Loading...
HomeMy WebLinkAboutMS 15-12; CANNON ROAD SENIOR HOUSING; PERMANENT BMP CONSTRUCTION CERTIFICATION; 2021-02-26 (2)City of Car[sbad Land Development Engineering City of Carlsbad Attn: Valerie Airey 1635 Faraday Avenue Carlsbad, CA 92008 Civil E11gi11eeri11g • S11r11eyi11g February 26, 2021 J.N. 16-1006 RE: Permanent BMP Construction Certification for PA22: flow-through Planters at Casa Aldea, Project No. M.S. 15-12, Drawing No. 500-SA Dear Valerie, The BM P's have been installed, inspected, and comply with all applicable requirements. This certification -form specifica lly includes the following BMP's: • Biofiltration Basin (treatment control) • Pervious Pavers (Source control) • Storm Drain inlets and stencils (Source control) The party responsible for mainte.nance: Casa Aldea Carlsbad, LP 6102 Gullstrand Street, San Diego, CA. 92122 Attn: Carl Gustafson (858) 455-1771 Enclosed please find: 1. Single sheet BMP Plan for SWQMP prepared by Tory R. Walker Engineering, Inc. dated November 15, 2017 2. Photographs of the BMP basins during construction. 3. Photographs of the completed Biofiltration basins, the storm drain inlets and the associated stencils installed 4. Photographs of the pervious pave rs installed. O'Oay Consultants Inc. 'i!7I0 ui,,,,, ,\vo11ueW~.s(. Suite 100 ( ;mlsb~ti Calllornlo 920 I 0,AA0fl Very truly yours, ~~ t 0£ O'DAY'CONSULT.A:NTS1 INC. George O'day, Registered Civil Engineer. E-mail: otJay@odayco11sullants.com Websilff www,odayconsultants,oom Tcil: 760.93 I ,nOo Fa: : 7130.931.8680