HomeMy WebLinkAbout2335 TERRAZA GUITARA; ; CB901155; Permit" B U I L D I N G
08/15/90 11:49
' Page 1 of 1
Job Address: 2335 TERRAZA GUITARA
Permit Type: SINGLE FAMILY DWELLING
Parcel No: 215-582-11-00
Valuation: 174,996
PERMIT Permit No: CB901155
Project No: A9001261
Development No: DEV89063
Str: Fl: Ste:
Construction Type: VN
Occupancy Group: R3/M1
Description: PLAN 3 PC
Class Code: CT 84-41
90-290 2325 SF 422
Status:
Applied:
-fr;p~':.!:~-
07/06/90
07/06/90
DC
: SF GARAGE PHASE
CONTRACTOR
LOT l<PO
FIELDSTONE
OWNER
5465 MOREHOUSE DR #250
SAN DIEGO, CA 92121
FIELDSTONE CORPORATION
Fees Required ***
Fees:
Adjustments:
Total Fees:
Fee description
Building Permit
Plan Check
Strong Motion Fee
11,978.00
.00
11,978.00
Enter 'Y' to Autocalc P.F.F.
F.M.F./G.M.F. and Zone(99)
Enter 'Y' to Autocalc Lacosta TIF
Enter 'Y' to Autocalc Bridge Fee
or manually enter M.F.F.
Enter Park-in-Lieu Dist#(9) twice
* BUILDING TOTAL
**
Enter "Y" for Plumbing Issue Fee >
Each Plumbing Fixture or Trap >
Each Building Sewer >
Each Water Heater and/or Vent >
Gas Piping System >
Each Vacuum Breaker >
* PLUMBING TOTAL
Enter "Y" for Electric Issue Fee >
Single Phase Per AMP >
* ELECTRICAL TOTAL ($10 Minimum)
Enter 'Y' for Mechanical Issue Fee>
Install Furn/Ducts >
Each Install/Reloc Appliance Vent>
Each Hood/Fireplace >
* MECHANICAL TOTAL
Apr/Issue:
Validated By:
Lie. C 402826 619-546-808 1
Lie. OWNER
Fees Collected & Credits ***
Total Credits:
Total Payments:
Balance Due :
Units Fee/Unit
310,00
1713.00
4.00
15.00 2.50
1.00 6.50
1.00 2 .50
1.00 2.50
2.00 2.50
100.00 .25
1.00 9.00
4.00 4.50
2.00 6.50
.00
250.00
11,728.00
Ext fee Data
902.00
586.00
12.00
6125.00
310.00
670.00
530.00
1713.00
983.00
11831.00
7.50
37.50
6.50
2.50
2.50
5.00
62.00
5.00
25,00
30.00
15.00
9.00
18.00
13.00
55.00
y
06
y
y
y
y
y
7437 0 /1 /90
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad CA 92009 (61
____ ..L____
PERMIT# CB901155
DESCRIPTION: PIAN 3 PC
SF GARAGE
TYPE: SFD
CITY OF CARLSBAD
INSPECTION REQUEST
FOR 09/26/91
90-290 2325 SF 422
PHASE 5 LOT 160
JOB ADDRESS: 2335 TERRAZA GUITARA
APPLICANT: FIELDSTONE COMPANY
CONTRACTOR: FIELDSTONE
PHONE:
PHONE:
OWNER: FIELDSTONE CORPORATION PHONE:
STR:
5468081
INSPECTOR AREA MP
PLANCK# CB901155
OCC GRP
CONSTR. TYPE NEW
FL: STE:
REMARKS: MH/RUDY/529-9964 PAGER
SPECIAL INSTRUCT:
619-546-~sr /
INSPECTOR +~--·~l'--~---------
TOTAL TIME:
co LVL DESCRIPTION COMMENTS
19 ST Final Structural
29 PL Final Plumbing
39 EL Final Electrical
49 ME Final Mechanical
-------------------
--------------------------------------
***** INSPECTION HISTORY *****
DATE DESCRIPTION ACT INSP COMMENTS
072291 Interior Lath/Drywall AP MP
072291 Exterior Lath/Drywall AP MP
070991 Rough Combo AP PY
070991 Shear Panels/HD's AP PY
062491 Shear Panels/HD's NR MP
062491 Rough/Topout AP MP
062491 Gas/Test/Repairs AP MP
062091 Shear Panels/HD's NR MP
121890 Ftg/Foundation/Piers AP MP
121290 Underground/Under Floor AP MP
FIN,/WT~\NG INSPECTION
DEPT: BUILDING ENGINEERING l_~ PLANNING U/M
PLAN CHECK#: CB901155
PERMIT#: CB901155
PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 160
ADDRESS: 2335 TERRAZA GUITARA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
L ''• -·-
WATER
DATE: 09/16/91
PERMIT TYPE: SFD
=======-=====----=====--==----==----===---===---===--=========~==============
INSPECTEDC 'Bu,Q<..L--
DATE t/cY-,/~l INSPECTED: APPROVED-~ DISAPPROVED BY:
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
==~==========---==========---=====--===---=====-===--~===:===================
COMMENTS:
FINAL BUILDING INSPECTION -~/;::<_-~~-~
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATtR
PLAN CHECK#: CB901155 TE: 09/16/91
PERMIT#: CB901155 PERMIT TYPE: SFD
PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 160
\/ADDRESS: 2335 TERRAZA GUITARA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
INSPECTED
~'
DATE
BY: INSPECTED: 9-2. 3-9 {
'
INSPECTED DATE
BY: INSPECTED:
INSPECTED DATE
BY: INSPECTED:
APPROVED / DISAPPROVED
APPROVED DISAPPROVED
APPROVED DISAPPROVED
======================-=~~=====-=====--==~===--------====--~==--====--=======
COMMENTS:
DEPT: BUILDING ENGINEERING
PLAN CHECK#: CB901155
PERMIT#: CB901155
PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 160
ADDRESS: 2335 TERRAZA GUITARA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
~N
1/M WATER
DATE: 09/16/91
PERMIT TYPE: SFD
-=========================-===---==---===---=---------==---===------=========
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
DATE a /11. la, // INSPECTED: ~ APPROVED ✓
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
==================~===========--===---=====-=----===--==----==-=---==========
COMMENTS:
~~~~L BUILDING INSPECTION
DEPT: BUILDING ~~b-) FIRE PLANNING U/M
PLAN CHECK#: CB901155
PERMIT#: CB901155
PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 160
ADDRESS: 2335 TERRAZA GUITARA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
INSPECTED .;;? DATE
BY: t;:::>/tc INSPECTED: •
INSPECTED DATE
BY: INSPECTED:
INSPECTED DATE
BY: INSPECTED:
9 ... /(·9/ APPROVED
APPROVED
APPROVED
WATER
DATE: 09/16/91
PERMIT TYPE: SFD
X DISAPPROVED
DISAPPROVED
DISAPPROVED
============================-==-=-=---===--------=-==========================
COMMENTS:
POST-TENSIONING AND EWNGA.TION CHARI'
JOB NAME Algg Hills Phase V SCS&T 8912271
ADDRESS 2335 Terraza Gultara DATE 01-11-91
IJ:Jr NUMBER 160 GAU'.;E # C-950
BUIIDING PERMIT CB901155 CALIBRATION DATE 10-15-90
PIAN FILE 3A
Sl'RAND GAUiE EWNGATION. inches
NUMBm RFADIOO INITIAL DESIGN 'IUI'AL Nal'ES
1 5262 1-5/8 1-5/8
2 5262 2-3/8 2-3/8
3 5262 2-3/8 2-1/2
4 5262 2-3/4 2-3/4
5 5262 2-3/4 2-5/8
6 5262 2-3/4 2-5/8
7 5262 2-3/4 2-3/4
8 5262 2-3/4 2-5/8
9 5262 2-3/4 2-3/4
10 5262 2-7/8 2-3/4
11 5262 2-3/4 2-3/4
12 5262 4 4 Lift Off 5100
13 5262 4 4-1/8
14 5262 4 4
15 5262 4 4
16 5262 1-1/2 1-1/2
17 5262 4-1/8 4-1/8
18 5262 3-1/2 3-1/2
19 5262 3-1/2 3-1/2
20 5262 3-1/8 3-1/4
BOUTHl!RN CALIFORNIA BOIL ANO TESTING, INC.
6280 RIVERDALE STREET, P.O. BOX 20827, SAN DIEGO, CALIFORNIA 92120 (61 9] 280-432 1
678 ENTERPRISE STREET, ESCON□IOO, CALIFORNIA B2025 (S 19) 746-4544
REJ:J:ORT CF COMPRESSION TESTS
FILE NUMBER 8912271 DATE January 2, 1991 ASTM (C39) {2$CONCRETE
0 MORT,....R J □s Alga Hills
A □oREss 2335 Terraza Gultara -Lot 160
OvVNER
ARCHITECT Robert Bowlus Associates
E"JGINEER JEM I I I
c □NTRAcT□R Fieldstone
'-□CAT1QN tN STRUCTURE
CEM!-'N T
S. W. corner of slab-on-grade
I I
t'>.OMIX T;_,RE
ROC~'.
Mr>< r,_,CJ DA PROPORTIONS
Tl'\,1E IN ~.71XER MINUTES
Sc_L,MP_ ,~"CHES I FABRIC,<'>. TE' D BY
Lfil te ~ : DJ
~~ORATORY NO
I MA<=IK #3
Sorrento
Sorrento
S500016/5 sack
50
4-1/4 MS TRUCK NO 114
7886 7887 7888
0 Gl"IOUT
0 GUNITE
D
Permit #CB901155
TICKET NO 140791
r-~-----+-----+-~-+----~--+--r-~
1 □A-:-E ,.11A □E 12-26-90 Discarded
CATE ,:O!"CE 1VE O 12-27-90
CATE 'ESTEO
r-,._,,A X(MUt-,.,1 LOAD. LBS
::= M PRE SS1VE STR. PSI
AGE TESTED. DAYS
RE'□ 8 PSI AT 28 DAYS
_."_r \/'✓T_iCU FT (PLASTIC)
1-02-91
6.00
28.27
66,000
2,330
7
2,500
o,sTF<,auT 1 □N (3) Ben F. Smith, Inc.
( 1) J EM II I
(1) City of Carlsbad
(1) Sorrento Ready Mix
1-23-91
90,750
3,210
28
SOUTHERN CALIFORNIA
SOIL ANO TESTING, INC.
REVIE VVEO BY
Michael B. Wheeler, R.C.E. #45358
GEOCON
iltmnATION OBSERVATION REPORT ···"'f ·;,
JOB NAME: d:.4-i' IL·L(2' FILE N0.: ...... );.....0t._,:.···...::..· _ • ..,_,' ·...:....· "...;;.../
I I DATE: ;·;;_, i J-1 /~~,
PERMIT NO.: PLAN FILE NO.:
ePU:RPOSE OF OBSERVATION: ro Verify soil conditions exposed are similar to those anticipated.
&I Footing excavations extend to proper depth and bearing strata.
□ · Verify foundation reinforcement complies with minimum recommended in soil report.
Q Verify slab reinforcement, sand bedding and moisture barrier comply with minimum
recommended in soil report.
□ Other: ______________________________ _
e SOIL REPORT RECOMMENDATIONS BASED ON:
G:l_ Expansion Condition; JXI VERY LOW ~ LOW □ MEDlUM □ HIGH
~ Fill Geometry /i\~),4 k.:Z,,/ .td -;, -6 ~-12 ~ ,:'.'.'f.
□ Other: ·
0 VERY HIGH
e MINIMUM FOUNDATION RECOMMENDATION:
Footing Depth: [:ij12 INCHES O 18 INCHES O 24 INCHES OTIIER: _________ __,._
Footing Reinforcement: 0 NO. 4 T&B O 2-N0.4 T&B O N05 T&B OTiiER: fi:·?:/ U.A'=it .. u•"'f.
Interior Slab Reinforcement: 0 &c6-10/10 □ 6:x.6.fl/6 □ NO. 3 @24 INCHES O NO. 3@ 18 INCHES
Slab Bedding Material and Thickness: s~ /, '-I I) Vapor Barrier: L <:Sr""'--C ,
e FOUNDATION PLAN REVIEWED: YES □
If yes, identify and describe:
e OBSERV
~ ~
D
n:\ W!)job\dra1Lin1\fdnobrpLlOO
, rmance with Soil Report (see "Purpose of Observation").
· nformance with Foundation Plans.
:•1•G1C1D CGICIITI
,' PIii• STII-D CCIICIIITI .· •••CIICID .. ....,
□ STJIUCT.STUL ..... ., C&u1•L.•-•-•CAT1•
C •1Nf'CIIICIO •---□ ,1u IMIIVINe
Oonca
o••c••·· .... T•L. ...... lall■N ...... ·••o• ... -■ •.. ••1.~•DD .• TC.I
INIP'N,
DATI
'2-,..,
j
½._ 27(),<)I
LOCATIONS 01' WOtllC INs,rcTID, UST HM'LU TAUN, WOttlC •urCTED, Joa ,.oaLIIIIS. 'IIOCHIIII ........ ,. ETC.
INCL."'Da.■ INl'O ... ATION ••o"'T -·-"''""' 01' ... Tc .. , ..... •1.AC&D o• -·· ··--·•-•-. NUM■••· T••··. , •• NT. NO'S.
... T•tT ........ c, TAot&NI IT•"'CT. CONNaCTION■ , ........... & .... T. ■DI.Tl TO•t111•DI c .. ac••ot aTc,-:.:.::
,, ,
,,,
I f.o I , ,, z L.
C,;<J
-~"'--.·i·'.:~-·'.··_._-~;.-,
. --~~ •~.r ..•• ;_.