HomeMy WebLinkAbout1038 CAMINO DE LAS ONDAS; ; CBRA2017-0217; PermitBuilding Permit Finaled
(city of
Carlsbad
Residential Associated Permit
Print Date: 01/24/2023 Permit No: CBRA2017-0217
Job Address: 1038 CAMINO DE LAS ONDAS, CARLSBAD, CA 92011 Status: Closed -Expired
Permit Type: BLDG~Associated Permit Residential
2145315400
Work Class: Single Family Detached
Parcel#:
Valuation: $392,444.15
Occupancy Group:
#of Dwelling Units: 1
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
4
3.0
GOLDEN SURF
Track#:
Lot#: 2
Project#: DEV13028
Plan#:
Construction Type:VB
Orig. Plan Check#: PC2017-0028
Plan Check#:
Applied:
Issued:
Finaled Close Out:
Final Inspection:
09/11/2017
11/01/2017
INSPECTOR: Burnette, Paul
Frazee, Tim
Wong, Cindy
Collins, Michael
Description: GOLDEN SURF: LOT 1 // PLAN 2 // 2,431 SF LIV// 463 SF GARAGE// 99 SF PATIO// 70 SF DECK
Applicant: Property Owner: CoApplicant:
NEW POINTE COMMUNITIES INC
TYLER SANDSTROM
16880 W BERNARDO DR, # 230
SAN DIEGO, CA 92127-1614
(858) 254-9911
NEW POINT INVESTMENT 3S LLC
16880 W BERNARDO DR, # 230
SAN DIEGO, CA 92127
NEW POINT COMMUNITIES INC
16880 W BERNARDO DR, # 230
SAN DIEGO, CA 92127
FEE
BRIDGE & THOROUGHFARE District 2 -Zone 20
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
COMMUNITY FACILITIES DISTRICT (CFD) FEE
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -inside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER BENEFIT AREA FEES -L
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP INSPECTION TIER 1 -Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1-MEDIUM
SWPPP PLAN REVIEW TIER 1-Medium
TRAFFIC IMPACT Residential Single Family w/in CFD
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $47,627.51 Total Payments To Date: $47,266.51 Balance Due:
Building Division
EXPIRED PERMIT
PERMIT HAS EXPl~;EO IN ACCORO;\NCE WITH C.B.C
SECTION 106.4.4 AS A'-1EN0D flY C kC.18.04.020
DArE)1,LfJa_'??_ s1G'i.\TURt .. ~0£_J_~i:~~--P
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
AMOUNT
$19,280.00
$1,666.15
$473.00
$2,859.86
$66.00
$170.00
$92.00
$182.00
$7,142.48
$16.00
$5,029.00
$1,562.00
$934.00
$51.02
$238.00
$292.00
$56.00
$69.00
$2,800.00
$352.00
$4,169.00
$128.00
$361.00
Page 1 of 2
' ' ,,
PERMIT IN.,PECTION HISTORY for (CBRA2017-0217)
Permit Type: BLDG-Associated Permit Residenti: Application Date: 09/11/2017 Owner: NEW POINT INVESTMENT 35 LLC
Work Class: Single Family Detached Issue Date: 11/01/2017 Subdivision: PARCEL MAP NO 06136
Status: Closed -Finaled Expiration Date: 03/06/2019 Address: 1038 CAMINO DE LAS ON DAS
IVR Number: 6277 CARLSBAD, CA 92011
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04117/2018 0411712018 BLDG-17 Interior 055191-2018 Failed Tim Frazee Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Need to patch pony walls and sides of the No
shower
0412412018 04/2412018 BLDG-17 Interior 055907-2018 Passed Paul Burnette Comple!e
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Need to patch pony walls and sides of the Yes
shower
0710312018 07/03/2018 BLDG-34 Rough 062962-2018 Passed Michael Collins Complete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency EMR emailed to SDGE Yes
BLDG-Final Inspection 062963-2018 Failed Michael Collins Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
0813112018 BLDG-Fire Final 067653-2018 Rescheduled Cindy Wong Incomplete
Checklist Item COMMENTS Passed
FIRE-Building Final No
0910712018 09/07/2018 BLDG-Fire Final 069010-2018 Passed Cindy Wong Complete
Checklist Item COMMENTS Passed
FIRE-Building Final Yes
0911312018 09/1312018 BLDG-Final Inspection 069896-2018 Failed Paul Burnette Rei nspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
Tuesday, January 24, 2023 Page 2 of 2
Building Permit Inspection History Finaled
(City of
Carlsbad
PERMIT INSPECTION HISTORY for (CBRA2017-0217)
Permit Type: BLDG-Associated Permit Residenti, Application Date: 09/11/2017 Owner: NEW POINT INVESTMENT 35 LLC
Work Class: Single Family Detached Issue Date: 11/01/2017 Subdivision: PARCEL MAP NO 06136
Status: Closed -Finaled Expiration Date: 03/06/2019 Address: 1038 CAMINO DE LAS ON DAS
IVR Number: 6277 CARLSBAD, CA 92011
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
11/16/2017 11/16/2017 BLDG-21 040718-2017 Passed Paul Burnette Complete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
12/05/2017 12/05/2017 BLDG-11 042305-2017 Passed Paul Burnette Complete
Foundation/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
02/12/2018 02/12/2018 BLDG-15 Roof/ReRoof 048491-2018 Passed Paul Burnette Complete
(Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03/12/2018 03/12/2018 BLDG-14 051341-2018 Passed Tim Frazee Complete
Frame/Steel/Bolting/We
lding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04/02/2018 04/02/2018 BLDG-84 Rough 053453-2018 Passed Paul Burnette Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
04/09/2018 04/09/2018 BLDG-18 Exterior 054266-2018 Passed Paul Burnette Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-23 054267-2018 Passed Paul Burnette Complete
Gas/Test/Repairs
Tuesday, January 24, 2023 Page 1 of 2
FIELD MEMO
ADVANCED GEOTECHNICAL SOLUTIONS, INC.
CLIENT: /v /) & 1
iaAGS
P/W: {76/-/'5
DATE: /'2.-S;-~ 1'7 CLIENT'S REPRESENTATIVE: ,:;_ J~s
PROJECT NAME: 0,-;(d_;,·· -~y~
---------------
PROJECT LocAT1ON: ~ v Is h,,q ,,,/
REPORT NO.:
WEATHER:
TRACT NO.:
Footing/Caisson Excavation (Indicate as-built and design embedment depths, setback)
Retaining Wall (Indicate type of wall, if drains installed per plan, limits of select backfill -if observed)
D Presaturation (Indicate depth of presaturation and moisture content)
D Subgrade (Specify curb and gutter, flatwork, or pavement)
D Removal Bottom D Subdrain
D Reinforcing Steel
D Keyway Excavation
D Special Inspection: ___________ _
D Concrete Testing D Other: _______________ _
CJ.,.,_._ I CJ t, '/ZA Zo 1-r 1!---t !:(
2 -{.l-,,,, I '2 C:5 IZA 2 o l--7 fl 'I 6
LIMITS OF OBSERVATION/ TESTING COVERED BY THIS NOTICE:
(_)""'-# 3 C-tf~A -Z o / 1.-c• 2/ 7
-C/4... c;-c Ii' rz,A '2..<!t 7 -o z1 ~ {)1,,,,,,,,-1-4-c{ l-c-,j I It 2/ 15'3I C4oo
c'vi s-J~ JI oCA-..f_ t<il -z /:r '214 ~ 3 I ~~0 " -C..1J~-ClsRA z,,11-oz 14-
DESCRIPTION OF PROJECT AC,TIVITES/ T/STING: ··-. _____ < , __ Tl_ /4ha-.lA _ L cl,.. l;rcf/'<-.f hL-1, fJ2'1-1;) f-c,, / ~ CUA /:cv ~e./
{.,,A. tf,UL,t? l-"' it 'z.,,,,,c:-·y,vt<__.u,rd h II / a,.,_,1 a,,,,_, CiUL;l.c. I., (.__
+tv Pu 'Pv.t,z_ 14"(_•n·f-_
g0I lc.l~ cv-,J 1-rkl h~d L1 It___ Ct..£--, ,i,, c:t Cc;;~ c,,__ (.,., ;=I:~
cippv?JU So. l< /kp,vts, I
---73:i--.-z~z.-~--z:c, :1r -1-~1_q;,~;.:., ( Vcry t-;.,.,,.) --~
1;J.1t~ fl?pi'ovd c;,,,; r 1~p,.yb
SFri;VISllORS/FIRM: J4g;.5· 'f2cp,v/::;' 17<;/~/$-2 71;_,(;./J
----~------~---
1 v -21-11
AGSTECHNI rw,_....._,.-----., 1 BILLED HOURS I --j
i FIELD OFFICE TRAVEL I
SIGNED: -----'=c:::__::::::,==::~---
PRINTED: __ 2_7i_-_V-< ___ ~--
!
PAGE -Lo~
memo2015.xlsx/Memo
CLIENT'.S REPR~.ENTATIV~"
SIGNED:9,) ,
PRINTED: ~----s
TITLE: ___________ _
DATE:
TO:
PROJECT:
PROJECT No.:
MEMORANDUM
November 30, 2017
Tyler Sandstrom
Golden Surf
17-315
~HTK
STRUCTURAL ENGINEERS, LLP
14288 Danielson S!reet • Sute-#200 • Poway, CA92064-ffl19
(85B) ., .. ,... • WWW. HTI<SE.COM • Fax (658) B7._,959
The slab dowels shown in detail 2/SDl may be omitted if the slab and footing are poured
monolithically.
From: HTK
Copies to: File Page 1
~21
;,.
c
~z
~o ~
0 z
.,
,
~
z
c.
,
~N
~~
l:
=
=
F
=
~
4 u ~
D
lll
.
O
P
l
f
..
.
.
.
""
"
"
1
.
• '
--
-
-
I
~~
~
!~~
~;
i
I
GO
L
D
E
N
SU
R
F
HO
M
E
S
ST
R
l
!
l
!
T
AD
D
R
l
!
S
S
CA
R
D
I
F
F
,
CA
92
0
0
7
I I
H
I
2
I
_.
J
~
I
Il
ii
h
-~
-
~
'
..
''
~
~
~
>¥
=
~~
.
0:
,
S1
1
V
M
,U
:
I
O
l
S
31
~
N
I
S
ii
¥
¼
@ll
V
M
·
O
N
O
l
:
l
!
S
lm
l
i
m
I
D
!/
)
w
..
0 z U)
w 5
0.
.
:Ii
w
,
..
~.,
_, C ~ 6 z 0 a:
..
U)
S1
1
V
M
1:
:
1
O
O
1
.
:
l
0N
O
:
>
3
S
-•
•-
;,!
,
..
®ll
V
M
-
~
N
O
~
!
S
1!
2
!
3
'
4.0
"'
w
,-0 z z 0 ~ w
z z 0 0 w
,-:5
0..
0.
.
0 ,-
r I
SPEAR & ASSOCIATES, INC.
NOVEMBER 27, 2017
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
1635 FARADAY AVENUE
CARLSBAD, CA 92008-7314
RE: SETBACK CERTIFICATION
GOLDEN SURF
1000 CAMINO DE LAS ONDAS
CARLSBAD,CA
DRAWING NO. 496-7A
PROJECT NO. CT 13-04
CIVIL ENGINEERING AND LAND SURVEYING
475 PRODUCTION STREET
SAN MARCOS, CA. 92078
(760) 736-2040
FAX (760) 736-4866
I HEREBY CERTIFY, THAT BY FIELD SURVEY ON NOVEMBER 22, 2017, THE BUILDING FORMS
FOR THE ABOVE REFERENCED PROJECT AS SHOWN ON .DRAWING NO. 496-7 A, MEET THE
MINIMUM SETBACK REQUIREMENTS AS SHOWN ON THE TABLE BELOW. SURVEY
MONUMENTS AT THE PROPERTY CORNERS WERE LOCATED AND USED TO 'ESTABLISH THE
MINIMUM BUILDING SETBACKS.
FRONT YARD
SIDE YARD
REAR YARD
LOT 1 SETBACKS
N/A
10
20
RESPECTFULLY SUBMITTED,
~
RAY SPEAR
PLS 6404
LOT 2 SETBACKS
10
7.10
14.2