Loading...
HomeMy WebLinkAbout2382 TERRAZA RIBERA; ; CB901126; Permit. . 08/15/90 11:47 Page 1 of 1 B U I L D I N G Job Address: 2382 TERRAZA RIBERA Permit Type: SINGLE FAMILY DWELLING Parcel No: 215-582-25-00 Valuation: 153,846 PERMIT Permit No: CB901126 Project No: A9001232 Development No: DEV89063 Str: Fl: Ste: Construction Type : VN Occupancy Group: R3/M1 Description : PLAN 2 PC Class Code : 90-290 2027 SF 439 CT 84-41 Status: ISSUED Applied: 07/06/90 Apr/Issue: 08/15/90 Validated By: DC : SF GARAGE PHASE 5 ._ ___ 74 L,oi'" n--1 CONTRACTOR FIELDSTONE OWNER *** 5465 MOREHOUSE DR #250 SAN DIEGO, CA 92121 FIELDSTONE CORPORATION Fees Required *** *** Fees: 11,117.00 Adjustments: .00 Total Fees: 11 ,117.00 Fee description Building Permit Plan Check Strong Motion Fee Enter 'Y' to Autocalc P.F.F. F.M.F./G.M.F. and Zone(99) Enter 'Y' to Autocalc Lacosta TIF Enter 'Y' to Autocalc Bridge Fee or manually enter M.F.F. Enter Park-in-Lieu Dist#(9) twice * BUILDING TOTAL Enter "Y" for Plumbing Issue Fee Each Plumbing Fixture or Trap Each Building Sewer Each Water Heater and/or Vent Gas Piping System Each Vacuum Breaker * PLUMBING TOTAL > > > > > > Enter "Y" for Electric Issue Fee > Single Phase Per AMP > * ELECTRICAL TOTAL ($10 Minimum) Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts > Each Install/Reloc Appliance Vent> Each Hood/Fireplace > * MECHANICAL TOTAL Lie . C 402826 619-546-8081 Lie. OWNER Fees Collected & Credits *** Total Credits: Total Payments: Balance Due: Units Fee/Unit 1713.00 4.00 .00 1.00 1.00 1.00 2.00 100,00 1.00 4.00 2 .00 " 2 .50 6.50 2.50 2.50 2.50 .25 9 .00 4 .50 6 .50 .00 250.00 10,867.00 Ext fee Data 829 .00 539.00 11.00 5385.00 Y 310.00 06 670.00 Y 530 .00 Y 1713.00 983.00 10970.00 7.50 Y 37.50 6.50 2 .50 2.50 5.00 62.00 5.00 Y 25.00 30.00 15.00 Y 9,00 18.00 13.00 55.00 PERMIT# CB901126 DESCRIPTION: PLAN 2 PC SF GARAGE TYPE: SFD CITY OF CARLSBAD INSPECTION REQUEST FOR 08/12/91 90-290 2027 SF 439 PHASE 5 LOT 174 PHONE: STR: 5468081 INSPECTOR AREA MP PLANCK# CB901126 OCC GRP CONSTR. FL: TYPE NEW STE: JOB ADDRESS: 2382 TERRAZA RIBERA APPLICANT: FIELDSTONE COMPANY CONTRACTOR: FIELDSTONE OWNER: FIELDSTONE CORPORATION PHONE: PHONE: 619-5;;~8n~v INSPECTOR /-'-rt REMARKS: MH/RUDY/529-9964 PAGER SPECIAL INSTRUCT: TOTAL TIME: CD 19 29 39 49 DATE LVL DESCRIPTION ST Final Structural PL Final Plumbing EL Final Electrical ME Final Mechanical DESCRIPTION ***** 052891 Interior Lath/Drywall 052891 Exterior Lath/Drywall 051091 Shear Panels/HD's ACT COMMENTS ~ INSPECTION HISTORY ***** ACT INSP COMMENTS AP MP AP MP AP MP 051091 Frame/Steel/Bolting/Welding AP MP 050991 Shear Panels/HD's NR MP 050691 Shear Panels/HD's NR MP 050391 Gas/Test/Repairs AP MP 050391 Rougll/Topout AP MP 042991 Roof/Reroof AP MP 112890 Underground/Under Floor AP MP ~c:---f~NAL BUILDING INSPECTION DEPT: BUILDING ENGINEERIN FIRE PLANNING U/M PLAN CHECK#: CB901126 PERMIT#: CB901126 PROJECT NAME: PLAN 2 PC 90-290 2027 SF 439 SF GARAGE PHASE 5 LOT 174 ADDRESS: 2382 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA WATER DATE: 07/26/91 PERMIT TYPE: SFD ====-====-=========-==-=-==-=-=-==-=-==-=-=------------=-=-===========-====== INSPECTED,...-:;),..-? 7' DATE BY: /. • . INSPECTED: 7•30-?/ APPROVED DISAPPROVED L IN~PECTED 0dP DATE ~-'1,9/ INSPECTED: APPROVED -1... DISAPPROVED BY. • ~ • INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED -=--=-==-=----=--==--=-=-==-=-=--=-=-==-=-=-------------------=-=-===---=-=-= DEPT: BUILDING FINAL BUILDING INSPECTION ENGINEERING FIRE PLANNING @7 WATER PLAN CHECK#: CB901126 PERMIT#: CB901126 PROJECT NAME: PLAN 2 PC 90-290 2027 SF 439 SF GARAGE PHASE 5 LOT 174 ADDRESS: 2382 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA DATE: 07/26/91 PERMIT TYPE: SFD ===================================== .. ==== .. ============= ,===/=' ============== INSPECTED / • DATE , / ~ BY: r) / INSPECTED: '~ ,. 7-f; ( APPROVED _L _ DISAPPROVED _ INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: APPROVED DISAPPROVED APPROVED DISAPPROVED =============================================-=-=-=-=-=-===============-=-=== COMMENTS: k<2.4To/ -(/L S. DEPT: BUILDING ENGINEERING PLAN CHECK#: CB901126 PERMIT#: CB901126 FIRE PROJECT NAME: PLAN 2 PC 90-290 2027 SF 439 SF GARAGE PHASE 5 LOT 174 ADDRESS: 2382 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA U/M WATER DATE: 07/26/91 PERMIT TYPE: SFD ================-==----------=-------=--=-=------------=--=-==-=============- INSPECTED DATE ~ / BY: !)!& INSPECTED: APPROVED ~ DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED =============================================--=--=========================== COMMENTS: DEPT: BUILDING FINAL B~ILDING INSPECTION ENGINEERING ~~ PLANNING U/M L/ PLAN CHECK#: CB901126 PERMIT#: CB901126 PROJECT NAME: PLAN 2 PC SF GARAGE 90-290 2027 SF 439 PHASE 5 LOT 174 ADDRESS: 2382 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA RECEIVED ~ J L 3 0 1991 WATER DATE: 07/26/91 PERMIT TYPE: SFD ===-==-=-=--=-=----=----=----=--=----=--=-=--=-==----=-========-=--------=--= INSPECTED ~ BY: qc~ INSPECTED BY: INSPECTED BY: DATE INSPECTED: ?$'/9/9/ APPROVED¥-DISAPPROVED DATE INSPECTED: ____ APPROVED DISAPPROVED DATE INSPECTED: ____ APPROVED DISAPPROVED =====================-=-==-=-==-=--=-==-=-==-=-==-==-======================== COMMENTS: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING PLAN CHECK#: CB901126 PERMIT#: CB901126 FIRE PLANNING PROJECT NAME: PLAN 2 PC 90-290 2027 SF 439 SF GARAGE PHASE 5 LOT 174 / ADDRESS: 2382 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA U/M DATE: 07/26/91 PERMIT TYPE: SFD ==============-=-==-=-=-=-==-=-=-=-=-======-=-=-==-=-================-=--=-== INSPECTED liiA~ DATE 3-(,-91 .. 1 BY: INSPECTED: APPROVED DISAPPROVED • INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED ====================================-========-=-============================= COMMENTS: POSI'-TENSIONJNG AND ELONGATION OlARI' JOB NAME Algg Hills Phase V SCS&T 8912271 ADDRESS 2;)82 Terraza Gultara .Q8TI; 01-11-91 Im NUMBER 174 GAIX;E # C-950 BUIIDI!::!G PERMIT CB901126 CALIBRATION DATE 10-15-90 PIAN FILE 2 SI'RAND GAU:;E ELONGATION, inches NUMBER RE7illmG INITIAL DESIGN TO:rAL NOTES 1 5262 1-5/8 1-5/8 2 5262 1-5/8 1-5/8 3 5262 2-1/8 2-1/8 4 5262 2-3/4 2-3/4 5 5262 2-3/4 2-1/2 6 5262 2-3/4 2-5/8 7 5262 2-3/4 2-5/8 8 5262 2-3/4 2-5/8 9 5262 3 3 10 5262 2-3/4 2-5/8 Lift Off 5000 11 5262 2-3/4 2-5/8 12 5262 3-3/4 3-5/8 13 5262 3-3/4 3-3/4 14 5262 3-3/4 3-5/8 15 5262 3/4 3/4 16 5262 4-1/8 4 17 5262 4-1/8 4-1/8 18 5262 3 3-1/8 Lift Off 5200 19 5262 2-1/2 2-3/8 20 5262 2-1/2 2-3/8 BOUTHl!RN CALIFORNIA BOIL ANO Tl!BTING, INC. 6280 RIVERDALE STREET, P.O. BOX 20627. SAN DIEGO. CALIFORNIA 92120 (619) 2B0-4321 B78 ENTERPRISE STREET. ESC □N□I□□. CALIFORNIA 8202!5 (B 1 BJ 7 46-4!544 REPORT CF COMPREBBION TEBTB F,LE NUMBER 8912271 DATE December 18, 1990 ASTM ( C39) li'l CONCRETE .JOB Alga Hills AooRcss 2382 Terraza Ribera OWNEl=I ARcH,TECT Robert Bowlus Associates ENG,NEER Jem I II coNTRAcT□R Fieldstone Construction Co. LOCATION IN STRUCTURE CEMENT S. E. corner of slab-on-grade II ADMIXTURE SAr-..JO l=IOCK MIX ,"-.IQ OR Pl=IOPORTIONS TIME IN MIXER. MINUTES SLUMP, INCHES FABRICATED BY Tested by: DJ Sorrento Sorrento 5500016/5 sack 90 5 MS TRUCK ND 111 0 MORT,..,R 0 GROUT 0 GUNITE D Permit #CB901126 TICKET NO 136704 LABORATORY NO MARK 7280 7281 7282 DATE MADE DATE RECEIVED DATE TESTED O•AMETEA, INCHES AREA SQ INCHES MAXIMUM LOAD, LBS CCMPAESSIVE STl=I. PS\ AGE TESTED, DAYS RE'□ 0 PSI AT 28 DAYS UNIT vvr/cu FT (PLASTIC) 12-11-90 12-12-90 12-18-90 6.00 28.27 60,000 2,120 7 2,500 DISTRIBUTION (3) Ben F. Smith, Inc. ( 1) J EM II I (1) City of Carlsbad SOUTHERN CALIFORNIA BOIL ANO TESTING. INC. REVIEWED BY· ~ftL{ Michael B. Wheeler, R.C.E. #45358 Southern California Soil & Testina I _, nc. um RIVIUIDALE ST ..... o. aox 20l27 UN IMl90, CAL.IF '2120 · l'HONI :lelMUl SPECIAL INSPECTION SERVICE IIGISTIIID IMSPICTOll'S WIIKL Y IIPOIIT NO. " I ,.OIi ...... SNOINe ON .. ·························· .... ·. . ....... COVUING WOltl( ,.U,ORMED □ RE 1.WOIIC£0 CQHClt[T[ □ STltUCT. STEEL AS~LY 0 GL.Ul• L ... f'AINIICATION WHICH ltEQUIRfD 4,itROVAL IY D P'ltE. STlt£Sst0 CONClt£T[ D It[ INF'OltCEO GYltSU,, D OTHU THE S,.ECIAL IN5'fCTOR o, D It[ I Nf'OltC[O MA SONIIY D P'ILE OltlYING ........................................... JO■ •00111sa1 •u11.01Ne ll'SIIMIT NUMeSII I "'LAN l'ILS NUMes11 0-KIIOII ll'IIIOJSCT NAMK / // AIIIC:HITSCT /,/ r C0NITII ... •J'•t.. tl"Vt'S. -M>K. KTC.11 O&a-ITIIIENGTH 110UIIC: K 011 M,.4111, .... , ...... 0s1c1111•• .... T•t...lMta CISIIGN.IIK•-GIIIAOS • .. ,..III •. WSt..0-11100. KTC,I GKNSll•t.. CONTIIIACTOIII CONTIII, OOING IISll'011TS0WOIIK t..••• IIISCSIVING • TSITING CONaTII. MAT'L , t•Mll't..KI n.S,'N. LOCATIONS OF WOltK INSPECTED, TEST SAMPLES TAKEN, WOltK ltEJECTEO, JOI PltOILEMS, P'ltOGltESS, ltfMAltKS, ETC. DATE tNC"-UO~• IN,ro■MATION ••ouT -AMOUNTI 0 ,r'MATC.lllt&L. .. LAC C.0 o• WOtllK •11111,olllMIED; NU ......... TV•·· I, IOCNT. NO•s. O' TIEST a•M•L.lll TAKllNI ITIIIUC T. C ONNl:CTIO N• (WC.LO• WAD& M.T . aO\.TS TO,-QUCDt CHCCKIED; CTC. Ix_-. ' . -J ~~ '• . .vr't .t ' J '-&\, I ;.:-t",/7, C cuh t1a,1~ /s ~ , r' 4 c ,,,,,.,.... / ,.-c;•·; ~ ~-:> -' , . -Jsl // / , ~ :l'57/ II • ' ..,, J ""~ II ~" I I "' ., r J -I t"'\{ J , /T" C ,.,, ~-• CERTIFICATION OF COMPLIANCE I HEIEIY CEUIFY THAT I HAVE INSPECTED ALL Of THE AIOVE IEPOITED WOIK. UNLE$$ OTHERWISE NOTED, I HAVE fOUNO THIS WOii( TO COMP'LY WITH THE APP'IIOVEO P'LANS, SP'ECIFICATIONS, AND Al'P'LICAILE SECTIONS OF THE GOVUNING IUILOING LAWS. I. ~ '6 ; ,. 'l-?~~~ .. ~/ ff Ri.br~q ~- r F.l t,, -""l JJ/ ~ -. -.~ C, /! Jj 1.,./-1{ ~.;:.. '/£/i./ ,,.. '- ~ -I JI I~ I .. r .,, ·- -/ / r // 'I :. ;r -' ., GEOCON l~CO HrOR-\T EO FOUNDATION OBSERVATION REPORT JOB NAME: A Id •'-f/.J/s ( LOCATION: l,.._,rs (73 171-1 t !?S----------1 > (ADDRESS, LOT NUMBER/BUILDING NO., ETC.) FILE NO.: i&G-ot{-v 1/ DATE: 12-/d9tJ PLAN ffiE NO.: L PERMIT NO.: ____________ _____, ePURPOSE OF OBSERVATION: ~ Verify soil conditions exposed are similar to those anticipated. ,81 Footing excavations extend to proper depth and bearing strata. D Verify foundation reinforcement complies with minimum recommended in soil report. ~ Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report. D Other: _______________________________ _ e SOIL REPORT RECOMMENDATIONS BASED ON: fBI Expansion Condition; 0 VERY LOW 12' LOW O MEDIUM O HIGH 0 VERY HIGH D§ FillGeometry C',.,-k.1cr:1 1[ - D Other:-------------------------------- • MINIMUM FOUNDATION RECOMMENDATION: ~R c.-.kf 0 -·'1 1T ,:,v.1-1-, \..,.., ,, Footing Depth: Sil 12 INCHES O 18 INCHES O 24 INCHES OTIIER: /;-x,,:,,~.£.:7°"1 fh~.,,,'b:"l, / Footing Reinforcement: e9 NO. 4 T&B O 2-NO.4 T&B O NO.5 T&B OTIIER: &:.r · T~M,rn...-.•I ~---d Interior Slab Reinforcement: lllf' 6x6-10/10 0 6x6-6/6 0 NO. 3 @ 24 INCHES O NO. 3 @ 18 INCHES Slab Bedding Material and Thickness: $ .. e(, ~-61:'t,N,(). Vapor Barrier: U.s~ e FOUNDATION PLAN REVIEWED: YES D If yes, identify and describe: e OBSERVATIONS: ), □ D Substantial conformance with Soil Report (see "Purpose of Observation"). Substantial conformance with Foundation Plans. Other: _______________________________ _ • COMMENTS: 4// ht,•&; :ex:cav«fttiaf: e/Jse,·«£,/ a,r in ;<&ra I ¢<>4'.&rM•~ 1r1,1,flt #v C«,mme;zul<t lcin 9 ;u,seitlial in a.,r « tc,-ef"-<l-1fl f'<;RPc:t; Loa I l; tZLf (1 r zr: erw·n:r,>i 'l1w 1 <~,.r< ,·;:Is ,af: lrni?:/z 7~e&; t:Nr<bve-, :t:6:f 111,,~,•r1:1..,~ -/~te::~ 4'11.t2t6 °1 et119WVl¢L:16rL is ,.,,,,6&5 t?~cat1K12<-tt&ai cc frr!«Yef -c<e"'JCC, c"f -tf..e n:\wpjob\dral\.ing\fdnobrpl.100