Loading...
HomeMy WebLinkAbout2335 TERRAZA GUITARA; ; CB901155; Permit" B U I L D I N G 08/15/90 11:49 ' Page 1 of 1 Job Address: 2335 TERRAZA GUITARA Permit Type: SINGLE FAMILY DWELLING Parcel No: 215-582-11-00 Valuation: 174,996 PERMIT Permit No: CB901155 Project No: A9001261 Development No: DEV89063 Str: Fl: Ste: Construction Type: VN Occupancy Group: R3/M1 Description: PLAN 3 PC Class Code: CT 84-41 90-290 2325 SF 422 Status: Applied: -fr;p~':.!:~- 07/06/90 07/06/90 DC : SF GARAGE PHASE CONTRACTOR LOT l<PO FIELDSTONE OWNER 5465 MOREHOUSE DR #250 SAN DIEGO, CA 92121 FIELDSTONE CORPORATION Fees Required *** Fees: Adjustments: Total Fees: Fee description Building Permit Plan Check Strong Motion Fee 11,978.00 .00 11,978.00 Enter 'Y' to Autocalc P.F.F. F.M.F./G.M.F. and Zone(99) Enter 'Y' to Autocalc Lacosta TIF Enter 'Y' to Autocalc Bridge Fee or manually enter M.F.F. Enter Park-in-Lieu Dist#(9) twice * BUILDING TOTAL ** Enter "Y" for Plumbing Issue Fee > Each Plumbing Fixture or Trap > Each Building Sewer > Each Water Heater and/or Vent > Gas Piping System > Each Vacuum Breaker > * PLUMBING TOTAL Enter "Y" for Electric Issue Fee > Single Phase Per AMP > * ELECTRICAL TOTAL ($10 Minimum) Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts > Each Install/Reloc Appliance Vent> Each Hood/Fireplace > * MECHANICAL TOTAL Apr/Issue: Validated By: Lie. C 402826 619-546-808 1 Lie. OWNER Fees Collected & Credits *** Total Credits: Total Payments: Balance Due : Units Fee/Unit 310,00 1713.00 4.00 15.00 2.50 1.00 6.50 1.00 2 .50 1.00 2.50 2.00 2.50 100.00 .25 1.00 9.00 4.00 4.50 2.00 6.50 .00 250.00 11,728.00 Ext fee Data 902.00 586.00 12.00 6125.00 310.00 670.00 530.00 1713.00 983.00 11831.00 7.50 37.50 6.50 2.50 2.50 5.00 62.00 5.00 25,00 30.00 15.00 9.00 18.00 13.00 55.00 y 06 y y y y y 7437 0 /1 /90 CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad CA 92009 (61 ____ ..L____ PERMIT# CB901155 DESCRIPTION: PIAN 3 PC SF GARAGE TYPE: SFD CITY OF CARLSBAD INSPECTION REQUEST FOR 09/26/91 90-290 2325 SF 422 PHASE 5 LOT 160 JOB ADDRESS: 2335 TERRAZA GUITARA APPLICANT: FIELDSTONE COMPANY CONTRACTOR: FIELDSTONE PHONE: PHONE: OWNER: FIELDSTONE CORPORATION PHONE: STR: 5468081 INSPECTOR AREA MP PLANCK# CB901155 OCC GRP CONSTR. TYPE NEW FL: STE: REMARKS: MH/RUDY/529-9964 PAGER SPECIAL INSTRUCT: 619-546-~sr / INSPECTOR +~--·~l'--~--------- TOTAL TIME: co LVL DESCRIPTION COMMENTS 19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical ------------------- -------------------------------------- ***** INSPECTION HISTORY ***** DATE DESCRIPTION ACT INSP COMMENTS 072291 Interior Lath/Drywall AP MP 072291 Exterior Lath/Drywall AP MP 070991 Rough Combo AP PY 070991 Shear Panels/HD's AP PY 062491 Shear Panels/HD's NR MP 062491 Rough/Topout AP MP 062491 Gas/Test/Repairs AP MP 062091 Shear Panels/HD's NR MP 121890 Ftg/Foundation/Piers AP MP 121290 Underground/Under Floor AP MP FIN,/WT~\NG INSPECTION DEPT: BUILDING ENGINEERING l_~ PLANNING U/M PLAN CHECK#: CB901155 PERMIT#: CB901155 PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422 SF GARAGE PHASE 5 LOT 160 ADDRESS: 2335 TERRAZA GUITARA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA L ''• -·- WATER DATE: 09/16/91 PERMIT TYPE: SFD =======-=====----=====--==----==----===---===---===--=========~============== INSPECTEDC 'Bu,Q<..L-- DATE t/cY-,/~l INSPECTED: APPROVED-~ DISAPPROVED BY: INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED ==~==========---==========---=====--===---=====-===--~===:=================== COMMENTS: FINAL BUILDING INSPECTION -~/;::<_-~~-~ DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATtR PLAN CHECK#: CB901155 TE: 09/16/91 PERMIT#: CB901155 PERMIT TYPE: SFD PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422 SF GARAGE PHASE 5 LOT 160 \/ADDRESS: 2335 TERRAZA GUITARA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA INSPECTED ~' DATE BY: INSPECTED: 9-2. 3-9 { ' INSPECTED DATE BY: INSPECTED: INSPECTED DATE BY: INSPECTED: APPROVED / DISAPPROVED APPROVED DISAPPROVED APPROVED DISAPPROVED ======================-=~~=====-=====--==~===--------====--~==--====--======= COMMENTS: DEPT: BUILDING ENGINEERING PLAN CHECK#: CB901155 PERMIT#: CB901155 PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422 SF GARAGE PHASE 5 LOT 160 ADDRESS: 2335 TERRAZA GUITARA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA ~N 1/M WATER DATE: 09/16/91 PERMIT TYPE: SFD -=========================-===---==---===---=---------==---===------========= INSPECTED BY: INSPECTED BY: INSPECTED BY: DATE a /11. la, // INSPECTED: ~ APPROVED ✓ DATE INSPECTED: DATE INSPECTED: APPROVED APPROVED DISAPPROVED DISAPPROVED DISAPPROVED ==================~===========--===---=====-=----===--==----==-=---========== COMMENTS: ~~~~L BUILDING INSPECTION DEPT: BUILDING ~~b-) FIRE PLANNING U/M PLAN CHECK#: CB901155 PERMIT#: CB901155 PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422 SF GARAGE PHASE 5 LOT 160 ADDRESS: 2335 TERRAZA GUITARA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA INSPECTED .;;? DATE BY: t;:::>/tc INSPECTED: • INSPECTED DATE BY: INSPECTED: INSPECTED DATE BY: INSPECTED: 9 ... /(·9/ APPROVED APPROVED APPROVED WATER DATE: 09/16/91 PERMIT TYPE: SFD X DISAPPROVED DISAPPROVED DISAPPROVED ============================-==-=-=---===--------=-========================== COMMENTS: POST-TENSIONING AND EWNGA.TION CHARI' JOB NAME Algg Hills Phase V SCS&T 8912271 ADDRESS 2335 Terraza Gultara DATE 01-11-91 IJ:Jr NUMBER 160 GAU'.;E # C-950 BUIIDING PERMIT CB901155 CALIBRATION DATE 10-15-90 PIAN FILE 3A Sl'RAND GAUiE EWNGATION. inches NUMBm RFADIOO INITIAL DESIGN 'IUI'AL Nal'ES 1 5262 1-5/8 1-5/8 2 5262 2-3/8 2-3/8 3 5262 2-3/8 2-1/2 4 5262 2-3/4 2-3/4 5 5262 2-3/4 2-5/8 6 5262 2-3/4 2-5/8 7 5262 2-3/4 2-3/4 8 5262 2-3/4 2-5/8 9 5262 2-3/4 2-3/4 10 5262 2-7/8 2-3/4 11 5262 2-3/4 2-3/4 12 5262 4 4 Lift Off 5100 13 5262 4 4-1/8 14 5262 4 4 15 5262 4 4 16 5262 1-1/2 1-1/2 17 5262 4-1/8 4-1/8 18 5262 3-1/2 3-1/2 19 5262 3-1/2 3-1/2 20 5262 3-1/8 3-1/4 BOUTHl!RN CALIFORNIA BOIL ANO TESTING, INC. 6280 RIVERDALE STREET, P.O. BOX 20827, SAN DIEGO, CALIFORNIA 92120 (61 9] 280-432 1 678 ENTERPRISE STREET, ESCON□IOO, CALIFORNIA B2025 (S 19) 746-4544 REJ:J:ORT CF COMPRESSION TESTS FILE NUMBER 8912271 DATE January 2, 1991 ASTM (C39) {2$CONCRETE 0 MORT,....R J □s Alga Hills A □oREss 2335 Terraza Gultara -Lot 160 OvVNER ARCHITECT Robert Bowlus Associates E"JGINEER JEM I I I c □NTRAcT□R Fieldstone '-□CAT1QN tN STRUCTURE CEM!-'N T S. W. corner of slab-on-grade I I t'>.OMIX T;_,RE ROC~'. Mr>< r,_,CJ DA PROPORTIONS Tl'\,1E IN ~.71XER MINUTES Sc_L,MP_ ,~"CHES I FABRIC,<'>. TE' D BY Lfil te ~ : DJ ~~ORATORY NO I MA<=IK #3 Sorrento Sorrento S500016/5 sack 50 4-1/4 MS TRUCK NO 114 7886 7887 7888 0 Gl"IOUT 0 GUNITE D Permit #CB901155 TICKET NO 140791 r-~-----+-----+-~-+----~--+--r-~ 1 □A-:-E ,.11A □E 12-26-90 Discarded CATE ,:O!"CE 1VE O 12-27-90 CATE 'ESTEO r-,._,,A X(MUt-,.,1 LOAD. LBS ::= M PRE SS1VE STR. PSI AGE TESTED. DAYS RE'□ 8 PSI AT 28 DAYS _."_r \/'✓T_iCU FT (PLASTIC) 1-02-91 6.00 28.27 66,000 2,330 7 2,500 o,sTF<,auT 1 □N (3) Ben F. Smith, Inc. ( 1) J EM II I (1) City of Carlsbad (1) Sorrento Ready Mix 1-23-91 90,750 3,210 28 SOUTHERN CALIFORNIA SOIL ANO TESTING, INC. REVIE VVEO BY Michael B. Wheeler, R.C.E. #45358 GEOCON iltmnATION OBSERVATION REPORT ···"'f ·;, JOB NAME: d:.4-i' IL·L(2' FILE N0.: ...... );.....0t._,:.···...::..· _ • ..,_,' ·...:....· "...;;.../ I I DATE: ;·;;_, i J-1 /~~, PERMIT NO.: PLAN FILE NO.: ePU:RPOSE OF OBSERVATION: ro Verify soil conditions exposed are similar to those anticipated. &I Footing excavations extend to proper depth and bearing strata. □ · Verify foundation reinforcement complies with minimum recommended in soil report. Q Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report. □ Other: ______________________________ _ e SOIL REPORT RECOMMENDATIONS BASED ON: G:l_ Expansion Condition; JXI VERY LOW ~ LOW □ MEDlUM □ HIGH ~ Fill Geometry /i\~),4 k.:Z,,/ .td -;, -6 ~-12 ~ ,:'.'.'f. □ Other: · 0 VERY HIGH e MINIMUM FOUNDATION RECOMMENDATION: Footing Depth: [:ij12 INCHES O 18 INCHES O 24 INCHES OTIIER: _________ __,._ Footing Reinforcement: 0 NO. 4 T&B O 2-N0.4 T&B O N05 T&B OTiiER: fi:·?:/ U.A'=it .. u•"'f. Interior Slab Reinforcement: 0 &c6-10/10 □ 6:x.6.fl/6 □ NO. 3 @24 INCHES O NO. 3@ 18 INCHES Slab Bedding Material and Thickness: s~ /, '-I I) Vapor Barrier: L <:Sr""'--C , e FOUNDATION PLAN REVIEWED: YES □ If yes, identify and describe: e OBSERV ~ ~ D n:\ W!)job\dra1Lin1\fdnobrpLlOO , rmance with Soil Report (see "Purpose of Observation"). · nformance with Foundation Plans. :•1•G1C1D CGICIITI ,' PIii• STII-D CCIICIIITI .· •••CIICID .. ...., □ STJIUCT.STUL ..... ., C&u1•L.•-•-•CAT1• C •1Nf'CIIICIO •---□ ,1u IMIIVINe Oonca o••c••·· .... T•L. ...... lall■N ...... ·••o• ... -■ •.. ••1.~•DD .• TC.I INIP'N, DATI '2-,.., j ½._ 27(),<)I LOCATIONS 01' WOtllC INs,rcTID, UST HM'LU TAUN, WOttlC •urCTED, Joa ,.oaLIIIIS. 'IIOCHIIII ........ ,. ETC. INCL."'Da.■ INl'O ... ATION ••o"'T -·-"''""' 01' ... Tc .. , ..... •1.AC&D o• -·· ··--·•-•-. NUM■••· T••··. , •• NT. NO'S. ... T•tT ........ c, TAot&NI IT•"'CT. CONNaCTION■ , ........... & .... T. ■DI.Tl TO•t111•DI c .. ac••ot aTc,-:.:.:: ,, , ,,, I f.o I , ,, z L. C,;<J -~"'--.·i·'.:~-·'.··_._-~;.-, . --~~ •~.r ..•• ;_.