Loading...
HomeMy WebLinkAbout2525 EL CAMINO REAL; 111; CBC2022-0021; Recycle{city of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 De_'!f!Joprr,ent Service~ Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Applicable to ALL t,IEW CONSRUCTION, ADDITIONS AND ALTERATIONS. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D I recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete andl submit this form when applying for a Building Permit. Note: Permits will not be issued without a con,pleted Construction Waste Management Plan. ~::;..J'-42:l,,i:f:..,J,:-_L<'s...='-l----~'Project Title Project Address 2525 El Camino Real -Suite 111 & 113 -Carlsbad, CA 92008 APN 1563020900 Appllcan_t Name Ret<iiil Construction Services, Inc. □ '!✓r o" Last First Applicant Address 11 ;343-39th St. North -Lake Elmo, MN 55042-9586 Phone 1651 l 704~1705 E-mail Address dbraun@retailconstruction.com Applicant Mailing Address _s_a_rn_e_a_s_a_b_o_v_e ______________________ _ (if different than project address} Project Type {check all that apply}: Residential □ Commercial [Z] Brief Description Ne~ retail tenant build out in existing space I Project Size 7,256 Sq ft Estimated Cost ofpro)ect $._5_9_1.c...,4_3_7_._0_0 ________ _ (square footage) Please check the appropriate box: !✓It plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction. D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. i Print Name Dan Bra~n (PM) Slgnature __ ..,fJ,c.=_,=-=~=-::__ _____ .Date 01 · 10 ·2022 Page 1 of4 Rev. 2.10.21 PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will I cont'd) n~! be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: • • Permit No. __________ Project Title Cotton On Mega --------""--------- Project Address 2525 El Camino Real -Suite 111 & 113 -Carlsbad, CA 92008 APN 1563020900 Applicant Name Retail Construction Services, Inc. Phone 651-704-1705 Last ! First • • Com1 lete the following table with estimated waste tonnage to be generated by your project. This is your plan for construction waste management. Changes can be made on the final recycle report. Goal: the diversion rate shall be 65% by weights of debris. Material Type Complete this fine of the table only if or,fy using WASTE MANAGEMENT 10ll-off bins. Mixed C&D Debris i ' Parking lot Asphalt & Concre~e Brick/ Masonry /Tile Mixed Inert Debris Cabinets, Doors, Fixtures, Windows (circle all that apply) Carnet Carpet Padding/ Foam Cardboard Ceiling Tile (acoustic) Drywall (used, new, scrap) Landscape Debris (brush, tre:es, stumps, etc.) No dirt. Unpainted Wood & Pallets Concrete Roofing Materials . Scran Metal Stucco Other: TOTAL • Estimated Waste Quantity (tons) 35Tons Estimated A Place a(✓) check next to items to be reused or salvaged B Place a(✓) check next to items to be recycled C Place a(✓) check next to Items to be disposed at landfill X To meet 65% Diversion: Requirement (estimate) _3_5 _______ x 0.65 =-_____ 22_._7_5 ____ tons Contractor/Owner Sig~ature I) Total Estimated Waste from above J/tvh lJ~ Date Minimum Required Diversion 01-10-2022 Page 2 of4 Rev. 7/1120 Ccityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 part 2 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP}: Section 4.408.1 and Section 5.408.1 of the 2019 California Green Building Standards requires at Jeast 65% of non•hazardous construction debris is recycled and/or salvaged for reuse. NEXT STEPS, STEP 1. Before the Peoltct - a. Review your CWMP completed prior to permit Issuance. (copy is attached to your Job card) This plan demonstrates how you will recycle a minimum of 65" of the construction waste generated from your project by choosing: Waste M•magement or Self Haul. STEP 2 -During the Project a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where materials were taken. b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are (at a minimum) 65% of the waste generated by your project STEP 3 -After the Project a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Octupancy, Applicant must submit the fully completed and approved (ORR) of the Construction Waste Managem!;mt Plan (CWMP) TabJe. b. Provide the DRR and receipts to your building inspector. FOR MORE INFORMATION: NOTICE: Appllcant (contractor and subcontractors) shall comply with the project's CWMP. It is the Appltcant's responsibility to collect au receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working with the City's fraiicnised hatiler;waste Mahagement, ·onefcumulatlVe project receipt Is acceptable. However; lt is the Applicant's responsibility to confirm that the bins are collected for C&D Recycling. 1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper storage and handling procedures to reduce broken and damaged materials, and reusing materials wh~never possible. 2. Waste Management Seivices can provide 2 roll-off bins, one for commingled construction debris and one for trash. The commingled construction roll-off bin will be taken to a Certified Mixed C&O Processing Facillty to sort the material and create receipt(s). to demonstrate the project has met a 65% diversion rate or greater. 3. Applieilnts with a goal of recycltng greater than 65% of the project's total waste should work with, the City's exclusive franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll~off bins for particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible. 4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste dlVerslon receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to http:ljwww.sandjego.goy/environmental-seryices/recyding/cd/lndex.shtml. 5, If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. Rev. 11112118 PART 2 Complete before final Inspection, obtain WASTE MANAGEMENT signature, and retum with receipts prior toflnal building approval. DEBRIS RECYCLING REPORT (ACTUAL): Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided In and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. A B C Date Material Type ActUalAmt Actual Amt Actual Ami Destination Faclllty Reused or Recycled Disposed In (Name, Address. Phone} Salvaged Landfill Wl!lllki Palomar Transfer Station, 5960 El 0l/05/2018 Concnte (brolcen) 5 tons Camino Real -----··-?>le,'is' I \%.'\1 Diversion Rate Achieved _ ____,,3=L?'-'-', 'is'::..,1_,, .--==s=s=-:1--=-i=------Ll/5 .4 % Total of columns A -4-B Total of columns A + 8 t-C DIVERSION Contractor/Owner Signature % _,ft<~ , :J'.· IS--J~ate Attach the following documentation to this Report: Return completed form and documentation to: • Origin a I rec;yciing weight tickets, landfitl weight tickets • Original donation receipts wlth photos and/or Itemized descriptions Any other relevant information to support Recycling Report City of Carlsbad Bulldlng Division (lSt Floor) 1635 Fantday Avenue Carlsbad, CA 92008 Rov. 11112/18 IJhe Shoppes •t_C.rlsbod jThe Shoppes at Carlsbad , ,,_ -_ypes •t C.rlsbod The Shoppes at Carlsbad The Shopoos •t C.rlsbod The Shoppes at Carlsbad The Shoppes at Carlsbad The Shoppes at C•rlsbad The Shoppes 1t C.rlsbod IToe Shoppes •t Carlsbad The <"""-s at C.rlsbod r'The Shoppes at C.rtsbod The Shoppes at C.rlsbod The Shoppes at C.rtsbad The Shoppes •t Carlsbad The Sho ......... s at Carlsbad The Shopoes at Carlsbad The Shoppes at Carlsbad The Shoppes at Carlsbad The Shoppes at Carlsbad TM Shoppes at Carlsbad Dump and Return Dump_ and Return Oumo and Return Dump and Remove Dump and Return Dump and Return Dump and Return Dume and Return Oumo and Return Dump and Return Dume and Return Dump and Return Dump and Return Dump and Return Dump and Return Dump and Return Oumo and Return Dump and Return Dump and Remove Dump and Return Dump and Return Waste ~~ement NatioMI Services, Inc-WM~1150 -~i_!t~ Man,.!iement National Services, lnc-WMNllSO Wtite Manacemeiit Nattonal services, Inc -WMN1150 Waste Manacement Natkmal Serv.ces, Inc -WMN1150 Waste Management National Servtces, Inc -WMN1150 Waste Man,acement Nationiil Serv.ces, lnc-WMN1150 Waste Management NatioMI Services Inc -WMN1150 Waste Management Nationill Services, Inc -WMNtlSO Waste Man11ement National Servk:es, Inc -WMN1150 Waste Management National Services, lnc-WMN1150 Waste Man.11ement N1tional Servk:ti, Inc -WMN1150 Waste Management National Services, Inc -WMNUSO Wffle Manq:ement National Servk:es, Inc -WMN11SO Waste Management National Services, Inc -WMNUSO Waste Management National Servtees Inc -WMN1150 Waste Mana,ement National Services, lnc-WMN1150 Waste Mana,erMnt National ServtceS, Inc -WMN1150 Waste Management National Services, lnc-WMN1150 Waste Manaaement NatiOnal Services lnc-WMN1150 Waste Mana1ement NatKJnal Services, Inc -WMNUSO Waste MaMCement National Services, lnc-WMN11S0 _f:onst~cdon_ Open Top COT.ContManq.CottonOn.01 40.0 YO Construction Open Top COT.ContM_~0CottonOn.01 40.0 YD ......,,~~•"'"-uuu V),""I'" ,...,.., .... OT.ContMan~.CottonOn.01 40.0YD Construction Open Top COT.ContM""'i,CottonOn.02 40.0YO Construction Onan Too COT.ContMonat1.CottonOn.Ol 40.0YO Construction Oe!n Top COT.ContManas.CottonOn.01 40.0YO COnstruction Open Top COT.ContM•nat1-CottonOn.Ol 40.0YO Construction Open Top COT.ContM•noa.CottonOn.01 40.0YO Construction Open Top COT.ContManaa,.CottonOn.01 40.0YO Construction Open Top COT.ContManag.CottonOn.01 40.0YD Construction Ooen Too COT.ContM1nac.CottonOn.Ol 40.0YD Construction Open Top COT.ContManae.CottonOn.01 40.0YD Construction Ooen Top COT.ContMonq.CottooOn.01 40.0YD Construction Open Top COT ContManae.CottonOn.01 400YD Construction Open Top COT.ContManq.CottonOn.01 40.0YD Construction Open Top COT.ContManae.CottonOn.01 40.0YD Construction Open Top COT.ContMana..CottonOn.02 40.0YD Construction Open Top COT.ContMana,.CottonOn.01 40.0YD Construction Open T COT.ContManag.CcttonOn.02 40.0YD Construction Open Top COT.ContMonag.CottonOn.01 40.0YD Construction O nTop COT.ContManac.CottonOn.01 40.0YD _Construction Oebfls_P.30003.1150COT03302022.2 3/31/2022 2.8 Construction Oebrls P.30003.1150COT040120:f2.3 4/1/2022 ., -.--4.61 '-onstruction Oe.bns P.30003.1150COT04062022.4 4/6/2022 _4.~~1 -Construction Debris P.30021.1150C0104082022.2 4/13/2022 6.99 Construction Debris P.30003.1150COT04122022.5 4/13/2022 4.881 Constructlon Debris P .30003.1150COT06022022.6 6/2/2022 3.18 Construction Debris P .30003.1150COT06032022. 7 6/3/2022 --H] Construction Debris P .30003.1150COT06092022.8 6/9/2022 2 Construction Debris P.30003.1150COT06272022,9 6/27/2022 2.26 Construction Debris P.30003.1150COT07122022.10 7/12/2022 0.01 Construction Debris P.30003.1150COT07222022.11 7/25/2022 3.22 Construction Debris P.30003.1150COT08022022.12 8/2/2022 2.27 Construction Debris P.30003.1150COT08152022.13 8/15/2022 3.89 Construction Debris P 30003 1150COT08162022.14 8/16/2022 3.89 Construction Debris P.30003.1150COT08172022.15 8/17/2022 4.81 Construction Debris P.30003.1150COT08182022.16 8/18/2022 I Construction Otbris P.31845.1150COT08192022.2 8/19/2022 I Construction Debris P 30003.1150COT08192022.17 8/19/2022 0.421 Construction Debris P.31845.1150COT08242022.3 8/24/2022 Construction Debris P.30003.1150COT08252022.18 8/25/2022 Construction Debris P30003.1150COT09122022.19 9/12/2022