HomeMy WebLinkAbout2359 TERRAZA GUITARA; ; CB901121; Permit~j/1~)'90 11: 47
Page 1 of 1
B U I L D I N G
Job Address: 2359 TERRAZA GUITARA
Permit Type: SINGLE FAMILY DWELLING
Parcel No: 215-582-05-00
Valuation: 143,262
P E R
Str:
Permit
Project
Development
Fl : Ste:
No: CB901121
No: A9001227
No: DEV89063
Construction Type: VN
Occupancy Group: R3/M1
Description: PLAN 1 PC 90-290
Class Code:
1875 SF 459
CT 84-41 Status:
Applied :
ISSUED
07/06/90
08/15/90
DC
: SF GARAGE PHASE T 1
Lor ,sy,
CONTRACTOR FIELDSTONE
OWNER
5465 MOREHOUSE DR #250
SAN DIEGO, CA 92121
FIELDSTONE CORPORATION
*** Fees Required ***
Fees:
Adjustments:
Total Fees:
Fee description
Building Permit
Plan Check
Strong Motion Fee
10,687.00
,00
10 ,687.00
Enter 'Y' to Autocalc P.F.F.
F.M.F./G.M.F. and Zone(99)
***
Enter 'Y' to Autocalc Lacosta TIF
Enter 'Y' to Autocaic Bridge Fee
or manually enter M.F.F.
Enter Park-in-Lieu Dist#(9) twice
* BUILDING TOTAL
Enter "Y" for Plumbing Issue Fee >
Each Plumbing Fixture or >
Each Building Sewer >
Each Water Heater and/or >
Gas Piping System >
Apr/Issue :
Validated By:
Lie. C 402826 619-546-8081
Lie . OWNER
Fees Collected & Credits ***
Total Credits:
Total Payments:
Balance Due:
1713.00
4 .00
Fee/Unit
.00
250.00
10,437.00
Ext fee Data
794.00
516.00
10.00
5014.00 Y
310,00 06
670.00 Y
530.00 Y
1713.00
983,00
10540.00
7.50 Y
Each Vacuum Breaker ) __ _
2 .50
6 ,50
2.50
2.50
2.50
37,50
6.50
2.50
2.50
5.00
* PLUMBING TOTAL
Enter "Y" for Electric Issue Fee >
Single Phase Per AMP >
* ELECTRICAL TOTAL ($10 Minimum)
Enter 'Y' for Mechanical Issue Fee>
Install Furn/Ducts >
Each Install/Reloc Appliance Vent>
Each Hood/Fireplace >
* MECHANICAL TOTAL
1 00 .00
1.00
4.00
2 .00
.25
9.00
4.50
6.50
62 .00
5 .00 Y
25.00
30.00
15.00 Y
9.00
18.00
13.00
55.00
7437 08/15/90 01 01 ,,
PERMIT# CB901121
DESCRIPTION: PLAN 1 PC
SF GARAGE
TYPE: SFD
CITY OF CARLSBAD
INSPECTION REQUEST
FOR 10/02/91
90-290 1875 SF 459
PHASE 5 LOT 154
STR:
PHONE: 5468081
INSPECTOR AREA MP
PLANCK# CB901121
OCC GRP
CONSTR. TYPE NEW
FL: STE: JOB ADDRESS: 2359 TERRAZA GUITARA
APPLICANT: FIELDSTONE COMPANY
CONTRACTOR: FIELDSTONE
OWNER: FIELDSTONE CORPORATION
REMARKS: MH/RUDY/529-9964
PHONE: 619-546-108~ _,
PHONE: t........___--
INSPECTOR Ii'\, 'v ... ,---+-----------SPECIAL INSTRUCT:
TOTAL TIME:
CD LVL DESCRIPTION
19 ST Final Structural
29 PL Final Plumbing
39 EL Final Electrical
49 ME Final Mechanical
DATE DESCRIPTION
*****
072591 Interior Lath/Drywall
072591 Exterior Lath/Drywall
071591 Shear Panels/HD's
071591 Rough Combo
071591 Gas/Test/Repairs
070991 Shear Panels/HD's
070991 Rough/Topout
ACT COMMENTS
INSPECTION HISTORY *****
ACT INSP COMMENTS
AP MP
AP MP
AP MP
AP MP
AP MP
AP PY
AP PY
070991 Frame/Steel/Bolting/Welding AP PY
070991 Rough/Ducts/Dampers AP PY
070991 Rough Electric NR PY
070591 Rough/Topout NR MP
061891 Roof/Reroof AP MP
121890 Ftg/Foundation/Piers AP MP
121190 Underground/Under Floor AP MP
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING
PLAN CHECK#: CB901121
PERMIT#: CB901121
FIRE PLANNING
PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459
SF GARAGE PHASE 5 LOT 154
ADDRESS: 2359 TERRAZA GUITARA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
DATE
U/M 9
DATE: 09/10/91
PERMIT TYPE: SFD
INSPECTED
BY: INSPECTED: (}-Z~-9/
7==================
APPROVED DISAPPROVED
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED:
DATE
INSPECTED:
----
APPROVED DISAPPROVED
APPROVED DISAPPROVED
=============================================-=-=============================
COMMENTS:
DEPT: BUILDING
FINALL~LD)G INSPECTION
ENGINEERING ~PLANNING U/M
PLAN CHECK#: CB901121
PERMIT#: CB901121
PROJECT NAME: PLAN 1 PC
SF GARAGE
90-290 1875 SF 459
PHASE 5 LOT 154
ADDRESS: 2359 TERRAZA GUITARA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
RECEIVFn SEP 1 6 1991
WATER
DATE: 09/10/91
PERMIT TYPE: SFD
===--------------------------------------=--============-------------========
INSPECTED ~
BY: ex~
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED: 2(-7,6'( APPROVED /:-
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
=============================================================================
COMMENTS:
FINAL BUILDI ,?~PEC't'ION
DEPT: BUILDING ENGINEERING
PLAN CHECK#: CB901121
PERMIT#: CB901121
FIRE PLANN
PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459
SF GARAGE PHASE 5 LOT 154
ADDRESS: 2359 TERRAZA GUITARA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
PR.
DATE
INSPECTED:
DATE
INSPECTED:
U/M
APPROVED
APPROVED
WATER
DATE: 09/10/91
PERMIT TYPE: SFD
DISAPPROVED
DISAPPROVED
====================-------------============-----===========================
COMMENTS:
--J:'' NAL BUILDING INSPECTION
DEPT: BUILDING GINEERING
PLAN CHECK#: CB901rz-:i--
PERMIT#: CB901121
FIRE PLANNING
PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459
SF GARAGE PHASE 5 LOT 154
ADDRESS: 2359 TERRAZA GUITARA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
U/M WATER
DATE: 09/10/91
PERMIT TYPE: SFD
============================----=========----==========---===================
INSPECTED ~,J~
BY: 6 r,;?.
INSPECTED
BY:
INSPECTED
BY:
COMMENTS:
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
?-~·9/ APPROVED ~ DISAPPROVED
APPROVED DISAPPROVED
APPROVED DISAPPROVED