HomeMy WebLinkAbout1490 TARA CT; ; CB003225; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04/10/2001 Residential Permit Permit No:CB003225
Building Inspection Request Line (760) 602-2725
Job Address: 1490 TARA CT CBAD
Permit Type: RESDNTL Sub Type: SFD Status: ISSUED
Parcel No: 2074400200 Lot#: 5 Applied: 05/17/2000
Valuation: $245,440.00 Construction Type: VN Entered By: RMA
Occupancy Group: Reference #: CT98-20 Plan Approved:
04/10/2001
# Dwelling Units: Structure Type: SFD Issued: 04/10/2001
Bedrooms: 4 Bathrooms: 3 Inspect Area:
Project Title: JAMES CANYON ESTATES-PLAN 3 Orig PC#: PC00-70
2791 SF+654 SF GAR+128 SF DECK Plan Check#:
Applicant:
HALLMARK COMMUNITIES
STE 208
2775 VIA DE LA VALLE
DEL AMRR CA 92024
858 259-0606
Total Fees: $19,840.62
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Inspector:
Owner:
6210 04/10/01 0002 01
CGP
Total Payments To Date: $0.00 Balance Due: $19,840.62
$1,132.08
$0.00
$735.85
$0.00
$0.00
$24.54
$1,755.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,400.00
D5/8
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Master Drainage Fee:
Sewer Fee:
Additional Fees:
TOTAL PERMIT FEES
FINAL APPROVAL
Date: 1¢/,:J/c;; Clearance:
$0.00
$80.00
$1,871.00
$0.00
$4,467.01
$4,123.39
$0.00
$0.00
$418.00
$472.00
$0.00
$161.00
$41.25
$69.50
$0.00
$0.00
$0.00
$1,897.00
$193.00
$19,840.62
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as '1ees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been riven a NOTICE similar to this or as to which the statute of limitations has nreviouslv otherwise expired.
02
19840-62
City of Carlsbad Bldg Inspection Request
For: 10/09/2001
Permit# CB003225
Title: JAMES CANYON ESTATES-PLAN 3
Description: 2791 SF+654 SF GAR+128 SF DECK
Type: RESDNTL Sub Type: SFD
Job Address: 1490 TARA CT
Suite: Lot 2
Location:
APPLICANT HALLMARK COMMUNITIES
Owner: VISTA HIGHLANDS LL C
Remarks:
Total Time:
Inspector Assignment: RCB
Phone: 8585184452
Inspector: -~~"~:_-_(' __ _
Requested By: JERRY
Entered By: KAREN
CD Description Act Comments
19 Final Structural ~
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs
lnsgection Histo01
Date Description Act lnsp Comments
10/04/2001 89 Final Combo NR RC NO WATER METER
09/05/2001 39 Final Electrical AP RC
09/04/2001 39 Final Electrical NR RC TOO MANY COVER PLATES MISSING
07/27/2001 82 Drywall/Ext Lath/Gas Test AP RC
07/23/2001 16 Insulation AP RC
07/18/2001 84 Rough Combo AP RC
07/03/2001 13 Shear Panels/HD's AP RC
06/26/2001 15 Roof/Reroof AP RC CHECK TRUSS BRACING ON SHEAR INSP
06/22/2001 15 Roof/Reroof co RC B.N, ON DRAG TRUSSES, B.N. ON BLKS ON SHR WALLS
05/09/2001 11 Ftg/Foundation/Piers AP SR
05/02/2001 11 Ftg/Foundation/Piers co SR STRONG WALLS DIFFER FROM APPROVED PLANS, ALL ELSE OK
05/02/2001 12 Steel/Bond Beam AP SR
04/23/2001 21 Underground/Under Floor AP SR
04/23/2001 22 Sewer/Water Service AP SR
04/20/2001 21 Underground/Under Floor co SR NOS TO ELIMINATE WET VENTS/
04/20/2001 22 Sewer/Water Service co SR NOS TO INSTL CLEANOUTS/ PRESSURE TEST ND
•
City of Carlsbad Bldg Inspection Request
Permit# CB003225
04/19/2001 21 Underground/Under Floor
04/19/2001 22 Sewer/Water Service
For: 10/09/2001
Inspector Assignment: RCB
CO SR NOT UNDER WATER TEST
CO SR NOT CONNECTED TO SEWER
City DI Carlsbad
~ ·: Final Building Inspection ...,.. . -\-
Dept: Building P nning CMWD St Lite Fire
Plan Check #:
Permit#: CB003225
Project Name: JAMES CANYON ESTATES-PLAN 3
2791 SF+654 SF GAR+128 SF DECK
Address: 1490TARACT
Contact Person: JERRY
Sewer Dist: CA
Phone: 8585184452
Water Dist: CA
Lot:
Date: 10104/2001
Permit Type: RESDNTL
Sub Type: SFD
2
···························································· .................................................................... , ........................ .
lnspe4 t::k-a.J Date (,/q(d ~ Disapproved: __ Inspected: Approved: By: Id' >j '
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
······································································· .................................................................. , ................ ,
Comments: _____________________________ _
ffl ;;;;;;;;ldi .. n·· .~ -•~~necuon ea -~ '\
Dept: Building EngineeriL, .. ~ning)CMWD St Lite
Plan Check #: .
Fire
Date: 10/04/2001
Permit Type: RESDNTL Permit#:
Project Name:
CB003225
JAMES CANYON ESTATES-PLAN 3
2791 SF+654 SF GAR+128 SF DECK
Address: It 11,r¥ I
Contact Person: JERRY Phone: 8585184452
Sewer Dist: CA Water Dist: CA
Sub Type: SFD
Lot: 2
..........................................................................................................................................................
Inspected ~ Date
Approved:/ By: Inspected: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __
Inspected Date
By: Inspected: Approved: Disapproved: __ ······································ ................................................ ,, .................................................................. ,
Comments: ------------------------------