Loading...
HomeMy WebLinkAbout1030 CAMINO DE LAS ONDAS; ; CBRA2017-0215; PermitBuilding Permit Finaled (city of Carlsbad Residential Associated Permit Print Date: 01/24/2023 Permit No: CBRA2017-0215 Job Address: 1030 CAMINO DE LAS ONDAS, CARLSBAD, CA 92011 Status: Closed -Expired Permit Type: BLDG-Associated Permit Residential Work Class: Single Family Detached Parcel#: 2145315400 Track#: Valuation: $377,483.47 Lot#: Occupancy Group: #of Dwelling Units: 1 Project#: Plan#: 1 DEV13028 Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: ProjectTitle: 3 2.5 GOLDEN SURF Construction Type:VB Orig. Plan Check#: PC2017-0028 Plan Check#: Applied: Issued: Fina led Close Out: Final Inspection: 09/11/2017 11/01/2017 INSPECTOR: Burnette, Paul Frazee, Tim Wong, Cindy Collins, Michael Krogh, Andy Description: GOLDEN SURF: LOT 1 // PLAN 1 // 2,313 SF LIV// 502 SF GARAGE// 175 SF PATIO// 87 SF DECK Applicant: Property Owner: CoApplicant: NEW POINTE COMMUNITIES INC TYLER SANDSTROM 16880 W BERNARDO DR, # 230 SAN DIEGO, CA 92127-1614 (858) 254-9911 NEW POINT INVESTMENT 35 LLC 16880 W BERNARDO DR, # 230 SAN DIEGO, CA 92127 NEW POINT COMMUNITIES INC 16880 W BERNARDO DR, # 230 SAN DIEGO, CA 92127 FEE BRIDGE & THOROUGHFARE District 2 -Zone 20 BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) COMMUNITY FACILITIES DISTRICT (CFD) FEE ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -inside CFD SB1473 GREEN BUILDING STATE STANDARDS FEE SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement SEWER BENEFIT AREA FEES -L SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLDG SWPPP INSPECTION TIER 1 -Medium BLDG SWPPP PLAN REVIEW FEE TIER 1-MEDIUM SWPPP PLAN REVIEW TIER 1 -Medium TRAFFIC IMPACT Residential Single Family w/in CFD WATER METER FEE 1" Displacement WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P) WATER TREATMENT CAPACITY CHARGE 5/8" Displacement Total Fees: $47,356.06 Total Payments To Date: $46,995.06 Balance Due: EXPiRED PERMIT PERMll HAS fXPIF:ED IN ACCORU,\NCE WIT!! C.B.C SECTION 106.~.4 AS A'-lENDrn PY c.r~ .. C.18.04.020 Building Division DAIE l .9.4 f'.2 :;!G.\.ITIJRE 'fj[_, ~--_ 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov AMOUNT $19,280.00 $1,612.90 $529.03 $2,859.86 $66.00 $170.00 $92.00 $182.00 $6,870.20 $16.00 $5,029.00 $1,562.00 $934.00 $49.07 $238.00 $292.00 $56.00 $69.00 $2,800.00 $352.00 $4,169.00 $128.00 $361.00 Page 1 of 2 ,GG";_\"' "/ ~ ' ' PERMIT INSPECTI\1N ,t1ISTOR~,lo , (CBR2017-0215) Permit Type: BLDG-Associated Permit Residenti, Work Class: Single Family Detached Status: Closed -Finaled Application Date: 09/11/2017 Owner: NEW POINT INVESTMENT 35 LLC Issue Date: 11/01/2017 Subdivision: PARCEL MAP NO 06136 Expiration Date: 12/31/2018 IVR Number: 6275 Address: 1030 CAMINO DE LAS ONDAS CARLSBAD, CA 92011 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS Passed BLOG-Building Deficiency Not ready No Tuesday,January24,2023 Page 3 of 3 " ' ,J''S "'0 "X' ,v, ' PERMIT INSPECTION HISTGRi:1or, {l1:l;JRA2017-0215) Permit Type: BLDG-Associated Permit Residenti: Application Date: 09/11/2017 Owner: NEW POINT INVESTMENT 35 LLC Work Class: Single Family Detached Issue Date: 11/01/2017 Subdivision: PARCEL MAP NO 06136 Status: Closed -Finaled Expiration Date: 12/31/2018 Address: 1030 CAMINO DE LAS ONDAS IVR Number: 6275 CARLSBAD, CA 92011 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready, complete all lath. Yes BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout Yes BLDG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers 04/03/2018 04/03/2018 BLDG-82 Drywall, 053641-2018 Passed Paul Burnette Complete Exterior Lath, Gas Test, Hot Mop Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-17 Interior Lath-Drywall Yes BLDG-18 Exterior Lath and Yes Drywall BLDG-23 Gas-Test-Repairs Yes 0411712018 04/1712018 BLDG-17 Interior 055188-2018 Failed Tim Frazee Reinspection Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Needed to patch pony walls and sides of No showers 0412412018 04/24/2018 BLDG-17 Interior 055905-2018 Passed Paul Burnette Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Needed to patch pony walls and sides of Yes showers 0710312018 07103/2018 BLDG-34 Rough 062952-2018 Passed Michael Collins Complete Electrical Checklist Item COMMENTS Passed BLDG-Building Deficiency EMR emailed to SDGE Yes BLDG-Final Inspection 062953-2018 Failed Michael Collins Re inspection Incomplete Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No 08127/2018 08/27/2018 BLDG-Fire Final 067648-2018 Cancelled Cindy Wong Re inspection Incomplete Checklist Item COMMENTS Passed FIRE-Building Final Yes 09/13/2018 09/13/2018 BLDG-Final Inspection 069895-2018 Failed Paul Burnette Rei nspection Incomplete Tuesday, January 24, 2023 Page 2 of 3 Building Permit Inspection History Finaled {city of Carlsbad PERMIT INSPECTION HISTORY for (CBRA2017-0215) Permit Type: BLDG-Associated Permit Residenti, Application Date: 09/11/2017 Owner: NEW POINT INVESTMENT 35 LLC Work Class: Single Family Detached Issue Date: 11/01/2017 Subdivision: PARCEL MAP NO 06136 Status: Closed -Finaled Expiration Date: 12/31/2018 Address: 1030 CAMINO DE LAS ONDAS IVR Number: 6275 CARLSBAD, CA 92011 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 11/17/2017 11/17/2017 BLDG-21 040822-2017 Passed Andy Krogh Complete Underground/LI nderflo or Plumbing 12/05/2017 12/05/2017 BLDG-11 042306-2017 Passed Paul Burnette Complete F ou n dation/Ftg/P iers (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 02/08/2018 02/08/2018 BLDG-15 Roof/ReRoof 048208-2018 Failed Paul Burnette Reinspection Incomplete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency No 02/12/2018 02/12/2018 BLDG-15 Roof/ReRoof 048488-2018 Passed Paul Burnette Complete (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 03/08/2018 03/08/2018 BLOG-13 Shear 051262-2018 Passed Paul Burnette Complete Panels/HD (ok to wrap) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 03/22/2018 03/22/2018 BLDG-84 Rough 052494-2018 Failed Michael Collins Reinspection Incomplete Combo(14,24,34,44} Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready, complete all lath. No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 03/28/2018 03/28/2018 BLDG-84 Rough 052891-2018 Passed Paul Burnette Complete Combo(14,24,34,44) Tuesday, January 24, 2023 Page 1 of 3 FIELD MEMO ADVANCED GEOTECHNICAL SOLUTIONS, INC. CLIENT: N ,j) & 1 CLIENT'S REPRESENTATIVE: 5_ ✓5YlG,5' PROJECT NAME: 0~ &l._14, ~ y~ PROJECT LOCATION: Ce, v /,; k,,,q ,:/' TRACT NO.: P/W: /'7-0 /-I'$ DATE: /Z-':>-/7 REPORT NO.: WEATHER: Footing/Caisson Excavation (Indicate as-built and design embedment depths, setback) Retaining Wall (Indicate type of wall, if drains installed per plan, limits of select backfill -ifobserved) D Presaturation {Indicate depth of presaturation and moisture content) D Subgrade (Specify curb and gutter, flatwork, or pavement) D Removal Bottom D Subdrain D Reinforcing Steel D Keyway Excavation D Special Inspection: ___________ _ D Concrete Testing D Other: _______________ _ ___ g_l-t_f_1"_-l~ __ ;..;..;.) 116te/4 h~;;rr it Ct.,£.-, -1,1 ,:7,,ec~,-J;:w,c,,.__ r..~ ,=t~ qJ>p_v'O_"-< Su. I.--Jk p ,v ls, ; 6'-1--1L~r"'1__j_t1:/f__ t,:_'tJ f?_vi1-<_<j!_~ { ~,y £ ov) ~ /-v-_ -f'C<.,~a_:"'-G...~_ /;J,.rt~ /Jpp ('~wJ __ <;,,j r fl<_p.,v't:S_ _ SITl!VISl+ORS/FIRM: Ai5' P,cp:v/::;'~_'__~o/-t3,-2 '5-(,--/7 10~21--11 SIGNED: _ ___c:::;:,._==+-~~ PRINTED: ______ --+-- PAGE _Jo~ memo2015.xlsx/Memo BILLED HOURS FIELD OFFICE ; TRAVEL CLIENT'S REPRE~SENTATIVE 0 SIGNED:~_~ ~ PRINTED: I -¾; ) TITLE: ___________ _ DATE: TO: PROJECT: PROJECT No.: MEMORANDUM November 30, 2017 Tyler Sandstrom Golden Surf 17-315 rJ:lHTK STRUCTURAL ENGINEERS, LLP 14288 Danielson Street • Sule #200 • Poway, CA 92064-8819 {858) B79-BBS9 • WWW. HTKSE.COM • Fal( (858) 679-l:!959 The slab dowels shown in detail 2 / SD 1 may be omitted if the slab and footing are poured monolithically. From: HTK Copies to: File Page 1 ... ~ .. Bl le' I'•.! ... "' >V Dmz (Ii••·•· 4" &I.Ae 0M GRAOI! HI "3 • l&'HAWAY At CENTER Of-9'..Ae O\,'Ellt.2'&.ANOOYE!llt kr>MILV~~ER OVEJt 2'6N-U) .. '"""""" .f I I I I I l I I L FOUNDA 110N PLAN 3 ec;..tl.2, \t"•l'-0' [!],•.,· ---7r--- D 21',cl&'GRA.C>Eee.AH Hf)-'& Tf& ., TIE&• Cl" '"' QHIIITPMb PQIQl'IQI CNWl Pit L •'NN.IILAO~GltADf~lll£t,P.P"Ellt&Gl&.6~~ -1'C1.£1Ht.lH)O>.etl10e1'\.llll.BAM111to-.-at2·CU,ANMC). 1. AUP'COTN:iM01Mtfl'Etfl\.M ! ~~~;:1rg:,.~_,~,~":::C~~~LI I t. 1Qt:AC0fTIGMl,LD~tfE~~ •• ...,.____. N>ICA,TEll~~a&:Ol!TM.M,$7 1, ~ N>ICATNLm&a-NNtioW.1.. K!e.&'fOJfQltMMNtHM.1.&c::t,BUt, .. Fat.-U..ll..Aeet..c:ft&•PlOCllltOfll,f.N&.eDNICU\.~. t. l"'fl:IOlt TO c.GltffllAGTalt Jll!aa61"1«. 4 !11.D'G Cff'T. PO.M>Anc::N NIPECT10MMIOU!M:l,N!fl'&W.l.~l!lt&DNiOl'PICW.. tl~TM.411 A.J Met.o'6,.ADl<UP'll!!P'.in:t>tl,t,CC,QIIDM::fH'fWM .,..._ aJ Mtltl.lT"r~MAYl"ettt4l"A:ftJll!.T~4 C<>PAC1!D CJ 11-1! M) !)CAYA.TICle, n4e" IOI.I !>P.t.Ni!ltl'£ 04ARACT!M'T1CI t ~<;.WJJarrCOf'c:IR1TOH90LSllff"ClRT, to. D ~':a,~~~~~ r *D 5 ,mR4Dw.fiidiifl6W.klemi n,,, Qt )Kl ea. ~ 90EDLU OH 6S k:ft MiftNGt«', I. CXXXXX] tPCATU » ITl.06 • »• o,c;. N.OJU ~~I •• f! !! r " I ~ ! :z:., "" 11.D§ 1el OI ::,~~ u,t ~ II !:!i z-=i Ill~~ ~ " .,...,,, -Dd tf4'•r-e,• _,.. I• n.,e SD4 a: 0 0 ... . .. Q w "' ,i a: ... . ... . ;; ; ... . ... . ; a: 0 0 ... . .. Q w ti ) ,i a: ., l; = ; = a = . = s e = . ~ '" ~ ; ' ill ~= = = = = . ! h 11 §d ; ~~ U h • . ~~ CD S1 1 V M Al : I O l S 31 ~ N I S lm @ ij ®ll V M · O N O l : l l . S 1E ! B 1 . ., "' w .. 0 z "' w ~ ... . 11 . :I ! w .. !>_. ... . <( 3: .; z 0 a: .. "' • ~,; O l l l l o \ a l l :U 910 C tl / t o / N L SS O l l i : A : a l XI Zln l CL / 1 1 /t.G ti rlC I S L \ 3 1 1 11 9 1 - n : ! 11 / U / Z O I &.' f O d l A ! i l l " 8 a t - m 5 0 / U / I O I' HC I I S l , U l l " I T l l 3 ' 0 0 . . o / a / M I! f;" I O St\ 1 ' J.L \'t ! 0~ "' w ... 0 z z 0 ti w z z 0 (.) w .. . j "-"-0 .. . SPEAR & ASSOCIATES, INC. NOVEMBER 27, 2017 CITY OF CARLSBAD ENGINEERING DEPARTMENT 1635 FARADAY AVENUE CARLSBAD, CA 92008-7314 RE: SETBACK CERTIFICATION GOLDEN SURF 1000 CAMINO DE LAS ONDAS CARLSBAD, CA DRAWING NO. 496-7A PROJECT NO. CT 13-04 CIVIL ENGINEERING AND LAND SURVEYING 475 PRODUCTION STREET SAN MARCOS, CA. 92078 (760) 736-2040 FAX (760) 736-4866 I HEREBY CERTIFY, THAT BY FIELD SURVEY ON NOVEMBER 22, 2017, THE BUILDING FORMS FOR THE ABOVE REFERENCED PROJECT AS SHOWN ON _DRAWING NO. 496-7 A, MEET THE MINIMUM SETBACK REQUIREMENTS AS SHOWN ON THE TABLE BELOW. SURVEY MONUMENTS AT THE PROPERTY CORNERS WERE LOCATED AND USED TO ESTABLISH THE MINIMUM BUILDING SETBACKS. FRONT YARD SIDE YARD REAR YARD LOT 1 SETBACKS N/A 10 20 RESPECTFULLY SUBMITTED, ~ RAY SPEAR PLS 6404 LOT 2 SETBACKS 10 7.10 14.2