HomeMy WebLinkAbout2020-11-03; City Council; ; Consideration of a mixed-use, density bonus development project consisting of 294 residential units and 10,000 square feet of specialty commercial uses on 20.65 acres at (7)Marja Acres
Jeff Murphy, Community Development Director
Tom Frank, Transportation Director
November 3, 2020
Location
Map
2
3
Aerial Map
Marja Acres
CT 16-07/PUD 16-09/PUD 2018-0007/
SOP 2018-0001/CDP 16-33/HDP 16-02/
SUP 16-02/EIR 2017-0001 (DEV16038)
9
0 65 130 260 390 -
Project Information
4
•Mixed-Use Development Project
–294 Residential units
•248 market-rate units
•46 lower income senior units
•Specialty Commercial space (10,000 square feet)
•Senior apartment building
–One (1) two-bedroom/one bath unit (757 s.f.)
–45 one-bedroom/one bath units (524 –545 s.f.)
•Deed-restricted for 55 years
•100% Affordable to seniors 55 and over
–37 Very-Low Income Units
–9 Low-Income Units
5
Project Information
Site Plan
6
AFFORDASLE SENIOR
APARTMENTS
CAFE/RESTAURANT
URSAN FARM
NEIGi:I-IBOR!-100D
RETAIL
POCKET FARK
VILLAGE GREEN
FLAY STRUCTURES
7
STOREFRONT WOW
Archltactura+Planning !:~~ 12~~n Karman Ave,
=.:·s~~;;:14
ktav.com
BOARD FORM SIDING
New Urban West, Inc
16935 W. Bernardo Dr. Ste. 260
San Diego, CA
92127
/
..• ~ ,11 11111-
GOOSENECK WALL LIGHTS
.----J
Marja Acres
Carlsbad.CA AFFORDABLE SENIOR APARTMENTS SCALE: NTS AC 1.3
VIGNETTES
8 New Urban West, Inc
16935W.BernardoDr.Ste.260
~~ ?~iego, CA
Marja Acres
Carlsbad.CA RESTAURANT PERSPECTIVE SCALE: NTS
9 Archltactura+Plannlng
~~f~ 12~~n Karman Ave,
~~~.:S~~;;: 14
ktav.com
New Urban West, Inc
16935W.BernardoDr.Ste.260
San Diego, CA
92127
Marja Acres
Carlsbad,CA 6-PLEX (SMALL) PERSPECTIVE SCALE: NTS AB 1.0
10 Archltactura+Plannlng i~f~ 12~~n Karman Ave,
~;.:·s~~ff:14
kmv.com
New Urban West, Inc
16935W.BernardoDr.Ste.260
San Diego.CA
92127
Marja Acres
Carlsbad,CA 4-PLEX (LARGE) PERSPECTIVE SCALE: NTS
•GC §65915-65918
•Density Bonus Application
–224 base density units
–80 density bonus units (70 proposed)
–304 total allowed units (294 proposed)
•45 units must be affordable (46 proposed)
•Requested incentives and waivers
11
State Density Bonus Law
State Density Bonus Law
•Requested Waivers/Reductions
–Residential not secondary to commercial for mixed use
–Reduction of townhome parkway and sidewalk width
–Waive 10’ townhome setback from private street
–Waive 10,000 cubic yard grading volume standard
–Waive 6-foot vertical retaining wall height standard
–Waive maximum El Camino Real Corridor cut and fill standards
•Requested Incentive/Concession
–Allocation of 158 dwelling units and allow horizontal mixed use
12
State Housing Accountability Act
•GC §65589.5(j)(1) states cities shall not disapprove a
project or impose a condition requiring lower density
unless the city finds based on a preponderance of
evidence that the project would have a specific, adverse
impact on public health or safety, or there is no feasible
method to satisfactorily mitigate or avoid such adverse
impact
13
Project Issues and Concerns
•Not enough affordable units
•Lacking visitor parking
•Restrict short-term rentals
•Soil contamination and dust
•Transportation/Mobility
14
Number of Affordable Units
15
•City did not accept original project’s 15 ADUs of the 50
affordable units, so only proposed 35 units
•Project provides 46 senior affordable apartments, more
than original project
•Exceeds the number required to meet density bonus
and inclusionary housing requirements
Visitor Parking
16
•The project provides 101 visitor parking spaces for the
townhomes -70% more than city code requires
•Visitor parking also provided for affordable senior
apartments -city codes require none
•Project conditioned that all parking spaces in townhome
two-car garages, on-street and in parking lots are to be
used for parking only
Short-Term Rentals
17
•Conditions require parking spaces to only be used for
parking –addresses conversion concern
•Coastal zone allows short term vacation rentals -city
cannot legally prohibit
•Developer offered to restrict them in CC&Rs
Soil Contamination and Dust
18
•All applicable Phase I guidelines were followed
•Will follow all required fugitive dust reduction measures
•Fuel line in El Camino Real abandoned and purged in
1987 -no record of incidents or leaks
Soil Contamination and Dust
19
•Applicant has offered to impose a condition to conduct
additional testing prior to grading
A.11-l.l,."1..,utlC.-lml.Wk,n-&S>1=llP --~ ~!.":'f2010 P,p?
Tt.rEIP.abomclud<dle"!lhJ're_,,oaromm<Dll<ller,ubmiHedbyknmI<rRichmd 0."11FUDd,rl,ml:LbatroiSfdc-,erm1bou!lbtadt,ql,IC)·cr111tPbosellllds11Jf1"SpCDdedtoU..
.. meC<JIDID<flttt',Sq,1emberll,!020len,rtotb,Pl>IIIWl!Comm,rucnr>mngmrulari,..,.. (EIR.pp O.l-29J-0.l-l!l6:ScatrR,port.Ellhil:o.rll.J
Do-sp,.~alloflbeobc,.,,ubstanualn"W?>Oe1DthrrK01ddoc,im,11t1~U..•doquacycf\be
elll"Jronmmtalne,.,..._ ~ ISCUI ~ lh.,1 mrmbrn of\be CfflllDBlllll)"contmu< <oupr•« .,_,,,,.aboulpctmllal<CIIWIWlalleacn\bel"rcj,<1S1~.n..=crdtoda~dom<mtnttt.
=~~U..l'To)'CtwiJ!•<>1c.,,..•"g,u&>mhuuds,,,-lu?Mdomlllll<ru.h1mpact
K,,,,nb,l-_ ll>mlUJle lhu C<>Ull<dhu ,,_.,i,t,cOOil'.,..,,~u, lb., l'n>J<'1.curch<Dt,s
Wllling1c <'0!1a,wily opH to wplemo,,t lh• liollcwlll! <ClldiaOG:
Pncr 10 ISIUIDUO(t p-1d!Dip,,1m1~ 0.,...-lol'ff !hall subcm1an 1¢11ed IDd 1Uppl""'111lll Ph,,.. I £:o,uonmemal S.t,A,s,umnd("\JpdatrdPluw nto ib, DlrKl<>r ofCcttm11llUIJ· O.-.·,k,pmn11 for ,n,n,-md appro,.·al Th, Updo~ Ph.IS<' I ,h,Jlq,ocilicallyudud,tbrfollow1113
Amuu.mun,ofJO~mdS""""'°'"""""'i.,.wni,,,,,u..c,...i andi,,.,,db)•an,n,~proi,,s;,onalm=on!.u>~W!lh
A~TMEm7-1Jguidi:lmoo;
A&lilwlwsotl,ampiesr.hallt,,ooll"'1ed1nmylocat1C11"-hme p,Sll<ld,o.-,re,«ndcriut•;
A&lilwlw ootl Y.e>ple, illalJ t,, colltd..t m Lhe dnpbDn of mi· l'R'-
1978 builduig ("'-'1l!q! Ol form«ly doa>olnbed): and
ll>tsoil~lffcollo,;t,dos~ofLhe"'l'pl•mectlall'hl«Jshallt,, i...!edforponqu.u
IflboUpd,1edl'hawldtmo1011n1.,lhotlbopo)'Clroa:,pll<-,">1ball1ppbc:1bl,
n:sideau-llsc:,HlllD!lhf.-.bol<h.110Mtbtrwod:sha!Jt,,reqwred. IfU..Up:jat<,d Pb-I~• Rtto~ fo,"lroomelllal Coodittoa. O.-,.,¥tba!l?q,u,• ~~~=~IDA=~~•) andm,plemeal oil
B,,e,:1.,.,. tbrabo\,ep,opo;,dcondiOOD. ,.., t,,li.,,., myO<ttstmdm,1;1'"""' "!ardmg lbt
OX1'1mgl'r0jecl 111,·, coodraoa 11,,.,bHacomplttdy md llwougbly oddrH...:l n.. l'fo)'CISlle
do..no1po,,opole<>lwDl!fillic.,...,,uoommi.i,mpartandtbeUp:!,t,,dPh>,.[willconl'inn-111bJ,ct101Ulfsr.,,,ew ad "Pf"O"al-lhltfatt?lcr!Ol~Cfl gr,dmgponmt
Transportation & Mobility
•TIA Guidelines not being followed
–Scoping agreement
–How vehicle trips calculated
–Inconsistent application relative to CEQA
•Incorrect application of Transportation Impact Fees
•No signalized intersections at entries
•Congestion due to U-turns at intersections
•Insufficient mitigation
20
Transportation & Mobility
Scoping Agreement
•Done at beginning of review process
•Establishes scope/approach of the traffic analysis
•TIA Guidelines implemented April 2018
•Marja Acres filed application in 2016
•Not reasonable to require after 2-years of analysis
•Project still required to comply with TIA standards
21
Transportation & Mobility
Net Traffic Trips
•Project driveway count results in “2,334 ADT”
–Snap shot in time, taken from a single site
–NOT a recognized method in the TIA Guidelines
•SANDAG Trip Generation Rates results in “901 ADT”
–Based on empirical data from several studies/reports
–Preferred method in the TIA Guidelines
22
Transportation & Mobility
Traffic Impact Fee
•Higher ADT count results in higher impact fees
•TIF is collected pursuant to city’s fee ordinance
–Fee not based on project’s ADT analysis
–Fee based on a table that assigns trip generating rate
for specific land use types
–Necessary to ensure consistency in fee collection
23
Transportation & Mobility
California Environmental Quality Act (CEQA)
•LOS versus VMT
–TIA Guidelines versus SANTEC/ITE Guidelines
•CEQA measures traffic based on VMT
–Carlsbad VMT Guidelines
–Project complies
24
Transportation & Mobility
Signalized intersections at project entrance
•Standards recommend 2,600’ spacing between lights
•New signals would result in spacing of 1,067’
•Closely spaced intersections decrease capacity,
increasing congestion and delay
•Unsignalized intersection would be unsafe
25
Transportation & Mobility
Impacts due to U-Turn
•Project only allows right turn in/out of site
•Ranch St. & Kelly Dr. impacted by U-turn
•Analysis used higher ADT count
•Project trips demonstrate adequate queuing storage
•Signal timing being adjusted
26
Transportation & Mobility
Traffic Mitigation
•Bus stop trashcan & bench
•Bike rack & repair station
27
Transportation & Mobility
Traffic Mitigation
•Bus stop trashcan & bench
•Bike rack & repair station
•2 deceleration lanes
•Traffic signal controller
•Subsidized rideshare
program
•Subsidized transit
program
28
•Designated Trans.
Coordinator
•Participation in citywide
TDM program
•TDM monitoring and
reporting requirements
TOM FRANK
Transportation Director
Background
•On October 20, 2020, City Council determined six
facilities ‘deficient’ and directed the following:
–Five facilities to be further analyzed and returned to
the Traffic & Mobility Commission for further
discussion
–Exemption request for the sixth segment, El Camino
Real between Tamarack Avenue & Cannon Road, to
be considered as part of Marja Acres application
30
Requirements for Addressing Deficiencies
Prior to Senate Bill 330, when a vehicle level of service was deficient, City Council could:
1.Adopt a plan to fund and build improvements to address the deficiency
2.Adopt a moratorium to prohibit development
3.Find the street facilities exempt from the vehicular Level of
Service and implement Transportation Demand
Management (TDM) and Transportation System
Management (TSM)
31
After Senate Bill 330
After Senate Bill 330, when a vehicle level of service is
deficient, City Council can:
1.Adopt a plan to fund and build improvements to address
the deficiency
2.Find the street facilities exempt from the vehicular Level of
Service and implement TDM and TSM
32
El Camino Real (ECR)
Tamarack Ave to Cannon Rd
Southbound Only
33
..;r.~-----...-··1 " ,. .. ~··--·-U\l •-i ·--v-I
r4,-' ff !
i 8i9, I -~ ., I
( '.l, L,~ ' Ar--'"""~-'
\ ·--, \. '°'~!!!I"'-I
\. ..... 1 '· ~ ~ ,.,.,.,.. '·-·-7
\ ~.. ------Ju ,
s #'° ~ ~ ------.. ,,, !
,._," ~' 4 , -• -: ... ,.,,, Pl , !i;. ._\::::: .. · \ l / $\
~ . '
"" " ' \. -~~~ ',; i
~----;-----I'\ .._,,,..._ ---.... : : .;;~"'~ I !
L,
-_LL;:llel:e--n~sow, \,A·----··"t / r• r1
--C t.~---,____, I
--D • "•-,••-•"'--'
--E
-F
■ ■ • • Roadway E><empt
CJ Car1sbad Boundanes
0 5 2
Mlleo
N
34
Third Party Review
•Extension of College Blvd is not funded at this time
•The City Council can identify a street facility as built-
out and exempt if it meets criteria from General Plan
Policy 3-P.9
•With no feasible improvements identified, recommend
the street facility as exempt
35
Recommendation
That the City Council…
1)Adopt the resolution exempting southbound El Camino Real
between Tamarack Avenue and Cannon Road from the GMP
vehicular LOS performance standard
2)Adopt the resolution and permits,
•Certifying the EIR and associated findings
•Approving the permits/plans for the proposed project
•Condition requiring additional soil testing as drafted in
applicant’s Nov. 2,2020 letter
36
37
Prior to issuance of a grading pe1mit, Developer shall subn1it an updated and
supple111ental Phase I Enviromnental Site Assessn1ent ("Updated Phase I") to the
Director of Conu11unity Develop1nent for review and approval. The Updated Phase I
shall specifically include the following:
• A 111ini1nun1 of 30 borings and 8 c,01n posite sainples shall be collected
and tested by an envirom11ental professional in accordance with
ASTM E 1527-13 guidelines;
• Additional soil sa111ples shall be collected in any location where
pesticides were stored onsite;
• Additional soil san1ples shall be collected in the drip lines of any pre-
1978 building ( existing or forn1erly den101ished); and
• The soil san1p les collected as part of the supple111ental Phase I shall be
tested for paraquat.
If the Updated Phase I de1nonstrates that the project c01nplies with all applicable
residential screening thresholds, no further work shall be required. If the Updated
Phase I ide.ntifies a Recognized Enviromnental Condition, Developer shall prepare a
Phase II Envirom11ental Site Assessment ("ESA") and i111ple111ent all
reconnnendations included in the Phase II ESA.
Marja Acres
Jeff Murphy, Community Development Director
Tom Frank, Transportation Director
November 3, 2020
Back-Up Slides
39
Project Consistency
•General Plan and R-15/GC GPLU
•Density Bonus Ordinance and Inclusionary Housing
•RD-M/C-2 Zoning and Planned Development Ordinances
•Hillside Development Ordinance
•Site Development Plan for Affordable and Senior Housing
•Scenic Preservation Overlay Zone –El Camino Real
•Subdivision Ordinance and Local Coastal Program
•McClellan-Palomar Airport Land Use Compatibility Plan
•Growth Management
40
Final EIR 2017-0001
•Draft EIR 2019
•Recirculated Draft EIR 2020
•Final EIR August 2020
•All impacts mitigated to a level
below significant
•CEQA Findings of Fact/Mitigation
Monitoring & Reporting Program
41
Prepa,edkx Pfe(»(edby
City or Caris~d HOR Englneenl'lg, Inc.
16nF11r11dayAvenue 591 Caminodel.aRejn3,
Car1sbltd,
CA9208a SanOie;;io,CA
GMP Circulation
•Southbound El Camino Real between Tamarack Avenue
and Cannon Road
•City Council determined segment is deficient on October
20, 2020
•Additional analysis already completed by the project for
this segment, additional measures and features included
•Meets criteria for exemption per General Plan Policy 3-
P.9
42
Post Planning Commission Comments
•Public comments raised potential environmental
concerns after close of EIR public review comment
periods
•Appropriate to respond to these comments
•Staff responses included with comments in staff report
•All environmental issues adequately and appropriately
addressed in the project analyses and EIR
43
Excess Dwelling Unit Bank
•Allocation of 158 units from the Excess Dwelling Unit
Bank (EDUB)
•As of Aug. 31, 2020, the Northwest Quadrant had 646
total units available to be allocated
–118 outside the Village, 528 within the Village
area
•Project will be allocated the remaining units outside
the Village, plus units from the Village
44
Affordable Housing
•General Plan Update required additional affordable units or
deeper level of affordability for site
•PC Resolution No. 7114
–15% of total units (44 units) affordable at 50% AMI
instead of 80% AMI -equates to $51,222 monthly rents
•Project provides 15.6% (46 units) affordable at 50% and 60%
AMI -equates to $51,155 monthly rents
•Benefit to low income households overall
45
Project Overview
•Site Size –20.65 acres
•Two parcels –one residential, one commercial
•GPLU – R-15 Residential/General Commercial (GC)
•Zoning –Residential Density –Multiple (RD-M) /General Commercial (C-2)
•Within the Coastal Zone, appealable boundary
•Lot Coverage –29.8% (residential zone)
•Exemption of El Camino Real segment
46
Residential
•Townhomes in buildings of four to eight units each
•“Large” style with flat roofs, most with roof decks
–Units are 1,912 –2,349 s.f.
•“Small” style with pitched roofs
–Units are 1,703 –1,734 s.f.
•106 four-bedroom/2.5 or 4 bath units
•142 three-bedroom/2.5 bath units
47
Density Bonus –Intent
•Promote the construction of affordable housing
•Implement goals, objectives and policies of the
Housing Element
•Implement California Government Code
•Provide incentives to encourage developers to
construct affordable housing
48
Density Bonus –
Incentives/Concessions
•Project is utilizing its two allowed incentives/concessions for:
–Withdrawal of 158 units from the city’s Excess
Dwelling Unit Bank (EDUB)
–Mixed-use in separate buildings on commercial site instead of vertical within one building
49
Density Bonus – Waivers/Reductions
•Project is utilizing six waivers/reductions for:
–Waiver of the provision specified in CMC Section
21.28.015(C)(2) for residential uses to be secondary
to primary commercial uses in the C-2 zone
–Reduction of parkway width and sidewalk width
standards in CMC Section 21.45.060 from 5 to 3.5
feet for parkways and from 5.5 to a minimum of 4
feet for sidewalks
50
Density Bonus – Waivers/Reductions
–Waiver of the 10’ building setback requirement
from private street in CMC Section 21.45.080 (Table
E, Section E.5) to provide a 10’ landscaped buffer
–Waiver of Hillside Development Ordinance 10,000
cubic yard grading volume standards in CMC
Section 21.95.040(D)(2)
51
Density Bonus – Waivers/Reductions
–Waiver of Hillside Development Ordinance
maximum 6-foot vertical retaining wall height
standard in CMC Section 21.95.140(C)(1) to allow
over-height retaining walls
–Waiver of maximum cut and fill standards in El
Camino Real Corridor Development Standards
Section IV(B) to allow cuts and fills greater than 10
feet
52
Residential Area
53
TYPICAL "SMALL TOWNS•
W/ PITCHED ROOF. NO
ROOF TOP DECKS. SEE /
UNIT PLANS FOR PATIO
SPACE REQUIREMENTS. ,
I
I
' ,
l
ROOF DECKS IN
THIS AREA, TYP. SEE
SHEET AB2.1 AND
AB2.1.3
I PICAL FLAT ROOF WITi I~-
ROOF DECK ACCESS
HATCH LEGEND
6 HATCHING INDICATES ROOF DECKS.
□ ~:~~H~~;d~D~~~~~~:::~~~.PER PRIVATE
Parking
•All townhomes: two-car garages, 496 spaces
•Senior apartments: 38 carport spaces, 18 uncovered
spaces on-site/on-street
•Commercial: 60 spaces
•Visitor parking: 101 parallel spaces both sides of interior
loop street
•3,034 Average Daily Trips (ADT) -net increase of 901
ADT above existing 2,133 ADT for on-site uses
54