Loading...
HomeMy WebLinkAbout2651 ACUNA CT; ; CBRA2019-0361; PermitBuilding Permit Finaled {city of Carlsbad Residential Associated Permit Print Date: 03/28/2023 Job Address: 2651 ACUNA CT, CARLSBAD, CA 92009 Permit No: Status: CBRA2019-0361 Closed -Finaled Permit Type: BLDG-Associated Permit Residential Work Class: Single Family Detached Parcel#: 2154910900 Track#: Valuation: $685,651.73 Lot#: Project#: DEV2019-0174 Plan#: Occupancy Group: #of Dwelling Units: 1 Bedrooms: Construction Type: Bathrooms: Occupant Load: Orig. Plan Check#: PC2019-0097 Plan Check #: Code Edition: Sprinkled: Project Title: GOERTZEN RESIDENCE Description: GOERTZEN: 4,102 SF SFO // 448 SF DECKS// 910 SF PATIO// 943 SF GARAGE FEE Property Owner: 1731 THOMAS LLC 7491 ESFERA ST CARLSBAD, CA 92009-7824 BRIDGE & THOROUGHFARE District 1 -Single Family BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION LOCAL FACILITIES MANAGEMENT ZONE (LFMZ) -ZONE 6 MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -outside CFO SB1473 GREEN BUILDING STATE STANDARDS FEE SDCWA SYSTEM CAPACITY 0.75" (3/4") Displacement STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLDG SWPPP PLAN REVIEW FEE TIER 1-MEDIUM TRAFFIC IMPACT Residential Single Fam. Outside CFO WATER METER FEE 1" Displacement (P) WATER SERVICE CONNECTION 0.75" (3/4") DISP (P) WATER TREATMENT CAPACITY 0.75" (3/4") Displacement Total Fees: $44,665.44 Total Payments To Date: Building Division $44,665.44 Applied: 12/18/2019 Issued: 02/17/2021 Finaled Close Out: 03/28/2023 Final Inspection: 03/22/2023 INSPECTOR: Renfro, Chris Kersch, Tim Alvarado, Tony Balance Due: AMOUNT $530.00 $2,595.00 $216.50 $96.00 $175.00 $310.00 $110.00 $224.00 $23,997.81 $28.00 $5,312.00 $89.13 $246.00 $55.00 $3,900.00 $282.00 $6,351.00 $148.00 $0.00 Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov PERMIT INSPECTION HISTORY for (CBRA2019-0362) Permit Type: BLDG-Associated Permit Residenti; Work Class: Second Dwelling Unit Appli cation Date: 12/18/2019 Issue Date: 02/17/2021 Status: Closed -Finaled Expiration Date: 01/10/2022 Scheduled Date IVR Number: Actual Inspection Type Start Date Inspection No. Checklist Item Are inactives slopes properly stabilized? Are areas flatter than 3:1 covered or protected? Are sediment controls properly maintained? Are erosion control BMPs functioning properly? Are natural areas protected from erosion? Do basins appear to be maintained as required? Are perimeter control BMPs maintained? Is the entrance stabilized to prevent tracking? Have sediments been tracked on to the street? Are storm drain inlets protected and maintained? Have materials collected around the storm drains? Has sediment accumulated on impervious surfaces? Are dumpsters and trash receptacles covered? Has trash/debris accumulated throughout the site? Are stockpiles and spoils protected from runoff? Are all storage areas clean and maintained? Were spills/leaks observed during the inspection? Were there any discharges during the inspection? Are portable restrooms properly positioned? Do portable restrooms have secondary containment? COMMENTS Tuesday, March 28, 2023 23754 Inspection Status Owner: 1731 THOMAS LLC Subdivision: CARLSBAD TCT#75-04 Address: 2653 ACUNA CT CARLSBAD, CA 92009 Primary Inspector Reinspection Inspection Passed Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Page 5 of 5 Permit Type: Work Class: Status: Scheduled Date 07/14/2021 06/20/2022 03/24/2023 PERMIT INSPECTION HISTORY for (CBRA2019-0362) BLDG-Associated Permit Residenti, Application Date: 12/18/2019 Owner: 1731 THOMAS LLC Second Dwelling Unit Issue Date: 02/17/2021 Subdivision: CARLSBAD TCT#75-04 Closed -Finaled Expiration Date: 01 /10/2022 Address: 2653 ACUNA CT IVR Number: 23754 CARLSBAD, CA 92009 Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Start Date Status Checklist Item COMMENTS Passed BLDG-Building Deficiency Cancel No 07/14/2021 BLDG-13 Shear Panels/HD (ok to wrap) Checklist Item 161887-2021 COMMENTS Passed Tim Kersch BLDG-Building Deficiency Cancel 06/20/2022 BLDG-Final Inspection Checklist Item 185243-2022 COMMENTS Partial Pass Chris Renfro BLDG-Building Deficiency TCO FINAL pending final paperwork and CM&I Final BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final 03/24/2023 BLDG-Final Inspection Checklist Item BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final BLDG-SW-Inspection 206273-2023 COMMENTS Passed Tony Alvarado Final Inspection conducted on March 22, 20/23. Notes in computer system input on March 24, 2023: 1. New single-family dwelling with attached garage -approved. 2. New single-family dwelling ADU within existing dwelling footprint-approved. 3. New swimming pool and spa permitted and approved. 4. New Permit for electrical temporary power pole signed off -approved. 5. Fire prevention department and construction management inspection department-(Public Works inspector Allison), approved final CMN&I inspections. 20627 4-2023 Passed Tony Alvarado Passed Yes Re inspection Passed No Yes Yes Yes Yes Passed Yes Yes Yes Yes Tuesday, March 28, 2023 Inspection Complete Incomplete Complete Complete Page 4 of 5 Permit Type: Work Class: Status: Scheduled Date 06/15/2021 07/01/2021 PERMIT INSPECTION HISTORY for (CBRA2019-0362) BLDG-Associated Permit Residenti; Application Date: 12/18/2019 Owner: 1731 THOMAS LLC Second Dwelling Unit Issue Date: 02/17/2021 Subdivision: CARLSBAD TCT#75-04 Closed -Finaled Expiration Date: 01 /10/2022 Address: 2653 ACUNA CT IVR Number: 23754 CARLSBAD, CA 92009 Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection BLDG-21 Underground-Underfloor Plumbing BLDG-31 Underground-Conduit Wiring March 5, 2021: 1. Underground water plumbing lines and electrical conduit wrapped in protected, scope of work been approved. 2. Foundation slab and footing reinforcement steel, Per structural engineer plan detail specification and notes-approved. 3. Geotechnical/soils engineer slab/pad and footing bottom certification -approved and filed city records. ••• pending*'* 4. Building corners-footprint and footing-form setbacks to property lines. 5. Building height certification form required per civil or surveyor, needs to be completed. 6. Informed contractor/owner Henry, the (2) city requirements pending and required prior to next inspection. 7. Rest of foundation and footing pad slab steel reinforcement work Approved, and OK to pour concrete. March 5, 2021: 1. Underground water plumbing lines wrapped and electrical conduit protected, scope of work been approved. 2. Foundation slab and footing reinforcement steel, Per structural engineer plan detail specification and notes-approved. 3. Geotechnical/soils engineer slab/pad and footing bottom certification -approved and filed city records. ••• pending*" 4. Building corners-footprint and footing-form setbacks to property lines. 5. Building height certification form required per civil or surveyor, needs to be completed. 6. Informed contractor/owner Henry, the (2) city requirements pending and required prior to next inspection. 7. Rest of foundation and footing pad slab steel reinforcement work Approved, and OK to pour concrete. 06/15/2021 BLDG-15 Roof/ReRoof (Patio) 159651-2021 Passed Tony Alvarado 07/01/2021 BLDG-13 Shear Panels/HD (ok to wrap) 160963-2021 Cancelled Tim Kersch Yes Yes Complete Reinspection Incomplete Tuesday, March 28, 2023 Page 3 of 5 Permit Type: Work Class: Status: Scheduled Date PERMIT INSPECTION HISTORY for (CBRA2019-0362) BLDG-Associated Permit Residenti; Application Date: 12/18/2019 Owner: 1731 THOMAS LLC Second Dwelling Unit Issue Date: 02/17/2021 Subdivision: CARLSBAD TCT#75-04 Closed -Finaled Expiration Date: 01/10/2022 Address: 2653 ACUNA CT IVR Number: 23754 CARLSBAD, CA 92009 Actual Inspection Type Start Date Inspection No. Inspection Status Primary Inspector Reinspection Inspection Checklist Item COMMENTS BLDG-11 Foundation-Fig-Piers (Rebar) March 5, 2021: BLDG-12 Steel-Bond Beam 1. Underground water plumbing lines wrapped and electrical conduit protected, scope of work been approved. 2. Foundation slab and footing reinforcement steel, Per structural engineer plan detail specification and notes-approved. 3. Geotechnical/soils engineer slab/pad and footing bottom certification -approved and filed city records. ••• pending*** 4 . Building corners-footprint and footing-form setbacks to property lines. 5. Building height certification form required per civil or surveyor, needs to be completed. 6. Informed contractor/owner Henry, the (2) city requirements pending and required prior to next inspection. 7. Rest of foundation and footing pad slab steel reinforcement work Approved, and OK to pour concrete. March 5, 2021: 1. Underground water plumbing lines and electrical conduit wrapped in protected, scope of work been approved. 2. Foundation slab and footing reinforcement steel, Per structural engineer plan detail specification and notes-approved. 3. Geotechnical/soils engineer slab/pad and footing bottom certification -approved and filed city records. *** pending0 * 4. Building corners-footprint and footing-form setbacks to property lines. 5. Building height certification form required per civil or surveyor, needs to be completed. 6. Informed contractor/owner Henry, the (2) city requirements pending and required prior to next inspection. 7. Rest of foundation and footing pad slab steel reinforcement work Approved, and OK to pour concrete. Passed Yes Yes Tuesday, March 28, 2023 Page 2 of 5 Building Permit Inspection History Finaled (city of Carlsbad I PERMIT INSPECTION HISTORY for (CBRA2019-0362) Permit Type: BLDG-Associated Permit Residenti; Work Class: Second Dwelling Unit Status: Closed -Finaled Application Date: 12/18/2019 Owner: 1731 THOMAS LLC Issue Date: 02/17/2021 Subdivision: CARLSBAD TCT#75-04 Expiration Date: 01/10/2022 Address: 2653 ACUNA CT CARLSBAD, CA 92009 IVR Number: 23754 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 02/19/2021 02/19/2021 BLDG-24 Rough/Topout 150905-2021 Partial Pass Tony Alvarado Checklist Item BLDG-Building Deficiency COMMENTS February 19, 2020: underground plumbing-approved. No Building Deficiencies. 1. Underground waste, vent, with clean-outs plumbing lines-(only)-scope of work, per engineer's detail specifications-approved. 03/05/2021 03/05/2021 BLDG-81 Underground 152035-2021 Passed Tony Alvarado Combo(11, 12,21,31) Tuesday, March 28, 2023 Reinspection Incomplete Passed Yes Complete Page 1 of 5