HomeMy WebLinkAbout2022-06-23; Growth Management Citizens Committee; ; Presentation SlidesMay 26, 2022Meeting 4
June 23, 2022
Carlsbad __,_-:
TOMOR
Growth Management Citizens Committee
(Cityof
Carlsbad
Call to Order & Roll Call
Carlsbad ~-:
TOMOR
Approval of Minutes
Carlsbad ~-:
TOMOR
Public Comment
Carlsbad ~-:
TOMOR
Welcome
& Introductions
Carlsbad ~-:
TOMOR
GROUND RULES
Encourage diversity of ideas; every idea is a good idea during
brainstorming.
Avoid applying personal biases based on geography, organizational
affiliation, etc. –think about the city as a whole.
Establish and follow general time limits for discussion items.
Always be respectful.
Be prepared by reading materials and thinking about topics ahead of
meetings.
Encourage all to speak –both primary and alternate members.
Actively search for ways to identify gaps in data and make requests
based on those gaps.
COMMITTEE PURPOSE
Promote balanced consideration of a range of
perspectives on issues affecting the future
growth and quality of life in Carlsbad and
identify the key elements of a new plan to
manage growth in Carlsbad in a way that
maintains an excellent quality of life while also
complying with state law.
11 PERFORMANCE STANDARDS
•City Administrative Facilities
•Libraries
•Parks
•Open Space
•Circulation
•Fire Response
•Schools
•Drainage
•Sewer Collection
•Water Distribution
•Wastewater Treatment
MEETING TOPICS & SCHEDULE
DATE/T IME
June 23, 2022
S p.m,.
July 2a, .2022
S p.m,.
Aug,. 2S, .2,022
S p.m,.
POTENT IAL TOP ICS
Wastewater treatment drainage, sewer and water
distribution, schools
Traffic an1d mobility circulatio,n, em1ergency
response, SAN o,AG de,mo1g1 ra ph ics/19 rowth
pr,o j ectio ns
Orientation,
background &
history
COMMITTEE PROCESS
MAR –APRIL 2022
Information & dialogue on
existing standards
Discussion &
recommendation
development for
future standards
MAY –AUGUST 2022 SEPT –OCT 2022
Draft recommendations
available for public reviewCommittee meetings are open to the public and livestreamed.
Review &
discuss draft
recommendations
for new quality-
of-life standards
NOV 2022 –JAN 2023
Discuss &
finalize
report for
City
Council
FEB 2023
•••••• --l
CHARTER AMENDMENT (JUNE 14, 2022)
lrf' a committee mem1be1r that was ap1poiintedl to 1rep1resent 01ne of the Boards and ·Comm1iissi,ons
has a term that concludes p1riio1r to the com1m1irttee complletii1ng irts w,ork, the 1membe1r iis allowed
to remaiin on the ,committee unrtiil the wo1rk co1ncludes but must report bac 1 -· to the1
repre,sented bo1aird or commissiion at the 1rep 1resenrted board or commission's r,equest., lllf a
commilttee member resiigns hiis or her appoi'ntment before the co1m1mittee"s ·work. has
concluded,, he or she shall noti'fy the Mayor and City Council iin writing, with copies sent to the
Cilty Cl~erk., City .M~r!~B~f. and the Comm1unity Develo1pment Director. The resigning rommittee
members designated allte1rnate shall~ automatically become a regular comm"ttee member for
the remaiining duration of the com1mittee. If the alternate member chooses not to fill! the
vacancy, at the'ir n ext schedullled m1eet'ing, the com1mittee ·will consider whether to recomm1end
that the Mayor and City Cou nc11I fi II the vacated posmti'on.,
TODAY’S AGENDA
•Discussion Items
–Committee Business
•Schools Performance Standard
•Wastewater Treatment Performance Standard
•Drainage Performance Standard
•Sewer and Water Distribution Performance Standard
•Committee Member Requests for Agenda Items
•Public Comment (continued if needed)
•Adjourn
1.Committee Business
Carlsbad ~-:
TOMOR
Schools Performance Standard
Carlsbad ~-:
TOMOR
SCHOOLS
PERFORMANCE STANDARD
School capacity to meet projected
enrollment within the Local Facility
Management Zone as determined by the
appropriate school district must be
provided prior to projected occupancy.
Carlsbad ~-:
TOMOR
BACKGROUND
•Established with original Citywide
Facilities and Improvements Plan
•4 school districts in Carlsbad
•School districts control production of
schools
•City has limited control
•City verifies capacity when development
is proposed
SCHOOLS
SCHOOL STANDARD –STATUS
•Carlsbad Unified School District
Sufficient capacity for current enrollment
and expected future growth
•San Marcos Unified School District
Currently at maximum capacity
Issuing will-serve letters for development
in Carlsbad
Schools serving Carlsbad can
accommodate expected future growth
SCHOOLS
SCHOOL STANDARD –STATUS
•Encinitas Union Elementary School
District
Sufficient capacity for current enrollment
and expected future growth
•San Dieguito Union High School District
Sufficient capacity for current enrollment
and expected future growth
SCHOOLS
p 'l C f' (
0 r a n
City of
Encinitas
L •• 1
Maerkle i
Reservoir! i...-..-,
!
City of
Vista
City of
San Marcos
N~Nl
I I I r---~..:
I i
Canyo': j
High =
nQry \ n . •• ..,,J, ...., ___ ___
Figure 7-1: School Districts and Facilities
1§1 Senior Center
(J City Library
Schools
-Elementary School
-Middle School
-High School
Alternative/Continuation School
LJ Private School
-Post-Secondary/Specialty School
LJ Public School District Boundary
Highways
Major Street
Planned Street
Railroad
[~] City Limits
0.5
S00ACRES
Miles
Source: Cicy of Carlsbad, 2013;SANDAG, 2013; Dyett & Bhatia, 2013.
SCHOOL STANDARD
BUILDOUT ANALYSIS
•Capacity sufficient for future population
(based on buildout of General Plan)
•Future demand based on two main factors:
Increase in housing from planned land uses
Average number of students in a household
•Average household student population
expected to decline
SCHOOLS
SCHOOL STANDARD
BUILDOUT ANALYSIS
•Sufficient school capacity for buildout of
General Plan, based on:
Currently planned housing units
Declining student population per household
•School capacity evaluated when more housing
units are considered (e.g., Housing Element)
SCHOOLS
Carlsbad ~-:
TOMOR
SCHOOL FUNDING
•Local, State and Federal funding sources
•State Proposition 98 (largest funding source)
•Carlsbad Proposition P (2006)
$198 million bond measure + $47 million from
State
Renovations, modernization, new
construction (CUSD)
•SMUSD Proposition K (2010)
$287 million bond measure
Renovations, modernization, new
construction
SCHOOLS
OTHER CONSIDERATIONS
•Limited local control
•School districts comply with local zoning
•School districts can vote to deem local zoning
inapplicable
•Schools must comply with local rules for
drainage, roads and grading
SCHOOLS
Carlsbad ~-:
TOMOR
OTHER CONSIDERATIONS
•City can require dedication of land and/or fees
when approving development
•Development impacts on school capacity
evaluated per Growth Management and
California Environmental Quality Act
SCHOOLS
Carlsbad ~-:
TOMOR
DISCUSSION QUESTIONS
•Is this standard important to quality of life in
Carlsbad?
•Should this standard be re-evaluated in any
way?
Drainage Facilities Performance Standard
Carlsbad ~-:
TOMOR
DRAINAGE FACILITIES
PERFORMANCE STANDARD
Drainage facilities must be provided
as required by the city concurrent
with development.
Carlsbad ~-:
TOMOR
Background
DRAINAGE FACILITIES
•Original 1980 Drainage Master Plan goals:
•Assess performance of existing drainage
facilities
•Identify drainage infrastructure needs
•Develop funding mechanism for planned
facilities
•Current plan (2008) is being updated
•Maintenance, repair and replacement
projects incorporated into city’s Capital
Improvement Projects program
DRAINAGE BASINS
•Four drainage basins
•Buena Vista Creek
•Agua Hedionda
•Encinas Creek
•San Marcos Creek
•All areas currently meet
drainage performance
standards
DRAINAGE FACILITIES
DRAINAGE
BASINS
VS.
COUNCIL
DISTRICTS
SEWER COLLECTION
LEGEND
DRAINAGE BASI N
-BUENA Vil STA CRE!=IK
~ AGUA HEDIONDA CREEK
@ ENC INITAS CREEK
I BATIQUffOSISAN MARCOS CREEK
~[UJffi) ESCONDIDO CREE K
( C1tyof
Carlsbad
N
A
Drainage Facilities Adequacy
DRAINAGE FACILITIES
•Existing drainage facilities adequate to serve
current needs
•2008 Drainage Master Plan proposes
construction of new facilities to reduce
flooding risk
•New facilities provide backbone drainage
system through city buildout
Carlsbad ~-:
TOMOR
DRAINAGE FACILITIES FUNDING
•Planned Local Drainage Area (PLDA) fee program
•Four PLDAs
•Collect fees from new development/ redevelopment
•Funds projects in city’s CIP
•Reimburse developers who construct planned facilities
•Infrastructure Replacement Funds
•Funds used to rehabilitate or replace existing drainage
facilities
DRAINAGE FACILITIES
Carlsbad ~-:
TOMOR
CAPITAL IMPROVEMENT PROGRAM DRAINAGE PROJECTS
DRAINAGE FACILITIES
Drainage Master Plan Update Magnolia Ave Drainage Improvements
Tamarack/El Camino Real Channel Restoration Merwin Drive Storm Drain Improvements
Surface Drainage Improvements Park Drive Drainage Improvements
Storm Drain Condition Assessment Program Kelly Drive Channel Repair
Storm Drain System Repair Program Romeria St Drainage Channel Improvements
Carlsbad ~-:
TOMOR
Kelly Drive Channel Repair Tamarack/El Camino Real Channel Restoration
IMPROVEMENT PROJECTS
FLOOD CONTROL AND DRAINAGE FACILITIES
MAINTENANCE
DRAINAGE FACILITIES
Buena Vista Creek Channel Maintenance Agua Hedionda Creek Vegetation Maintenance
Buena Vista Creek Assessment District Calavera Dam Mitigation and Maintenance
Trash Capture Amendment Compliance
Program
Carlsbad ~-:
TOMOR
Buena Vista Creek Channel
Maintenance
DRAINAGE FACILITIES
Agua Hedionda Creek
Vegetation Maintenance
DISCUSSION QUESTIONS
•Is this standard important to quality of life in
Carlsbad?
•Should this standard be re-evaluated in any
way?
Carlsbad ~-:
TOMOR
Wastewater Treatment Performance Standard
WASTEWATER TREATMENT
STANDARD
Sewer plant capacity is adequate for at
least a five-year period.
WASTEWATER TREATMENT
WASTEWATER TREATMENT
STANDARD
•2021 average sewer flow = 6.3 million
gallons/day
•Carlsbad capacity rights at Encina
Water Pollution Control Facility =
10.26 mgd
•EWPCF total capacity = 40.5 mgd
WASTEWATER TREATMENT
WASTEWATER TREATMENT
Carlsbad Projected Sewer Flows
10 -"'C 9 C)
E 8 -~ 0 7 -LL
I.. 6 a,
+-' (a 5 ~ a, 4 +-'
8.31 ----A A .,. .,. ----, l ----..
-I ~ "-" U -l4----JI'~ -,. ~ I
v-" '-"
ti)
(a 3 ~
a, 2 C)
(a 1 I.. a,
~ -(a 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035
::i
C: Planning Year
C:
<(
--Historical Flows ---Projected Buildout Flows
WASTEWATER TREATMENT
Encina Water
Pollution Control
Facility
Annual Average Flows and Treatment Plant Capacity (mgd)
45 --,--------------------------,
40
_________ T!_eat~~nt Pl~n,!_ Capa~ity := ~O..:S_mgd __ L ____ _
+ ~ +
35 + + +
30 +
25 +
20
15 -+----+-----+-----+-----+-----+-----+-----+-----+--+---+---
1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040
YEAR
WASTEWATER TREATMENT FUNDING
•Sewer rates:
–Pay for operation, maintenance and capital improvement of wastewater treatment system
–Will fund replacement or rehabilitation through capital reinvestment (depreciation funding from rate revenue)
•Sewer Connection Fees:
–Charged to new users that connect to the sewer collection system
–Based on the quantity of sewer discharge (equivalent dwelling units)
–Pays for the capital cost of the portion of the system used
WASTEWATER TREATMENT
DISCUSSION QUESTIONS
•Is this standard important to quality of life in
Carlsbad?
•Should this standard be re-evaluated in any
way?
Sewer Collection Performance Standard
SEWER COLLECTION STANDARD
Trunk-line capacity to meet demand, as
determined by the appropriate sewer
districts, must be provided concurrent
with development.
•2021 average sewer flow = 6.3 million
gallons/day
•Projected sewer flow = 8.3 mgd (2040)
SEWER COLLECTION
SEWER COLLECTION
SYSTEM
•265 miles of gravity sewer
•13 lift stations
•4 miles of force main
•6 interceptors
SEWER COLLECTION
1 ;;J,,,. ..-,,, t ce
cl , •, arlsbad In er ,,,,,,, -l /
"· .. '
Agua
Hedion
~~~~-~ .....
South Agua Hedionda .
Interceptor
J
e tor
~~~.---=--7--:+-__, I
r'"' North Batiquitos __, j
Interceptor ~
_, r ----~ ~ --,
Carlsbad -v--:
TOMOR
SEWER PLANNING & DESIGN CRITERIA
SEWER COLLECTION
•Sewer Generation Rate:
–Residential (single or multi-family)
–Commercial, industrial, institutional
•Design Parameters:
–Gravity or force main system
–Pipe size and % full
–Velocity (min./max.)
–Pipe type (roughness)
SEWER COLLECTION FUNDING
•Sewer connection fees:
–Charged to new users that connect to the sewer collection system
–Based on the quantity of sewer discharge
(equivalent dwelling units)
–Pay for the capital cost of the portion of the system used
•Sewer rates:
–Pay for operation, maintenance and capital improvement of wastewater treatment system
–Will fund replacement or rehabilitation through capital reinvestment (depreciation funding from rate revenue)
SEWER COLLECTION
DISCUSSION QUESTIONS
•Is this standard important to quality of life in
Carlsbad?
•Should this standard be re-evaluated in any
way?
Carlsbad ~-:
TOMOR
Water Distribution Performance Standard
WATER DISTRIBUTION FACILITIES
STANDARD
•Line capacity to meet demand
(as determined by the water district)
must be provided concurrent with
development.
•A minimum of 10-day average storage
capacity must be provided prior to any
development.
WATER DISTRIBUTION
WATER
DISTRIBUTION
FACILITIES
•72 pressure regulating stations
•3 pump stations
•450 miles of water mains
•1 water storage reservoir
•12 water storage tanks
•12 interagency connections
Carlsbad Municipal Water District
Vallecitos Water District
Olivenhain Municipal Water District
WATER DISTRICTS SERVING CARLSBAD
AREAS WITH INCREASED
POPULATION
I
Planned Land Use
Rural Residential
Single Family Residential
Multi-Family Residential
•Mobile Home Park
• Group Quarters Facility
• Hotel/Motel
• Industrial
Roads/ ROW/ Utilities
• Commercial
• Government/ Office
• Public Services
• Healthcare
•Schools
• Outdoor Recreation
• Park/ Open Space
•Agriculture
Waterbody
•Mixed Use
Carlsbad -v--:.
TOMOR
WATER PLANNING & DESIGN CRITERIA
SEWER COLLECTION
•Customer Type/Water Demand:
–Residential (single or multi-family)
–Non-residential (commercial, industrial, institutional,
irrigation)
•Design Parameters:
–Flow demand (average, maximum day, peak hour, fire)
–Pressure (static, maximum day, peak hour, fire)
•Velocity
•Head loss
WATER SYSTEM
HYDRAULIC MODELING
•Maximum flow velocity
•Minimum water pressure
Maximum day demand
Max. day demand + fire flow
City of Oce:mside
Peak Hour Pressure
• < 20 l)SI
o 20-40psi
0 40-60psj
0 60-801)$1
o 80 -100psi
o 100-150 psi
• >150psi
01-...-..&._;......__..i.,_.__-1.., ___ ..__ ___ _
-2~:,00
J ERI\LE •2 TANK\
Vi-st.a ID
..u.ERKLE • 1 DAM
Ollvenhain MWD
I
Carlsbad -v--:.
TOMORR W
•Water connection fees:
–Charged to new users that connect to the water distribution system
–Based on estimated consumption and water meter size
–Pay for the capital cost of water distribution facilities
•Water rates:
–Pay for the costs of operation, maintenance and capital improvement of the water distribution system
–Will fund replacement or rehabilitation through capital reinvestment (depreciation funding from rate revenue)
WATER DISTRIBUTION FUNDING
DISCUSSION QUESTIONS
•Is this standard important to quality of life in
Carlsbad?
•Should this standard be re-evaluated in any
way?
Carlsbad ~-:
TOMOR
Committee Member Requests for Future Agenda Items
Carlsbad ~-:
TOMOR
Public Comment
Carlsbad ~-:
TOMOR
Adjournment
Next Meeting: July 28, 2022
Carlsbad ~-:
TOMOR