Loading...
HomeMy WebLinkAboutSDP 16-10; CARLSBAD OAKS NORTH LOT 8; BMP CERTIFICATION - BIO BASIN GRADES BMP A - M; 2019-01-28EXCEL ENGINEERING CORPORA TE: 440 State Place • Escondido, CA 92029 (760)745-8118 •Fax 745-8134 January 28, 2019 RE: Certification of Bio Basin Grades (BMPs A through M) LEVIN & DENTINO INC. DB.A. EXCEL ENGINEER/NG Precise Grading Plans for Carlsbad Oaks North Lot 8 (Whiptail Loop East) CityofCarlsbadDrawingNo. 497-9A, Project No. SDP 16-10 To Whom it May Concern: Excel Engineering performed several field surveys relating to the thirteen installed bioretention basins on the above-referenced project. The field surveys consisted of the following: Basin bottom excavation (August 25, September 20 and 28, 2017) Top of rock placement (September 28 and October 7, 2017) Finish surface and pipe works (October 5 and 21, 2017) Final Basin installation with landscape complete (January 19, 2018) In all cases, the bioretention basins' grades were found to be constructed in substantial conformance with the approved grading plans for the City of Carlsbad. This letter is to certify that the Best Management Practices (BMPs) as designed and detailed in the Storm Water Quality Management Plan (SWQMP) have been installed as shown on the BMP Site Plan and the Precise Grading Plans for the above-referenced project. Additionally, a Maintenance Agreement is in place and all further operations and maintenance of the BMP facilities will be completed as stated in that recorded document. If you have questions or need any additional information, please do not hesitate to call our corporate office. · Sincerely, ~n~ V:117\17011\Survey\Stake\Certs\biobasins\19.01 .28 17011 biobasins certs Final.doc EXCEL ENGINEERING CORPORA TE: 440 State Place • Escondido, CA 92029 (760) 7 45-8118 • Fax 7 45-8134 January 28, 2019 RE: Certification of Bio Basin Grades (BMPs A through M) LEVIN & DENTINO INC. D.B.A. EXCEL ENGINEERING Precise Grading Plans for Carlsbad Oaks North Lot 8 (Whiptail Loop East) City of Carlsbad Drawing No. 497-9A, Project No. SDP 16-10 To Whom it May Concern: Excel Engineering performed several field surveys relating to the thirteen installed bioretention basins on the above-referenced project. The field surveys consisted of the following: -Basin bottom excavation (August 25, September 20 and 28, 2017) -Top ofrock placement (September 28 and October 7, 2017) -Finish surface and pipe works (October 5 and 21, 2017) -Final Basin installation with landscape complete (January 19, 2018) In all cases, the bioretention basins' grades were found to be constructed in substantial conformance with the approved grading plans for the City of Carlsbad. This letter is to certify that the Best Management Practices (BMPs) as designed and detailed in the Storm Water Quality Management Plan (SWQMP) have been installed as shown on the BMP Site Plan and the Precise Grading Plans for the above-referenced project. Additionally, a Maintenance Agreement is in place and all further operations and maintenance of the BMP facilities will be completed as stated in that recorded document. If you have questions or need any additional information, please do not hesitate to call our corporate office. . ~ Sincerely, ~0-=-- Robert D. Dentino, PE V:117\17011\Survey\Stake\Certs\biobasins\19.01.28 17011 biobasins certs Final.doc