Loading...
HomeMy WebLinkAbout2023-04-04; City Council; Resolution 2023-097RESOLUTION NO. 2023-097 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS, DETERMINING THE BID SUBMITTED BY DB PIPELINE, INC. TO BE NON-RESPONSIVE, AND AWARDING A CONSTRUCTION CONTRACT TO CCL CONTRACTING, INC. FOR CONSTRUCTION OF THE KELLY DRIVE SEWER REPLACEMENT PROJECT, CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 5548-A, IN AN AMOUNT NOT TO EXCEED $770,890 WHEREAS, the City Council has determined it necessary, desirable, and in the public interest to construct the Kelly Drive Sewer Replacement Project, Capital Improvement Program, or CIP, Project No. 5548-A; and WHEREAS, on Dec. 13, 2022, the City Council adopted Resolution No. 2022-285, approving plans and specifications that included a Technical Expertise requirement and authorizing the City Clerk to advertise to receive bids for construction of the project; and WHEREAS, Section 404 of the City Charter allows the City Council to set its own bidding requirements in matters that are strictly a municipal affair; and WHEREAS, on Feb. 15, 2023, six bids were received via electronic format for construction of the project; and WHEREAS, the apparent lowest bid submitted by DB Pipeline, Inc. in an amount not to exceed $703,000 did not include sufficient documentation of meeting the Technical Expertise requirement and therefore staff recommend the bid be found non-responsive for failing to document that they met the expertise requirements stated in the bid solicitation; and WHEREAS, CCL Contracting, Inc. submitted the next lowest bid in an amount not to exceed $770,890, and staff determined that the bid is responsive and that CCL Contracting, Inc. is a responsible contractor; and WHEREAS, Carlsbad Municipal Code, or CMC, Sections 3.28.080(C) and 3.28.080(1)(6) require the City Counci l to award all formally bid contracts when the value exceeds $200,000; therefore, the project is subject to this requirement; and WHEREAS, CMC Section 3.28.040(C)(5) authorizes the City Manager, or designee, to approve change orders in the amount equal to the contingency set at the time of project award, which is $116,000 for the project; and WHEREAS, the City Planner has determined that the project is exempt from the California Environmental Quality Act, or CEQA, under State CEQA Guidelines Sections 15302 (replacement or reconstruction of existing facilities). None of the exceptions described in CEQA Section 15300.2 are applicable to this project. A notice of exemption was filed in the office ofthe San Diego County Clerk in compliance with Section 21152{b) of the Public Resources Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid in the amount of $703,000 submitted by DB Pipeline, Inc. is determined to be non-responsive as they failed to document that they met the Technical Expertise requirement. 3. That the bid in the amount of $770,890 submitted by CCL Contracting, Inc. for construction of the Kelly Drive Sewer Replacement Project, CIP Project No. 5548-A, is accepted, and the Mayor is hereby authorized to execute a contract with CCL Contracting, Inc. 4. That the City Manager, or designee, is hereby authorized to approve construction change orders up to $116,000. 5. That the award of this contract is contingent upon CCL Contracting, Inc. executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 calendar days of adoption of this Resolution. The City Manager may grant reasonable extensions of time to execute the contract and assemble the required bonds and insurance policies. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 4th day of April, 2023, by the following vote, to wit: AYES: NAYS: ABSTAIN: ABSENT: Blackburn, Bhat-Patel, Acosta, Burkholder, Luna. None. None. None. for KEITH BLACKBURN, Mayor at SHERRY FREISINGER, City Clerk (SEAL)