ZONE 8 LOCAL FACILITIES MANAGEMENT PLAN
AMENDMENT NO. 1
FACILITY FINANCING PLAN
A. INTRODUCTION
1. Purpose of Document
This Facilities Financing Plan has been prepared in conjunction with the Local
Facilities Management Plan for Zone 8, in satisfaction of the requirements of
the City of Carlsbad Growth Management Program (Municipal Code Section
21.90.010 et seq.).
This Plan provides financing information based on the facilities projected by
the Zone 8 Local Facilities Management Plan (LFMP), and its Amendment
No. 1, and based on the Carlsbad Growth Management Program performance
standards. Sources of funds and methods of guaranteeing funding are found
in this plan. Also found are Special Conditions as provided in the Zone 8
LFMP, as Amended.
2. Sources of Information
In addition to the Zone 8 LFMP document and Zone 8 LFMP Amendment
No. 1, sources used in this plan are the Carlsbad Capital Improvement
Document (1998-99), various public facilities master plans, and direct
conversations with city staff.
3. Ownership Circumstances in LFMP Zone 8
The ownership of property within Zone 8 consists of three landholdings; the
432.8 acre Kelly Land Company property, the 21.9 acre Kirgis property, and
276.5 acres owned by the City of Carlsbad, known as Macario Canyon.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 1 FINANCING PLAN
C 4. Finance Method
Section 21.90.080 of the Municipal Code requires a "financing guarantee" for
the provision of necessary public facilities. This plan identifies funding
sources and as such the use of these funds to implement provision of public
facilities constitutes that guarantee.
Developer Funding
Under this method, the developer will fund and construct certain required
facilities prior to or concurrent with development of his particular property.
Facilities to be funded in this way are those which normally would be
imposed as conditions of approval (or in the case of Area E, has been
imposed) of a tentative map under the City's development review process.
The financing guarantee required by the growth Management Ordinance that
funds will be available for construction of the required facility shall be
provided through delivery to the city of an acceptable security instriunent,
such as a surety bond, or through execution of an improvement agreement
prior to the recordation of the final map. The improvement agreement must
be in accordance with Section 66462 of the Subdivision Map Act and Section
20.16.060 of the Carlsbad Municipal Code. The agreement must also be
accompanied by a security instrument as described in Section 20.16.070 of the
Carlsbad Municipal Code, i.e., a security bond, cash deposit, or an instrument
or letter of credit.
City of Carlsbad Community Facilities District No. 1
A Mello-Roos community facilities district has been formed by the City of
Carlsbad and approved on May 7, 1991 by an affirmative vote of land owners
to fund construction of certain Citywide facilities, including a number of
facilities which are required by the Zone 8 LFlvlP.
The financing guarantee required by the growth Management Ordinance for
any of the facilities to be funded by Carlsbad CFD No. 1 is satisfied by
annexation to and participation in the district.
Development Impact Fees
Capital Improvement Program of the City of Carlsbad and special districts
contain plans to construct certain facilities including a number of facilities
which are required by the Zone 8 LFlvlP. Sources of funds for these facilities
are development impact fees which are collected at issuance of building
permit.
ZONE 8 LOCALFACIUTIES
MANAGEMENT PLAN 2 FINANCING PLAN
___ ,, ____________ ····-------------------------··-•··-·· .....
C
Facilities which are proposed to be funded directly from development fees
include wastewater treatment facilities and certain circulation and sewage
collection facilities. For facilities which are proposed to be funded from
development fees, payment of such fees will satisfy the private developer's
financial obligation for these facilities, as long as the applicable Growth
Management Program Performance standards are satisfied.
Reimbursement from City of Carlsbad Development Fee Fund
If a developer constructs a facility which is included in a fee program, he may
be reimbursed from the applicable fee fund, subject to City Council approval
and the following conditions:
• That sufficient, unobligated funds are available;
• That the reimbursement is consistent with the priority of project
funding within the most recent adopted Capital Improvement
Program; and
• That the reimbursement shall not exceed the maximum amount
budgeted in the most recent adopted Capital Improvement
Program.
B. TIMING OF DEMAND
Demand for various facilities is based on the type of development, its location
within the zone and when new development will be "on line". This analysis uses
the Phasing projection identified on Exhibit A of this Financing Plan for
projections regarding type, location and timing of new development. The LFMP,
and its Amendment No. 1, which modifies the analysis for Parks, Circulation and
Sewer Collection Facilities, analyzes the impact of new development on the
eleven identified public facilities categories and shows specific public facilities
requirements over time. The financing plan demonstrates how the projected
facilities requirements will be funded over time.
C. FINANCING
Public facilities funding sources and funding responsibilities, based on Zone 8
development projections identified through the Zone 8 LFMP, are described in
this section. Special Conditions which deal with facilities and funding are
provided as found in the LFMP. The following are sections which deal with each
of the identified public facilities categories.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 3 FINANCING PLAN
EXHIBIT A
Kelly Land Company
LFMP Zone 8 Phasing
Phase Year
I 1998
TOTAL
[ 1999
TOTAL
II 2000
TOTAL
III 2001
TOTAL
IV 2001-05
TOTAL
GRAND
TOTAL
ZONE 8 LOCAL FACIUTIES
MANAGEMENT PLAN
Planning
Area
E (1)
A (1)
A{2)
C
E (2)
E(3)
D,G,H (1)
I
J (1)
D,G H (2)
J (2)
F
N
L
K
M
Land Use DU
SFD-5000 18
I 1 8 I
MFD 72
MFD 39
SFD-7500 8
SFD-5000 72
SFD-5000 55
t 246
MFD (Apts.) 480
SFO-5000 73
SFO-7500 60
613
MFD (Apts.) 15
SFD-7500 27
N
SFD 11
MFD 26
MFD 7
86
!PARK
I
I
963
I
4
-PLANNING PROJECTIONS ONL y.
Acre ADT I EDU Population
180 18 41.72
18 o, 1 8 41. 72
5761 72 1 66.90
312 39 90.39
801 8 18.54
720 72 166.90
550 55 127 .48
20581 152 352.34
3840 480 1112.64
730 73 169.21
600 60 139.08 ·
5170 707 1638,80
120 15 34.77
270 27 62.59
2.6 1040
110 11 25.50
2oa1 26 60.27
561 7 16.22
2.6 1804/ 86 199.35
276.5 1750 800 0.00
276.5 1750 800 0 .00
279.1 10,962 1763 2232.21
FINANCING PLAN
C
1. CITY ADMINISTRATIVE FACILITIES
City Administrative Financing Matrix
Zones
City Administrative Estimated
Facilities Cost Timing
1. Public Service Center
-Construction $4,668,000 1998-99
2. New City Hall $26,019,000 2003-08
Total City Administrative
Costs $30,687,000
Funding
Options
1st
CFD#1
Sewer
CFD#l
2nd 3rd Notes
(1 )(2)
(2)
(1) There are no special conditions required of Zone 8 other than payment of the City's
Sewer Fees and participation in the Citywide CFO.
(2) Annexation of the Zone 8 Kelly Land Company property into the CFD No. 1 has occured. This
annexation involves the major development within the Zone.
Facility
The same Facilities are required for all zones in the City including Zone 8. There
are no Special Conditions specified in the Zone 8 LFMP.
Source of Funds
The City's Capital Improvement Program includes the above facilities. The
source of funds is Public Facility Fee collected at issuance of building permit.
Portions of the Public Service Center and New City Hall will be funded through
CFDNo.1.
Financing Guarantee
Annexation to and participation in Carlsbad CFD No. 1 satisfies the financing
guarantee for the facilities included in the CFD.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN . 5 FJNANClNG PLAN
C
2. LIBRARY FACILITIES
Library Financing Matrix
Zones
Library Estimated
Facilities Cost
1. Library Remodel $1,874,000
2. Library -Cole/North $13,165,000
Carlsbad Library Expansion
3. Library -South Carlsbad
Construction $20,992,000
Shelving 650,000
Collection 400,000
Total Library Costs $37,081,000
Funding
Options
Timing 1st 2nd 3rd Note
s
1999-00 PFF (1)
2009+ PFF/CFD #1 (1)(2)
1997-99 PFF/CFD#l (1)(2)
(1) There are no special conditions required of Zone 8 other than the payment of the City's Public
Facilities Fees (PFF) and participation in the Citywide CFO.
(2) Annexation of the Kelly Land Company into the CFO No. 1 has occurred.
Facility
The same facilities are required for all zones in the City, including Zone 8. There
are no Special Conditions specified in the existing Zone 8 LFMP.
Source Of Funds
The City's Capital Improvement Program includes the above facilities. The
source of funds is Public Facilities Fee collected at issuance of building permit
and CFD No. 1.
Financing Guarantee
Annexation to and participation in Carlsbad CFD. No. 1 satisfies the financing
guarantee for the facilities included in the CFD.
ZONE 8 LOCAL FACIUTIES
MANAGEMENT PLAN 6
FINANCING PLAN
C
C
3. WASTE WATER FACILITIES
Wastewater Financing Matrix
Zones
Wastewater Estimated
Facilities Cost
1. Encina Outfall Upgrade $10,545,000
2. Endna Phase V $10,736,000
Expansion
Total Wastewater Costs $21,281,000
Funding
Options
Timing 1st 2nd 3rd Notes
2002-08-Sewer Fees (1)
2003-2008 Sewer Fees (1)
/ Bonds
(1) No special funding is required at this time. Zone 8 will contribute to the funding of Wastewater
facilities through the payment of Sewer Connection Fees at time of development.
Facility
There are no Special Conditions contained in the Zone 8 LFMP. The following
actions will be pursued by the City, however, in order to ensure adequate
wastewater treatment capacity throughout a required five year period.
• Monitor Encina Treatment Plant flows on a monthly basis to determine
actual flow rates and to have an early warning of capacity problems.
Source Of Funds
The source of funds for sewer upgrades and expansions of treatment capacity is
the sewer connection fee collected by each district.
Financing Guarantee
Payment of sewer connection fee shall satisfy the financing obligations of private
development for Wastewater Facilities.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 7 FINANCING PLAN
C.
C
4. PARK FACILITIES
Park District 1 (Northeast Quadrant) Financing Matrix
Zones
Funding
Park Estimated Options
Facilities Cost Timing 1st 2nd 3rd Notes
1. Veterans Memorial Park $15,769,000 2004+ CFO
2. Park acquisition $2,300,000 2003-2008 PIL-NW
3. Cannon Lake Park $947,000 2009-2020 PFF
Total Park Costs 19,096,000
(1) Annexatmn of the Kelly Land Company property into the CFO No. 1 has occurred.
Facility
(1)
The proposed Zone 8 LFMP Amendment includes special conditions for Park
facilities as follows:
1. All residential development shall pay Park-In-Lieu and Public Facility Fees
for Park District 1.
2. Prior to the recordation of the first final map, issuance of a grading permit or
building permit, whichever occurs first within Zone 8, a Parks l'..grccmcnt shall
be required to include fr.e follo:wing provisions:
a. A letter of cr:edit or some other secured financing acceptable to the City in
the amount of $770,500 guaranteeing the construction of 6.7 aa=es of parkland,
from a financial institution and upon terms and conditions acceptable to the
Finance Director and City .'\ttorney at the time this agreement is e>Eecuted.
b. Park operating costs shall be proYided either through a leHer of credit or
some other secured financding from a financial institution and upon terms
and conditions acceptable to the Pinance Director and City Attorney or the
establishment of a Park District 1 Growth Management Pee that would COYJer
the operating costs for the Park. The amount of the costs and the time for
\vhieh the developers in Park District 1 ·would be responsible for thesee costs
shall be pro•1ided for 7Nithin the Parks Agreement.
c. The Parks l".,greement shall be consistent ,vith the requirements of the
City's Growth M:anagement Program.
d. The Parks Agreement shall provide mechanisms for reimbursements, Parl.:
In Lieu fee credits and/or PFP credits.
a. No residential development ·Nill be allowed after 1992 unless actions have
been taken to construct additional park facilities.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 8
FINANCING PLAN
C
C
2. All non-residential uses within Zone 8 shall pay Public Facilities Fees for
which the City allocates a portion toward improvement of City Parks.
Source Of Funds
The source of funds for the above-referenced future park facilities will be from
several different sources, including CFD No. 1, Park-In-Lieu fees, and Public
Facilities Fees.
Financing Guarantee
Payment of Park-In-Lieu Fees and Public Facilities Fees, and fees associated with
CFD No. 1, satisfies the financing guarantee for construction of the necessary
parks within the Park District No. 1.
ZONE 8 LOCAL FACIUTIES
MANAGEMENT PLAN 9 FINANCING PLAN
C
S. DRAINAGE FACILITIES
Drainage Financing Matrix
Zones
Drainage Facilities Amount
42" storm drain line under 200LF
Cannon Rd.
Desiltation basin at Cannon 1
Rd.@PAD
36" storm drain pipe 1500LF
throughPAH
36" storm drain pipe 700LF
through PAD
Desiltation basin Cannon 1
Rd.@PAD
24" storm drain pipe 3200LF
throughPAJ
Two 18" storm drain lines 600LF
through PAJ
Desil ta lion basin at east 1
boundary PA J ·
54" Faraday Ave. storm 2000LF
drain trunk.
18" storm drain line PA N 2400LF
to Faraday Ave.
Total Drainage Facility
Costs
Funding
Esl Options
Cost Timing 1st
$24,000 Concurrent Developer
w /Development
$50,000 Concurrent Developer
w /Development
$110,000 Concurrent Developer
w /Development
$50,000 Concurrent Developer
w /Development
$50,000 Concurrent Developer
w /Development
$150,000 Concurrent Developer
w /Development
$25,000 Concurrent Developer
w /Development
$50,000 Concurrent Developer
w /Development
$220,000 Concurrent City
w/Faraday Ave.
$90,000 Concurrent Developer
w I Development
$845,000
(1) City Drainage Area Fee funds in con1unction with Faraday Ave. construction
Source Of Funds
2nd 3rd Notes
(1)
Prior to approval of any Development Permit within Zone 8, the Developer shall
. pay the current drainage area fee established at the time of issuance of a
Development Permit.
Financing Guarantee
Prior to the recordation of a final map, these facilities must be constructed, or an
acceptable security instrument, such as performance bonding shall be provided
to the City, or an improvement agreement shall be executed.
ZONE B LOCAL FACIUTIES
MANAGEMENT PLAN 10 FINANCING PLAN
C
6. CIRCULATION
Circulation Facility
Zones
A. Cannon Road Cannon Road West; ECR to Existing
terminus at Lego Drive
Estimated Cost: $20 million
Source Of Funds: Carlsbad CFD No. 1 /Transnet/BTD No. 3
Developers fund frontage improvements.
Finance Guarantee: Participation in CFD No. 1 and BTD No. 3
Developer bonding for frontage
improvements
Reimbursement: Reimbursement to developer of qualifying
improvements constructed by them.
Estimated Cost
Estimated cost is obtained from City of Carlsbad Capital Improvement Program.
Source Of Funds
Cannon Road, including the Macario Canyon Bridge and the Agua Hedionda
Creek Bridge, is planned to be funded through four main sources as follows:
• $5.6 million funding through Bridge and Thoroughfare District No. 3, which
has been created. Funded by property owners within the District boundaries.
• $6.5 million funding through funds collected through CFD No. 1.
• $4.2 million funding through a State of California Transnet-Highway funding
grant.
• '$2.0 million funding through developer funding of frontage improvements.
Reimbursement to developers of qualifying developer-fronted Cannon Road
improvements will occur, subject to reimbursement agreements that may be
approved by the City Council.
Finance Guarantee
Though financing for this facility is in place, cash flow projections from the BTD
may be inadequate to guarantee construction concurrent with need. Therefore
the developer must enter into an agreement with the City to front the
construction cost for the cash flow gap and receive reimbursement from proceeds
of the BTD as property within the District develops.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 11 FINANCING PLAN
Circulation Facility
Zones
B. Intersection Improvements
Estimated Cost:
Source Of Funds:
Finance Guarantee:
Reimbursement:
Estimated Cost
Cannon Road / El Camino Real
Intersection
$1.16 million
Traffic Impact Fee fund
Developer of Area E to bond and
construct. Reimbursement through TIF.
Reimbursement to developer of qualifying
improvements constructed by them.
Estimated cost is obtained from City of Carlsbad FY 1998-99 Capital
Improvement Program.
Source Of Funds
Developer funded with reimbursement from Traffic Impact Fee Program.
Finance Guarantee
The required Traffic Impact Fee will be paid upon issuance of all future building
permits within Zone 8.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 12 FINANCING PLAN
C
Circulation Facility
Zones
C. Traffic Signal
Estimated Cost
Source Of Funds:
Finance Guarantee:
Reimbursement:
Estimated Cost
Cannon Road / Frost SL Intersection
$180,000
Developer funded (PFF)
Developer of Area E to bond and
construct.
Reimbursement to developer of qualifying
improvements constructed by them.
Estimated cost is obtained from developer sources.
Source Of Funds
Funding for this improvement will be provided by the developer of Area E.
Finance Guarantee
Financing guarantee will be via bonding through the Area E Subdivision
Improvement Agreements.
ZONE8LOCALFACILITIES
MANAGEMENT PLAN 13 FINANCING PLAN
C
Circulation Facllity
Zones
D. Faraday Avenue
Estimated Cost:
Source Of Funds:
Finance Guarantee:
Reimbursement:
Facility
Faraday Ave. extension from existing
westerly tenninus to Cannon Road
$3.5 million
CFDNo.1
CFDNo.1
NA
The Faraday Avenue extension is required by the LFMP in conjunction with the
development of Veteran's Memorial Park.
Estimated Cost
The estimated cost for the road segment and intersection facility is obtained from
the Adopted 1998-99 Capital Improvement Program.
Source Of Funds
Funding of the extension roadway will be through CFD No. 1 funds.
Finance Guarantee
CFO No. 1 has been established and funding is ongoing.
ZONESLOCALFACILITIES
MANAGEMENT PLAN 14 FINANCING PLAN
C
C
C
Circulation Facility
Zones
E. Park Drive
Estimated Cost:
Source Of Funds:
Finance Guarantee:
Reimbursement:
Source Of Funds
Park Drive widening along Zone 8
frontage
$250,000
Developer
Bonding in conjunction with approval of
Area A development
This facility will be funded and constructed by the developer of Area A of Zone 8
Finance Guarantee
Bonding in conjunction with approval of a development permit for Area A of
Zone 8.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 15 FINANCING PLAN
C
C
Circulation Facility
Zone 8
F. Traffic Signal
Estimated Cost:
Source Of Funds:
Finance Guarantee:
Reimbursement:
Source Of Funds
Traffic Signal; Cannon Road I Faraday
Avenue
$110,000
Public Facilities Fees
City funding through Public Facilities Fee
funds. In 1998-99 CIP.
Reimbursement of qualifying
expenditures to developers if constructed
by them.
This improvement will be funded through the City Public Facilities Fee account.
Finance Guarantee
City Public Facilities Fees funds.
Reimbursement
If the facility is constructed by the Zone 8 developer, the developer shall be
reimbursed for qualifying expenditures from the City Public Facilities Fees fund,
subject to City Council approval.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 16 FINANCING PLAN
_______________ ... _. ·-----------------
C
r
C
7. FIRE FACILITIES
Facility
None is required. There are no Special Conditions contained in the Zone 8
LFMP.
Source Of Funds
None is required
Financing Guarantee
None is required.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN
FfNANCfNG PLAN · 17
C
C
8. OPEN SPACE FACILITIES
Facility
None is required. There are no Special Conditions contained in the Zone 8
LFMP. According to the Citywide Facilities and Improvement Plan, Zone 8 is
dentified as already in compliance with the adopted performance standard.
Therefore, no further analysis is required pertaining to open space.
Source Of Funds
None is required.
Financing Guarantee
None is required.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN
FINANCING PLAN 18
'
C
C
9. SCHOOL FACILITIES
Facility
The following Special Conditions are contained in the Zone 8 LFMP:
Prior to the recordation of any residential final map, issuance of grading permit
or building permit, whichever occurs first, in Zone 8, an agreement shall be
entered into between Carlsbad Unified School District and the affected property
owner(s) that shall provide for the following:
1. The deeding of an acceptable school site to the Carlsbad Unified School
District if it is determined by the District a school within Zone 8 is
warranted.
2. A financing plan approved by the City and Carlsbad Unified school
District guaranteeing the construction of necessary elementary school
facilities in Zone 8 pursuant to condition #1.
If any reimbursements and/ or school fee credits are to be given, the school
agreement/ financing plan shall provide a mechanism to do so.
School Agreement
A Carlsbad Unified School District School Facilities Mitigation Agreement
between the Kelly Ranch developer and the Carlsbad Unified School District was
executed on November 20, 1997, which provides that a school site will not be
necessary within Zone 8, and that annexation of the property into Carlsbad
Unified CFD No. 3 will satisfy the funding of school facilities. This agreement is
in compliance with the LFMP condition which requires deeding of a school site if
warranted.
Source of Funds
School facilities will be funded through the collection of funds through school
facilities CFD No. 3.
Financing Guarantee
The Kelly Ranch property has annexed into CPD No. 3, and as a result, financing
of school facilities is.guaranteed.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 19 FINANCING PLAN
C
10. SEWER FA□LITIES
Sewer Facilities Financing Matrix
Zones
Est.
Sewer Facilities Amount Cost
21" -24" sewer trunk 2SOOLF $200,000
gravity line in Cannon Rd.
@PAE
Temporary 4" trunk . 2700LF $60,000
pressure line to NAHTL
21" -24" sewer trunk 3000 LF $240,000
gravity line in Cannon Rd.
@PADandPAG
Interim pump station 1 $110,000
24" -36" SAHTI line off-site 800LF $160,000
8" sewer mains 4000LF $100,000
24" sewer trunk gravity line 3500LF $300,000
in Farad av Ave.
SAHi permanent pump 1 $1,200,000
station
Total Sewer Facility $2,370,000
Costs
(1) City Sewer Fee funds.
Timin2
Concurrent
w /Development
Concurrent
w /Development
Concurrent
w /Development
Concurrent
w /Develooment
Concurrent
w /Development
Concurrent
w /Development
Concurrent
w /Development
Concurrent
w /Development
(2) City Sewer Fee funds in conjunction with Faraday Ave. construction.
Facility
Funding
Options
1st 2nd
Developer
Developer
Developer
Developer
City
Developer
City
City
The proposed Zone 8 LFMP Amendment contains the following special
conditions relative to sewer facilities:
Special Conditions (Except for Planning Areas "A" and "C") are as follows:
3rd
a. Prior to tl=te reeordation of any final map, issuaftee of grading permit or
bui-ldiftg permit, wl=tiche .. ,cr occurs first ift Zofte 8, a financing program
guaranteeing the construction of the South l'..gua Hedionda Interceptor from
IU Camino R:eal to the Vista Carlsbad Interceptor m1::1st be appro ... •ed by the
City:-
b. Prior to the issuance of any building permits for new devel~pment in
Zone 8 the City Engineer shall make a finding that adequate capacity exists
within the NAHi Trunk Line and the appropriate facilities have been
installed (including pump station) to direct sewage into the NAHi Line,
consistent with this LFMP Amendment, to accommodate such building
permits. In the event that this finding cannot be made, the City Engineer
Notes
(1)
(2)
(1)
ZONE 8 LOCAL FACIUTIES
MANAGEMENT PLAN
FINANCING PLAN 20
C
C
will not allow issuance of the building permits unless the South Agua
Hedionda Interceptor will be in place and operational to serve the ReW
subject resideRtial development within Zone 8.
c. Prior to the recordation of any final map, issuance of grading permits or
building permits, whichever occurs first in Zone 8, a financing program
guaranteeing the construction of the necessary sewer collection system
consistent with this LFMP Amendment, to serve the proposed development
must be approved by the City.
Source Of Funds
All Zone 8 development shall privately fund sewer facilities. In addition, prior to
approval of any development permit within Zone 8, the Developer shall pay the
required sewer fees to the Carlsbad Municipal Water District.
Financing Guarantee
The primary regional facilitiy within Zone 8 is the South Agua Hedionda Sewer
Trunk Line. The developers shall pay Sewer Fees and bond for development
improvements.
ZONE 8 LOCAL FACILITIES
MANAGEMENT PLAN 21 FINANCING PLAN
C
11. WATER FACILITIES
Water Facilities Financing Matrix
Zones
Est.
Water Facilities Amount Cost
On-site 8"-14" water 25000LF $800,000
mains, valves, reducing
stations
12" water distribution line 3200LF $110,000
in Faraday Ave.
Total Water Facility $910,000
Costs
Funding
Options
Timing 1st
Concurrent Developer
w /Development
Concurrent City
w /Development
(1) City Water Fee funds m conJunction with Faraday Ave. construction.
Source Of Funds
2nd 3rd Notes
(1)
Prior to approval of any Development Permit within Zone 8, the Developer shall
pay the required water fees to the Carlsbad Municipal Water District.
Financing Guarantee
Prior to the recordation of final map for Zone 8, this facility shall be constructed
or an improvement agreement shall be executed consistent with the conditions of
approval of and subject to the approval of the city engineer. The improvement
Agreement shall be in accordance with Section 66462 of the Subdivision Map Act
and Section 20.16.060 of the Carlsbad Municipal Code. Said improvement
agreement shall be secured with one of the following forms of security as
described in Section 21.16.070 of the Carlsbad Municipal Code: surety bonds,
cash, irrevocable instrument of credit or letter of credit, acceptable to the
Finance Director and City Attorney.
ZONE 8 LOCAL FACIUTIES