgrade standards as determined through the required monitoring program. Amendment to this Plan may be initiated by action of the Planning Commission or City Council at anytime. 6. If a public facility or service is found to not be in conformance with an adopted performance standard during the yearly monitoring, or at any other time, the matter will be immediately brought before the City Council. If the City Council determines that a non-conformance does exist then no future building or development permits shall be issued until those facilities are brou~ht into conformance with the adopted performance standard • . 7. After adoption of this Plan by the City Council, no building permits will be issued unless the performance standards are complied with. This includes all projects which were exempt under Section 21.90.030 (c) of the Carlsbad Municipal Code. SPECIAL CONDITIONS FOR ZONE 3 The following Special Conditions apply specifically to development in Zone 3 and must be complied with in addition to the General Conditions for Zone 3. These conditions are also listed separately under the analysis discussion of each facility. 7 11/87 City Administrative Facilities No special conditions are necessary at this time. Library No special condition~ are necessary at this time. Wastewater Treatment Capacity 1. The following actions shall be pursued by the City to ensure adequate wastewater treatment capacity throughout a five (5) year period. a. Monitor Encina Treatment Plant flows on a monthly basis to determine actual flow rates and to have an P-arly warning of capacity problems. b. Actively pursue acceleration and phasing of treatment plant Phase IV expansion to provide adequate capacity. c. When Carlsbad's actively seek agencies. sharP. leased of Encina flows reach 5.25 MGD, capacity from other Encina d. When Carlsbad Encina flows reach 5.45 MCD, proceed to activation of the Calavera Hills Reclamation/Treatment Facility. Plant to be activated when more cost effective treatment measures are no longer Feasihle and Carlsbad capacity at Encina has been reached. 2. All development within Zone 3 shall pay the applicable required Carlsbad Sewer District fees. Parks All Facility will he construct DrainaQe development shall pay Park-In-lieu fees and Public Fees for Park District 1. No residential development allowed after 1990 unless actions have been taken to additional park facilities. Drainage facilities shall be provided at the time of development to the satisfaction of the City Engineer. 8 11/87 Circulation Fire 1 ) All future pay Traffic participate District. development within Zone 3 shall continue to Impact Fees, Public Facilities Fees and in the Bridge and Thoroughfare Benefit 2) An on-going monitoring system shall be established to evaluate the aspects of improvements, development, and demand on circulation facilities. The required improvements of ~ section may be modified without formal amendment to this plan. 3} Should the performance standard of any facility within Zone 3 fall below the adopted level of service, all discretionary approvals or development permits shall be halted _until such time as appropriate mitigation is installed and the performance standard has been met. 4) Based upon the projected traffic volumes, the I-5/ Palomar Airport Road and the Paseo del Norte/Palomar Airport Road mitigation shall be designed, bonded, a schedule submitted and approved by the City Engineer indicating completion of these inter.sections within one to three years. Specifically, the mitigation required ls: (1) Free right turn I-5 northbound off-ramp to eastbound Palomar Airport Road. (2) Interim signalization of I-5 northbound off- ramp. (3) Interim signalization of I-5 southbound off- ramp. (4) Dual left turn lanes for Palomar Airport Road eastbound to northbound Paseo del Norte movement/replacement of median, restripping the westbound lanes and the addition of detector loops. 5) In any event, these improvements must he in place as needed to maintain conformance with the performance standard or all development will be stopped in zones which impact these interesections should the standard not be met. No special conditions are necessary at this time. Schools No special conditions are necessary at this time. 9 11/87 Sewer Collection System No special conditions are necessary at this time. Water Distribution System All development within Zone 3 shall pay the required Costa Real Municipal Water District fees. 9a 10 INTRODUCTION I. INTRODUCTION The purpose of this Local Facility Management Plan is to complete the second phase of the overall Growth Management Plan for Zone 3 within the City of Carlsbad. Phase One of the Growth Management Program established the Citywide Facilities and Improvements Plan based upon a phased buildout of the City's existing General Plan. For purposes of public facilities analysis, the City has been separated into 25 Local Facilities Management Zones as shown on "Local Facility Management Plan Boundaries", on Page 2. PLAN OVERVIEW This plan for Zone 3 provides a detailed description and analysis of how this area of the City will develop from its current status to buildout. The plan also demonstrates how and when each facility and improvement will be constructed in order to accommodate development within the Zone (phasing). It also provides a complete description of how each facility and improvement will be financed when mitigation is necessary. The body of the plan ls divided into separate sections for each public facility. In each section there will be a summary sheet which highlights the important information described in the analysis. This summary is broken down into three categories: Existing, Existing plus approved, and Future. The demand column in each of these categories will show two numbers: Demand The top number (1) represents the Citywide, Quadrant or Zone demand, depending upon the public facility being evaluated. The lower number (2) represents the specific zone demand for the public facility. Following the summary sheet will be the detailed analysis and additional information for the public facility. If a ·facility is not conforming with the adopted performance standard, there will be a discussion describing this situation, a mitigation or alternatives section, and a financing discussion. Each facility subsection will conclude with a sub-section, "Adequacy Findings". This section will summarize whether or not the public facility conforms with the adopted performance standard. 11 ZONE 3 -OVERVIEW The plan for Zone 3 is consistent with all aspects of the Citywide Facilities and Improvement Plan and ensures that the adopted performance standards shall be complied with as development occurs. Local Facilities Management Zone 3 is bounded on the west by the Pacific Ocean, on the north by Agua Hedionda Lagoon, on the east by the Ecke agricultural preser~e, and on the south generally by Palomar Airport Road. On August 4, 1987 the City Council aprroved a boundary adjustment for Zone 3 to incorporate an approximately 35 acre area which will be the site of the Car Country expansion. This boundary change necessitated a complete review of the Zone 3 plan and each facility analysis. The area is completely built out with the exception of a few infill lots and/or the expansion of existing developments. Future development of the zone includes single-family residences, duplexes, and commercial and industrial uses. The Map, "General Plan Land Use", shown on Page 14, denotes the General Plan Lanrl Use for Zone 3. The accompanying Land Use Zoning is shown on the, "Zoning" map, on Page 15. 12 11/87 ZONE 3 LOCAL FACILITIES MANAGEl\1ENT PLAN City of Carlsbad Growth Management Program '•..OVl!MBER 1987 ---------------------------- 13 ;·-·-·-·-·-·-·-·-·-·-·-· . I . .' u ZONE 1 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 GENERAL PLAN-LAND USE Al & Sf RR OS RESIDENTIAL Rl lO'.l'OENSln'(0-15,) JU.J.t LO\l',MEOIUM DENSITY(O·O RM MEOHIM OENs1n· ( <t-H) lllMH MEOllJM illC.11 DENSITY l1:1·1') RII ltlGII llENSJTY(lS·H) COMMERCIAL RRI INTENSIVE REGIONAL JlfTAIL RR£ EXTENSl\'E REGIONAL RETAIL RS REGION.U SERVICE C COMllotllNJn· COMMERCI.U N NEH,llff(>KlloOO COMMERCL\L TS TRA\'EI. SERVICES COMMERCL\L 0 PKOffSSJON,\l RH.A.TEO COO CENTR.o\L BUSINESS UISTIUCT Pl PL\NNEO INOtlSTRIAL G GO\'EkNMfNT f.o\CILJTIES U Pl/01 IC L!'TIUTJES I\C Rf.CREATION c;OMMERCL\L US Ot'ENSP.-KE NA.Jl NON RESll>ENTlAL RESERVE ZONE 22 ZONE 4 Cily of CMllbad G,o.,lh Managam.,. Proga,n NOVEMBER 1 9 a 1 -U1 . ZONE 1 I . I . LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 ZONING LEGEND RESIDINTIAL P·C PUNNED COMMUNITY ZONE R·A llESIDENTIAI. AGRICULnJllAL ZONE R·E RURAi. RESIDENTIAi. EsTATE ZONE R· I ONE•fAMltY REslDENTIAL ZONE R-2 lWO-fAMILY RESIDENTIAi. ZONE R·5 MULTIPLE FAMILY RESIDENnAL ZONE R·3L LIMITED MULll•fAMILY RESIOENTVJ. ZONE RD·M IIESIDENTIAL DENSln'·~IULTIPLE ZONE RD·H RESIDENTIAL DENSITY-HIGH ZONE IL\IHP llESIDENTIAL MOBIU. HOME l'MK ZONE R·P WIDErfT1AL PROFESSIONAL ZONE Rf RE.SIIJENllAL TOURJST ZONE RW RESIDENTIAL WATERWAY ZONE COMMERCIAL 0 OfflCE ZONE C-l NEIGHBORHOOO COMMERCIAL ZONE C·l GENERAL COMMERCIAL ZONE C·T COMMERCIAL·TOl!RIST ZONE C·M HEAVY COMMERCIAL·UMITED INDUST1tL\J. ZONE M lNDUSTIUAl ZONE P·M PLANNED INDUS1ll1AL ZONE L·C UMJTED CONTIIOL OS OPEN SPACE P·U P\/1\UC um.rrv ZONE City ol C1t1JNG Growth ~gemenl Prag,.. II NOVENSER 1 9 s 7 16 BUILDOUT PROJECTIONS II. BUILDOUT ASSUMPTIONS AND PROJECTIONS To adequately assess and plan for public facilities and services in Zone 3, it ls necessary to project the level of development that can be anticipated at the ultimate buildout of this Zone. Buildout projections are used to determine existing residential and non-residential land uses and to assess the ultimate potential that may be reached at the time Zone 3 ls built out. The ultimate buildout of Zone 3 has been approximated by examining: 1. the amount of existing land use, 2. the amount of approved, yet undeveloped land uses, and 3. the vacant land which can still be developed. The methodology used to compile the buildout projections ls consistent with that used in the Citywide Facilities and Improvements Plan and assumptions are described below: 1 • Existing Land Uses Surveys and analysis were conducted to determine the acreage of each land use category within Zone 3. Field checks and subsequent research ascertained how each parcel was actually being utilized as well as the square footage of existing commercial/industrial structures. The following Exhibits detail this information: E·xhib it A, "Existing Land Use Categories", Page 20. Exhibit B, "Existing Commercial Square Footaqe", Page 21. Exhibit c, "Existing Industrial Square Footage", Page 22. Approved But Undeveloped Land Exhibit D, "Approved Development Projects By Land Use Category", on Page 23 includes land uses which have approved projects but which have not been developed as of January 1, 1987. Buildout is constrained by approved projects because the land has been committed t~ a particular use or density, even though it is presently vacant. Approved projects are those which have received discretionary approval by the Planning Commission and/or City Council. 17 3. Vacant land All vacant land was inventoried by land use type to determine ultimate buildout of the zone. The Citywide plan directed all environmentally constrained land to be subtracted from the gross acreage figure for vacant land. Zone 3 ls in an infill area, however, and the remaining vacant land has very minimal environmental constraints. There are currently 231 existing residential units in Zone 3, however, when applying the growth control yield densities to the available residential land within the Zone, this results in a theoretical yield of 186 units. 58.2 (acres of RLM) x 3.2 (Growth Control Point) = 186 Units The current residential units total exceeds the growth control yield and the future buildout of this Zone will add an additional 21 units (which includes 15 single family dwelling and 3 duplexes). At buildout, the zone will exceed the growth control yield by 66 units. Because remaining development in this Zone is minimal, residential density will be balanced out by reduced development in other areas of the northwest quadrant. Therefore, 9rowth will continue to be below the control point in this quadrant. Staff finds that there are facilities to service this demand created by Zone 3, as well as capacity in the quadrant to allow the residential unit total to exceed the growth control yield. A set of assumptions regarding site coverage for industrial and commercial development was applied to the net developable acreage figures. It was assumed that every net developahle acre of industrial/commercial would result in a maximum square footage yield of 40%. This yield is based upon researching existing files. It takes into consideration height limits, setback requirements, and other regulations which affect overall lot coverage. See Exhibit F, "Vacant land Use Categories" on Page 25, for vacant land uses in Zone 3. 18 NOTE: This page was left blank 1 9 HIBIT A ZONE 3 EXISTING LAND USE CATEGORIES Listed below are the type and acreage of each land use category within Zone 3. GENERAL PLAN LAND USE DESIGNATION RESIDENTIAL: RL Low Density (0-1.5) RLM Low-Med Density (0-4) RM Medium Density (4-8) RMH Med-Hi Density (8-15) RH High Density (15-23) COMMERCIAL: CBO Central Business District C Community N Neighborhood RC Recreation TS Travel Services 0 Professional & Related RRE Extensive Regional Retail RRI Intensive Regional Retail RS Regional Service INDUSTRIAL: PI Planned Industrial OTHER: E J H HC p G u NRR OS RR FW MAJ MIN COL Elementary School Junior High School High School Continuation School Private School Government Facility Public Utilities Non-Residential Reserve Open Space Park City Owned State Owned Beaches State Owned Misc. Miscellaneous Railroad Freeway Major Arterial Minor Arterial Collector Street TOTAL ACREAGE 20 DWELLING UNITS 231 ACRES 58.2 ACRES 6.3 49.6 2.6 78.0 0.9 75.2 4.2 140.6 98.6 29.0 58.2 3.3 39 .1 47.4 691.2 1.7 7.9 63.1 n.3 2.6 11/87 EXHIBIT B ZONE 3 EXISTING COMMERCIAL SQUARE FOOTAGE ASSESSOR'S CAR GAS PARCEL NUMBER DEALERSHIP RESTAURANT RETAIL MOTEL STATION 211-060-12 3,128 211-060-13 1,105 211-060-02 15,929 211-060-10 45,549 211-060-16 25,516 211-060-09 15,321 211-060-17 6,691 211-060-18 28,395 211-060-19 27,900 211-060-15 25,858 211-060-14 10,400 211.,.060-07 40,853 211-060-06 25,939 211-050-10 Al fredos Dos 2,265 211-050-04 Hadleys 20,160 211-040-21,27 All Star Inn 23,843 211-040-29 Tip Top 17,424 211-170-10 Marie Callendars 13,151 210-170-06 McDonalds 4,533 210-010-07 Exxon 1,439 210-010-22,23 Pea Soup Andersens 27,585 1,000 71,589 3,200 211-050-01 Denny's 4,125 211-050-02 Mobil 1,579 211-050-06 Nursery land 5,040 Total 272,584 51,659 43,624 95,432 6,218 21 3/87 .EXHIBIT C ZONE 3 EXISTING INDUSTRIAL SQUARE FOOTAGE ASSESSOR'S INDUSTRIAL/ PARCEL NUMBER PM OFFICE GOVERNMENT UTILITY 211-050-08 Caltrans 8,652 211-050-09 23,932 211-040-25 1,152 210-090-36 51,000 210-090-43 6,210 210-090-44 · 20,385 210-090-39 52,000 210-090-37,25,26,27 28,29,30,31 34,830 210-090-32,33,34,35 41,42 125,215 210-090-45 84,432 210-090-46,48 151,000 210-017-08,09 11,013 210-017-04 68,222 211-030-27 79,362 211-030-28 12,132 211-030-32 20,940 211-030-31 20,000 211-030-30 18,726 211-030-25 108,126 211-03-06,08 Encina WPCF 64,400 211-040-25 1,152 210-010-26,32,33, 206-070-06 SDG&E 247,434 TOTAL 889,829 8,652 311,834 22 3/87 EXHIBIT D ZONE 3 APPROVED DEVELOPMENT PROJECT BY LAND USE CATEGORIES Listed below are the type and acreage of each land use category with approved, but unbuilt, projects within Zone 3. GENERAL PLAN LAND USE DESIGNATION RESIDENTIAL: RL Low Density (0-1.5) RLM low-Med Density (0-4) RM Medium Density ( 4-8) RMH Med-Hi Density (8-15) RH High Density (15-23) COMMERCIAL: CBD Central Business District C Community N Neighborhood RC Recreation TS Travel Services 0 Professional & Related RRE Extensive Regional Retail RRI Intensive Regional Retail RS Regional Service INDUSTRIAL: PI Planned Industrial OTHER: E J H HC p G u NRR OS Elementary School Junior High School High School Continuation School Private School Government Facility Public Utilities Non-Residential Reserve Open Space DWELLING UNITS ACRES 8 .1 5.4 * See Exhibit E for a further breakdown of specific projects. 23 3/87 City File Number CUP-246 SOP 83-11 CUP-284 ZONE 3 APPROVED PROJECTS Project Gross Name Acres Minlwarehouse & Office Complex 8.1 Palomar & Co. 4.72 7-Eleven .67 24 EXHIBIT E Approved Sguare Footage 104,068-Warehouse 70,000-0ffice 109,000-Restaur- ant, Theatre, Hotel 4,872-Retall Store 3/87 EXl-lIBIT F ZONE 3· VACANT LAND USE CATEGORIES As of January 1, 1987, the following types and amounts of land use were vacant and not in the development process. GENERAL PLAN LAND USE DESIGNATION RESIDENTIAL: RL Low Density (0-1.5) RLM Low-Med Density (0-4) Single Family Duplex RM Medium Density (4-8) RMH Med-Hi Oensity (8-15) RH High Density (15-23) COMMERCIAL: CBD Central Busines·s District · C Community N Neighborhood RC Recreation TS Travel Services 0 Professional & Related RRE Extensive ~egion~l Retail RRI Intensive Regional Ret~il RS Regional Service IUDUSTRIAL: PI Planned Industrial OTHER: E J H HC p G u MRR OS Elementary School Junior High School High School Continuation School Private School Government Facility Public Utilities Non-Residential Reserve Open Space 25 GROSS VACANT ACRES 5.15 .42 15.9 1.0 35 11.3 4.0 20.5 70.1 NET VACAtlT ACRES 5.15 .42 6.4 .4 28 A.. 5 1.6 8.2 70.1 11/87 POTENTIAL nWELLING UNITS 15 6 BUILDOUT POPULATION PROJECTION Residential The Management generation existing, breakdown, residential buildout population projection for Zone 3 was determined by applying a population rate of 2.471 persons per dwelling unit to the approved and potential future units. The population ·therefore, is as follows: Units Existing 232 Approved 0 Future 20 Buildout Population Projection Rate 2.471 = X 2.471 = X 2.471 = Population = 573 0 = 50 623 The buildout population projections are used consistently throughout this plan for the purpose of predicting demand for public facilities and improvements. Non-Residential The non-residential buildout projection for Management Zone 3 was determined by totaling the existing, approved and potential future square footage by use cate~ory. Auilding permit files were researched to determine the existinq and approved square footage. Vacant land square footage was calculated by multiplying the gross vacant acres (found on Exhibit F Vacant Land Use Categories) by 40%. The non- residential bulldout breakdown, therefore is as follows: Existing Approved Future Non-Residential Buildout Projection 26 Square Footage 1,679,832 287,940 1,324,224 3,291,996 11/87 27 PHASING III. PHASING -AN OVERVIEW It is necessary to provide a phasing schedule of development for the entire City, each quadrant, and each of the 25 Local Facility Management Zones for the purpose of: 1. Projecting future demands for public facilities on a yearly basis; and 2. Establishing the thresholds which identify when a public facility is needed; and 3. Assisting with the development of the City's Capital Improvement Program budqet. In the Citywide Plan, phasing of residential development was 1,250 dwelling units per year. These projections were based on a review of the San Diego Association of Governments (SANDAG) projections along with those utilized in the City's Capital Improvement Program and the Public Facilities Management Systems, Monitoring Report of April, 1986. In each Local Plan a key element will be the projected phasing schedule of development within that specific zone. These schedules are presented for the purpose of estahlishing thresholds for demand and future demands for puhlic facilities. By projecting these future public facility and improvement demands the appropriate funds may be allocated into the Capital Improvement Budget to assure they are in place as development occurs. The phasing schedule is not presented to estahlish a rate of growth within the City. It will he used to assure that growth occurs only as public facilities are available to ensure compliance with the adopted performance standards. The specific phasing schedule presented in this plan ls provided to accomplish the three purposes of phasing which were discussed above. These projections have been established by reviewing development in the pipeline which have tentative and final maps as well as applications pending. The same type of phasing has been prepared for SANDAG's Series VII for the entire City and will be utilized to review phasing projections presented in this and other local plans to determine the overall impact on public facilities and services. Zone 3 -Phasinq Schedule Phasing for Zone 3 incorporates the Citywide projections as well as localized factors unique to the Zone. These localized circumstances include: 1. The amount and type of developing projects: -Final Maps -Tentative Maps -Applications Pending 28 2. The ultimate type and amount of land use potential. 3. The amount of development that can he reasonably absorbed into the market. The specific residential phasing schedule for Zone 3 is shown below. The schedule assumes the zone will be completely built out by the end of 1995. The schedule phases those projects identified in the developing process beginning in 1987 through 1995. During this time period it is estimated that a total of 21 additional residential units will be built in Zone 3. Year 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 RESIDENTIAL PHASING Zone 3 Yearly Dwelling Increase 1 3 3 5 2 2 2 2 1 Total Dwelling Units 231 232 235 238 243 245 247 249 251 252 The phasing schedule assumes the zone's vacant or under developed land (with no applications penrling) will be developed beginning in 1987 and phased through the buildout of the zone. In all, a total of 252 residential dwelling units will exist at the buildout of Zone 3. This residential total, although above the growth control point, is in compliance with the Carlsbad Municipal Code as modified by the passage of Proposition Eon November 4, 1986 because adequate public facilities can be provided. Although this zone exceeds the growth control point, future development potential is minimal and it will be balanced out by reduced development in other areas of the northwest quadrant. 29 11/87 In Zone 3 the non-residential land uses will be phased based upon previous growth trends, location of parcels, and current applications being considered by the Plannin9 Department. The by 1996. The total F, "Vacant YEAR 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 non-residential land uses will be completely built out This assumes a phasing schedule which begins in 1987. vacant non-residential land uses are shown on Exhibit Land Use Categories" on Page 25. NON-RESIDENTIAL PHASING Zone 3 INDUSTRIAL ACREAGE COMMERCIAL ACREAGE 2.2 4.7 2.7 25.6 18.2 6.0 2.9 2.3 3.4 1.0 .1 7.6 Total Acreage 11.3 65.4 30 11/87 Phasing Summary It is estimated that ·the remaining re~idential units in Zone 3 will develop by 1995. Yearly residential growth is expected to range from a high of five units in 1990 to a low of one unit in 1994 and 1995. Non-residential development of Zone 3 was estimated to build out by 1996. The plan assumed that the already approved commercial projects plus vacant planned industrial at Avenida Encinas and Cannon Road would develop first. The plan also assume·d that the 7 .6 acre parcel (owned by Carltas) between Paseo del Norte and I-5 would be the last to develop because there are a number of regulatory (local Coastal Program) constraints that will require time to resolve. Future non-residential growth is projected to peak in 1988 (493,099 sq. ft.) and reach a low in 1995 (1,742 sq. ft.). The specific phasing of Zone 3, is presented for the purpose of determining future annual demand and thresholds for public facilities. It ls lmpossihle to predict the exact way development will occur in this zone of the City, but through these phasing projections the City will be able to establish a direct link between development and the need for public facilities. This link will allow the City to ensure compliance with the adopted performance standards at all times as growth occurs. And if compliance is not maintained, development will be stopped until it conforms with the adopted performance standards. 31 11/87 32 ZONE REQUIREMENTS IV. ZONE REQUIREMENTS FOR PUBLIC FACILITIES ANO SERVICES The Management Plan for Zone 3 addresses eleven separate facilities: 1. City Administrative Facilities 2. Library 3. Wastewater Treatment Capacity 4. Parks 5. Drainage 6. Circulation 7. Fire 8. Open Space 9. Schools 10. Sewer Collection System 11. Water Distribution System Each of these facilities will be evaluated to determine conformance with the adopted performance standard. The evaluation will be made in three stages based on existing demand, approved or committed demand, and future demand at buildout. For each of these facilities and services the followinq is provided: 1. An illustrative map showing what ls existinq and what will be needed as the zone develops to its ultimate buildout; 2. District boundary maps where facilities are provided by special districts (ie., school, water, sewer). 3. Adopted service level performance standards which must be complied with at all times as growth occurs; and 4. A detailed facility planninq and adequacy analysis for each of the public facilities and services. 5 • A list of special ensure conformance standard. conditions for each facility to with the adopted performance 6. A discussion of mitigation measures and financinq mechanisms relevant to each facility. The Citywide facilities, which include City Administrative Facilities, Lihrary, and Waste Water Treatment, have been analyzed in the Citywide Facilities and Improvements Plan. These will also be included in the Local Facility Management Plan to show compliance or to suggest alternatives to assure conformance with the adopted standard. 33 In any case, this analysis will show how each of the adopted performance standards will be compiled with as development occurs within the City, quadrant, and zone. This plan includes financing of all public facilities and services where non-conformance with the standard requires mitigation. It also includes a complete phasing schedule for all development within the zone. 34 35 CITY ADMINISTRATIVE FACILITIES CITY ADMINISTRATIVE FACILITIES ZONE 3 t • CITY AOMINISTRATION-&XISTING Q CITY AGMINISTRATION-PLANNl!D ZONE 3 ,-r--- -----.. ~t I , , , I •o I \ ' ', ,, .... " ' ' I I LOCAL FACILITIES MANAGEMENT PLAN 36 I I I / I \ AMEl'!'lEO NOVEME&I ~ 98 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMMARY SHEET CITY ADMINISTRATIVE FACILITIES BUILD OUT ADEQUACY PROJECTION DEMAND SUPPLY (Carlornw.:e MITIGATION FUNDING w/S1 ll'ldar d) EXISTING 86,539 106,084 YES N/A N/A 856 118,867 APPROVED 168,084 YES N/A N/A (!) 856 z -Cl) < :c 202,37 a. FUTURE NO 168,084** ------YES*** 934 * As of January 1, 1987, 32,328 square feet of demand has been approved. ** In the year 2005 this facility will no longer conform to the adopted performance standard. *** Zone 3 is scheduled· to phase out all of its residential land'by 1995. 37 11/87 CITY ADMINISTRATIVE FACILITIES I. PERFORMANCE STANDARD 1,500 square feet per 1,000 population must be scherlulea for construction within a five year period. II. FACILITY PLANNI~G AND ADEQUACY ANALYSIS The purpose of this analysis is to determine whether or not the performance standard is being met, and if the demand for Zone 3 complies with the overall Citywide analysis of City Administrative Facilities. A. Inventory 1. Buildout Assumptions: Current (Citywide/Zone) Buildout (Citywide/Zone) Population 57,495/571 134,914/623 Required Square Footaoe 86,539/856 202,371/934 2. Existinq City Administrative Facilities: City Hall Facilities City Hall Finance Dept. Modular Purchasing/Personnel Dept. Modular Leased Space Redevelopment Community Development Dept. Las Palmas Facility Public Safety and Service Center Phase I Police and Fire Depts. Vehicle Maintenance Totals Total Existing Facilities 38 SQUARE FEET Square Footage Temporary Permanent Space Space 12,899 22,627 53,700 10,358 99,584 2,700 1,800 4,500 Leased Space 2,000 2,000 106,084 11/87 As indicated on the table on the previous page, approximately 241 of existing administrative facilities are leased and 4.21 are temporary (portable modular units}. If the rental leases are terminated or the modulars are no longer used, the existing square footage of City Administrative Facilities will be reduced. At that time, the Management Plan for Zone 3, as well as the Citywide Plan, will need to be amended to modify the phasing assumptions in order to plan for more City Ad~lnistrative Facilities at an earlier time. 3. Facilities in City's Five Year Capital Improvements Program: Item a. Public Safety Center Phase II* Design Construction Sq. Ft. Year 86-87 62,000 89-90 Amount Source $ 255,000 PFF** $3,455,000 PFF/S/W** b. Total Facilities in City's 5 Year Capital Improvements Program. 62,000 square feet * Public Safety Center Phase II. Yard offices, Maintenance shops, and Purchasing warehouse for the use of Utility Maintenance, Parks & Recreation Maintenance, Street Maintenance and Purchasing. Approximate size is 62,000 square feet. This includes a two-story yard office and Purchasing warehouse with a 6,400 square foot mezzanine. ** PFF -Public Facilities Fee S -Sewer W -Water Enterprise 39 From these population projections a demand for City Administrative Facilities has been assessed. The specific phasing for Zone 3 is being projected based on the number of projects which are currently pending review, have received tentative approvals, or have received final approvals. The exact timing of these specific projects may vary, however, the timing of necessary public facility improvements would also vary accordingly. This will assure that the adopted performance standards will be met as development occurs. Exhibit G is provided as a projection of growth throughou~ the City of Carlsbad on a yearly basis. EXHIBIT G P L A N N I N G P R O J E C T I O N S O N L Y DWELLING UNIT ANO POPULATION PROJECTIONS ASSUMING A BUILDING RATE OF 1250 UNITS PER YEAR AND 2.471 PERSONS PER DWELLING UNIT YEAR EXISTING REMAINING PROJECTED GROWTH BEGINNING YEAR POP. ENDING YEAR POP. 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 B. Phasing o.u.•s c.u.•s 23,348 24,598 25,848 27,098 28,348 29,598 30,848 32,098 33,348 34,598 35,848 37,098 38,348 39,598 40,848 42,098 43,348 44,598 45,848 47,098 48,348 49,598 50,848 52,098 53,348 54,598 54,599 31,251 30,001 28,751 27,501 26,251 25,001 23,751 22,501 21,251 20,001 18,751 17,501 16,251 15,001 lJ,751 12,501 ll,251 10,001 8,751 7,501 6,251 5,001 3,751 2,501 l,251 l 0 1,250 1,250 1,250 1,250 1,250 1,250 l,250 l,250 1,250 1,250 l,250 l,250 1,250 l,250 1,250 l,250 l,250 l,250 l,250 l,250 l,250 l,250 l,250 l,250 l,250 l 57,693 60,782 63,870 66,959 70,048 73,137 76,225 79,314 82,403 85,492 88,580 91,669 94,758 97,847 100,935 104,024 107,113 110,202 113,290 116,379 119,468 122,557 125,645 128,734 131,823 134,912 60,782 63,870 66,959 70,048 73,137 76,225 79,314 82,403 85,492 88,580 91,669 94,758 97,847 100,935 104,024 107,113 110,202 113,290 116,379 119,468 122,557 125,645 128,734 lJl,823 134,912 134,914 Population projections for the entire City were made within the Citywide Facilities and Improvements Plan which have been updated and are shown on Exhibit G. This exhibit shows the yearly demand for City Administrative Facilities as well as the yearly demand created by Zone 3 based on the projected Citywide phasing. 40 .... .... --00 "' CITYWIDE AND ZONE 3 · PHASING OF CITY ADMINISTATIVE FACILITIES • PLANNING PROJECTIONS ONLY* I CITYWIDE ZONE 3 CITYWIDE FACILITIES AND IMPROVEMENTS LOCAL FACILITIES MANAGEMENT ............................. , .......•• ~~~~.~~~.~~~~:~:~:~ ........••••••••••...•..............• ~~~~································· STATUS NOTES AS OF I D.U.'S POP. so. FT. OF CONFORMANCE/ I D.U.'S POP SQ. FT. ZONE 3'S X JAN 1 (2.471/DU) DEMAND SUPPLY (NON·CONFORMANCE) (2.471/DU) OF DEMAND OF THE TOTAL EXISTING PROJECTED BUILDOUT (1) 1987 23,348 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 24,598 25,848 27,098 28,348 29,598 30,848 32,098 33,348 34,598 35,848 37,098 38,348 39,598 40,848 42,098 43,348 44,598 45,848 47,098 48,348 49,598 50,848 52,098 53,348 54,598 54,599 57,693 86,539 106,084 60,782 63,870 66,959 70,048 73, 137 76,225 79,314 82,403 85,492 88,580 91,669 94,758 97,847 100,935 104,024 107,113 110,202 113,290 116,379 119,468 122,557 125,645 128,734 131,823 134,912 134,914 91, 172 95,806 100,439 105,072 109,705 114,338 118,971 123,604 128,237 132,871 137,504 142, 137 146,no 151,403 156,036 160,669 165,302 169,936 174,569 179,202 183,835 188,468 193, 101 197,734 202,367 202,371 106,084 106,084 106,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 168,084 19,545 14,912 10,278 5,645 63,012 58,379 53,746 49,113 44,480 39,847 35,213 30,580 25,947 21,314 16,681 12,048 7,415 2,782 (1,852) (6,485) (11,118) (15,751) (20,384) (25,017) (29,650) (34,283) (34,287) NOTES: (1) PHASE 11 OF THE SAFETY CENTER (+APPROX. 62000 SQ. FT.) 232 235 238 243 245 247 249 251 252 252 252 252 252 252 252 252 252 252 252 252 252 252 252 252 252 252 252 573 581 588 600 605 610 615 620 623 623 623 623 623 623 623 623 623 623 623 623 623 623 623 623 623 623 623 860 871 882 901 908 916 923 930 934 934 934 934 934 934 934 934 934 934 934 934 934 934 934 934 934 934 934 CITYWIDE DEMAND 0.99X 0.96X 0.92X 0.90X 0.86X 0.83X 0.81X 0.78X 0.76X 0.73X 0.70X 0.68X 0.66X 0.64X 0.62X 0.60X 0.58X 0.57X 0.55X 0.54X 0.52X 0.51X 0.50X 0.48X 0.47X 0.46X 0.46X These projections were based on a review of the San Diego Association of Governments (SANDAG) projections along with those utilized in the City's Capital Improvement Program and the Public Facilities Management Systems, Monitoring Report of April, 1986. m >< :::c CD -I :::c Currently, Zone 3 has 231 dwelling units which generates a 856 square footage demand for City Administrative Facilities. As of January 1, 1987, the existing Citywide demand for City Administrative Facilities was 86 539 square feet of which the demand for Zone 3 is included. Zone 3 has the potential to create an addition~! 79 square feet of demand C. Adequacy Findings City Administrative Facilities based upon the projected phasing of Citywide development and that of Zone 3, will conform with the adopted standard until the year 2005. The following Exhibit I, "City Administrative Facilities", on Page 43 shows the existing and committed facilities, projected Citywide demand, and Zone 3's phased demand. III. MITIGATION A. Special Conditions for Zone 3 No special conditions are necessary at this time B. Financing Public Facilities Fees are continuing to be collected Citywide and in Zone 3. Future residential development will create a relatively small demand for City Administrative Facilities (79 sq. ft. of additional demand at buildout) therefore, it is assumed that the minimal proportionate share required of this zone will be financed by Public Facilities Fees paid by future Zone 3 development. In other words no other financing mechanism will be required as a condition of development relative to adequate City Administrative Facilities. 42 CITY ADMINISTRATIVE FACILITIES ZONE 3 220 200 EXISTING FACILITIES 180 168,084 ~. 168,084 168,084 (/) w f-160 _J u <( 140 lJ.. 2 0,,-.... 120 <( -2 >-C PROJECTED CITYWIDE DEMAND f-0 100 m -(/) X ,I= u :::J :c w 0 -l.c OJ f-80 -f-'--" -I w w lJ.. 60 w 0:: <( 40 =i ZONE 3 DEMANDS 0 (/) 93~ 20 901 934 934 934 0 -20 1990 1995 2000 2005 2013 .... YEARS .... --00 ..... 44 LIBRARY ZONE 3 ■ 1.18RAAll!S-l!XISTING D UIRARll!S-PLANNl!O ZONE 3 I \ ' ' .... ......... ..... ' ' LOCAL FACILITIES MANAGEMENT PLAN 45 \ I I LIBRARY e.1., *c..,,,... o, •• , ................. _. ~-~ ::: ~--'· I ' I \ AMENDED ~OVEMBER 198 7 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMMARY SHEET LIBRARY BUILD OUT ADEQUACY PROJECTION DEMAND SUPPLY (Ccnomww:e MITIGATION FUNDING w/Stlriiard) 46,154 EXISTING 31,500 YES(1) ------ SQ. FT. 457 APPROVED 58,509 72,60 N0(2) ------ SQ. FT. (3) (!) z -() 0 (,J) < :c 107,931 a. FUTURE ------------ SQ. FT. 627 Notes: (1) Based upon action of the City Council on 7/7/87 to schedule and finance the construction of additional L1braiy space, the adopted performance standard is being complied with. (2) By the year 2003, there could be a shortage of Library facilities. (3) For year 1992. 46 11/87 LIBRARY I. PERFORMANCE STANDARD 800 square feet per 1,000 population of Library must be scheduled for construction within a five year period. II. FACILITY PLANHINt AND ADEQUACY ANALYSIS This analysis determines whether or not the performance standard is being met and, if the facility demand from Zone 3 is consistent with the analysis of the adoptea Citywide Facilities and Improvements Plan (CC Reso 8797) for Library Facilities. A. Existirg as of Inventory 1. Facilitv Demand (Citywide/Zone 3) (1-87/1-87) Ultimate Builoout (Citywide/Zone 3) as of (2013/2013) Poµ.tlation Pro,iections 57,693/571 134,914/623 2. Existing Library Facilities*: Olw1ff1 Leased Library Facilities (As of 1/1/87) Sq.Ft. Sq. Ft. Civic Center Library (1200 Elm Ave) 24,600 Adult Leaming Center (1207 Elm Ave) 400 La Costa Area Library (7750 El Ccfllino Real) 4,S(X)lH- Wa:t'ffiOlJre 2,(XX) Total 24,600 6,900 (% of Space) (78Xi) (22\'i) Rf:qllirro ~ Footaqe L!6, 154/457 107 ,931/498 Total Sq. Ft. 31,500 ( 100;~) * Source -Citywide Fceilities crd Improvenents Plan (CC Reso 8797) ¼-If-The La Costa Area Library lease will terntlnate wien the rew S::llrt:h Carlsi:)aj Library is ronstructed. 47 11/87 3. Phased library Facilities: A) The City's Five Year Capital Improvement Program: The City's adopted Five Year C.I.P. for fiscal years 1986- 91 includes $650,000 for the design of a main South Carlsbad Library. B) Other information On July 7, 1987 the City Council took three actions to provide for the South Carlsbad library. They were: 1. Approved the recommended South Carlsbad Library site within Zone 6 (portion of N-RM-1) and directed the City Manager to negotiate purchase agreement with the owner. 2. Directed the City Manager to include funds in the CIP for land acquisition and construction of the South Carlsbad library. 3. Directed the City Manager methods of financing and Carlsbad library. to evaluate alternative constructing the South These actions are incorporated into the 1987-92 CIP. At this time the following time and cost schedules have been developed: Description land Acquisition Grading Design Construction CIP Fiscal Year 1988-89 1988-89 1988-89 89-90 to 90-91 Estimated Costs In 1987 Dollars $ 1. 1 Mil .9 Mil .6 Mil 8.4 Mil $11.0 Mil The South Carlsbad library will involve building a sa,noo square foot facility of which 48,000 square feet will be occupied for library use in 1991. The additional 10,000 square feet will be leased out by the City until it is needed. It is projected this additional 10,000 square feet of space would be needed in 2002 based on the Citywide Facilities and Improvements Plans phasing assumptions. · The following summarizes existing and phased library Facilities which serve to meet the performance standard for the years 1987- 2013. 48 11/87 Existing Library Facilities: Owned Leased Total Civic Center Library (1200 Elm Ave) Adult Learning Center (1207 Elm Ave) La Costa Area Library (7750 El Camino Warehouse Real) Sq. Ft. 24,600 Sq. Ft Sq. Ft. 400 4,500 2,000 Total 24,600 6,900 31,500 (% of Space} (78%) Approved Phased Library Facilities: 1987-92: Phase in -1992 South Carlsbad Library (Phase I) 48,000 Phase out -'1992 Adult Learning Center (1207 Elm Avenue) La Costa Area Library (7750 El Camino Rd) Warehouse Total Library space that meets Performance Standard for years 1987-1991 72,600 (% of Space) (100%) Phase-in -1999 to 2002 South Carlsbad library (Phase II) 10,000 Total 82,600 (% of Space) (100%) B. Phasing (22%) 400 4,500 2,000 6,900 (0%) 0 0 (0%) (100%) 72,600 ( 100%) 10,000 82,600 ( 100%) For the phasing of Library Facilities Zone 3 and Citywide population projections are based on Exhibit G: "Citywide and Zone 3 Residential Phasing Schedules" on Page 40. From facilities this Plan population would also standard is these population projections rlemands for library has been assessed. As stated in Part IV "Phasing" of the exact phasing of dwelling units and subsequent may vary. Consequently public facility-improvements vary to continually assure the adopted performance maintained. Exhibit J: "Zone 3 Residential Phasing nf Llhrary Facilities" on Page 50, projects the phased demand and supply of Library facilities consistent with the adopted Citywide facilities and Improvements Plan (CC Reso 8797) and recent City Council action. Exhibit K, on Page 52 charts existing and committed Library Facilities supply along with phased Citywide and Zone 3 Library 'Facilities demand. 49 11/87 CITYWIDE AND ZONE 3 • PHASING OF LIBRARY FACILITIES * PLANNING PROJECTIONS ONLY• CITYWIDE ( 1) ZONE 3 (2) ---------------------- ------------------------------------~------------------------------------------------------------------------------------------------STATUS NOTES AS OF D.U.'S POP. SQ. FT. OF CONFORMANCE/ I D.U.'S POP SQ. FT. OF ZONE 3'S X JAN 1 (2.471/DU) DEMAND SUPPLY (NON-CONFORMANCE) DEMAND OF THE TOTAL CITYWIDE DEMAND --------------------------------------------------------------------------------------------------------------------------------- EXISTING (3) 1987 23,348 57,693 46,154 31,500 (14,654) 232 573 459 0.99X PROJECTED (3) 1988 24,598 60,782 48,625 31,500 (17. 125) 235 581 465 0.96X (3) 1989 25,848 63,870 51,096 31,500 (19,596) 238 588 470 0.92" (3) 1990 27,098 66,959 53,567 31,500 (22,067) 243 600 480 0.90X (4) 1991 28,348 70,048 56,038 31,500 (24,538) 245 605 484 0.86X 1992 29,598 73, 137 58,509 n,600 14,091 247 610 488 0.83X 1993 30,848 76,225 60,980 n,600 11,620 249 615 492 0.81X 1994 32,098 79,314 63,451 n,600 9,149 251 620 496 0.78X 1995 33,348 82,403 65,922 72,600 6,678 252 623 498 0.76X m u, 1996 I 34,598 85,492 68,393 72,600 4,207 252 623 498 0.73X X 0 (5) 1997 35,848 88,580 70,864 82,600 11,736 252 623 498 0.70X :::c 19981 37,098 91,669 73,335 82,600 9,265 252 623 498 0.68X DJ 1999 38,348 94,758 75,806 82,600 6,794 252 623 498 0.66X -2000 39,598 97,847 78,277 82,600 4,323 I 252 623 498 0.64X -t 2001 40,848 100,935 80,748 82,600 1,852 252 623 498 0.62" '-2002 42,098 104,024 83,219 82,600 (619)1 252 623 498 0.60X 2003 43,348 107, 113 85,690 82,600 (3,090) 252 623 498 0.58" 2004 44,598 110,202 88,161 82,600 (5,561) 252 623 498 0.57" 2005 45,848 113,290 90,632 82,600 (8,032) 252 623 498 0.55X 2006 47,098 116,379 93,103 82,600 (10,503) 252 623 498 0.54X 2007 48,348 119,468 95,574 82,600 (12,974) 252 623 498 0.52X 2008 49,598 122,557 98,045 82,600 (15,445) 252 623 498 0.51X 2009 50,848 125,645 100,516 82,600 (17,916) 252 623 498 0.50X 2010 52,098 128,734 102,987 82,600 (20,387) 252 623 498 0.48X 2011 53,348 131,823 105,458 82,600 (22,858) 252 623 498 0.47" 2012 54,598 134,912 107,929 82,600 (25,329) 252 623 498 0.46X BUILDOUT 2013 54,599 134,914 107,931 82,600 (25,331) 252 623 498 0.46X ------------------------------------------------------------------------------------------------------------------------------------- NOTES: (1) FROM CITYWIDE FACITILITES AND IMPROVEMENTS PLAN (CC Reso 8797) (2) FROM ZONE 3 LOCAL FACILITIES MANAGEMENT PLAN .. (3) BASED UPON ACTION OF THE CITY COUNCIL ON 7/7/87 TO SCHEDULE AND FINANCE THE CONSTRUCTION OF THE SOUTH .. CARLSBAD LIBRARY, THE ADOPTED PERFORMANCE STANDARD IS BEING COMPLIED WITH UNYIL 1992 • -(4) SOUTH CARLSBAD LIBRARY PHASE I AND DELETION OF LEASED SPACE. co .... (5) SOUTH CARLSBAD LIBRARY PHASE II C. Adequacy Findings The City Council, on July 7, 1987, earmarked funds for site acquisition and construction of a 58,000 square foot facility to be built by 1992. 48,000 square feet is expected to be leased out by the City until needed. This action brings Library Facilities into compliance with the performance standard. It is projected the 48,000 square feet of additional space will enable the City to comply with the Library Performance Standard until the year 2002. III. MITIGATION A. Special Conditions for Zone 3 1. No conditions are necessary for the purchase of Library facilities in Zone 3 because the City Council has taken action to provide needed Library Facilities in accordance with the adopted performance standard. This action included: a. Approving a preferred South Carlsbad Library site. b. Directing the City Manager to negotiate an agreement to acquire the site. c. Earmarking funds to guarantee the financing needed for site acquisition and construction of a 58,000 square foot Library facility. d. Providing for construction to be completed by 1991 (within 5 years). 2. Once the design of South Carlsbad Library is approved by the City, the City shall in the next yearly review of this plan make adjustments to the land use and public facility demands from Zone 3 to reflect the addition of the Library and deletion of potential residential dev.elopment. B. Financing The City Council on July 7, 1987 took action to earmark sufficient funds to acquire the site and to construct a 58,000 square foot South Carlsbad Library. The City Council has guaranteed the necessary funds to accom·plish th is project, although the specific long-term financing mechanism has not been determined. The City currently collects a Public Facility Fee (PFF) which is set at 3.5% of permit valuation. This fee is applied at the time of building permit issuance. 51 11/87 LIBRARY ZONE 3 130 120 110 107,931 100 >--90 (r <( 80 (r 82,600 82,600 (D :J Ul 70 I -g m X I-0 60 :z: U1 w {/) a, N w :J -Li... 0 -i .r: 50 wt, " (r <( 40 ::J 0 (/) 30 31,500 20 10 0 480 498 498 498 498 -10 1990 1995 2000 2005 2013 YEARS 53 WASTEWATER ZONE 3 ~ EN CINA WASTE WATER TREATMENT FACILITY t ZONE 3 WASTE '"WATER TREATMENT C.lyatC.W, .... I LOCAL FACILITIES MANAGEMENT PLAN I I ' AMENneo NOVEMBER 1sa1 54 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMMARY SHEET WASTEWATER TREATMENT CAPACITY BUILD OUT ADEQUACY PROJECTION DEMAND SUPPLY (Carionnrce MITIGATION FUNDING wlStrdard) EXISTING 4.7 See Page See Page 5.7 NO 59 59 MGO a 6.6d APPROVED 8.6b,d YES N/A N/A MCD C, z ----Cl) < J: 7.7c Q. .FUTURE 8.6c,d YES N/A N/A MGD --- a. Buildout assumptions are for the entire sewer service area which includes Zone 3. The following analysis of a Citywide facility, therefore, focuses on the entire sewer service area, and not just. on Zone 3. · b. Assumes Phase IV expansion of Encina. c. Oemand and Supply, as of 1995. d. Demand and Supply, as of 1991. 55 11/87 WASTEWATER TREATMENT CAPACITY I. PERFORMANCE STANDARD Sewer plant capacity is adequate for at least a five year period. II. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory Sewer service in the City of Carlsbad is provided by three separate and independent agencies, Leucadia County Water District, San Marcos County Water District, and the City of Carlsbad. Sewer service for Zone 3 is provided entirely by the City of Carlsbad. 1. Buildout Assumptions (Carlsbad Sewer Service Area): Wastewater Treatment Demands Carlsbad Population Current Buildout 40,356 95,669 * EDU -Equivalent Dwelling Units EDU* Current Buildout 21,354 47,800 MGD** Current"" Buildout 4.7 11.8 ** MGD -Million Gallons per Day -Average Dry Weather Flow (ADWF) 2. Existing Facilities The City of Carlsbad has capacity available at two treatment plant facilities. Secondary treatment capacity is provided through the Encina Water Pollution Control Facility (WPCF) which is a regional facility owned by six member agencies. The current rated capacity of the plant is 22.5 MGD of which Carlsbad retains ownership of 25.4 percent (5.7 MGD). The City of Carlsbad also holds title to the Calavera Hills Treatment Plant which has a capacity of 1.2 MGD. The Calavera Facility is not operational at this time and will require the expenditure of $1.1 to $1.5 million to make it functional. Operation of the Calavera Hills Plant is estimated to cost $360,000 per year. Comparable treatment at the Encina WPCF is estimated at $135,000 per year. The Calavera Hills Plant is not economical to operate for treatment capacity except in the absence of needed capacity at Encina. 56 11/87 3. Facilities in the City's Five Year Capital Improvements Program: The adopted CIP includes two items which will be financed from the sewer fund which affect wastewater treatment capacity: B. a. Encina WPCF -Phase IV expansion, scheduled to begin in 1989, and completed in 1991 -$6,500,000 Carlsbad's share of this facility is 2.9 MCD. b. Calavera Hills $2,000,000 for 1986-87 and the 1990-91 Fiscal Years. Construction to be phased to correspond to capacity needs. Phasing and Service Demand Based on data maintained by the City Development Processing Services Department, on March 31, 1987, 22,965 EDU's had been permitted by the City. Utilizing 246 GPO per EDU and the adopted 3% vacancy factor, 985 EDU's of capacity remain to be issued prior to reaching Carlsbad's share of capacity at the Encina WPCF. The Citywide Facilities Management Plan is based on phased growth of 1,250 dwelling units per year plus non- residential development. Using a similar phasing for the portion of the City within the Carlsbad Sewer Service Area an annual growth rate of 1,143 EDU's per year (905 residential EDU's and 238 non-residential EDU's) is projected. This phasing would indicate that Carlsbad's wastewater treatment allocation could be exceeded within a year. Staff has just completed an analysis of Carlsbad's wastewater flows to Encina WPCF to determine the actual flow value of an EDU. As of March 30, 1987, 21,354 equivalent dwelling units (EDU's) were connected and being billed by the City for sewer service. Flow corresponding to these EDU's has been measured at 4.69 MCD. That flow divided by the currently billed EOU's yields an actual flow rate of 220 gallons per day (GPO} per EDU. However, for planning purposes the City of Carlsbad has adopted a flow rate of 246 GPO per EDU. Evaluation of available capacity varies signific~ntly depending on the value of flow per EDU utilized. As can be seen from Table 1 on Page 52, utilizing 220 GPO per EDU, treatment capacity at Encina WPCF would be available until 1990 with plant expansion expected to be completed in 1991. C. Adequacy Findings Based on analysis of existing flow data and a range of projections it ls likely that current treatment capacity will be reached between 1988 and 1990, and that additional interim capacity will be required to meet the performance standard. Options exist to provide interim treatment capacity which would allow the Zone as well as the City's Sewer Service Area to meet 57 11/87 U'I 00 ... ... -00 ..... ill! 1987 1988 1989 1990 1991 1992 1993 1994 1995 TABLE 1 CARLSBAD SERVICE AREA DEMAND AND AVAILABLE WASTEWATER TREATMENT CAPACITY FLOW PROJECTIONS 1 EQUIVALENT DWELLING FLOW a 220 FLOW iii 246 UNITS CEDU'S) GAL/EDU (MGD)2 GAL/EDU CMGD) ENCINA CMGD) 21,354 4.69 5.25 5. 71 23,3843 5.14 5. 75 5. 71 24,492 5.40 6.03 5.71 25,600 5.63 6.29 5. 71 26,708 5.87 6.57 8.57 27,816 6.12 6.84 8.57 28,924 6.36 7 .12 8.57 30,032 6.60 7.38 8.57 31, 140 6.85 7.66 8.57 TREATMENT CAPACITY LAKE CALAVERA HILLS CMGD) TOTAL CMGD) 0.0 5. 71 0.6 6.31 0.7 6.41 0.7 6.41 0.0 8.57 o.o 8.57 0.0 8.57 0.0 8.57 0.0 8.57 1 NOTE: 1989 to 1995 EDU's are expanded 1,143 per year. This repres~nts 905 dwelling units and 238 EDU's of commercial and Industrial. (428,400 sq. ft. at 1,800 sq. ft. per EDU.) Each year is projected to July 1 to correspond to fiscal year budgeting and adjusted for a 3X vacancy • 2 MGD • Millions of Gallons Per Day 3 1988 EDU 1s • 22,965 EDU 1S issued 3-31-87 + 1,143 per Note 1 adjusted for 3X vacancy (22,965 + 1,143) X 0.97 • 23,384 performance standard. These alternatives are incorporated into conditions outlined in the following the proposed special Mitigation section. III. A. B. MITIGATION Special Conditions for Zone 3 1. The following actions shall be pursued by the City to ensure adequate wastewater treatment capacity throughout a five (5) year period: a. Monitor Encina Treatment Plant flows on a monthly basis to determine actual flow rates and to have an early warning of capacity problems. b. Actively pursue acceleration and phasing of treatment plant Phase IV expansion to provide adequate capacity. c. When Carlsbad's share of Encina flows reach 5.25 MGD, actively seek leased capacity from other Encina agencies. d. When Carlsbad Encina flows reach 5.45 MGO, proceed to activation of the Calavera Hills Reclamation/Treatment Facility. Plant to be activated when more cost effective treatment measures are no longer feasible and Carlsbad capacity at Encina has been reached. Financing Sewer connection fees provide the primary source of funding fot both sewer line upgrades and expansion of treatment plant capacity. The timing of sewer facilities upgrades and the mechanism of financing are critical to analysis of the adequacy of funding for plant expansion. A complete financial and cash flow analysis should be conducted in conjunction w~th the Citywide Sewer Master Plan update. This analysis will provide a basis to evaluate development phasing within sewer basins and each Growth Management Zone. Priority for funding should be given to wastewater treatment capacity. 59 11/87 60 PARKS 2 ZONE 3 ZONE 3 Park District Boundarie~ I 10 l cu,o1c.111aa a,.,.,,. Menlgeffl ... PrOc,' .... 5 NOVEMBER 1987 LOCAL FACILITIES MANAGEMENT PLAN 61 ZONE 3 COMMUNITY PARKS □ EXISTING • FUTURE * SPECIAL USE AREA ZONE 3 CALAVERA HILLS ---r-------... :-;l I I ' I I 10 \ \ ',, . ........ .... ' ' \ I I LOCAL FACILITIES MANAGEMENT PLAN 62 \~ ,. ,g. ,~ I I 1t ' I PARKS c:.1-,0,c ...... llro•rtl~~ .... $;11 -~ t ' ' AMENDED NOVEMBER 1987 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMMARY SHEET PARKS PARK DISTRICT 1• BUILDOUT ADEQUACY PROJECTION DEMAND SUPPLY (Cc:normrce MITIGATION FUNDING w/Stsiclard) EXISTING 69.15 79.2 YES N/A N/A 1.7 78.32 APPROVED 79.2 YES N/A N/A (!) 0 z -(I) < 118.44 ::i::: a. .FUTURE 79.2* NO ------ . 16 * Zone 3 is located in two Park Districts, 1 and 3. However, there are no residential units in Park District 3, therefore, no analysis is necessary in the local plan. · ** Based u~on the projected phasing for Park District 1, the standard will not be met in 1990. At that time, or prior to 1990 additional park acreage will be necessary. 63 11/87 PARKS I. PERFORMANCE STANDARD Three acres of Community Park or Special Use Area per 1,000 population within a park district, must be scheduled for construction within a 5-year period. Special Considerations The Citywide Plan divides the City into four park districts which are the same as the four City quadrants.· Zone 3 is located within the following two park districts: Park District 1 (NW Quadrant) and Park District 3 (SW Quadrant). Park District 3 will not be analyzed with regard to lone 3, because there will be no real impacts from Zone 3. This is due to the fact that no resid~ntial units from Zone 3 will be located in the SW Quadrant. Non-residential land uses do not impact parks under the provisions· of the Growth Management Ordinance. Therefore, the analysis below will focus only on Park District 1. The parks listed under existing inventory for Park District 1 reflect the park standards in effect at the time this area was developed and may not reflect the new Park and Recreation standards adopted in 1981. It would be difficult to apply the new Parks and Recreation Standards for community parks to this quadrant because Park District 1 ls largely developed and there are no remaining parcels over 200 acres (the minimum standard or dedication) as required in the City's Park and Recreation Element. Therefore, future community parks of 20 acres or more are not likely to be developed in Park Oistrict 1 • . Park District 3 will not be specifically analyzed in the hody of this analysis, although there are two areas which need to be discussed here. The first, deals with the issue of Alta Mira Community Park. This acreage was counted as useable park land in the Citywide Plan but will not be fully developable due to its steep slopes The future useabllity of Alta Mira Park will need to be addressed as these local plans are reviewed. The second area deals with current park standards. Future park lands dedicated in Park D strict 3 will he required to meet existing standards. PARK DISTRICT 1 II. FACILITY PLANNING AND ADEQUACY ANALYSIS The purpose of this analysis is to determine whether or not the park demand for Zone 3 complies with the adopted performance standard. 64 A. Inventory Existing Facilities Community Parks (Developed) Holiday Ownership City Active Natural/Passive Active Acres 5.4 27.0 6.8 3.0 Hosp Grove City Laquna Riviera City Magee City Active Total Developed 42.2 Special Use Areas Ownership ~ Acres Buena Vista CUSD Active 2.3 Cannon Park SOC&E Active 1. 7 Car Country City Passive 1.0 Chase Field City Active 2.3 CHS Tennis Courts cuso Active 3.0 Harding Community Center City Convnunity Center 1.0 Jefferson Elementary cuso Active 2.6 Kelly Eleme.ntary cuso Active 2.8 Magnolia cuso Active 4.2 Maxton Brown City Passive 1.4 Oak City Passive 0.4 Pine Elementary CUSD Active 2.0 Pio Pico City Passive 0.8 Rotary City ·Passive 1.0 Swim Complex City Active 3.0 Valley Jr. High School CUSD Active 7.5 Total 37.0 CUSO -Carlsbad Unified School District Proposed Future Facilities Ownership Type Acres Cannon Lake City Active 6.7 Pine School CUSD Active 7.0 Macario City Active 25.0 Pine Jr. Center CUSD Convnunity Center 3.0 (All facilities owned by CUSO have a one year joint-use agreements, renewable yearly with a 60 day cancellation clause which may be initiated by either party. The SDG&E Special Use Area originally had a 10 year lease which expired on May 31, 1973; however, the lease also provided for an automatic yearly renewal which is still in effect.) 65 11/87 B. Phasing 1 -. Buildout Assumetfons (1/1/87) Population Park District 1 Current 23,049 Buildout 39,479 Zone 3 Current 571 Buildout 623 2. Park Demand (Park District 1) Required Acres 69.15 118.44 1. 71 1.87 Listed below is the demand for parks generated by resi- dential development in Park District 1. Demand was determined by using the following formula: Yearly Dwelling Units x 2.471 = Population Population x Park Standard= Park Demand (by year) Supply is determined by analyzing existing parks and any parks scheduled for construction. This is compared with the demand to determine if the performance standard is being met. EXHIBIT L P L A N N I N G P R O J E C T I O N S O N L Y PARK DISTRICT 1 PROJECTED PARK DEMAND -V-PARK SUPPLY --------------------------------------------------------------------------YEAR DWELLING TOTAL POP. TOTAL PARKS TOTAL CONFORMS/ UNITS DWELLING POP. DEMAND SUPPLY (NON- UNITS CONFORMING) -------------------------------------------------------------------------- 1/1/87 9,328 9,328 23,049 23,049 69.15 79.20 10.05 1987 539 9,867 1,332 24,381 73.14 79.20 6.06 1988 308 10,175 761 25,142 75.43 79.20 3.77 1989 355 10,530 877 26,020 78.06 79.20 1.14 1990 192 10,722 474 26,494 79.48 79.20 (0.28) 1991 188 10,910 465 26,959 80.88 79.20 (1.68) 1992 227 11,137 561 27,520 82. 56 . 79.20 (3.36) 1993 167 11,304 413 27,932 83.80 79.20 ( 4. 60) 1994 303 11,607 749 28,681 86.04 79.20 (6.84) 1995 156 11,763 385 29,066 87.20 79.20 (8.00) 66 .3 • Park Demand (Zone .3 Only) Listed below ls the demand for parks generated specifically by residential development in Zone 3 and not the entire quadrant. Information must be generated from each zone before the whole quadrant can be analyzed. Demand for Zone 3 was reached by using the following formula: Yearly Dwelling Units x 2.471 = Population Population x Park Standard= Park Demand (by year) EXHIBIT M PARK DISTRICT 1 -PROJECTED PARKS DEMAND LOCAL FACILITY MANAGEMENT ZONE 3 YEAR 1987 1988 1989 1990 1991 1992 1993 1994 1995 DWELLING TOTAL UNITS DWELLING UNITS 232 232 3 235 3 238 5 243 2 245 2 247 2 249 2 251 1 252 67 POP. 573 7 7 12 5 5 5 5 2 TOTAL POP. 573 581 588 600 605 610 615 620 623 TOTAL PARKS DEMAND 1.72 1.74 1.76 1.80 1.82 1.83 1.85 1.86 1.87 4. Evaluation of Zone 3 within Park District 1 Listed below are the demand and supply of existing park acreage. Existing Acres Community Parks Special Use Areas 42.2 37.0 79.2 69.15 10.05 Acres Required Total Surplus Currently, in Park District 1 a surplus of 10.05 park acres exists. Based on phasing, it is anticipated that in 1990 an additional .28 acres of park will be neeoed to meet the auadrant demand. At that time, funding must bP. approved for construction of additional park acreage in Park District 1 within five years (See Financing Section). C. Adequacy Findings Park District 1 currently conforms with the adopted performance standard and will continue to do so until 1990. At that time, or in advance of 1990, additional park acreage will be needed or development will be stopped in Park nistrict 1. III. MITIGATIOU Currently, Park District 1 conforms with the adopted performance standard and needs no mitigation, although it is projected that a shortage will occur in 1990. Zone 3 is projected to phase its residen~ial development through 1995. Given this phasing, in 1990 Zone 3's residential development would be stopped until additional park acreage is added in the City's CIP or until another zone(s) solved this shortage. It is important (January 1987) has development of Zone 3 to in-lieu fees. Phased District 1 would add totaling $1,020,300. to note that Park District 1 currently $680,743 in park-in-lieu fees. Phased 1990 would add approximately $9,000 park- rlevelopment of the other zones in Park another $1,010,i,OO in park-in-lieu fees, The collected park-in-lieu fees supplemented with PFF fees could be used to either develop Cannon Lake Park (6.7 ac) or to construct a sµecial use area that would bring oar~s into conformance with the performance standard, or some other option. At this time, no specific mitigation is required and, therefore, no recommendation is provided. 68 11/87 A. Special Conditions for Zone 3 There are no conditions necessary at this time because park facilities in Park District 1 meet the adopted performance standards. All development shall pay Park-in-Lieu fees and Public Facility Fees for Park District 1. No residential development will be allowed after 1990 unless actions have been taken to construct additiona~ park facilities. No conditions are needed for Park District 3 because Zone 3 has no residential units in that district and, therefore, has no impact. 8. Financing Public Facility Fees and Park-in-Lieu Fees are continuing to be collected and no additional financing plan is needed at this time. Development will be monitored and when it appears that park acreage could fall below the standard, the City Council will have to consider options to increase developed park acreage. 69 11/87 70 DRAINAGE .... .._ co .... ;·-·-·-·-·-·-·-·-·-·-·-· i . I LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 DRAINAGE ~ EXISTING STORM DRAINS & SIZE PROPOSED STORM DRAINS & SIZE r------:, -OPEN CHANNEL CONCRETE LINED CHANNEL CONCRETE BOX CULVERT 0 3 e • ---- ZONE 4 I I . I I ..... C.tv OI Cat1:1bad NOVEMBER . t 9 e 7 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMMARY SHEET DRAINAGE BUILD OUT ADEQUACY PROJECTION DEMAND SUPPLY (Ccrlonnrce w/StSlderd) MITIGATION FUNDING EXISTING * * YES N/A N/A APPROVED ------YES N/A N/A C, z -en c( :I: Q. FUTURE ------YES YES** YES** * Specific drainage facilities will be required as individual projects are·approved in Zone 3. . ** A 24~ RCP required in Cannon Road from Pase~ Del Norte to Cannon Lake. A 2,4" RCP will also be required under AT & SF Railroad. Both improvements iill be required with development of the Car Country Expansion Area. 72 11/87 DRAINACE I. PERFORMANCE STANDARD Drainage facilities must be provided as required by the City concurrent with development. II. FACILITY PLANNING AND ADEQUACY ANALYSIS As was indicated in the Citywide Facilities and Improvements Plan, drainage is distinguished from all other public facilities and improvements because by its very nature it is more accurately assessed as specific development plans are finalized. However, certain facilities may be necessary which are larger than those required from a single development project and, therefore, need to be identified so that the proper funding can be collected for the construction of these facilities. A. Inventory The City's Master Drainaqe Plan, completed in March, 1980, does not identify major drainage facilities within Zone 3. The Master Drainage Plan is currently ~eing revised; preliminary research indicates that an RCP will be required in C~nnon Road to serve the north end of the Car Country expansion. A 24" RCP under the AT & SF Kailroad will also be required to serve the south end of the Car Country expansion. 1. Existing Faciliti~s Existing storm drains are shown on map "Drainage" on Page 70 with portions draining overland throuqh course that have been designdted as open space areas on the r.eneral Plan. The largest sub-basin within this Zone drains gPnerally on a northerly direction to the Agua Hedionda Lagoon. The other smaller suh- basins along the coast and south of Palomar Airport Road drain westerly to the Pacific Ocean. 2. Builnout Assumptions Future development within Zone 3 will consist of the following: Budget. Commercial Industrial Residential 4-6.9 Acres 11.3 Acres 21 Units 3. Facilities in the Five Year Capital Facilities Progr-am: TherP. are no improvements scheduled in the current C.I.P. 73 11/87 B. Phasing Since the demand for future drainage facilities within Zone 3 will be localized and generated by specific development, it will be addressed as that development occurs. There is no significant drainage impact from development outside of Zone 3. Canyon De Las Encinas, a major water course parallel to Palomar Airport Road, crosses Zone 3 at its southerly end and has been identified as an ~pen space area with no improvements required within the 100 Year Flood Boundary. C. Adequacy Findings Existing facilities conform with the adopted performance standard. A 24" reinforced concrete pipe (RCP) in Cannon Road and a 24" RCP under the AT & SF Railroad will be required with the expansion of Car Country. III. A. MITIGATION Special Conditions for Zone 3 Draina~e facilities shall be provided at the time of development to the satisfaction of the City Engineer. B. Financing Drainage improvements shall be financed by the developer. 74 11/87 75 CIRCULATION CIRCULATION ELEMENT-ROADS AND INTERSECTIONS _______________ ll~ ~s==--:~-=.~ ... ~,~;.i==-i~-=..-_-_-_-_-_-_~~~~=========~~--_, .,.,!'-·-·-·-·-·-·-·-·-·-·-·~·~1~~--~-, ... :•""' A" Nil"" 1-------===========::_------:-.-:--, -=-,-,-,~,,.......-,----------7' ·-•-.----------------------11---------------~---'---------~ \ . \ ZONl 1 I I Q PFF TRAFFIC SIGNAL LOCAL FACILITIES MANAGEMENT PLAN -ZONE 3 -I I -------------------:-: ... , FUTURE ALIGNMENT ZONE 22 t¥1¥~ ~ I \ ' NOVEMBER 196 · LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMMARY SHEET CIRCULATION BUILD OUT ADEQUACY PROJECTION DEMAND SUPPLY (Ccnomw1:• w/Stirdard) MIT/GA TION FUNDING EXISTING APPROVED FUTURE * ** *** See * * YES Page 81 See ** ** NO Page 81 (!) z -(/) c( :c. a. See *** *** YES Page 81 All intersections are currently in conformance with the adopted perf~rmance standard. See Page 86 See Page 86 See Page 86 Three impacted road segments or intersections are non-conforming at traffic levels generated with existing plus approved projects. (See Page 78). · · Zone 3's buildout is so minimal that the buildout Circulation Element will mitigate traffic impacts to performance standard levels. 77 11/87 CIRCULATION I. PERFORMANCE STANDARD No road segment or intersection in the zone nor any road segment or intersection out of the zone which ls impacted by development in the zone shall be projected to ~xceed a service level C during off-peak hours, nor service level D during peak hours. Impacted means where twenty percent or more of the traffic generated by the Local Facility Management Zone will use the road segment or intersection. II. FACILITY PLANNING AND ADEQUACY ANALYSIS The purpose of this analysis is to determine whether or not the circulation system within Zone 3 conforms to the adopted performance standards for Zone 3. It will also address all Circulation Element Roads and Intersections outside of Zone 3 impacted by twenty percent or more of the traffic generated by Zone 3 to ensure conformance with the adopted performance sta11dard. A. Inventory The following Circulation Element Roads and intersections are located in Zon~ 3. See "Circulation Element Roads and Intersections" on Page 76. Roads 1. Palomar Airport Road -Prime Arterial -126' Right-of- Way 2. Carlsbad Boulevard/Cannon Road -Major Arterial -102' Right-of-Way 3. Paseo del Norte/Avenida Encinas -Secondary Arterial -84' Right-of-Way Intersections 1. Cannon Road and Paseo del Norte 2. Cannon Road and I-5 3. Cannon Road and Avenida Encinas 4. Cannon Road and Carlsbad Boulevard 5. Carlsbad Boulevard and Palomar Airport Road 6. Palomar Airport Road and Avenlda Encinas 7. Palomar Airport Road and I-5 8. Palomar Airport Road and Paseo del Norte 78 Existing Conditions The existing conditions of these road segments and intersections all comply with the adopted performance standard. B. Phasing This analysis considers all of the existing traffic which flows through road segments or intersections which are impacted by the Car Country Expansion of Zone 3 as well as projecting the future traffic generated by projects which have received discretionary approvals. At this level of analysis the following impacted road segments and intersections fall below and do not conform with the adopted performance standard if additional improvements are not constructed. Existing Existing plus Committed A.H. P.M. A.H. P.M. Peak Peak Peak Peak Northbound I-5 at Palomar Airport Rd. C C F F Southbound I-5 at Palomar Airport Rd. C C F F Palomar Airport Rd. at Paseo del Norte A C D F Existing levels of service are based on actual traffic counts at these intersections. The existing plus committed levels of service take the existing traffic counts and project the trips which will be generated from those committed or approved projects and the Car Country Expansion to Zone 3. The I-5 southbound off-ramp to Palomar Airport Road currently operates at LOS D during a portion of the morning peak hour, however, the duration of this LOS Dis approximately for one-third of the 7:30 a.m. to 8:30 a.m. peak hour. Between 7:30 and 7:40 the delay on the off-ramp does not exceed 90 seconds, an average delay; during the time from 7:40 a.m •• to 8:00 a.m., some delays up to three minutes were recorded, but average delays generally do not exceed two minutes. After 8:00 a.m., to 8:30 a.m., average delays were generally no more than thirty seconds in length. Also, during the morning peak hour,. the free-flowing traffic on Palomar Airport Road experiences no delay and ls considered to operate at LOS A. 79 11/87 The I-5 northbound off-ramp traffic also experiences a LOS D during approximately one-third of the morning peak hour. Although delays up to two minutes were recorded during the twenty minute period.· The average delay during the remainder of the peak hour ~as approximately thi~ty seconds. The free-flowing traffic on Palomar Airport Road (without stop signs) experienced no delay and is considered to operate at LOS A. Since the off ramp traffic contributes approximately one third of the total traffic at the ramp intersections, and the LOS D is experienced by the off ramp traffic for only one thir1 of the peak hour, the combined traffic is considered to operate at LOS C during the morning peak hour at these ramp intersections. The afternoon peak hour level of service at these ramp intersections is similar to the morninq peak hour, i.e. the duration of the LOS D for the ramp traffic is only about one third of the peak hour, while the east-west traffic on Palomar Airport Road flows at LOS A. Therefore, the ramp intersections are considered to operate at LOS C for the total peak hour traffic. The Zone 3 Circulation section has not been phased on a yearly basis which will be con~istcnt with the plans for Zones 1 through 6. They were not phased on a yearly basis because the Barton-Aschman traffic study, which is the source for this analysis, was set up to analyze traffic at three threshold points; at existinq developMent, at existing plus committed development, and at buildout. For this reason, plus the fact that the zone is almost built out, staff determined this method of analysis was consistent with the phasing reqttirement outlinerl in Chapter 21.90 of the Carlsbad Municipal Code. However, based on the projected buildout rate of the Carlsbad area, the mitigation meas,ires have been categorized as either "short-term" (1-3 years) or "long-term" (5-10 years). C . Adequacy Findings The existing road segments and intersections which are impacted by Zone 3 1 s traffic, all conform with the arlnpterl performance standard. When all approved or committed projects traffic generation is added, three intersections fail to meet the adopted standard and are projected at Level "F": 1. Palomar Airport Road at I-5 Northbound 2. Palomar Airport Road at I-5 Southbound 3. Palomar Airport Road at Paseo del Norte Based upon projected development which affects these intersections, it is anticipated that at some point in the future, as approved projects are coristructe~, they will fail to meet the ~dopted performance standarn. 80 11/87 It is anticipated that the existing residential land uses will be able to build out prior to these intersections failing to meet the adopted performance standard. The remaining non- residential land uses may not be able to completely develop until improvements are made at these intersections. As more specific development plans and other Local Facility Managemen~ Plans are prepared for those zones which impact these intersections, it will become clearer as to the exact timing of these needed improvements. III. MITIGATION The Barton-Aschman traffic report and additional supplemental analyses identify improvements to these impacted intersections which will enable them to conform with the adopted circulation standard. For the near term (1-3 years) and the long term (5-10 years). Northbound I-5 at Palomar Airport Road Widening of the east and west approaches to provide an additional through lane for each direction would allow this intersection to operate at a level of service at existing plus committed of A and B respectively. These improvements are shown on Exhibit N, "Palomar Airport Road -I-5 Northbound" on Page 87. However, these improvements would require the ultimate widening of the I-5/Palomar Airport Road overpass, and would be needed in the long- term, 5-10 years. An increment of traffic from the Car Country Expansion of Zone 3 or an equal amount from committed projects, can be accommodated without overpass widening by providing a free right turn lane for the northbound to east~ound off ramp movement and by signalization. This off ramp intersection would operate at LOS A and C during the A.M. and P.M. peak hours, respectively. These interim improvements are shown on page 88, and would be needed in the short-term, 1-3 years. Southbound I-5 at Palomar Airport Road The improvements would consist of re-stripping to provide two through lanes for eastbound and westhound traffic and widening of the southbound off ramp to provide three lanes (one left only, one right only and one optional). These improvemenis ~ould result in a service level of A and C respectively with the existing plus committed projects. These improvments are shown Exhibit P, "Palomar Airport Road I-5 Southbound" on Page 89. However, these 81 11/87 improvments would require the ultimate widening of the I-5 Palomar Airport Road overpass, and would be needed in the long term, 5-10 years. An increment of traffic from the Car Country Expansion of Zone 3, or an equal amount from committed projects, can be accommodated without overpass widening by the interim signalization of this southbound off ramp intersection, and the widening of Palomar Airport Road at the southbound on ramp. This off ramp intersection would operate at LOS A and A during the A.M. and ~.M. peak hours, respectively. The interim improvement would he necessary in the short-term, 1-3 years. Palomar Airport Road at Paseo del Norte The improvements consist of widening the westbound approach to provide a separate right-turn only lane and widening the northbound approach to provide two left-turn only lanes. Signage would also be recommended for the westbound approach to direct traffic to the proper lanes. These improvements would result in a level of service of B and n respectively. The improvmenis are shown on Exhibit Q, "Palomar Airport Road -Paseo del Norte" on Page ?O. Before the development of all committed projects, an increment of traffic from Car Country Expansion or an equal amount from the committed projects can be accommodated at the Palomar Airport Road/Paseo del Norte intersection by the addition of a dual left turn lane for the eastbound to northbound movement. This dual left turn lane can be accommodated within the existing curbs of Palomar Airport Road by the removal of the existing eight foot median, restripping the westbound lanes, and the addition of detector loops in the new left turn lane, as shown on Page 91. These interim improvements would be needed in the short term, 1-3 years. All street improvements needed to bring all roads up to full standards required by the Circulation Element for Zone 3 are provided as additional information on Table 1, "Bulldout Improvements", Page 94. Traffic Impacts of Future Development In Zone 3 there are no residential projects and only three non-residential projects in the approval or committed category including the Car Country Expansion. The traffic generated by these projects will have a minor impact on Circulation Element Roads and Intersections in Zone 3. As noted above, three intersections will be at Service Level "F'' when existing plus committed projects impacting these 82 11/87 intersections have been constructed. Based on staff's estimate of phasing, these committed projects will not be completely built out until 1995. The 18 remaining vacant lots will most likely be developed prior to 1995. Therefore, it has been determined that the remaining vacant residential lots in Zone 3 will be able to buildout before the three above mentioned intersections fail to meet the performance standard for circulation. Some of the vacant non-residential lots in Zone 3 that do not have any approvals or committed projects may not be developed until after 1995. If by the time these lots are ready to develop the intersections of Palomar Airport Road and 1-5 and Palomar Airport Road and Paseo del Norte do not comply with the performance standard these properties will not be able to develop until the intersections are improved. Outside Traffic Impacts from Zone 3 Traffic generated by Zone 3 does not impact any Circulation Element Road or Intersection outside of the Zone. Zone 3 is bisected by Interstate 5, California's major north-south highway. As shown by Exhibit S, "Trip Generation -Zone 3", on Page 92 the vast majority of the traffic generated by Zone 3 will consist of travel service, industrial or office uses. Almost all of the travel service traffic will utilize Interstate 5 when entering or leaving the Zone. Some of the office/ industrial traffic may use surface streets; however, the total araount of traffic impacting any road segment or intersection outside of Zone 3 would be less than 20% of the total traffic generated by Zone 3. Buildout Arterial Improvements All of the Circulation Element Roads have been constructed to their full length within Zone 3 except Cannon Road extended east from Paseo del Norte. All of these roads have sections that have not been built out to their ultimate right-of-way width. Many of the traffic signals needed at the intersections of arterial streets in Zone 3 have not been constructed at this time. Each of the arterials within Zone 3 has been broken into segments, as shown on map "Existing and Proposed Street Improvements", on Page 93. This exhibit distinguishes between fully improved and partially improved segments of the roads. It also notes future traffic signals that will need to be installed prior to buildout or at buildout. Partially improved segments or intersections needing a 83 11/87 A • traffic signal at some future date have been assigned a letter. Underneath this letter is a series of numbers and letters which list the neened improvements on each unimproved section. The legend on Table 1, "Buildout Improvements" on Page 94 explains what each of these letters signifies. The needed improvements, the approximate length of the needed improvements, the approximate cost of the improvements and the source of the improvements is shown on Table 1, "Buildout Improvements" on Page 94. This information was obtained from a number of sources. A field survey was done by staff to determine what improvements were needed on each partially improved segment. The approximate length of the needed improvements was determined by the use of maps, recent aerial photos, or actually measuring the length of the needed improvements in the field. The cost estimates for the needed improvements were obtained from a number of sources. Some of these improvements have been identified as Bridge and Thoroughfare Benefit District Projects. Others were identified as Public Facility Fee funded projects. The Engineering Department has already estimated the approximate cost of improvements that would be provided as Bridge and Thoroughfare Benefit District and Public Facility Fee funded projects. Staff estimated the cost of other needed improvements that were not listed as Bridge and Thoroughfare or Public Facilities Fee projects. This was done by obtaining an approximate cost estimate per linear foot for various portions of a Circulation Element roadway. It should be noted that all of the estimated costs for the needed improvements are based on 1987 costs. Future inflation rates could substantially increase the cost of these improvements. In addition, unforseen soils problems necessitatinq excessive amounts of grading could substantially increase the cost of the needed improvements. This is especialfy so for the needed improvements that have not been listen as Bridge and Thoroughfare or Public Facility Fee projects since no detailed engineering studies have been done for these improvements. Special Conditions for Zone 3 1) All future development within Zone 3 shall continue to pay Traffic Impact Fees, Public Facilities Fees and participate in the Bridge and Thoroughfare Benefit District. 84 11/87 2) An on-going monitoring system shall be established to evaluate the aspects of improvements, development, and demand on circulation facilities. The required improvements of ~ section may be modified without formal amendment to this plan. 3) Should the performance standard of any facility within Zone 3 fa~l below the adopted level of service, all discretionary approvals or development permits shall be halted until su~h time as appropriate mitigation is installed and the performance standard has been met. 4) Based upon the projected traffic volumes, the I-5/ Palomar Airport Road and the Paseo del Norte/Palo~ar Airport Road mitigation shall be designed, bonded, a schedule submitted and approved by the City Engineer indicating completion of these intersections within one to three years. Specifically, the mitigation required is: (1) Free right turn I-5 northbound off-ramp to eastbound Palomar Airport Road. (2) Interim signalization of I-5 northbound off- ramp. (3) Interim signalization of I-5 southbound off- ramp. (4) Dual left turn lanes for Palomar Airport Road eastbound to northbound Paseo del Norte movement/replacement of median, restripping the westbound lanes and the addition of detector loops. 5) In any event, these improvements must be in place as needed to maintain conformance with the performance stdndard or all development will be stoned in zones which impact these interesections should the standard not be met. B. Financing The source of funds for th~ needed future circulation improvements in Zone 3 and impacted by Zone 3 is also listed on Table 1, on Page 94. The City collects fees from all projects located in the Bridge and Thoroughfare Benefit Oistrict. This money will go for interchange improvements at the intersections of Palomar Airport Road, Poinsettia Lane, La Costa Avenue and Interstate 5. The cost of improving the intersection of Palomar Airport Road and Interstate 5 which is located in Zone 3 is estimated at $5,100,000. 85 11/87 The City currently collects a Public Facility Fee (PFF) which is set at 3.5% of permit valuation. This fee is paid at time of building valuation. Certain street improvements as well as all needed traffic signals in Zone 3 will be paid for by Public Facilities Fees. See Table 1, Page 94. A few of the needed improvements are adjacent to large parcels of undeveloped, but developable land. When these parcels are developed the applicant will be required to construct the needed improvements. See Table 1, Page 94. Other needed improvements have been identified that will not be provided by developers, PFF funds or Bridge and Thoroughfare funds. See Table 1, Page 94. These segments are located adjacent to undevelopable properties or are adjacent to properties that have already been developed with single family residences. The City has several options for financi~g the improvements along the segments for which no clear funding source has been identified: 1) Add them to the list of projects which will be funded through Public Facility Fees. 2) Require future development within Zone 3 and outside Zone 3 which contributes traffic to these segments to fund part or all of the cost of the needed improvem.ents. 3) Establish Assessment Districts to pay for the needed improvements. 4) Establish traffic impact fees for all projects contributing traffic to the impacted road sections or intersections. 86 11/87 PALOMAR AIRPORT· ROAD ~ --+ -+ ., al z U') ..!. t +- +- J .. SPCHEMATIC OF PROPOSED IMPROVEMENTS AT ALOMAR AIRPORT AT 1-5 NORTHBOUND ATON ASCHMAN ASSOCIAT S. INC. (EXISTING PLUS COMMITTED CONDITION) 87 EXHIBIT N 6 N I I I I I ' 1-5 NORTHBOUND ON-RAMP 0 < 0 a: t-a: 0 0.. a: < 0: < ~ 0 ...I < a. ~I I I I I Cl) Cl) ~ f5 ::s 0 i t,.; !Q ~ I l I I l l I- I EXHIBIT 0 Remove existing curb -a tripe eaatbould lane construct new curb and radius for right tum only lane ~ RIGHT TURN ONI.Y ~ 1-5 NORTHBOUND OFF-RAMP I-• (IJ EXISTING CURB -----r:zq INTERIM OFF-RAMP IMPROVEMENTS 88 11/87 PALOMAR AIRPORT .... .... al en U") I EXHIBIT P S '--'C~H;.:E~M:,,;:.A.;:..T:...:IC~O:...;;F;;.=.P.:..:R~O:.:.;:PO::.:S.::E:...D:..:.l.:...M.:..P..:.RO_;:V:.:E:;.;:M;..:.E:..:;N:.;T:..;S:.:.A=T;.__ ____ ___.noN ~ALOMAR AIRPORT ROAD AT 1-5 SOUTHBOUND .. BARTON-ASCHMAN ASSOCIATES. INC. (EXISTING PLUS COMMITTED CONDITIONS) lJ 89 PALOMAR AIRPORT ROAQ- --+ \.. ~ ~ t ~ ~ 0 z ..J UJ 0 0 UJ en c( c.. EXHIBIT Q ~ +-TO I-5 NB RAMP +-TO I-5 SB RAMP +-TI-RU • SCHEMATIC OF PROPOSED IMPROVEMENTS 6 ~~~!~~N~q~~~!~~EN A~~i§sl~~.~ri;'IlEsR:] .. !~c::. R=O~A~D~~A::T:;:;P~A~S~E~O:::;D~:E=L=N=O=R=T=E============-,-n N (EXISTING PLUS COMMITTED CONDITION) Li 90 -PALOMAR AIRPORT ROAD EXISTING CURB 171 121 121 ---~...-...... ___ ._.. ___ -', _______________ JO • 101 RIGl-tT TURN ONLY Existin Curb 121 12' 171 INTERIM MITIGATION FOR CAR COUNTRY EXPANSION WITHIN EXISTING CURBS 91 EXHIBIT R NORTH LEG NO CHANGE PASEO DEL NORTE ( 1) Remove existing median (2) Restripe for dual eastbound to northbound left turns (3) Install detector loops in nP.w left turn lane SOUTH LEG NO CHANGE 11/87 w (!J z < :I: (.) 0 z (!J w _,J I-en < w ID N TRIPS GENERATED FROM LOCAL FACILITY MANAGEMEN~ ZONE 3 ---------------------------------------------------------------------------------------------------EXISTING APPROVED FUTURE LAND SQ.FT./ TRIPS SQ.FT./ TRIPS SQ.FT./ TRIPS TOTALS % OF TOTAL USE UNITS GENERATED UNITS GENERATED UNITS GENERATED TRIPS ---------------------------------------------------------------------------------------RESIDENTIAL 232 2,320 20 200 2,520 2.14% COMMERCIAL CAR DEALERS 272,584 16,355 243,936 14,636 30,991 26.28% RESTAURANT 51,659 3,100 4,700 1,410 4,510 3.82% RETAIL 43,624 21,812 4,872 2,436 24,248 20.56% MOTEL 95,432 3,150 78,300 1,500 4,650 3.94% GAS STATION 6,218 2,250 2,250 1.91% DINNER THEATER 26,000 2,600 2,600 2.20% TRAVEL SERVICE 277,042 33,245 33,245 28.19% IND./PM OFFICE 889,829 17,797 70,000 1,400 196,020 3,920 23,117 19.60% OFFICE 17,424 348 348 0.30% MINIWAREHOUSE 104,068 520 520 0.44% GOVERNMENT 8,652 26 69,696 209 235 0.20% UTILITY 311,834 1,559 357,192 1,786 3,345 2.84% TOTALS 68,369 9,866 54,344 132,579 ---------------------------======== ------------------------------------------------------------------------------------------------------------------------------ m X :c IXJ --4 1/) I (I) ASPHALT MEDIAN NEEDS REPLACEMENT I ON NORTH IIDE"' -----------~::.:.::.:~..:;,-, (L) I ;·-·-·-·-·-·-·-·-·-·-·-· ; (H) • M -------~-r--~ ZONE 1 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 [i] FULLY IMPROVED ROADWAYS [] PARTIALLY IMPROVED ROADWAYS Q PFF TRAFFIC SIGNAL L-LANE BL-BIKE LANE M-MEDIAN CG-CURB & GUTTER $-SIDEWALK SL-STREET LIGHT ST-STREET TREE (C) ZONE 4 I I I 01y ot Carltbad Gtowch Managem.-.1 Pr0t7am NOVEMBER 1 8 8 7 (A) (B) (C) ( D ) ( E ) (F) (G) (H) TABLE 1 ZONE 3 Buildout Improvements Paseo Del Norte -sidewalk, streetlights, street trees for approximately 2,000 feet on east side. Approximate cost $56,925. Source-future deielopment of the property. Avenida Encinas, (south of Palomar Airport Road) -2 lanes, bike lane, sidewalk, curb, gutter, street lights, street trees for approximately 2,700 feet on west side. Approximate cost -$356,063. Source -see alternatives. * Note -Extensive fill required, which could substantially increase the cost of this improvement. Palomar Airport Road and Interstate 5 -Bridge and Ramp Improvements 2 lanes, 2 bike lanes, 2 curb+ gutter, 2 sidewalk, 2 streetlight. Approximate Cost -$5,100,000. Source -Bridge and Thoroughfare Benefit District. Palomar Airport Road (west side of freeway to Carlsbad Boulevard intersection) Bridge widening, T-intersection, 2 lanes, median, 2 sidewalks, 2 bike lanes, 2 curb+ gutter, 2 street trees, 2 streetlights, traffic signal. Approximate cost $3,600,000. Source -PFF. * Note -Palomar Airport Road and Carlsbad Boulevard to be made into a signalized fully improved T intersection. Carlsbad Boulevard (Palomar Airport Road to northerly boundary). 2 lanes, median, 2 sidewalks, 2 curb and gutter, 2 streetlights, 2 street trees for approximately 4,000 feet Approximate cost $1,105,400. Source -see alternatives. Cannon Road (Carlsbad Boulevard to easterly edge of Terramar) Lane, median, curb + gutter, sidewalk, streetlight, street tree for approximately 750 feet on the south side. Approximate cost $204,263. Source -see alternatives. Road (Easterly Edge of Terramar to east side of I-5) Cannon Median $184,000. Approximately 1600 feet. Approximate cost Source -see alternatives. Cannon Road (East side of I-5 to easterly terminus) Replace asphalt median with planted median, sidewalk on north side. Approximately 750 feet: Approximate cost $107,250. Source -Development on SDG&E property in Zone 13. 94 (I) Traffic Signal Cost -$120,000. Palomar Airport Road and Interstate 5. Source -PFF. · (J) Traffic Signal Cannon Road and Paseo del Norte. Cost -$65,000. Source -PFF. (K) Traffic Signal Cannon Road and Interstate 5. Cost -$120,000. Source -PFF. (L) Traffic Signal -Cannon Road and Carlsbad Boulevard. Cost -$65,000. Source -PFF. (M) Traffic Signal Cannon Road and Avendia Encinas. Cost -$60,000. Source -PFF. 95 96 FIRE * FIRE STATIONS-EXISTING 0 l'IRE STATIONS-flLANNeO 11 1ft In u I I I FIRE RESPONSE TIME --STATION 1 --STATION 2 •--STATION 3 ■■■ -STATION 4 ZONE 3 I Sig,"' __ ,_, -' -I --·-~ _.,. 10 LOCAL FACILITIES MANAGEMENT PLAN 97 I I FIRE CllyOI- • NOVEMBER Is a 1 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMMARY SHEET FIRE BUILD OUT ADEQUACY PROJECTION DEMAND SUPPLY (Cor1ornww:e w/St!rdard) MITIGATION FUNDING EXISTING APPROVED .FUTURE * 232 Units * YES NIA N/A 0 Units * YES N/A N/A C, z -(J) < :c Q. 252 Units * YES YES** N/A The existing Fire Station locations will guarantee compliance with the adopted performance standard at all times as the Zone builds out. 98 11/87 FIRE I PERFORMANCE STANDARD No more than 1,500 dwelling units outside of a five minute response time. II. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventory Zone 3 ls-presently served by Fire Station No. 4 located at 6885 Batiquitos Road. It ls also within the five minute response time of Fire Station No. 1 located at 1275 Elm Avenue. B. Phasing Because Zone 3 ls almost entirely built out and because future development will be minimal, there will be no impact on conformance with the adopted performance standard. Therefore, it was not necessary to do a phasing analysis for fire services in Zone 3. c. Adequacy Findings During preparation of the Citywide Facilities and Improvements Plan, it was determined that Zone 3 presently meets the fire performance standard and will continue to conform to this standard to bulldout of the Zone. III. A. MITIGATION Special Conditions for Zone 3 No conditions are necessary for fire services in Zone 3 because fire Station 4 ls located within the required five minute response time of the entire zone. In addition, Station 1 also provides back-up response to much of Zone 3 with five minutes. B. financing All fire facilities are in place for Zone 3 and the required performance standard has been met and, therefore, no special funding mechanisms are required. 99 100 OPEN SPACE ... 0 ... j[ :~;y;'./'.;.;_ /r' •I.,., LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 OPEN SPACE-EXISTING AND FUTURE lVO ' ., . .,. · 1 ; \ "f •. ~ •· .,. P acilic Ocean Zone 3 Is an infill zone and has no opportunity tor an increase In the amount of open apace fl OPEN SPACE AREA ,, NOVEMBER 1 ea 1 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMM_ARY SHEET OPEN SPACE BUILD OUT ADEQUACY DEMAND SUPPLY PROJECTION ( C Cl"lf011TW1Ce w/Strdard) MITIGATION FUNDING EXISTING APPROVED .FUTURE * * * YES N/A N/A * * YES N/A N/A C, z -en < :c: a. * * YES YES** N/A Ouring preparation of Citywide Facilities and Improvement Plan, it was determined that the adopted performance standards for Open Space in Zone 3 have already been met. 102 11/87 OPEN SPACE I. PERFORMANCE STANDARD Fifteen percent of the exclusive of environmentally must be .set aside for permanent concurrent with development. total land ~rea in the zone constrained non-developable land open space and must be available II. FACILITY PLANNING ANO ADEQUACY ANALYSIS A. Inventory During preparation of the Citywide Facilities and Improvements Plan it was determined that certain areas of the City are already developed or meet or exceed the requirements for Open Space and, therefore, an analysis is not needed in the local plan. This includes Zones 1 through 10, as well as, 16. Zone 3, an infill zone, is almost completely built out with only a small amount of remaining land available for development. This eliminates the opportunity to create future permanent open space unless existing structures are removed. For these reasons, the Open Space facility for Zone 3 needs no further analysis. Zone 3 has 98.6 acres of land which are designated as Open Space in the land Use Element of the General Plan. This land falls into two major categories: (1) Cannon Park and (2) miscellaneous State City owned land. Please refer to Exhibit A, "Existing land Use Categories" on Page 20, for the exact breakdown by acreage. B. Phasing Because Zone 3 is an infill zone with no future· opportunity to increase open space, the phasing requirements for Open Space were not addressed as required by Chapter 21.90.110(d)(2) of the Carlsbad Municipal Code. C. Adequacy Findinas During preparation of the Citywide Facilities and Improvements Plan, it was determined that the adopted performance standards for Open Space in Zone 3 have already been met. I I I. A. MITIGATION Special Conditions for Zone 3 There are no special conditions which apply at this time. 103 11/87 B. Financing Because Zone 3 creates a minimal amount of future development, it has been assumed development will continue to provide open space as a part of specific development approvals. Therefore, financing was not addressed as required by Chapter 21.90.110(d)(3) of the Carlsbad Municipal Code. 104 11/87 105 SCHOOLS School District Boundaries CARLSBAD •o ZONE 3 ZONE 3 LOCAL FACILITIES MANAGEMENT PLAN 106 ZONE 3 t • • • 0 D 6 ZONE 3 PA l OM A• EXISTING ELEMENTARY JUNIOR HIGH HIGH SCHOOL FUTURE ELEMENTARY JUNIOR HIGH HIGH SCHOOL <JI .. , ;;, I I , / /'' ,~ ...... o ... ,. I cosr• Do LOCAL FACILITIES MANAGEMENT PLAN 107 ,o ,::: \ ,. I-< r I , I I I \ SCHOOLS City i:tlCiWtsaaa Gro•fl'I ~Ml 12it-09'U" ~4 ~¾= / I AMENDED NOVEMBER1987 BUILD OUT LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SCHOOLS SUMMARY SHEET ADEQUACY PROJECTION DEMAND SUPPLY (Ccncrnaw:. wlStlSldard) MITIGATION FUNDING EXISTING * * YES NIA APPROVED ------YES NIA (!J z -(J'J < ::c a. FUTURE ** ** YES NIA *The Carlsbad Unified School District has capacity to meet the existing demands generated from Zone 3. **Because the future school demand from Zone 3 is minimal, the School District is able to provide capacity at all times as the Zone builds out. 108 NIA NIA NIA SCHOOLS I. PERFORMANCE STANDARDS School capacity to meet the projected enrollment within the zone as determined by the appropriate school district must be provided prior to projected occupancy. II. FACILITY PLANNING AND ADEQUACY ANALYSIS A. Inventorv Zone 3 falls completely within the houndaries of the Carlsbad Unified School District. Currently, there are no schools in the Southwest Quadrant. Elementary school students in Zone 3 attend Jefferson Street or Pine Street Elementary Schools. Secondary school students attend Carlsbad Junior and Senior High Schools. · The Citywide Facilities and Improvements Plan identifies general locations for future school sites in each school category. The locations are a result of the School Master Location Study, completed in 1982. The Carlsbad Unified School District is in the process of beqinninq to update the Scho-01 Master Location Plan. B. Phasing In Zone 3 there are presently 232 existing residential dwelling units. As the zone builds out, there will be an additional 20 residential dwelling units (14 sinale family and three duplexes). These units will add an additional nine students to the school demand generaten by Zone 3. The Carlsbad Unified School District has indicated the ability to handle the additional demand. Because the demand is so minimal and the adopted performance standard will continue to be met, ohasing of school facilities has not been addressed as reauired by Chapter 21.90.110(d}(2) of the Carlsbad Municipal Code. C. Adequacy Findings The Carlsbad Unified School District currently has capacity for the existing demand generated hy Zone 3. Because the future demand from this Zone is minimal, the school district will also be able to provide capacity to the ultimate buildout of Zone 3. 109 11/87 III. MITIGATION Special Conditions for Zone 3 No condl~ions are necessary. projected additional demand of only nine Unified School District has indicated accommodate the addition of this small existing facilities. B. Financing The Zone will create a students. The Carlsbad they will be able to number of students with Future development will continue to pay school fees and no financing options are necessary. The Carlsbad School District has indicated that they can accommodate the additional students generated in Zone 3 with existing facilities. Since existing facilities can handle the additional nine students, no financing alternatives for new facilities are required. 110 111 SEWER SYSTEM ZONE 3 ZONE 3 Sewer District Boundarie: •o r--i -l ........... " .. ~ . ,,,. . = _................... i : SAN MARCOS 5,n, .. , ..... LEUCADIA COUNTY cos,. cn,o,c•1•• i:--o•"' M.,..o-,ttent "'°•"' NOVEMBER 1987 LOCAL FACILITIES MANAGEMENT PLAN 112 ;·-·-·-·-·-·-·-·-·-·-·-· EXISTING j SEWER BASIN AH 13 PUMP • STATION / '-. • ◄e• FORCE MAIN □.:;;::--------------------------------\ I~ . \ . -·-·~ ., ZONE 1 . ., . I . I ,...,,. EXISTING PUMP STATION --- LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 EXISTING & PROPO.SED SEWER IMPROVEMENTS EXISTING SEWER LINES PROPOSED SEWER LINES ZONE 22 a: 0 t I.) a: ~ : ZONE 4 ~ t .. f .. ~ =~, ; . ·+------:,, g I ENCINA I WASTE WATER FACILITY I I C11v ot Carlabeel Gro,..1h Man.garn.n1 Pfogr.1m NOVEMBER 1 ea 7 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 SUMMARY SHEET SEWER COLLECTION SYSTEM BUILD OUT ADEQUACY PROJECTION DEMAND SUPPLY (Cc:normn:e w/Stsmrd) MIT/GA TION FUND-ING EXISTING * 15.66** YES N/A N/A HGO • 2 3 ,~ * APPROVED 15.66** YES N/A*** N/A*** HGO C, z -n "' c( J: * Q. .FUTURE *** NO*** *** HGO .• 32 * Interceptors are not monitored for existing capacity. (High water levels have been monitored and pipe capacity ls not being met.) ** iZ.76 MGD Vista/Carlsbad Sanitation interceptor~ existing agreements with Sanitation District. interceptor and 2.9 MGD Buena These capacities are based on City of Vista and Buena Vista *** Both interceptors will be upgraded as a result of future upstream demands generated outside of Zone 3. Specific improvements will be identified in Sewer Master Plan update. *** 114 11/87 SEWER COLLECTION SYSTEM I. PERFORMANCE STANDARD Trunk line appropriate sewer development. capacity district to meet demand as determined by the must be provided concurrent with II. FACILITY PLANNING AND ADEQUACY ANALYSIS Service Area Zone 3 lies entirely within and is served by the City of Carlsbad sewer service district. A. Inventory and Description Zone 3 includes the Encina Water Pollution Control Facility; therefore, all the major trunk line sewer interceptors pass through this zone to some extent or another. Only the Vista/Carlsbad interceptor and the R11Pna Sanitation interceptor are used to actually service Zone 3. The Vista/Carlsbad interceptor runs north to south across Zone 3 and handles the majority of the Zone 3 sewer collection needs as shown on map, "Existing and Proposed Sewer Improvements" on Page 108. There are a series of five sewer collection networks which branch out from the Vista/Carlsbad interceptor to service the various sewer sub-basins within Zone 3. Each of these sub-basins gravity flows to the Vista/Carlsbad interceptor with the exception of a small sub-basin which includes a sewer pump station. The sewer pump station services the Encina Power Plant property and the neighboring Terramar subdivision area. Per the sewer master plan the southwest quadrant of Zone 13 will drain into the sewer collections network on Paseo del Norte. The Vista/Carlsbad trunk line interceptor presently serves not only Zone 3 but Zones 1, 2, 7, 15, 24, 25 as well as portions of the City of Vista. In the future this line or an upgraded facility will also serve Zones 5, 8, 13, 14 and 16. A small portion of land in the southeast quadrant of Zone 3 is served by a gravity sewer collection network which connects to the Buena -Sanitation trunk line interceptor. The Buena Sanitation interceptor runs east to west across Zone 3 and presently serves Zones 3, 4, and 5, as well as portions of San Marcos and Vista. In the futare this line will additionally serve all or portions of Zones 13, 17 and 20. This line is also shown on map, "Existing and Proposed Sewer Improvements" on Page 108. 115 With the exception of the trunk line interceptor all the sewer collection facilities in Zone 3 are owned and maintained by the City of Carlsbad. The Vista/Carlsbad interceptor is jointly owned and maintained by the City of Carlsbad and The Vista Sanitation District. City capacity rights in the Vista/Carlsbad line through Zone 3 ~re ~n 41% of the pipe capacity which equates to approximately 12.76 million gallons per day. The Buena Sanitation interceptor ls owned and maintained by the Buena Sanitation District (County of San Diego). By agreement, the City of Carlsbad shares capacity rights in this line with the Vista Sanitation District and the Buena Sanitation District. City capacity rights in the Buena line through Zone 3 are 32.735% of the pipe capacity which equates to approximately 2.90 million gallons per day. 8. Phasing and Service Demand Existing committed and future sewer collection demands are shown on Exhibit R, "Sewer Demand" on Page 113. The service demands have been divided by interceptor to facilitate future analysis of each of these major sewer trunk line interceptors. The City is currently in the process of revising and updating _the sewer master plan. Until these revisions have been completed, analysis of the upstream service demands cannot be adequately made, although the analysis for Zone 3 has been completed. Facility Analysis The existing sewer collection networks for Zone 3 will conform with the adopted performance standard for existing and committed service demand. The sewer master plan does indicate the Vista/Carlsbad interceptor will not conform with the adopted performance standard at the bulldout needs of the City of Carlsbad and the Vista Sanitation District. These buildout demands of both the City of Carlsbad and the Vista Sanitation District will be the result of upstream development outside of Zone 3. The ultimate buildout of Zone 3 does not necessitate upgrading these facilities and will, therefore, conform with the adopted performance standard. The detailed analysis of the buildout needs of the Vista/Carlsbad interceptor will not be available until the sewer master plan has been updated or as upstream zones prepare their local plans. In addition, the recent study of the Buena Sanitation and San Marcos interceptors prepared by Dexter Wilson Engineering concludes that the combined capacity of these two interceptors will not conform with the adopted performance standard for the buildout needs of the City of Carlsbad and other associated sewer districts. As with the Vista/Carlsbad interceptor, the demands are almost entirely the result of upstream development outside Zone 3. The ultimate buildout of Zone 3 does not necessitate 116 upgrading these facilities and will, therefore, conform with the adopted performance standard. The detailed analysis of the buildout needs of the Buena Sanitation interceptor will not be available until the sewer master plan has been updated or as upstream zones prepare their local plans. c. Adequacy Findings The sewer collection system currently meets the adopted performance standard. Zone 3 will be able to buildout and not change this conclusion. However, as upstream or out of zone development is proposed, certain facilities (the Vista/Carlsbad interceptor) will need to be upgraded. The specific improvements will be addressed in the revised Sewer Master Plan as well as when the local plans which will impact this line are prepared. MITIGATION III. A. Special Conditio~s for Zone 3 The facility analysis above indicated that the sewer collection system for Zone 3 will conform to the adopted performance standard to the buildout of the zone. Therefore, pursuant to Section 21.90.110(d)(4) of the Carlsbad Municipal Code, no special conditions on future development are required at this time. B. Financing Future development will continue to pay sewer related fees which will fund the operations and maintenance of the system. 117 Master Plan Demand Trunkline Reach Status Interceetor Designation Existing Vista/Carlsbad 609-610 Buena Sanitation 209-610 ..... ..... Committed N/A 00 Future Vista/Carlsbad 609-610 Buena Sanitation 209-610 SEWER DEMAND EXHIBIT T ZONE 3 Land Use Residential Convnercial Industrial Utility Commercial Office Industrial Government Residential Commercial Industrial Commercial Acres/Square Footage/Number Demand (EDU's)* Demand of Units Subtotal 231 Units 231 396,000 SF 220 604,000 SF 250 311,800 SF 6 707 EDU 75,800 SF 42 30,800 SF 17 316,300 SF 131 73,200 SF 8 198 EDU None 21 Units 21 43.6 Acres 267 11.3 Acres 43 331 EDU 3.3 Acres 32 32 rnu * Equivalent dwelling units which equal average daily flow divided by 246 Gallons Per Day 11/87 119 WATER SYSTEM ZONE 3 Water Service Districts ros r • •o ; .......... , .. ,11,, ! j j 1 SAN MARCOS 1 f "''"'""""""'""" ..... : : ◄ '-'t OLIVENHA IN OlJVE NHA.tN Clly of c1,1in,•o Gro•tll Afat1eQ11m«tt PtcQf am fflg! NOVEMBER 1 9 a 7 LOCAL FACILITIES MANAGEMENT PLAN 120 ..... N ..... WATER DISTRIBUTION SYSTEM ZONE 1 I -I -EXISTING WATER LINES ••-■ PROPOSED WATER LINES LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 1 0 • ZONE 22 ~·' I I I I Cily of Cwllbad Growlh ManaQlltnant Ptogam NOVEMBER 1a1 LOCAL FACILITIES MANAGEMENT PLAN-ZONE 3 WATER DISTRIBUTION SYSTEM SUMMARY SHEET BUILDOUT ADEQUACY PROJECTION DEMAND SUPPLY (CQftlin•ice MITIGATION w/Stlftfard) EXISTING * * YES NIA APPROVED ------YES NIA (!J z -"' < J: ti. FUTURE ** ** YES NIA *The Costa Real Water District has capacity to meet the existing demands of Zone 3. **Because the future demands from Zone 3 will be minimal, the Water District will be able to provide capacity at all times as the Zone builds out. 122 FUNDING NIA N/A NIA WATER DISTRIBUTION SYSTEM I. PERFORMANCE STANDARD line appropriate development. capacity to meet demand as determined by the water district must be provided concurrent with A minimum 10 day average storage capacity must be provided prior to any development. II. FACILITY PLANNING ANO ADEQUACY ANALYSIS A. Inventory and Description Water service in the City of Carlsbad is provided by three independent agencies, Costa Real Municipal Water District, San Marcos County Water District, and the Olivenhain Municipal Water District. Water service for Zone 3 ls provided entirely by the Costa Real Municipal Water District. Costa Real Municipal Water District has identified those facilities which need to be added, upgraded, and improved in order to meet the needs of future growth within their service area. The facilities shown on map, "Water Distribution System" on. Page 116 are currently in place and servicing the existing development. As the Zone builds out, certain facilities will need to be improved, upgraded, or added to service the buildout of the Zone 3. As identified by the Costa Real Munidipal Water District, these facilities will be financed by the District's Capital Improvement Budget. Revenues for that budget are collected from Water Enterprise Funds charged by the water district. B. Phasing The performance standard indicates that line capacity must meet demand as determined by the appropriate water district. Costa Real Municipal Water District has indicated that minor improvements, such as the ones remaining in Zone 3, can be handled at the time of development, and the extent of those improvements cannot be determined until development occurs. Since Zone 3 ls largely developed and only minor improvements are necessary as determined by the water district, no phasing ls necessary. C. Adequacy Findings The Costa Real Municipal Water District service to Zone 3 conforms with the adopted performance standard. Because this 123 zone is almost completely built out, the additional water demands will be minimal and conformance with the standarrl will be maintained to the ultimate buildout of Zone 3. MITIGATION III. A. Special Conditions for Zone 3 All development within Zone 3 shall pay the required Costa Real Municipal Water District fees. B. Financinq Remaining facilities and improvements in Zone 3 will be financed by the Costa Real Municipal Water District's Capital Improvement Budget. Revenues for that budget are funded from Water Enterprise Funds charged by the District. 124 125 APPENDICES ADT Average daily daily vehicle trips associated region. APPENDIX 1 CLOSSARY trips. A guide of average, or estimated generated from a specific project or APN Assessor's Parcel Number. A portion of the legal description which specifically identifies each parcel of land. Buildout The year when the City of Carlsbad is completely developed with all associated public facilities in place. Bridge and Thoroughfare Benefit District -A district estahlished to fund major thoroughfares and bridge improvements. These bridge improvements are at I-5, Palomar Airport Road, Poinsettia lane, and la Costa Avenue. See Exhibit S, Page 125. CIP -Abbreviation for Capital Improvement Program. Community Park 20 -50 acres in size; designed to serve the broad recreational needs of several neighborhoods; located adjacent to secondary arterial or greater; publicly owned. Demand -The amount of needed facility generated within the zone, quadrant, or City based upon the adopted performance standard. DU -Abbreviation for dwelling unit. EDU Equivalent dwelling unit. The average amount of sewage generated by a single family household per day. Commercial and industrial developments are also converted into EOlJ's to assess their direct impact upon facilities. Environmentally Constrained lands -Beaches, wetlands, floodways, other water bodies, riparian and woodland habitats, slopes greater than 25%, major roadways, railroad tracks, and major powerline easements. 126 General Plan Density Ranges Residential Land Use Allowed Units Per Acre RL -Residential Low RLM -Residential Low-Medium RM -Residential Medium RMH -Residential Medium-High RH -Residential High Growth Management Control Point 0 -1 • 5 0 -4.0 4.0 -8.0 8.0 -15.0 15.0 -23.0 Re~idential Land Use Allowed Units Per Acre RL RLM RM RMH RH 1.0 3.2 6.0 11. 5 19.0 Established based upon the overall average land use yield in each designation or the midpoint of the density range. ICU -Abbreviation for Intersection Capacity Unit. The ratio of traffic demands to be placed on an intersection in relation to the capacity of an intersection. Level of Service The relative level of operation of an intersection or traffic signal. Level of Service (LOS) A B Description Free flow (relatively). If signalized, conditions are such that no approach phase ls fully utilized by traffic and no vehicle waits through more than one red indication. Very slight or no delay. Stable flow. If signalizP-d, an occa- sional approach phase is fully utilized; vehicle platoons are formed. This level is suitable operation for rural design purposes. Slight delay. 127 ICU Value 0.00-0.60 0.61-0.70 level of Service (LOS) C D E F Description Stable flow of operation. If signalized, drivers occasionally may have to wait through more than one red indication. Acceptable delay. Approaching unstable flow or operation; queues develop, but are periodically cleared. Tolerable delay. Unstable flow or operation; the inter- section has reached ultimate capacity; this condition is not uncommon in peak hours. Congestion and intolerable delay. Forced flow or operation. Intersection operates below capacity. ICU Value 0.71-0.80 0.81-0.90 0.91-1.00 1.00+ Derived from: Highway Capacity Manual, HRB Special Report 87. MGD Million gallons a day. A term used to describe flow of water or sewage. Net Vacant Acres Obtained by subtracting all of the 100% -----------constrained acres and one-half of the areas shown as 25-40% slopes. Industrial and commercial development were then multiplied by .4 to determine net acreage (this allows for all regulations which affect overall lot coverage). Open Space Pocket parks, homeowner ball fields, planned residential development (PRO), common areas, tennis courts, or other areas containing passive or active recreational facilities, such as major power line easements. PIL Park-in-Lieu Fee. A fee paid prior to the issuance of building permits in lieu of land dedication for park purposes. PFF -Public Facility Fee. A.2.5% fee paid prior to the issuance of building permits. All proceeds from this fund are used for the purpose of acquiring, building, improving, expanding and equipping public property, improvements, and facilities. 128 Special Use Area -1-5 acres in size; a local facility of only one or two activity type uses, i.e., tennis court, swimming pool, etc. TIF Traffic Impact Fee. A fee paid at issuance of building permits for various traffic circulation improvements. The City is divided into two fee categories: 1) The la Costa area and 2) the remainder of the City. See Ex~ibit T, on Page 126. 129 ZONE 3 ~ DISTRICT BOUNDARY ZONE 3 BRIDGE & THOROUGHFARE DISTRICT EXHIBIT U 130 t Cllyot~ Growlft Mane9'fflent Program LOCAL FACILITIES MANAGEMENT PLAN ZONE 3 POINSETllA LN ,+ 1111111 AREA BOUNDARY ZONE 3 n1 TRAFFIC IMPACT FEE EXHIBIT V c11., at Ca,1,uo Gowth Managlffflent A OQII' aM LOCA.L FACILITIES MANAGE~AENT PLAN 5· I 6l ,I I I 8: I 91 101 11 12 13 I l4ii !I ii 1s,1 lS; ' 17! I, 201'. 23.: ,i :I 24'.j :1 25 i '.I ' 26 ii 27 ,: 281: 'I 1: !: ll APPENDIX 2 11~1:'INANCF.: NO. 9808 ----- AN ORDINA~CE OF TFE CITY CCUNC!C. OF THE CITY CF CAP LS BAO, CAC. !F'<"H;,~r !A AMEND!MG T!TC.E 21 OF Tf..fE CAPLSBAD ~UN!C!P~L cnDE ~~ THE AD~!TION CF CHAPTEP 21. 90 ESTABLISHING A GROWTH 1'1ANAGE~4f.~T PROGPAM FOP THE CITY The City Council of the City of Carlsbad, California does ordain as follows: SECTION 1: That Title 21 is amended by the addition ~c Chapter 21.90 to read as follows: Sections: 21.90.010 21.90.020 21.90.030 21.90.031 21.90.032 21.90.033 21.90.040 21.90.050 21.90.060 21.90.070 21.90.080 21.90.090 21.90.100 21.90.110 " 21.90.120 21.90.125 21.90.130 21.90.140 21.90.150 21.90.160 21.90.170 21.90.180 21.90.190 "Chapter 21.90 Growth ~anage~ent Purnose and intent. Definitions. General crohibition, excections. Tolling of ti~e for consideration of applications sub~itted before the effective date of this chapter. Tollina of expiration of creviously issued develop~ent permits. Extensions of ~rior approvals orohibited. Comoliance with this chapter reauired. Establishment of local facilities ~anaQe~ent fee. Spec:al provisions for buildinq per:inits issued during temporary moratoriu~. Finding of health, safety and welfare necessary for the fees imoosed by sections 21.90.050 and 21.90.060. Perforfflance standard. - Citywide facilities and i~crovements plan. Local facilities ~anagement zones. Contents ~f local facility ~anaqement plans. i ~acilities management olan oreoartion. Facilities manaaement plan orocessinc. I~plementation of facilities and i~provements reauirements. Obligation to cay fees or install improve~ents reauired by any other law. Implementing guidelines. Exclusions. Council actions, fees, notice. Expiration of chapter. Severability. 1. 132 ,, 3' I 4[ I si I Si 11 i a:1 I I 91 j lOi I 11! I 12: 1:3 ii ·! 14 :; i 1s!I I 16:I :I 1,:1 1a,: 19 20' 21,; ' 22. 2:s'I 'I i• ' 24 'i ,, !I 25. ! ., ·, 26 ,, I ,, 27, 28 ! 21.90.010 Puroose and intent. (a) It is the r,olicy of the City of Carls:,ac to: (l) Provide auality housina ocportunities f~r alt economic sectors of the cc~~unity: (2) Provide a balanced co~~unitv ~it~ adecua~e commercial, industrial, recieational and op•n space areas t~ support th~ residential areas of the City: (3) Ensure that public facilities and i~orove~er.tsi ~eeting City standards are available concurre~t with th~ need 1 created by new development: (4) Balance the housina needs of the recion aaainst the cublic service needs of Carlsbad residents ar.d available fiscal and environ'"ental resources: (S) Encouraae infill develoo'"ent in urbanize~ areas before allowina extensions of public ·facilities ar.d improvements to areas which have yet to be urbanized: (6) ensure that all develocment is consistent the Carlsbad aeneral plan: (7) Prevent growth unless adeauate public facilities and im~rovements are provided in a phased and logical fashion as reauired by the general plan: -(8) Control of the timing and location of develooment by tyinq the oace of development to the provision cf public facilities and improvements at the times established by the citywide facilities and i.rnprover,1ents plan. (bl The City Council of the City of Carlsbad has determined despite previous City Council actions includin~ but not lill'lited to, ar,,endnients to the land use,. housina, and 9ar'<s and recreation elements of the general plan, amend~ents to City Council Policy No. 17, adoption of traffic il!'lcact fees, and modification of cark dedication and imorovement recuirements, that the deniand for facilities and imorovements has out?aced t~e supply resultin9 in shortages in public facilities and improvetTtents, ·includin~ l.Jut not limited to streets, parks, or,en space, schools, libraries, drainage facilities and general , govern~ental facilities. The City Council has f~rther deter~ine~ that these shortages are detrimental to the public healt~, safet~ and welfare of the citizens of Carlsbad. ! (c) This chaQter is adopted to ensure the implementation of the policies stated in subsection (a), to eliminate the shortages identified in subsection (bl, to ensure that no,development occurs without oroviding for adecuate facilities and improve~ents, to re~ulate the oace of develocr.e~t thereby ensuring a continued supply of housing over a ::::ei:-icd cf , years and to continue the auality of life for all econo~ic sectors of the Carlsbad cofflmunity. (d) This chapter will further the policies, goals ar.d objectives established herein by reauirino identification of all public facilities and improvements required for develop~ent, by prohibiting development until adeauate provisions for the ~ublic: facilities and improvements are made by developers of projects · within the City, and by givin9 develop'"ent nrioi:-ity to areas of the City where public facilities and i~orovements are already •-' place (infill areas). 2. 133 l. I 21 3 4 5 6 7 8 9 10 ll 12 Q < ID I 13 "' ~ I -« I < GI .) Ill C 141 ... ~ z z O ~ cc I 2 ►>0 1si m=c~ u :I :t .... ~ u I ->""' . 161 Z Ill~ Q Ill Z < U 5 -ID i !-~ 171 >-cc < < ,. u .. u l8il 1: 19 ·1 1, 20': 'I 21',i l 22: 23 :! :i 24:1 II 25 !; 26 :i :j 27 i, 28 ,, ·' ., I (e) This chapter replaces the tel'loorary !"OC"atoz:-iu:---:'": processing and approval of develop~ent projects imposed bv Ci:i Council Ordinance No. 9791. 21.90.020 Definitions. (a) Whenever the following terms are used in this chapte~ they shall have the meaning established by t·his sect ion unless from the context it is apparent that another ~eanino is intended: - ( l) "Citywide facilities and irnnrove!"ents olan" means a plan prepared and approved according to Section 21.90.090 identifying those facilities and imcrovements reauirec on a citywide basis to serve the projected population of the City 3s established by the general plan and providing an outline and budget for financing certain facilities and i~provements whic~ will be provided by the City. (2) •oevelopment pe·rmit" means any pernit, entitlement or approval whether discretionary or ministerial issued under Title 20 or 21 of this code and any leaislative actions such as zone chances, general plan amendments, or master plan approval or amendment. · (3) "Development" means any use to which land is put, building or other alteration of land and construction inciden~ thereto. (4), "Facilities• means any schools, parks, open space, or recreational areas or structures providin~ for fire, library, or govern~ental services, identified in a facilities management plan. (5) •I~provement• includes traffic controls, streets and highways, including curbs, gutters, and sidewalks, bridges, overcrossings, street interchanaes, flood control or storm drain facilities, sewer faci·lities, water facilities and lighting facilities. · (6) •t.ocal facilities management plan" means a facilities manaaefflent plan defined by Section 21.90.120 for a local facilities management zone which is established accordinc to Section 21.90.100. 21.90.030 General rohibition, exceotions. a Un ess exempted by the provisions o this chapte~ no application for any building permit or develop~ent oermit shall be accepted, processed or apcroved until a citywide facilities and i~provements plan has been adopted and a local facilities management plan for the applicable local facilities i management zone has been sub~itted and approved accordinq to t~is chapter. i (b} No zone chan9e, general plan aIT1endtT1ent, master· ;,lari a~endment or specific plan amendment which would ~ncease the 1 residential density or development intensity established by t~e general plan in effect on the effective date of this chaote~ shall be approved unless an amendfflent to the citywide Eacilities Manage~ent plan and the anplicable local f~cilities ~anace~ent olan has first heen approved. 3. 134 - 2i 10 11 12 13 I I ,I 141 I 151 ! lo; 11ll I 1sii ii 19,I 2011 :I 21 22 23 11 24" ·I I 25; 26 i 27 28 ' ,, I i (c) The classes of projects or pertrtits listed in t:;~s ! subsection shall be exempt from the provisions of subsect icr. (a\., Development permits and building permits for these ;>rejects · shall be subject to any fees established pursuant to the ci~-✓...,~=ei facilities and improvement plan and any applicable local facilities management plan. Cl) Redevelopment projects. (2) Projects consisting of the construction or alteration of a single dwelling structure for a fa~ily on a lot owned by the family intending to occupy the structure, or not to exceed one noncwner-occu~ied house per individual for one or more lots owned prior to July 20, 1986. (3) Building permits and final maps for ?rejects identified in Section 2(F) of Ordinance No. 9791 (projects for .which cons~r~ction had 7ommenced and were designated on the map~ marked Exhibit A to Ordinance No. 9791 •as developing•>. ( 4) Building permits for projects for which all required development permits were issued or approved on or befor January 21, 1986. If all required development permits were issued for a portion of the project only, the exemption shall \ apply to that portion. · ( S) Building permits for projects for which all required development permits were issued or apcroved before July 20, 1986 and for which building permits could have been issued under Ordinance No. 9791. If all required development i;)ermits were issued for a portion of the project only, the exemption shall apply to that portion. (6) Commercial and industrial projects ~ith approved development permits or with a cOll'lplete acplication en file with the City prior to June ll, 1986 for such permits. New i permits for commercial and industrial projects located wit~in an area· that has been previously approved for such uses :nay also be processed and approved. (7) Projects by nonprofit entities for structu~es and uses for youth recreational and guidance pro~rams such as boys and girls clubs. (8) Zone changes or general plan amendments ,· necessary to accomplish consistency between the general 9lan and, zoning, to implement the provisions of the Local Coastal Plano~; which the City Council finds will not increase the public \ facilities or services and which are initiated by the City Council or Planning Commission. (9) Public utility facilities and iJn~rovelT'enc projects without accommodations for permanent employees are exempt from the provisions of this chapter unless the City Council determines they are of sufficient size and scale to impact public facilities. (10) Adjustment plats. (11) Development permits for minor subdivisions located in the northwest auadrant of the City as defined in Ordinance No. 9791. Building permits for commercial or industrial construction on lots in such subdivisions may ~e approved. Residential building permits will not be aoc~oved =~=- lots in such subdivisions unless otherwise exempt under t~is 4. 135 l 2 3 4 5 6 7 8 9 10 ll 12 13 l4j1 isl l6i I l7j .I 1aJI " 19i! 2oi! '1 21 11 22:1 2:s,, 24;j ,! 25 :; ,1 26 ;; li 27' chapter except one permit for a nonowner-occupied lot ~ay be approved for each such subdivision. (d} The provisions of this subsection apply to final maps and other develop~ent permits for projects with a tentative map approved before July 20, 1986 which are not included in the exemptions listed in subsection (c). 1 . ( 1) If a tentative map or tentative parcel IT'ac wa1, approved on or before January 21, 1986 then, after approval of the citywide facilities plan, a final map or parcel mac ~ay be 1 processed and approved before the adoption of a local facil i t:y i management plan.· The expiration period for those tentative macs : shall be tolled until the citywide plan is adopted. The -i expiration of any development permits issued in conjunct ion .wi t:hj those maps shall be tolled until the applicable local facilities management plan is approved or, two years after the date the citywide plan is approved, whichever occurs first. · (2) If a tentative. map or tentative parcel mac wa approved after January 21, 1986 and before July 20, 1986, but th~ approval of final map or parcel map was prohibited by Ordinance No. 9791 then approval of ftnal maps and parcel maps is prohibited until after preparation of the applicable local facilities management plan. The expiration period of those tentative macs and tentative parcel maps, and any other development permits issued in conjunct ion with the maps shall be tolled until the local facilities management plan is approved, or two years after date the citywide facilities and improvements plan is approved, whichever occurs first. (e) The exemption for projects listed in subsection (c' (3), (4), (5}~ and (6) shall expire on July 20, 1988. After that1 date all development permits for those projects shall be fully ! subject to the provisions of this chapter. The exemptions for ! projects listed in subsection (c) (3), (4), (5), and (6) shall I apply only so long as the facilities and improvements recuired as a condition to the issuance of final development permits have been installed or are being installed pursuant to a secured agreement. Any breach of such secured improvement aqree1t1ent shall subject any remaining building pertrtits for the project t~ the provisions of subsection (a). (f) Final or parcel maps for projects listed in , subsection (c) (3), (4), (5), (6) and (7) which comply with all / the requirements of the Subdivision Map Act and Title 20 of this. Code which were filed with the City before July 20, 1986 1t1ay be : approved by the City Council, or City Engineer as appropriate, after July 20, 1986. Upon approval, those projects shall be subject to the exemQtion of subsection (c). (g) The City Council may authorize the processing of and decision making on buildin9 permits and development ~r~its for a project with a master plan approved before July 20, 1986 subject to the following restrictions: , (l) The City Council finds that the facilities and improvements reauired by the master plan are sufficient to meet ! the needs created by the project and that the master plan i developer has agreed to install those facilities and i~~rovements· to the sati~faction of the City Council. s. 136 I ,, I li I 2! i Si i 9i I 101 11 12! I 13! i l4il I 15 1 I lSi II 17!1 1a 1; :: 1911 21 22, ,I 23" ii 24 '.i I ,I 25 25, 27 28" (2) The master plan developer shall agree in writing that all facilities and improvement requirements, including but not limited to the payment of fees establis~ed =Y the citywide facilities and manaqement ~lan and the ap9licable local facilities management plan shall be applicable to development within the master plan area and that the master ~lar. developer shall comply with those plans. ( 3) The master plan establishes an educational park and all uses within the park comprise an integral part cf the educational facility. (4.) Building perntits for the 129 unit i:-esidentia.!. portion of Phase I of the project may be approved provided t~e applicant has provided written evidence that an educational entity will occupy Phase I of the project which the City Council finds is satisfactory and consistent with the goals and incer.t ce the approved master plan. ' ( 5) Prior to the approval of the final map for Phase I the master plan developer shall have agreed to participate in the restoration of a siqnificant lagoon and wetland resource area and made any dedications of property necessary to accomplish the restoration. Ch) After making the findings in paragraph l the City Council may authorize the processing of and decision making on master plans subject to the reauirements of paragraph 2. After the grant of the easement required by subparagraph (h)(iv) the tentative map for Phase I of the project, the site plan for the commercial development and the local coastal plan amendment may also be processed and approved. If such approvals are granted and, subject to all other provisions of this code, grading and building permits for construction of the golf course and firsc phase of the commercial portions of the project may be processed: and approved. · The processing and approval of all other developments and building permits within the master plan. shall not occur ~nti.l! after the citywide facilities plan and the local facilities management plan have been adopted by the City Council. (l)(i) That the master plan will provide all necessary public facilities for the project and will c~re any facilities deficits in the area affected by the project. ( ii) That the approval will not prejudice the , preparation of the citywide facilities plan and will improve t:-.e: level of public facilities and services in the area. (iii) That by the dedication of land and the construction of public improvements the project will make a significant contribution to the public facilities needs of the city and provide for the preservation or enhancement of sianificant environmental resources. (2)(i) The master plan shall include all of t~e information required by and implementing the provisions of Sections 21.90.090 and 21.90.110 for the area covered by the master plan. (ii) The applicant shall agree in writing that all facilities and improvement reauirements, including but noc limited to ~he payment of fees established by the cicywide 6. 137 .I 1 I 2i 3 4 1 I s; sl 71 8i I 91 101 I 111 121 I 13 1 l4ij 15 !i '1 16 :I ,I ,, 11:1 18;[ 19' 20 21 i 22, 23:1 ii 24 ;i 11 25 1' I 26 :1 i1 28 ii :, ii 11 facilities and improvement Plan and the applicable local facilities management plan shall be applicable to development within the master plan area and that the master plan develooer shall comply with those requirements. · (iii) The master plan applicant shall agree to participate in the restoration of a significant lagoon and wetland resource area. (iv) Prior to any processing on the ~aster plan the applicant shall grant an easement over the property necessary for the lagoon restoration and the right-of-way necessary for the widening of La Costa Avenue and its intersection with El Camino I Real. 21.90.031 Tolling of time for consideration of applications submitted before the effective date of this chapter. After approval of the citywide facilities and improvement plan and the applicable local facilities management plan applications for development permits which were accepted as complete before the effective date of this chapter shall have processing priority in relationship to the acceptance date. Until the approval of the plans all aoplicable time limits for processing the development permits shall be tolled. 21.90.032 Tollino of exoiration of oreviously issued development permits. If a discretionary development permit, other than a development permit issued in conjunction with a subdivision map, issued prior to July 20, 1986 has an expiration period within which building permits n,ust be issued and the issuance of buildinq permits for the project is prohibited by this chapter then the expiration period shall be tolled until t·he acplicable local facilities management plan is approved, or two years after the date the citywide p~an is approved, whichever occurs first. 21.90.033 Extensions of crior aocrovals orohibited. After approval of an applicable local fac1lities management plan an extension of the expiration date of any development permit shall not be granted unless the extension is found to be consistent with the plan. The decision makinq body considering an extension may condition the extension upon compliaace with the citywide plan and applicable local facilities management olan. 21.90.040 Comoliance with this chanter. (a) No development permit shall be approved unless the approving authority tinds that the permit is consistent with the citywide facilities and improvements plan and the applicable local facilities management plan. To ensure consistency the approving authority ~ay impose any condition to the approval necessary to implement the plans. I (b) No building permit shall be issued unless the fees, reouired by this chapter, and any applicable local facilities : management p_lan fees are first paid, and the oermit is consister.t 7. 138 I !I ii lli I 2:I ·1 3·1 411 ,, :11 I I 7: I a;I 9, i 101 11!1 12: Q I < = I 13; Ill ~ :c:C ., ., 00 -· ' < 14, z • :c 'I . ~ 0 15 ii ~a"~ 2 < ... ~ <.J ' -,. ..... % ... 8 Q 16 i ... i"' < ~o-~ --~ 17:i >• ;:: < < ► <.J -u 18. 19 20; 21 22, •I 23:: ' ·i 24 i 'I 25 26 ' 27 28 :; I " with the applicable local facilities management plan. As a condition to the issuance of any building permit pursuant to Section 21.90.030(cl the applicant shall aqree to pay the appropriate fees within 30 days of the date each fee is established. (cl The requirements of this chapter are imposed as 3 condition of zoning on the property to ensure i.nlplementation cf and consistency with the general plan and to i;:,rotect the public 1 health, safety and welfare by ensuring that public facilities ar.c improvements will be installed to serve new develoi;:,~ent i;:,rior to or concurrently with need. 21.90.050 Establish~ent of local facilities manace~e~~ (a) A local facilities manage~ent fee is hereby established to pay for improvements or facilities identified i~ 3 local facilit~es_management plan which are rel~ted ~o new I development within the zone and are not otherwise financed by an1 other fee, charge or tax on development, or are not installed cv a developer as a condition of a building permit or development · permit. The fee may also be used to pay for that port ion of the facilities or improvements identified in the citywide facilities and improvements plan attributed to develooment within the local zone which are not financed by other means. The facilities management fee shall be paid before the issuance of a building ! permit. The amount of the fee shall be determined based upon the estimated cost of the facility or improvement designated as ! necessary to accommodate additional development within the applicable local facilities management zone plus the estimated cost of facilities and i~provements identified in the citywide facilities and improvement plan attributable to the local zone. The fee shall be fairly apportioned among the new development. : (b) The fee required by this section is in addition to! any other means of fin? .. cing facilities or improvements j identified by a local facilities management plan or any other : tax, fee, charge or improvement reauirement which may be imposed i on the development of property under the provisions of state law~ this code or City Council policy. : (c) The amount of the fee for a local facilities ' management zone shall be set by City Council resolution after a public hearing, published notice of which shall be given according to Carlsbad Municipal Code Section 21.54.060(2) and Government Code Section 54992. (d) As a condition of any building or development permit application submitted after the effective date of this chapter the applicant shall agree to pay the fee established by ' i this section at the time a building permit is issued. (e) The fee established by this section shall at the time of issuance of a building permit. be levied 21.90.060 Soecial orovisions for ouildina oe~mits issued during temoorarv moratorium. (a) Applicants for projects for which building per~its. were issued after January 21, 1986 and before July 20, 1986 sha~l a. 139 71 I 81 I 91 10 ll 12 13, I I 14 11 1s1I ., 1sii 11il !1 20:, 21 :; ,I 22'! 23; I 24: i I 25 I' I :i 2s !I 27 :: ! 28 pay the fee established by Section 21.90.050 within 30 days aftej the amount of the fee is determined by the City Council. Paymeni:.j shall be made according to the agreement executed by the 1 applicant pursuant to Section 3 of Ordinance No. 9791. 1 21.90.070 Findin of health, safetv and·welfare necessary or the 21.90.060. (a) The City Council hereby declares that payment of the fee established and imposed by Sections 21.90.050 and 21.90.060 and installation of the facilities and improvements identified in a facilities management plan are necessary to achieve the policies established in Section 21.90.010 and to implement the City's general plan. If the fees are not paid or the facilities or improvements are not installed the public health, safety and welfare will suffer because there will be insufficient facilities and improvements to accommodate any new development. This finding is based upon City Council Policy No. 17, City Council Ordinance No. 9791, and the evidence presented at the public hearings on the ordinance adopting this chapter. (b) If any condition imposed as a conditon·of a development permit or building permit pursuant to this chapter i protested then the permit shall be suspended during the period o the protest. (c) This section is adopted pursuant to Government Section 65913.5. 21.90.080 Performance standard. The City ·council shall adopt general performance standards for each facility or improvement listed in Section 2l.90.090(b) or 21.90.llO(c). Specific performance standards foi citywide facilities shall be adopted as part of the citywide , facilities and improvement plan. Specific performance standards; for each zone shall be auopted as part of the local facilities management plan. If at any time after preparation of a local facilities management plan the performance standards established by a plan are not met then no development permits or building permits shall b4 issued within the local zone until the performance standard is met or arrangements satisfactory to the City Council guaranteeing the facilities and improvements have been made. ' 21.90.090 Cit wide facilities and imcrovements olan. a To imp ement the City s general plan by securing provision of facilities and improvements, and to ensure that I development does not occur unless facilities and improvements ar~ available the City Council shall adopt by resolution a citywide I facilities and improvements plan. The plan shall: Identify all! facilities and improvements necessary to accommodate the land I uses specified in the general plan and by the zoning; specify i size, capacity and service level performance standards for the I identified facilities and improvements1 establish specific ti~e / tables for acquisition, installation and operation of the facilities and improvements correlated to projected population 9. 140 7, lOi 11/I 12 ! I l:3;1 ., 14 I 'I 15 ·; 16 ,; 17 '! 18. 19 20' 21 22 ·: 23 :I ,, i 24' 25 26 27 28: :1 ' " I 'I growth, facility and improvement performance standards, and projected nonresidential develo~ment: identify the financing method or methods for each facility and improvement: and establish a facility and improvement bud~et for those facilities or improvements which will be constructed or financed by the I City. The plan shall encourage inf ill developn,ent and reduce t!"!e, growth inducing impact of premature extension of facilities or imcrovements to undeveloped.areas by establishing priorities for facility and improvement installation or financing. (b) The citywide facilities and improvement ~lan shall show how and when the following facilities and improvements ·.;ill be installed or financed as specified in subsection (c). (l) Major sewage transmission systems and se~age treatment plants: (2) Major water transmission lines: (3) Major area wide draina~e facilities: (4) Prime and Major arterials; freeway interchanges, bridges or overcrossings; (5) Fire facilities: (6) Governmental administration facilities: (7) Parks and other recreational facilities: ( 8) t.ibraries. Cc) The plan shall include the following information with regard to each facility and improvement listed in suosectio~ ( b) : i (1) An inventory of present and future 1 requirements for each facility and improvement based upon the ' -performance standard established for each facility and improvement. Cost estimates shall be included. The inventorv shall be consistent with the general clan and zoning for the· area. (2) A phasing schedule establishing the timing Eci:: installation or r:,rovisions of facilities or i,r.,crovements in relationship to the amo 1•11t of development activity (e.g. number ! of dwelling units, nu~ber of scruare feet of commercial space within the service area of the facility or improvement) and the facility and improvement performance standards. (3) A financing plan establishing various methods: of funding the facilities and improvements identified in the '. plan. The plan shall identify those facilities and improve~ents ! which would otherwise be provided as a requirement of processir.g' a devel9pment project (i.e. reauirements imposed as a condition of a development permit) or provided by the developer in order t~ establish consistency ~ith the general 9lan or Titles 18, 20 or . 21 of this Code, and those facilities and improvements ~or •.;hich, new funding methods which shall be sufficient to ensure i sufficient funds are available to construct or provide facilities or improvements when required by the phasing schedule. 1 (d) The City Manager shall prepare and present the plan to the City Council not later than one year from the effective date of this ordinance. 10. 141 3 11 411 I I 5' 61 11 ! ajl I gl i lOi 11[1 121 1:s I 14/i 'I 1s!I •! 16 i 19 ·: 20" 21: 22·:. 23 :! ·1 24 'I ,1 II 25 ,i 26 :: :I 27 28 1i -_ · ( e) Amendments to this citywide facilities and improvements plan shall~• initiated by action of the Planninc Commission or City Council. i I I 21.90.100 tocal facilities manaaement zones. I (a) The City Council shall divide the City into facilities management zones. i (b) The boundaries of the zones shall be established 'I based upon logical facilities and improvements plannina, , construction and service relationships to ensure the economicall0 efficient and timely installation of required facilities and • improvements. In establishing zone boundaries the City Council shall also be guided by the following considerations: (1) Service areas or drainage basins: (2) Extent to which facilities or improvements a~e in place or available; I (3) Ownership of property: plan areas; (41 Boundaries of existing zoning master plans: (5) Boundaries of pending zoning master plans; (6) Boundaries of potential future zoning master (7) Boundaries of approved tentative maps; (8) Public facilities relationships, especially the relationship to the City's planned major circulation network; (9) Special district service territories; (10) Approved fire, drainage, sewer, or other facilities or improvement master plans. . (c) The zones shall be established by resolution after! a public hearing notice of which is given pursuant to Section : 21.54.060(2) of this code. ' 21.90.110 Contents of local facilit ~ana e~ent olar.s. I a) A local fa~1l1t1es management plan shall be I prepared for each facility zone and shall cover the entire zone. i (b) The plan shall consist of maps, graphs, tables, and I narrative text and shall be based upon the general plan and 1 zoning applicable within the local zone at the time of plan ! approval. The local facilities management plan shall be d consistent with the citywide facilities and improvements plan an shall implement the citywide facilities and improvements plan i within the zone. 1 ~ (c:) The facilities management plan shall show how and when the following facilities and improvements necessary to - accommodate development within the zone will be installed or financed as specified in subsection (d). (1) Sewer systems (2) Water (3) Drainage . (4) Circulation (5) Fire facilities (6) Schools (7) Parks and other recreational facilities (8) Open space 11. 142 l.. 2! :3; I 4' Si I a: ! 71 a: i' i 91 I 10: 11/ I 12: i 131 141\ 1s !I I 16:! ,I 17 11 ., 18,: 19 20' 21: 22,; 2:3:! :1 I 24 !I •I 25 '! .. 26 ,I 27' 28 '! I p i _ · (d) The plan shall be consistent with and implement 1::-:el citywide facilities management plan and general plan and shall include the following information with regard to each facilitv and improvement listed in subsection (c): · Cl) An inventory of present and future requirements for each facility and improvement based u;,on the performance standard established for each facility. Because improvement reauirements for certain facilities and improvements may overlap zone boundaries a discussion of the need for coordination and a proposed coordination plan for facilities extending from one zone to another shall be included. Cost estimates shall be included. It must be shown that development in the zone will not reduce the facilities or imorove~ents capabilities or create facilities or improvements shortages i~ other zones or reduce service capability in any zone below the performance standard which is established pursuant to Section 21.90.080. The growth inducing impact of the ou·t of zone improvements shall be assessed. ( 2) A phasing schedule establishing the t•iffling for installation or provisions of facilities or improvements in relationship to the amount of development activity (e.g. number of d~elling units, number of square feet of commercial space, etc.) for the facilities management zone. The ~hasing schedule shall ensure that development of one area of the zone will not utilize more than the area's prorata share of facility or improvement capacity within that zone unless sufficient capacity is ensured for other areas of the zone at the time of the first development. The phasing schedule shall include a schedule of development within the zone and a market data and cash flow analysis for financing of facilities and improvements for the zone. The phasing schedule shall identify periods where the demand for facilities and improvements may exceed the capacity and provide a plan for eliminating the shortfall. In those situations when demand •xceeds capacity and it is not feasible tq increase the capacity prior to development, no development shall: occur unless a time schedule for and a means of increasing the 1 capacity is established in the plan. ( 3) A financing plan establishing various methods , of funding the facilities and improvements identified in the ;,lari fairly allocating the cost. to the various properties within the I zone. The plan shall identify those facilities and i.r.tprovements ! which ws,uld otherwise be provided as a ~equirement of processing: a development project (i.e. requirements imposed as a condition of a development ~rmit) or provided by the developer in orcer ~~ establish consistency with the general plan or Titles 18, 20 or / 21 of this Code, and those facilities and i~provements for which I new funding methods which shall be sufficient to ensure I sufficient funds are available to construct or provide ! facilities or improvements when required by the phasing schedulel ~here facilities or improvements are reauired for more than one i zone, the phasing plan shall identify those other zones and t~e : plan for each zone shall be coordinated. Coordination, however, i I shall not require identical funding methods. 12. 143 l, 21 3• 4 5 6 7 a 9 10 11 12 0 < ID I 131 14 ... a: a: ~ < ' . u ... < 14 1 ... ~ z 0 z a: o>~o 15 -►<~ IDij~~ ....... u ,_ :-liU • 16; z ... i0 ... z < U ~ -ID 17! ! .. ~ > ... a: < < > u ... 'I ij 1a:; . 1911 11 20J: ,I 21 1i I II 22.;; 23 ii Ii 24:! ,1 • 1! 25 :; 26 :: " 27 28 :; (4) A list or schedule of facilities recuirements correlated to individual development projects within the zone. (e) The local facilities management plan shall establish the proportionate share of the cost of facilities and improvements identified in the citywide facilities and improvement plan attributable to development of property on the local facilities management zone. 21.90.120 Local facilities management olan preparation. (a) A local facilities management plan may be prepared by the City or by the property owners within the zone accorcina to the procedures established by this section. (b) The City Council, upon its own initiative, may ~Y resolution direct the City Manager to prepare a facilities management plan for any zone. The City Council may assess the cost of preparing the plan to the owners within the zone after a hearing ten days written notice of which is given to the propert owners within the zone. The cost shall be spread prorata according to acreage and development potential. (c) All owners within the zone may jointly submit a facilities management plan. (d) For zones in which joint submission of a facilitie management plan is shown to be not feasible any owner or group c~ cooperating owners within the zone may petition the City Council, to allow the owner or group of owners to prepare the plan. Afte a meeting for which ten days prior written notice has been given to the property owners within the zone, the City Council may permit the owner or group of owners to prepare and submit the 1 plan. A limit based on the estimated cost of the plan shall ~e I deterniined at the time of the hearing. The actual cost shall be I determined when the plan is adopted and shall be assessed ~rorata based on acreage and development potential to property within the facilities management zone. The assessment. shall be collected b~ the City at the time any application for a development project j within the zone is submitted. The owner or owners who prepared i the plan shall be reimbursed for the cost of the plan less the J owner's or owners' prorata share. No reimbursement shall be mac unless the plan is approved. Cost of preparation shall not include interest. · (e) As an option to preparation by the owner or group of owners as provided in subsection (d) the City Council may decide to direct the City Manager to prepare the facilities management plan. The cost of preparation shall be advanced to the City by the requesting owner or owners, assessed to all t~e owners and reimbursed as provided in subsection (d). 21.90.12S Facilities mana ement olan orocessinc. a Fac1 1t1es management pans shal be reviewed according to the following procedure: ' I (1) A completed facilities management 9lan complying with this chapter, and accompanied by a processinq in an amount established by City Council resolution, ~ay be submitted to the Planning Director for processing. !: the fee i 13. l 2 3 4 5 6 7 I al 9 10 ll 12 131 l4 I I l5! I I l6;1 17 !I 18 11 19 11 lj 20 :i 11 21!: " 22:: 23!! 11 24 ·1 25 ,I 26 :: :I 27 28 i • I the Planning Director deter-mines that the plan ccrr,pUes wi t:1 provisions of Section 21.90.110 the director shall set a facilities management plan for public hearing before t~e Commission within sixty days of receipt of a corr,plete ?lanr.:.:-:,;; : I application. (2) The hearing shall be noticed according to t:ie I provisions of Section 21.S4.060(2). A staff report containinc ! recommendation on the plan shall be prepared and furnished to· i:.!".et i;,ubl~c, the applicant, and the Planning Commission prior to the i hearing. (3) The Planning Commission shall hear and consider the application for a facilities management plan and shall by resolution prepare recommendations and findinqs for the City Council. The action of the Commission shall be filed wit:1 the City Clerk, and a copy shall be mailed to the owners within the facility zone. (4) When the Planning Commission action is filed with the City Clerk, the Clerk shall set the matter for public hearing before the City Council. The hearing shall be noticed according to the provisions of Section 21.54.060(2). j (S) The City Council shall hear the matter, .and after considering the findings and recommendations of the Planning Commission, may approve, conditionally approve or d~ny facilities management plan. The City Council may include in the resolution adopting the facilities management plan any fees or facilities improvement requirements which it deems necessary to impose on development projects within the zone in order to implement the citywide facilities and improvement plan and the local facilities management plan. (b) A facilities management plan may be amended following the same procedures for the original adoption. (c) A local facilities management plan shall be considered a project for the purposes of Title 19 of this Code. , Environmental documents should be processed concurrently with th~ plan. · · 21.90.130 !mclementation of facilities and imcrove~e~ts reauirements. (a) To ensure that the provisions of this chacter and the general plan are met the following shall apply: i (1) Except as otherwise provided in this chapter n9 development permit shall be approved unless the map or oermit is consistent with the local facilities manage!Tlent ~lan and unless provision for all facilities and improvements related to the development project are provided or funded. (2) No building permit shall be issued unless all applicable fees, including but not limited to, public facilities fees, bridge and thoroughfare fees, traffic impact fees, facilities management fees, school fees, park-in-lieu fees, sewe~ fees, water fees, or other development fees identified in the · citywide facilities and improvements plan and local facilities !Tlanagement plan and adopted by the City Council have first =:een paid or provision for their payment has been made to the satisfaction of the City Council. 14 • 145 4 5 6 7 a 9 10 ll 12 13 14. 15 161 1,I I 1a;: ,,. I ,. 19il 2oil I, 21li ,j 22:i 23'1 I 241 I Ii 25 :; 26 27 • 28 'I (b) The citywide facilities and improvement plan and the local facility management plan process is part of the Citv's ongoing planning effort. It is anttcipated that amend~ents to the plans may be necessary. Adoption of a facilities management plan does not establish any entitlement or right to any particular general plan or zoning design•tion or any particula~ development proposal. The citywide facilities and improvements plan and the local facilities management plans are guides to ensure that no development occurs unless adequate facilities or improvements will be available to meet demands created by development. The City Council may initiate an amendment to any of the plans at any time if in its discretion it deteniines that an amendment is necessary to ensure adequate facilities and improvements. (c) If at any tinie it appears to the satisfaction of the City Manager that facilities or i.r.tprovements within a facilities management zone or zones are inadequate to accommodate any further developnient within tha_t zone or that the performance standards adopted pursuant to Section 21.90.100 are not beinq ~et he shall immediately re~ort the deficiency to the Council. If the Council determines that a deficiency exists then no further building or development permits shall be issued within the affected zone or zones and development shall cease until an amendment to the citywide facilities and illlprovernents plan or j' applicable local facilities management plan which addresses the deficien·cy ·is approved by the City Council and the perforn,ance standard is met. (d) The Planning Director shall monitor the developmen activity for each local facilities management zone and shall prepare an annual report to the City Council consisting of ma9s, graphs, charts, tables and text and which includes a developniental activity analysis, a facilities and L~provements adequacy analysis, a facility revenue/expenditure analysis and reconimendation for any ar.iendments to the facilities management plan. The co~tent of the annual report ·shall be established ~Y the City Council. (e) The City Council shall annually review the citywidl facilities and improvements plan at the time it considers the City's capital improvement budget. 21.90.140 Obligation to oav fees or install improvements reauired by any other law. I Nothing 1n this chapter shall be construed as · relieving a builder, developer or subdivider frorn any ~ublic improvement requirement, dedication reauirement or fee requirement which is imposed pursuant to Titles 13, 18, 20 or 21 of this code or pursuant to any City Council policy. 21.90.150 Imolementina guidelines. The City Council may adopt any guidelines it deems necessary to implement this chapter. 21.90.160 Exclusions. i· (al Development proposals which consist of facilities, i 15. 146 Q < aa I "' ~ a: a: .. < <:II c;· '\I < ]j . ;;: 0 -= < '= (.,) 2 ~ "" -(.,) -~"" ~ % ... ~ Q ... % < ~a-~ --..I >-= < < ,. (.,) u ;1 I I ll 2! I I 3: 4 5 6 7/ I ' 8 9 10 ll 12 13 I 14ij 15 :1 •I 161 i 17! I 18 I' ,I 19 11 20 :: 21'.! ., :, 22-1 23 :1 24: I 25 i, 26 :1 27 '1 28 or structures constructed by a city, county, special district, state, or federal government or any agency, department, or subsidiary thereof for governmental purposes are excluded f~cm the provisions of this chapt~r. This exclusion shall not a99ly to development proposals to which a "°ssessory interest tax wculc be applicable. (b) Tentative maps the application for which was accepted before August 6, 1985 ~ay be approved without complyin9 with the plans adopted pursuant to this Chapter but any other development permits or building permits for the project shall ":e subject to the reauirements of the plans. The tentative map shall be subject to Section 21.90.030. 21.90.170 Council actions, fees, notice. (a) Whenever this chapter requires or permits an action or decision of the City Council, that action or decision shall be accomplished by a resolution. (b) The City Council shall establish ap9lication and processing fees for the submission and processing of facilities management plans and for any other request made under Section 21.90.100, 21.90.120 or 21.90.140. {c) Whenever written notice is required to be given to property owners under this section the notice shall be mailed by first class mail to the owners shown on the last equalized assessment roll. 21.90.180 Exciration of chapter. This chapter shall expire on June 30, 2001 unless it is extended or reenacted on or before that date. 21.90.190 Severabilitv. If any section, subsection, sentence, clause or phrase of the ordinance codified in this chapter is for any reason held to be invalid or unconstitutional by the decision of any ~uurt of competent jurisdiction, such decision shall not affect the validity of the remaining (.)Ortions of the ordinance codified in this chapter. The City Council , declares that it would have passed the ordinance codi_fied in this chapter and each section, subsection, sentence, clause and phrase thereof, irrespective of the fact that any part thereof be declared invalid or unconstitutional. ✓ SECTION 2: ~he City Council makes the following findings: l. Since January 1985, the City of Carlsbad has been i undertaking a comprehensive review of the Land Use Element of its General Plan. As part of that review a Council appointed Citizens Committee prepared a comprehensive report and recommendation to the City Council. That report was subject to public hearings by both the Planning Commission and City Council. Included in the recoml'l'lendations of the Citizens Committee wei:e : recommendations that no new development should occur unless 16. 147 i :I l l: ! aj I 31 41 i ' 5! 6 7 ai 91 101 11 12 Q C ID I 13 "' ... a:: a:: ,c • --II C 14!1 \ -.z -CZ: ~0 CD 8 C !!r 15!1 2~ ... . ... <J ! ... >.., . z ... I a l6i ... z < IJ ! -Ill I ! ~ ~ 171 > a: C C > <J i; -G 1a1: !' 19 20:: 21:: ·I 22 I ;i 23ii 24!1 25 i1 26 ii ~?71, 28 'i II II I, adequate-public facilities are available concurrently with need to serve the new development. 2. On August 6, 198S, the City Council adopted Interi~ Ordinance No. 9766, imposing certain temporary land use controls on property within the City, consistent with the recommendation of the Citizens Committee. On September 3, 1985, the City Council adopted Interim Ordinance No. 9771 which extended the restrictions of Ordinance No. 9766 until July 20, 1986. on 1- 0ecember 10, 1985, the City Council approved in concept several I land use proposals not contained in the Citizens Committee 1· report. On January 21, 1986 the City Council adopted Urgency Ordinance No. 9791 imposing a temporary moratorium on development! approvals based on the findings contained _in that ordinance. on April 22, 1986 the City Council revised City Council Policy No. 1 17, based on the findings contained therein. On May 6, 1986 the City Council adopted Ordinance No. 8107 establishing a traffic impact fee for the La Costa Area of the City. The City Council finds that all of these actions plus the adoption of Chapter 21.90 of the Carlsbad Municipal Code are necessary to ensure adequate public facilities are available to serve any new development in the City. Without Chapter 21.90 and the requirements imposed by it, adequate public facilities may not b available to serve new development or building. Development or building without public facilities is contrary to the City General Plan and would be dangerous to the public health and safety. 3. This action of the City Council is consistent with i long standing policies and objectives of the City to ensure : adequate public facilities wifnin Carlsbad. This action will protect the public health, safety and welfare of the citizens of i Carlsbad by ensuring safe streets, adequate water, sewer and drainage facilities, su-iicient fire protection and recreation facilities. 4. This action is consistent with the City's policy to! provide housing opportunities for all economic sectors of the 11 community, because sufficient opportunities for new housing continue to exist within the City and Chapter 21.90 does not 1 1 affect the number of houses which may be built. In addition, develop~ent of housing for low and moderate income persons and I families would most likely occur in areas of the City which are i designated for highest development priority. By encouraging 1 development of infill areas first, where the infrastructure is 1 already existing, the cost of housing may be reduced• l' s. Because any new development affects public facility availability it is necessary to impose the fees and charges whic, will be used to provide public facilities on any new building inl the City. The Council finds that failure to impose the fees and 1 charges on any new building in the City will adve-rsely affect thJ public health and safety by reducing the safety of its City's : streets, increasing the burden on water, sewer, drainage and fir~ 17. 148 I I l'. a 9 10 111 I 121 la,: 19· 20 · 21 22, ·I 23:i ii 'I 24il 25: I 27, 28 ·: i II ·I f aci_l ities, and by overcrowding existing schools, parks and recreatiQnal facilities. 6. Adoption of Chapter 21.90 will not adversely af:ec: the regional welfare. By ensuring that adeauate and safe ~1.iblic facilities and improvements will exist to serve all of the development in Carlsbad and because many of these facilities and improve~ents are used by persons residing in neighboring ar~as and cities the safety and welfare of the whole region is enhanced. SECTION 3: The City Council intends to implement the growth management program contained in Chapter 21.90 by follo·.,i:-1qi -! the work program in Exhibit A which is hereby made a pa rt of th i si ordinance. The City Council may adjust the work program without amending this ordinance as they determine necessary to accomplish effective growth management for the City of Carlsbad. EFFECTIVE DATE: This ordinance shall be effective I thirty days after its adoption, and the City Clerk shall certify! I to the adoption of this ordinance and cause it to be published at! ' I least once in the Carlsbad Journal within fifteen cays after its : i adoption. The fees created by Section 21.90.0S0 of this ordinance shall be effec:;.ive as to building permits for single oa multifamily residential projects 60 days after the adoption of this ordinance. INTRODUCED ANO FIRST READ at a regular meeting of the . I Carlsbad City Council held on the ,, 24th I cay of _J_u_n_e _____ ,. 1986 and thereafter 18. 11J9 ! 5: 6 7 I a 9 10 / 11 12 1:51 ' 1411 15 16 17 18 19 20,: 2lli ;I 22:1 I 23' I 241 I 25 j' 26i 27 .28 i PASSED AND ADOPTED at a regular meeting of said City Council held on the day of ----___ J_ul~v.._ ___ , 1986, by the lst following vote, to wit: ATTEST: AYES: Council ~embers Casler, Lewis, Kulchin, Chick and Peccine NOES: None ABSENT: None 150 • . APPENDIX 3 REFERENCE SOURCES 1. Citywide Facilities and Improvements Plan, City of Carlsbad, Revised September 29, 1986 2. Master Drainage Plan for the City of Carlsbad, adopted June, 1980 3. Sewer Master Plan, City of Carlsbad November, 1976 June, 1984 April, 1985 4. Costa Real Municipal Water District Master Plan, FPhruary, 1985 5. Parks and Recreation Element of the General Plan, City of Carlsbad, June, 1982 . 6. Memo to Planning Commission from Parks and Recreation Director, dated March 26, 1987 7. Circulation Element of the General Plan, City of Carlsbad 8. Standard Design Criteria for the Design of Public Works Improvements in the City of Carlsbad, 1984 9. Draft Barton-Aschman Traffic Study, March, 1987 10. Capital Improvement Program Budget, 1986-1987 11. Capital Improvement Program, 1987-1991 151 1 2 3 4 5· 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 APPENDIX 4 · PLANNING COMMISSION RESOLUTION NO. 2650 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF .CARLSBAD, CALIFORNIA RECOMMENDING APPROVAL OF THE LOCAL FACILITIES MANAGEMENT PLAN FOR ZONE 3 ON PROPERTY GENERALLY LOCATED SOUTH OF AGUA HEDIONDA LAGOON, NORTH OF AND INCLUDING THE ENCINA WASTEWATER TREATMENT PLANT, EAST OF THE PACIFIC OCEAN TO A POINT JUST EAST OF PASEO DEL NORTE. APPLICANT: CITY OF CARLSBAD CASE NO.: LOCAL FACILIITES MANAGEMENT PLAN -ZONE 3 WHEREAS, a verified application has been filed with the City of Carlsbad and referred to the Planning Commission, and WHEREAS, the City Council passed Resolution No. 8797 adopting the Citywide Facilities and Improvements Plan establishing facility zones and performance standards for public facilities, and WHEREAS, the City Council passed Resolution No. 9808 requiring the processing of a Local Facilities Management Plan, and WHEREAS, the Planning Commission did, on the 18th day of March, 1987, and on the 15th day of April, 1987, hold a duly noticed public hearing as prescribed by law to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the Local Facilities Management Plan for Zone 3. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) B) That the above recitations are true and correct. That based on the evidence presented at the public hearing, the Commission APPROVES Local Facilities Management Plan - Zone 3, based on the following findings and subject to the following conditions: 1-52 Findings: l. 2 3 4 5 6 7 8 9 10 11 12 1) 2) 3) 4) 5) That the Local Facilities Management Plan for Zone 3 is consistent with the Land Use Element, the Public Facilities Element, and the other Elements contained in Carlsbad's General Plan. That the Local Facilities Management Plan for Zone 3 is consistent with Section 21.90 of the Carlsbad Municipal Code (Growth Management), and with the adopted Citywide Facilities and Improvements Plan. That the Local Facilities Management Plan and the conditions contained therein will promote the public safety and welfare by ensuring that public facilities will be provided in conformance with the adopted performance standards. · The .Local Facilities Management Plan will control the. timing and locations of growth by tying the pace of development to the provision of public facilities and improvements. The Plan will prevent growth unless public facilities and service.a are available in conformance with the adopted performance standards. 13 Conditions: 14 1) 15 16 17 Ill/ 18 Ill/ 19 J / / / / 201 Ill/ Ill/ 21 22 Ill/ 231 Ill/ 24 Ill/ 25 Ill/ 26 Ill/ /Ill Approval is granted for Local Facilities Management Plan - Zone 3 as contained in the Plan titled Local Facilities Management Plan Zone 3, dated March 4, 1987, attached hereto, and incorporated herein by reference. 27 2al PC RESO NO. 2650 -2- 153 1 2 3 4 5. 6 7 8 9 10 ll PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning Commissi0n of the City of Carlsbad, California, held on the 15tn aay of April, 1987, by the following vote, to wit: ATTEST: AYES: NOES: ABSENT: Chairperson Marcus, Hall, Schramm & Schlehuber. Commissioners: McFadden & McBane. Commissioner Holmes. ABSTAIN: None. MARY CARLS CUS, Chairman PLANNING COMMISSION 13 PLANNING DIRECTOR(_:,N 14 15 16 17 18 19 20 21 22 23 24 25 26 27 PC RESO NO. 2650 -3- 28 154 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 · 18 19 I 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 9084 ----- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA APPROVING A LOCAL FACILITIES MANAGEMENT PLAN FOR LOCAL FACILITIES MANAGEMENT ZONE 3. WHEREAS, a local facilities management plan has been prepared for local facilities management zone 3 in acco.rdance with Chapter 21.90 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did on March 18, 1987 and April 15, 1987 hold duly notice public hearings as required by law to consider said plan and at the conclusion of the hearing adopted Resolution No. 2650 making findings and recommending that the City Council adopt a plan; and WHEREAS, a Negative Declaratton was issued by the Planning . Director on April 22, 1987 and approved by the Planning Commission on April 15, 1987 indicating that the local facilities management plan is not anticipated to have any significant adverse impact on the environment; and WHEREAS, the City Council at their meeting of May 19, 1987 held a duly noticed public hearing and considered all the t~stimony and arguments of anyone desiring to be heard, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California as follows: 1. That the above recitations are true and correct. 2. That the findings of the Planning CQmmission in Planning Commission Resolution No. 2650 constitute the findings of the City Council. 3. That the local facilities management plan for zone 3 dated March 4, 1987 on file with the City Clerk and incorporated 155 (. , . 1 2 3 4 5 6 7 8 9 10 herein by reference is hereby approved. Any development occurring within the boundaries of zone 3 shall comply with all the terms and conditions of said plan. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the 19th day of _M_a_y ___ , 1987 by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and Larson NOES: None ABSENT: None 11 C 12 ATTEST: 13· 16 17 18 19 20 21 22 23 24 25 26 27 28 (SEAL) -2- 156