Loading...
HomeMy WebLinkAbout2792 GATEWAY RD; 101; CBC2022-0429; PermitBuilding Permit Finaled (_ City of Carlsbad Commercial Permit Print Date: 04/25/2023 Job Address: 2792 GATEWAY RD, # 101, CARLSBAD, CA 92009-1749 Permit No: Status: CBC2022-0429 Closed -Finaled Permit Type: BLDG-Commercial Work Class: Tenant Improvement Parcel#: 2133001000 Valuation: $473,109.12 Occupancy Group: B #of Dwelling Units: Bedrooms: Bathrooms: Occupant Load: 200 Code Edition: 2019 Sprinkled: Yes Project Title: Track#: Lot#: Project#: Plan#: Construction Type:11I-B Orig. Plan Check#: Plan Check#: Applied: 12/12/2022 Issued: 02/02/2023 Fina led Close Out: 04/25/2023 Final Inspection: 04/18/2023 INSPECTOR: Kersch, Tim Description: IDA WEALTH MNGMT: Tl COMBINING ALL SUITES FOR SINGLE TENANT (8208 SF) Applicant: SAFDIE RABINES INTERIORS JENNIFER DEAK 925 FORT STOCKTON DR SAN DIEGO, CA 92103-1817 (619) 297-6153 FEE BUILDING PLAN CHECK Property Owner: 2792 GATEWAY LLC 2792 GATEWAY RD, # 102 CARLSBAD, CA 92009-1749 BUILDING PLAN REVIEW-MINOR PROJECTS (LDE) BUILDING PLAN REVIEW-MINOR PROJECTS (PLN) CERTIFICATE OF OCCUPANCY COMM/IND Tl -NON-STRUCTURAL SB1473 -GREEN BUILDING STATE STANDARDS FEE STRONG MOTION -COMMERCIAL (SMIP) Total Fees: $3,552.49 Total Payments To Date: $3,552.49 Contractor: SPW CONSTRUCTION INC 1808 ASTON AVE, # STE 100 CARLSBAD, CA 92008-7369 (760) 931-1130 Balance Due: AMOUNT $1,218.46 $194.00 $98.00 $16.00 $1,874.56 $19.00 $132.47 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as 11fees/exaction.11 You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov { City of Carlsbad COMMERCIAL BUILDING PERMIT APPLICATION B-2 Plan Check Est. Value PC Deposit Date Job Address 2792 GATEWAY RD. CARLSBAD, CA 92009 Tenant Name #: IDA WEAL TH MANAGEMENT Suite: ____ ~APN: 213.300-10-00 Lot #:,_1_0 ___ Year Built: _2_00_7 ________ _ Year Built:_20_0_7 __ Occupancy:_B __ _ Construction Type:_v_-B __ Fire sprinklers@'EsONo A/C:0YES0No BRIEF DESCRIPTION OF WORK: COMMERCIAL TENANT IMPROVEMENT D Addition/New: ____________ ,New SF and Use, __________ New SF and Use _______ SF Deck, _______ .SF Patio Cover, SF Other (Specify) ____ _ [{]Tenant Improvement: _8_,2_08 ____ SF, Existing Use: _______ Proposed Use: ______ _ _____ SF, Existing Use: Proposed Use: ______ _ D Pool/Spa: _____ .SF Additional Gas or Electrical Features? ____________ _ D Solar: ___ KW, ___ Modules, Mounted:ORoof OGround D Re roof: _____________________________________ _ D Plumbing/Mechanical/Electrical Dmher: ______________________________ _ APPLICANT (PRIMARY CONTACT) Name: JENNIFER DEAK Address· 925 FORT STOCKTON DRIVE City· SAN DIEGO State:,_c_A __ .Zip: 92103 Phone· 619-297-6153 PROPERTY OWNER Name: JASON LABRUM Address: 2792 GATEWAY RD. City: CARLSBAD Phone: 760-707-5555 State:_c_A __ .Zip: 92009 Email. JENN IFER@SAFDIERABINES.COM Email: JASON.LABRUM@IDAWEALTH.COM DESIGN PROFESSIONAL Name: SAME AS APPLICANT Address;..• ________________ _ CONTRACTOR OF RECORD Business Name: WHITE CONSTRUCTION, Inc Address: 1808 Aston Ave, Suite 100 City.._· ________ ,State:, ___ .Zip: _____ City: CARLSBAD State:_cA __ .Zip: 92008 Phone· Phone: 760-390-8196 Email: Email: angela@WHITECONSTRUCTI0Ninc.C0M Architect State License: ____________ CSLB License#: 1023856 Class: _______ _ Carlsbad Business License# (Required): BLNR000431-02-2017 APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. NAME (PRINT): Jennifer Deak SIGN: DATE: 11.30.2022 1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov REV. 07/21 THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _ A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO PERMIT ISSUANCE. (OPTION A): LICENSED CONTRACTOR DECLARATION: I herebyaff i rm under penalty of perjury that I am licensed under provisions of Chapter 9 ( commencing with Section 7000 / of Division 3 of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the following declarations {CHOOSE ONE): D1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. PolicyNo. ______________________________________ _ -OR- (!]1 have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: -'-"'-'-"-'-"_0_•'-'-"-'-"°-'-"-"'-"-------------- Policy No. 9243036 Expiration Date:-"-'"-'--------------- -OR- Ocertificate of Exemption: l certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: _____________________ .Lender's Address: ____________________ _ CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that theinformationon the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. Angela Slevinsky, NAME (PRINT): Project Specialist SIGNATURE: Note: If the person signing above is an authorized agent for the contractor provide a letter of -OR - (OPTION B): OWNER-BUILDER DECLARATION: DATE: 12/1/2022 I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. L....ni'44, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). -OR-D1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). -OR-□1 am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason: AND, D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner. By my signature below I acknowledge that, except for my personal residence in which t must have resided for at least one year prior to completion of the improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed contractors./ understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is submitted or at the following Website: http://www.leginfo.ca.gov/calaw.html. OWNER CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the information on theplansisaccurate. lagree to comply with all City ordinances and State laws relating to building construction. NAME (PRINT): SIGN: __________ DATE: ______ _ Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner. 1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov 2 REV. 07/21 Permit Type: Work Class: Status: Scheduled Date 04118/2023 f ++ 0 , " "';01 00 , J,ee:M·ir1"1,x:11~ecT10N H1si~it ,a~: fcec:2022-0429 > BLDG-Commercial Application Date: 12/12/2022 Owner: 2792 GATEWAY LLC Tenant Improvement Issue Date: 02/02/2023 Subdivision: Closed -Finaled Expiration Date: 09/05/2023 Address: 2792 GATEWAY RD, # 101 IVR Number: 45184 CARLSBAD, CA 92009-1749 Actual Inspection Type Start Date Inspection No, Inspection Primary Inspector Reinspection Inspection Status BLDG-85 T-Bar, Ceiling 205135-2023 Passed Grids, Overhead Checklist Item BLDG-Building Deficiency BLDG-14 Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout BLDG-34 Rough Electrical BLDG-44 Rough-Ducts-Dampers NOTES Created By Angie Teanio COMMENTS TEXT 760-535-6200 Jim 04/18/2023 BLDG-Final Inspection Checklist Item 208320-2023 COMMENTS Passed BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final NOTES Created By Angie Teanio TEXT 760-535-6200 Jim Tim Kersch Complete Passed Yes Yes Yes Yes Yes Created Date 03/08/2023 Tim Kersch Complete Passed No No No No No Created Date 04/17/2023 Tuesday, April 25, 2023 Page 2 of 2 OFFICE USE ONLY SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE RECORD ID # __________________ 1 PLAN CHECK# __________________ 1 BP DATE Business Name Business Contact Telephone# IDA WEAL TH MANAGEMENT JENNIFER DEAK 619-297-6153 Project Address (include suite) City State Zip Code APN# 2792 GATEWAY RD. CARLSBAD CA 92009 213-300-1 0-00 Mailing Address (include suite) City State Zip Code Plan File# SAME AS ABOVE Project Contact Applicant E-mail Telephone# JENNIFER DEAK JENNIFER@SAFDIERABINES.COM 619-297-6153 The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: {not required for projects within the City of San Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Occupancy Rating: Facility's Square Footage (including proposed project): 5. Organic Peroxides 9. Water Reactives 13. Corrosives 1. Explosive or Blasting Agents 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART 11: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH HAZARDOUS MATERIALS DIVISION {HMD): If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123. Call (858) 505M6700 prior to the issuance of a building permit. FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 1. 2. 3. 4. 5. 6. 7. 8. YES NO (for new construction or remodeling projects) Is your business listed on the reverse side of this form? (check all that apply). □ 0 □ 0 Will your business dispose of Hazardous Substances or Medical Waste in any amount? □ 0 Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 pounds and/or 200 cubic feet? □ □ □ □ □ El Will your business store or handle carcinogens/reproductive toxins in any quantity? El Will your business use an existing or install an underground storage tank? El Will your business store or handle Regulated Substances (CalARP)? El Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? El Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). 0 CalARP Exempt I Date Initials 0 CalARP Required I Date Initials 0 CalARP Complete I Dale Initials PART 111: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD): The following questions are intended to identify the majority of air pollution issues at the planning stage. Your project may require additional measures not identified by these questions. Some residential projects may be exempt from APCD requirements. If yes is answered for either questions 1, 2 or 5 or for more comprehensive requirements, please contact APCD at apcdcomp@sdcounty.ca.gov; (858) 586-2650; or 10124 Old Grove Road, San Diego, CA 92131. YES NO 1. El D Will the project disturb 100 square feet or more of existing building materials? 2. El D Will any load supporting structural members be removed? 3. D El (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPAMapproved building inspector course? 4. D El (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, a notification may be required at least 10 working days prior to commencing asbestos removal. Additionally, a notification may be required prior to the removal of a load supporting structural member(s) regardless of the presence of asbestos. 5. D El Will the project or associated construction equipment emit air contaminants? See the reverse side of this form for typical equipment requiring an APCD permit. If yes, contact APCD prior to the issuance of a building permit. 6. D D (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school bounda ? Briefly describe business activities: Briefly describe proposed project: CORPORATE OFFICE COMMERCIAL TENANT IMPROVEMENT I declare under penalty of pe~ury that to the best of my knowledge and belief t e ~spo~~~s made heF,ein are true and correct. JENNIFER DEAK QffV!JJ,Y-v j:Jr2.IJJ-v 11/30/2022 I Name of Owner or Authorized Agent Signature of Owner or Authorized Agent Date FOR OFFICAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ________________________________ _ BY· DATE· I I EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMO* APCD COUNTY-HMO APCD COUNTY-HMO APCD . A stamp in this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply HM-9171 (9/18) County of San Diego M DEH -Hazardous Materials Division ( City of Carlsbad I INSTRUCTIONS: STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 442-339-2750 www.carlsbadca.gov To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements, "PRIORITY DEVELOPMENT PROJECT (PDP) requirements or not considered a development project. This questionnaire will also determine if the project is subject to TRASH CAPTURE REQUIREMENTS. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrentlv. PROJECT INFORMATION PROJECT NAME: IDA WEAL TH MANAGEMENT APN: 213-300-10-00 ADDRESS: 2792 GATEWAY RD. CARLSBAD, CA 92009 The project is (check one): D New Development D Redevelopment The total proposed disturbed area is: ft2 I ) acres The total proposed newly created and/or replaced impervious area is: ft2 I \ acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP#: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. This Box for City Use Only YES NO Date: Project ID: City Concurrence: □ □ By: E-34 Page 1 of4 REV 08/22 STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building IZl □ or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 6, mark the box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing building): PROJECT IS A COMMERCIAL INTERIOR TENANT IMPROVEMENT If you answered "no" to the above question, the project is a 'development project', go to Step 2. STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; OR □ □ b) Designed and constructed to be hydraulically disconnected from paved streets or roads; OR c) Designed and constructed with permeable pavements or surfaces in accordance with US EPA Green Streets quidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ □ accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ □ If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 6, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption (e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): If you answered "no" to the above questions, your project is not exempt from PDP, go to Step 3. E-34 Page 2 of 4 REV 08/22 ~ i'~~ 1n1111mr::" -""li"""'~~:;7:C\'jif'?\li""'''""7'Y -, ,. ii(i ' ·li( a\ 3:,-1,,'i'I. ~Ao~., > ·a rft' t,,, '\&/' •• , 1~~, •, , ,. , i~"':t· t,, '-~•:;l;t' "' iif Jt;-: · ill'•! ,P"ll,;.'7' (<~ il.l'l.(f~l ,JI cit! tj ;,);t ~l=C~fi:.~,t, 'L "' ' ~ "" _...,.:.i.;i...., ~~ ...,.. ~ To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )): YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces □ □ collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of □ □ impervious surface? This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a □ □ facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious □ □ surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or areater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a □ □ land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project □ □ site? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally □ □ Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).* 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair □ □ shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes □ □ RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 1 O. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land □ □ and are expected to generate pollutants post construction? 11. Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of □ □ impervious surface or (2) increases impervious surface on the property by more than 10%? (CMG 21.203.040) If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, complete the trash capture question. If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT'. Go to step 5, complete the trash capture question. • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. E-34 Page 3 of 4 REV 08122 . STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A)= sq. ft. □ □ Total proposed newly created or replaced impervious area (B) = sq. ft. Percent impervious area created or replaced (B/A)*100 -% If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, complete the trash capture question. If you answered "no," the structural BM P's required for PDP apply to the entire development. Go to step 5, complete the trash capture question. . STEPS. . . TO BE COMPLETED FciRALL DEVELOPMENT PROJECT$ Complete the question below regarding your Project (SDRWQCB Order No. 2017-0077): YES NO Is the Project within any of the following Priority Land Use (PLU) categories and not exempt from trash capture requirements per section 4.4.2.2 of the BMP Manual? R-23 (15-23 du/ac), R-30 (23-30 du/ac), Pl (Planned Industrial), CF (Community Facilities), GC (General □ □ Commercial), L (Local Shopping Center), R (Regional Commercial), V-B (Village-Barrio), VC (Visitor Commercial), 0 (Office), VC/OS (Visitor Commercial/Open Space), Pl/O (Planned Industrial/Office), or Public Transportation Station If you answered "yes", the 'PROJECT' is subject to TRASH CAPTURE REQUIREMENTS. Go to step 6, check the first box stating, "My project is subject to TRASH CAPTURE REQUIREMENTS ... " and the second or third box as determined in step 3. If you answered "no", Go to step 6, check the second or third box as determined in step 3. List exemption if applicable for 'no' answer here: STEP6 CHECK THE APPROPRIATE BOX(ES) AND COMPLETE APPLICANT INFORMATION . 0 My project is subject to TRASH CAPTURE REQUIREMENTS and must comply with TRASH CAPTURE REQUIREMENTS of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP). 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. I will submit a "Standard Project Requirement Checklist Form E-36". If my project is subject to TRASH CAPTURE REQUIREMENTS, I will submit a TRASH CAPTURE Storm Water Quality Management Plan (TCSWQMP) per E-35A. □ My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) per E-35 template for submittal at time of application. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. ~ My project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Applicant Name: JENNIFER DEAK Applicant Title: DESIGNER Applicant Signature: 'Jv,n,ni/~,r iJJmk Date: 12.07.22 E-34 Page 4 of 4 REV 08/22 ..ii ( City of Carlsbad CLIMATE ACTION PLAN CONSISTENCY CHECKLIST B-50 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov PURPOSE if\'N l 'l LD?}, _ This checklist is intended to help building permit applicants identify wlpql(§~'A~i'¢X~~ (CAP) ordinance requirements apply to their project. This completed checklist (B-50) and su~a~ ii;!,.~~ filrusfile included with the building permit application. The Carlsbad Municipal Code (CMC) can be referenl:letl1'db'ring completion of this document by clicking on the provided links to each municipal code section. NOTE: The following type of permits are not required to fill out this form ❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool c'"'"'"''" ••• a ~,,.,, ,,,., c'"'""'m ;, eo=ra9"' m """ '" '"'"' ,,, '"" d=m,m. lit certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar wi rgy compliance, IECC/HERS Compliance Specialist, ICC GB Energy Code Specialist, RESNET HERS rater certifie c ed ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC en Inspector/Plans Examiner, or Green Building Residential Plan Examiner. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by o~e, check N/A and provide an explanation or code section describing the exception. I- Details on CAP ordinance requirements are available at each section by clicking on the municipal code link pro..,..The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energyoand Green Code sections . Project Name/Building Permit No.: Property Address/APN: Applicant Name/Co.: Applicant Address: IDA WEALTH MANAGEMENT BP No.: CBC2022-0429 2792 GATEWAYY RD. CARLSBAD, CA 92009 / 213-300-10-00 JENNIFER DEAK 925 FORT STOCKTON DRIVE SAN DIEGO, CA 92103 Contact Phone: 619-297-6153 Contact Email: JENNIFER@SAFDIERABINES.COM Contact information of person completing this checklist (if different than above): Name: JENNIFER DEAK Contact Phone: 619-297-6153 Company name/address: SAFDIE RABINES INTERIORS Contact Email: JENNIFER@SAFDIERABINES.COM Applicant Signature: :f:wvni/m' ;J)eal Date: 01/03/2022 B-50 Page 1 of 7 Revised 04/21 Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet. Building Permit Valuation (BPV) $ breakdown $473,109.12 D Residential □ New construction D Additions and alterations: □ BPV < $60,000 □ BPV 2: $60,000 □ Electrical service panel upgrade only □ BPV 2: $200,000 Iii Nonresidential D New construction I!! Alterations: □ BPV 2: $200,000 or additions 2: 1,000 square feet □ BPV 2: $1,000,000 □ 2: 2,000 sq. ft. new roof addition 1. Energy Efficiency A high-rise residential building is 4 or more stories, including a Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor area is residential use 2A*, 3A*, 1B, 2B, 'Includes detached, newly constructed ADU 4A*, 3B,4A N/A N/A All residential additions and alterations 1A,4A 4A 1-2 family dwellings and townhouses with attached garages only. 'Multi-family dwellings only where interior finishes are removed 1A, 4A' 1B, 4A' and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed 18, 2B, 3B, 4B and 5 1B, 5 1B,2B,5 Building alterations of 2: 75% existing gross floor area 2B,5 1 B also applies if BPV 2: $200,000 Please refer to Carlsbad Municipal Code (CMC) 18.21.155 and 18.30.190,and the California Green Building Standards Code (CAL Green) for more information. Appropriate details and notes must be placed on the plans according to selections chosen in the design. A D Residentialadditionoralteration.!:$60,000buildingpenmitvaluation. □ N/A __________ _ Details of selection chosen below must be placed on the plans referencing CMC □ Exception: Home energy score 2: 7 18.30.190. (attach certification) Year Built Single-family Requirements Multi-family Requirements □ Before 1978 Select one option: □ Ductsealing □ Attic insulation □Cool roof □ Attic insulation □ 1978 and later Select one option: □ Lighting package □ Water heating Package □ Between1978and1991 Select one option: □ Ductsealing □ Attic insulation □Cool roof □ 1992 and later Select one option: □ Lighting package □ Water heating package Updated 4/16/2021 3 B. Iii Nonresidential' new construction or alterations ~ $200,000 building permit valuation, or additions~ 1,000 square feet. See CMC 18.21.155and CALGreen Appendix AS □ N/A A5.203.1.1 Choose one:□ .1 Outdoor lighting □ .2 Restaurant service water heating (CEC 140.5) □ .3Warehousedocksealdoors. □ .4DaylightdesignPAFs □ .5Exhaustairheatrecovery □ N/A A5.203.1.2.1 Choose one:□ .95 Energy budget (Projects with indoor lighting OR mechanical) □ .90 Energybudget (ProjectswithindoorlightingANDmechanical) □ N/A A5.211.1" □ On-site renewable energy: □ N/A A5.211.3" □Green power. (If offered by local utility provider, 50% minimum renewable sources) □ N/A AS.212.1 □ Elevators and escalators: (Project with more than one elevatorortwo escalators) □ N/A AS.213.1 !!I Steel framing: (Provide details on plans for options 1-4 chosen) □ N/A • Includes hotels/motels and high-rise residential buildings ---------- "Foralterations2:$1,000,000 BPV and affecting> 75%existinggrossfloorarea, ORalterationsthatadd 2,000squarefeetof new roof addition: comply with CMG 18.30.130 (section 28 below) instead. 2. Photovoltaic Systems A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to CAP section 3B below (low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected. Floor Plan ID (use additional CFA #d.u. Calculated kWdc' sheets if necessary) Total System Size: kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.) 'Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type If proposed system size is less than calculated size, please explain. kWdc Exception □ □ □ □ B. Ii] Nonresidential new construction or alterations ~$1,000,000 BPV AND affecting ~75% existing floor area, OR addition that Increases roofarea by ~.ooo square feet Please refer to CMC 18.30.130 when completing this section. 'Note: This section also applies to high-rise residential and hotel/motel buildings. Choose one of the following methods: II Gross Floor Area (GFA)Method GFA: 8,208 SF I!! If< 1 O,OOOs.f. Enter: 5 kWdc Min.SystemSize: 5 kWdc D 112: 10,000s.f. calculate: 15 kWdcx (GFN10,000)" "Round building size factor to nearest tenth, and round system size to nearest whole number. Updated 4/16/2021 4 □ Time-Dependent Valuation Method AnnualTDVEnergyuse:***-----~x .80= Min. system size: ______ kWdc *** Attach calculation documentation using modeling software approved by the California Energy Commission. 3. Water Heating A. D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section. Provide complete details on the plans. □ For systems serving individual dwelling units choose one system: □ Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise residential only) □ Heat pump water heater AND PV system .3 kWdc larger than required in CMG 18.30.130 (high rise residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential) □ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher □ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors □ Exception: □ For systems serving multiple dwelling units, install a central water-heating system with ALL of the following: □ Gas or propane water heating system □ Recirculation system per CMG 18.30.150(8) (high-rise residential, hotel/motel) or CMG 18.30.170(8) (low- rise residential) □ Solar water heating system that is either: □ .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recovery □ Exception: B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide complete details on the plans. □ Water heating system derives at least 40% of its energy from one of the following (attach documentation): □ Solar-thermal □ Photovoltaics □ Recovered energy □ Water heating system is (choose one): □ Heat pump water heater □ Electric resistance water heater(s) □Solar water heating system with .40 solar savings fraction □ Exception: It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as specified by the ordinances. Updated 4/16/21 5 4. Electric Vehlcle Charging A D Residential New construction and major alterations* Please refer to CMC 18.21.140 when completing this section. □ One and two-family residential dwelling or townhouse with attached garage: □ One EVSE Ready parking space required □ Exception : □ Multi-family residential· □ Exception · Total Parking Spaces EVSE Spaces Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready" other "Capable" Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearestwhole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable" 'Major alterations are: ( 1) for one and two-familydwellingsand townhouses with attached garages, alterations have a building permit valuation;;:$60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation;;, $200,000, interiorfinishesare removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed. 'ADU exceptions for EV Ready space (no EV ready space required when): (1) The accessory dwelling unit is located within one-half mile of public transit. (2) The accessory dwelling unit is located within an architecturally and historically significant historic district. (3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure. (4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit. (5) When there is a car share vehicle localed within one block of the accessory dwelling unit. B. D Nonresidential new construction (includes hotels/motels) □ Exception : _____________ _ Please refer to CMC 18.21.150 when completing this section Total Parking Spaces Proposed EVSE (10% of total) I Installed (50% of EVSE) I other "Ready" I Other "Capable" I I I Calculation: Refer to the table below: Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces □ 0-9 1 1 □ 10-25 2 1 □ 26-50 4 2 □ 51-75 6 3 □ 76-100 9 5 □ 101-150 12 6 □ 151-200 17 9 □ 201 andover 10 percent of total 50 percent of Required EV Spaces Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable" Updated 4/16/2021 6 5. Iii Transportation Demand Management (TDM): Nonresidential ONLY An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT. City staff will use the table below based on your submitted plans to determinewhetherornoryourpermit requires a TDM plan. lfTDM is applicable to your permit, staff will contact the applicant to develop a site-specific TDM plan based on the pem,it details. Acknowledgment: Employee ADT Estimation for Various Commercial Uses ■ EmpADTfor first 1,000 s.f. EmpADTI Use 1000 s.f.1 Office (all)2 13 Restaurant 11 Retails 8 Industrial 4 Manufacturing 4 Warehousing 4 1 Unless otherwise noted, rates estimated from /TE Trip Generation Manual, 10thEdition 13 11 4.5 3.5 3 1 2 For all office uses, use SANDAG rate of 20 ADTl1,000 sf to calculate employee ADT , Retail uses include shopping center, variety store, supermarket, gyms, pharmacy, etc. Other commercial uses may be subject to special consideration Samele calculations· Office: 20,450 sf 1. 20,450 sf 11000 x 20 = 409 Employee ADT Retail: 9,334 sf 1. First 1,000 sf= 8 ADT 2. 9,334 sf -1,000 sf= 8,334 sf 3. (8,334 sf 11,000 x 4.5) + 8 = 46 Employee ADT OCCUPANT AREA: 8,208 SF FIRST 1000 SF= 13 7,208 I 1000 =7.208 X 13 = 93.704 (94 EMPLOYEES) 94 + 13 = 107 TRIPS I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should my pem,itrequire a TDM plan and understand that an approved TDM plan is a condition of pem,itissuance. ApplicantSignature: :f<vwrvfff" ;}.Jcalv Date: Ol/03J2022 Person other than Applicant to be contacted for TDM compliance (if applicable): Name(Printed): __________________ _ Phone Number: ____ _ Email Address: __________________ _ Updated 4/16/2021 7 ( City of Carlsbad CLIMATE ACTION PLAN (CAP) COMPLIANCE CAP Building Plan Template B-55 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www.carlsbadca.gov The following summarizes project compliance with the applicable Climate Action Plan ordinances of the Carlsbad Municipal Code and California Green Building Standards Code (CALGreen), current version. Use this form to summarize all applicable CAP measures for your 11i1ii1i1ii IF CAP MEASURES ARE APPLICABLE, IMPRINT THIS COMPLETED FORM ONTO PROJECT PLANS, 1, ENERGY EFFICIENCY APPLICABLE: 0YES □ NO Complies with CMC 18.30.190 & 18.21.155 OYes ON/A Existing Structure, year built: -'-""-' ___ _ Prepared Energy Audit? Oves D No Energy Score: _____ _ Efficiency Measures included in scope: STEEL FRAMING 2. PHOTOVOLTAIC SYSTEM APPLICABLE: OYES 0 NO Complies with CMC section 18.30.130 and 2019 California Energy Code section 150,l(c)14 OYes ON/A Required Provided Size of PV system (kWdc): Sizing PV by load calculations 0Yes 0No If by Load Calculations: Total calculated electrical load: 80% of load: Hardship Requested Hardship Approved Oves ~ □Yes □No 3. ALTERNATIVE WATER HEATING SYSTEM APPLICABLE: □ YES 0 NO 4. Complies with CMC sections 18.30.150 and 18.30.170? Alternative Source: o Electric o Passive Solar Hardship Requested Hardship Approved Oves ON/A Oves 0No □Yes □ No ELECTRIC VEHICLE (EV) CHARGING APPLICABLE: DVEs [2]No Complies with CMC section 18.21.140? Panel Upgrade? Total EV Parking Spaces: No. of EV Capable Spaces: No. of EV Ready Spaces: Oves ON/A Oves ONo Required Provided No. of EV Installed Spaces: Hardship Requested Oves QNo Hardship Approved [JVes ONo 5. TRAFFIC DEMAND MANAGEMENT APPLICABLE: □ YES 0 NO Compliant? Oves ONo TOM Report on file with city? D Yes □No