HomeMy WebLinkAbout2525 EL CAMINO REAL; 111; CBC2022-0021; Recycle{city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
De_'!f!Joprr,ent Service~
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Applicable to ALL t,IEW CONSRUCTION, ADDITIONS AND ALTERATIONS. You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D
I recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste
Management or approved haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete andl submit this form when applying for a Building Permit. Note: Permits will not be issued
without a con,pleted Construction Waste Management Plan.
~::;..J'-42:l,,i:f:..,J,:-_L<'s...='-l----~'Project Title
Project Address 2525 El Camino Real -Suite 111 & 113 -Carlsbad, CA 92008 APN 1563020900
Appllcan_t Name Ret<iiil Construction Services, Inc. □ '!✓r o"
Last First
Applicant Address 11 ;343-39th St. North -Lake Elmo, MN 55042-9586
Phone 1651 l 704~1705 E-mail Address dbraun@retailconstruction.com
Applicant Mailing Address _s_a_rn_e_a_s_a_b_o_v_e ______________________ _
(if different than project address}
Project Type
{check all that apply}:
Residential □ Commercial [Z]
Brief Description Ne~ retail tenant build out in existing space
I
Project Size 7,256 Sq ft Estimated Cost ofpro)ect $._5_9_1.c...,4_3_7_._0_0 ________ _
(square footage)
Please check the appropriate box:
!✓It plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction.
DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction.
D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE
MANAGEMENT.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief. i
Print Name Dan Bra~n (PM) Slgnature __ ..,fJ,c.=_,=-=~=-::__ _____ .Date 01 · 10 ·2022
Page 1 of4 Rev. 2.10.21
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
I cont'd) n~! be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
• • Permit No. __________ Project Title Cotton On Mega --------""---------
Project Address 2525 El Camino Real -Suite 111 & 113 -Carlsbad, CA 92008 APN 1563020900
Applicant Name Retail Construction Services, Inc. Phone 651-704-1705
Last ! First
• • Com1 lete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type
Complete this fine of the table only if
or,fy using WASTE MANAGEMENT
10ll-off bins.
Mixed C&D Debris i
' Parking lot Asphalt & Concre~e
Brick/ Masonry /Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carnet
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, tre:es,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Concrete Roofing Materials .
Scran Metal
Stucco
Other:
TOTAL
•
Estimated
Waste Quantity
(tons)
35Tons
Estimated
A
Place a(✓) check
next to items to be
reused or salvaged
B
Place a(✓) check next
to items to be
recycled
C
Place a(✓) check next
to Items to be
disposed at landfill
X
To meet 65% Diversion: Requirement (estimate) _3_5 _______ x 0.65 =-_____ 22_._7_5 ____ tons
Contractor/Owner Sig~ature
I) Total Estimated Waste from above
J/tvh lJ~ Date
Minimum Required Diversion
01-10-2022
Page 2 of4 Rev. 7/1120
Ccityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59 part 2
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP}: Section 4.408.1 and Section 5.408.1
of the 2019 California Green Building Standards requires at Jeast 65% of non•hazardous construction debris is recycled and/or
salvaged for reuse.
NEXT STEPS,
STEP 1. Before the Peoltct -
a. Review your CWMP completed prior to permit Issuance. (copy is attached to your Job card) This plan demonstrates how
you will recycle a minimum of 65" of the construction waste generated from your project by choosing: Waste
M•magement or Self Haul.
STEP 2 -During the Project
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are
(at a minimum) 65% of the waste generated by your project
STEP 3 -After the Project
a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Octupancy, Applicant must submit the
fully completed and approved (ORR) of the Construction Waste Managem!;mt Plan (CWMP) TabJe.
b. Provide the DRR and receipts to your building inspector.
FOR MORE INFORMATION:
NOTICE: Appllcant (contractor and subcontractors) shall comply with the project's CWMP. It is the Appltcant's responsibility to
collect au receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's fraiicnised hatiler;waste Mahagement, ·onefcumulatlVe project receipt Is acceptable. However; lt is the Applicant's
responsibility to confirm that the bins are collected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures to reduce broken and damaged materials, and reusing materials wh~never possible.
2. Waste Management Seivices can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&O Processing Facillty to sort the material and
create receipt(s). to demonstrate the project has met a 65% diversion rate or greater.
3. Applieilnts with a goal of recycltng greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll~off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies,
etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste dlVerslon receipts from
a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
http:ljwww.sandjego.goy/environmental-seryices/recyding/cd/lndex.shtml.
5, If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated
Recycling Facility.
Rev. 11112118
PART 2 Complete before final Inspection, obtain WASTE MANAGEMENT signature, and retum with receipts prior toflnal
building approval.
DEBRIS RECYCLING REPORT (ACTUAL):
Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided In and with this
form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
A B C
Date Material Type ActUalAmt Actual Amt Actual Ami Destination Faclllty
Reused or Recycled Disposed In (Name, Address. Phone}
Salvaged Landfill
Wl!lllki Palomar Transfer Station, 5960 El
0l/05/2018 Concnte (brolcen) 5 tons Camino Real -----··-?>le,'is' I \%.'\1
Diversion Rate Achieved _ ____,,3=L?'-'-', 'is'::..,1_,, .--==s=s=-:1--=-i=------Ll/5 .4 %
Total of columns A -4-B Total of columns A + 8 t-C DIVERSION
Contractor/Owner Signature % _,ft<~ , :J'.· IS--J~ate
Attach the following documentation to this Report: Return completed form and documentation to:
• Origin a I rec;yciing weight tickets, landfitl weight tickets
• Original donation receipts wlth photos and/or Itemized descriptions
Any other relevant information to support Recycling Report
City of Carlsbad
Bulldlng Division (lSt Floor)
1635 Fantday Avenue
Carlsbad, CA 92008
Rov. 11112/18
IJhe Shoppes •t_C.rlsbod jThe Shoppes at Carlsbad
, ,,_ -_ypes •t C.rlsbod
The Shoppes at Carlsbad
The Shopoos •t C.rlsbod
The Shoppes at Carlsbad
The Shoppes at Carlsbad
The Shoppes at C•rlsbad
The Shoppes 1t C.rlsbod
IToe Shoppes •t Carlsbad
The <"""-s at C.rlsbod
r'The Shoppes at C.rtsbod
The Shoppes at C.rlsbod
The Shoppes at C.rtsbad
The Shoppes •t Carlsbad
The Sho ......... s at Carlsbad
The Shopoes at Carlsbad
The Shoppes at Carlsbad
The Shoppes at Carlsbad
The Shoppes at Carlsbad
TM Shoppes at Carlsbad
Dump and Return
Dump_ and Return
Oumo and Return
Dump and Remove
Dump and Return
Dump and Return
Dump and Return
Dume and Return
Oumo and Return
Dump and Return
Dume and Return
Dump and Return
Dump and Return
Dump and Return
Dump and Return
Dump and Return
Oumo and Return
Dump and Return
Dump and Remove
Dump and Return
Dump and Return
Waste ~~ement NatioMI Services, Inc-WM~1150
-~i_!t~ Man,.!iement National Services, lnc-WMNllSO
Wtite Manacemeiit Nattonal services, Inc -WMN1150
Waste Manacement Natkmal Serv.ces, Inc -WMN1150
Waste Management National Servtces, Inc -WMN1150
Waste Man,acement Nationiil Serv.ces, lnc-WMN1150
Waste Management NatioMI Services Inc -WMN1150
Waste Management Nationill Services, Inc -WMNtlSO
Waste Man11ement National Servk:es, Inc -WMN1150
Waste Management National Services, lnc-WMN1150
Waste Man.11ement N1tional Servk:ti, Inc -WMN1150
Waste Management National Services, Inc -WMNUSO
Wffle Manq:ement National Servk:es, Inc -WMN11SO
Waste Management National Services, Inc -WMNUSO
Waste Management National Servtees Inc -WMN1150
Waste Mana,ement National Services, lnc-WMN1150
Waste Mana,erMnt National ServtceS, Inc -WMN1150
Waste Management National Services, lnc-WMN1150
Waste Manaaement NatiOnal Services lnc-WMN1150
Waste Mana1ement NatKJnal Services, Inc -WMNUSO
Waste MaMCement National Services, lnc-WMN11S0
_f:onst~cdon_ Open Top COT.ContManq.CottonOn.01 40.0 YO
Construction Open Top COT.ContM_~0CottonOn.01 40.0 YD
......,,~~•"'"-uuu V),""I'" ,...,.., .... OT.ContMan~.CottonOn.01 40.0YD
Construction Open Top COT.ContM""'i,CottonOn.02 40.0YO
Construction Onan Too COT.ContMonat1.CottonOn.Ol 40.0YO
Construction Oe!n Top COT.ContManas.CottonOn.01 40.0YO
COnstruction Open Top COT.ContM•nat1-CottonOn.Ol 40.0YO
Construction Open Top COT.ContM•noa.CottonOn.01 40.0YO
Construction Open Top COT.ContManaa,.CottonOn.01 40.0YO
Construction Open Top COT.ContManag.CottonOn.01 40.0YD
Construction Ooen Too COT.ContM1nac.CottonOn.Ol 40.0YD
Construction Open Top COT.ContManae.CottonOn.01 40.0YD
Construction Ooen Top COT.ContMonq.CottooOn.01 40.0YD
Construction Open Top COT ContManae.CottonOn.01 400YD
Construction Open Top COT.ContManq.CottonOn.01 40.0YD
Construction Open Top COT.ContManae.CottonOn.01 40.0YD
Construction Open Top COT.ContMana..CottonOn.02 40.0YD
Construction Open Top COT.ContMana,.CottonOn.01 40.0YD
Construction Open T COT.ContManag.CcttonOn.02 40.0YD
Construction Open Top COT.ContMonag.CottonOn.01 40.0YD
Construction O nTop COT.ContManac.CottonOn.01 40.0YD
_Construction Oebfls_P.30003.1150COT03302022.2 3/31/2022 2.8
Construction Oebrls P.30003.1150COT040120:f2.3 4/1/2022 ., -.--4.61
'-onstruction Oe.bns P.30003.1150COT04062022.4 4/6/2022 _4.~~1 -Construction Debris P.30021.1150C0104082022.2 4/13/2022 6.99
Construction Debris P.30003.1150COT04122022.5 4/13/2022 4.881
Constructlon Debris P .30003.1150COT06022022.6 6/2/2022 3.18
Construction Debris P .30003.1150COT06032022. 7 6/3/2022 --H] Construction Debris P .30003.1150COT06092022.8 6/9/2022 2
Construction Debris P.30003.1150COT06272022,9 6/27/2022 2.26
Construction Debris P.30003.1150COT07122022.10 7/12/2022 0.01
Construction Debris P.30003.1150COT07222022.11 7/25/2022 3.22
Construction Debris P.30003.1150COT08022022.12 8/2/2022 2.27
Construction Debris P.30003.1150COT08152022.13 8/15/2022 3.89
Construction Debris P 30003 1150COT08162022.14 8/16/2022 3.89
Construction Debris P.30003.1150COT08172022.15 8/17/2022 4.81
Construction Debris P.30003.1150COT08182022.16 8/18/2022 I
Construction Otbris P.31845.1150COT08192022.2 8/19/2022 I
Construction Debris P 30003.1150COT08192022.17 8/19/2022 0.421
Construction Debris P.31845.1150COT08242022.3 8/24/2022
Construction Debris P.30003.1150COT08252022.18 8/25/2022
Construction Debris P30003.1150COT09122022.19 9/12/2022