Loading...
HomeMy WebLinkAbout2344 TERRAZA RIBERA; ; CB901119; PermitB U I L D I N G P E R M I T Permit No: CB901119 Project No: A9001225 Development No: DEV89063 O~/"i. 5/9 0 11: 4 7 l Page 1 of 1 Job Address : 2344 TERRAZA RIBERA Permit Type: SINGLE FAMILY DWELLING Parcel No: 215-582-18-00 Valuation: 143,262 Str: Fl: Ste: Construction Type: VN Occupancy Group: R3/M1 Description: PLAN 1 PC Class Code: 90-290 1875 SF 459 CT84-41 Status: ISSUED Applied: 07/06/90 Apr/Issue: 08/15/90 Validated By: DC : SF GARAGE PHASE 5 7 L..OI ll,Pt CONTRACTOR FIELDSTONE OWNER 5465 MOREHOUSE DR #250 SAN DIEGO, CA 92121 FIELDSTONE CORPORATION *** Fees Required *** Fees: 10,687.0 Adjustments: .00 Total Fees: Fee description Building Permit Plan Check Strong Motion Fee Enter 'Y' to Autoc le P.F.F. F.M.F./G.M.F. and Zone(99) Enter 'Y' to Autocalc LaCos a Enter 'Y' to Autocalc Bridge Fee or manually enter M.F.F. ** Enter Park-in-Lieu Dist#(9) twice * BUILDING TOTAL Enter "Y" for Plumbing Issue Fee > Each Plumbing Fixture or Tap Each Building Sewer > Each Water Heater and/or Vent > Gas Piping System > Lie. C 402826 619-546-8081 Lie. OWNER Fees Collecte & Credits *** 1 Cr its: otal P n s: B ue: /Unit .00 250.00 10,437.00 Ext fee Data 794.00 516.00 10.00 5014.00 Y 310 .0 0 06 670.00 Y 530.00 Y 1713.00 983,00 10540.00 7.50 Y Each Vacuum Breaker >~-- 2.50 6.50 2.50 2.50 2 .50 37.50 6.50 2 .50 2,50 5.00 * PLUMBING TOTAL Enter "Y" for Electric Issue Fee > Single Phase Per AMP > * ELECTRICAL TOTAL ($10 Minimum) Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts > Each Install/Reloc Appliance Vent> Each Hood/Fireplace > * MECHANICAL TOTAL 100,00 1.00 4.00 2.00 .25 9.00 4.50 6.50 7 ..i7 81 /90 000 62.00 5.00 'i 25,00 30.00 15.00 Y 9.00 18.00 13.00 55,00 0 37 ~ APPROVAL CITY OF CARLSBAD JNSP.\1_:,_ ATE 2075 Las Palmas Dr., Carlsbad CA 92009 (619) 43 'A C -)..L-- _' re PERMIT# CB901119 DESCRIPTION: PLAN 1 PC SF GARAGE TYPE: SFD CITY OF CARLSBAD INSPECTION REQUEST FOR 08/06/91 90-290 1875 SF 459 PHASE 5 LOT 167 STR: INSPECTOR AREA MP PLANCK# CB901119 OCC GRP CONSTR. TYPE NEW FL: STE: JOB ADDRESS: 2344 TERRAZA RIBERA APPLICANT: FIELDSTONE COMPANY CONTRACTOR: FIELDSTONE OWNER: FIELDSTONE CORPORATION PHONE: 5468081 PHONE: 619-546-8081 PHONE: REMARKS: MH/MARK/438-0468 SPECIAL INSTRUCT: TOTAL TIME: CD 19 29 39 49 LVL DESCRII>TION ST Final Structural PL Final Plumbing EL Final Electrical ME Final Mechanical INSPECTOR ------------ ACT COMMENTS ~---- ------------------- ------------------- ***** INSPECTION HISTORY***** DATE DESCRIPTION ACT INSP COMMENTS 080291 Final Combo co MP 051791 Exterior Lath/Drywall AP MP 051791 Interior Lath/Drywall AP MP 050691 Rough Combo AP MP 050391 Shear Panels/HD's AP MP OK TO WRAP 050191 Shear Panels/HD's NR MP 042991 Rough/Topout AP MP 042991 Gas/Test/Repairs AP MP 042391 Roof/Reroof AP MP 042391 Shear Panels/HD's NR MP 042391 Rough/Topout NR MP 121390 Ftg/Foundation/Piers AP MP 120690 Underground/Under Floor AP MP DEPT: BUILDING FINAL BUILDING INSPECTION ENGINEERING ~ PLANNING U/M PLAN CHECK#: CB901119 PERMIT#: CB901119 PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 167 ADDRESS: 2344 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA WATER DATE: 07/26/91 PERMIT TYPE: SFD =======~====--=---=~---=---=---=--==--======~=------===========-==-========== ~~7PECT<j£J,I..._. DATE d INSPECTED: J,/'j/9( APPROVED -¼ DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED ======================~====================~==-==--============-==-========== COMMENTS: DEPT: BUILDING FINAL BUILDIN..@_~E~TION ENGINEERING FIRE ~) U/M PLAN CHECK#: CB901119 PERMIT#: CB901119 PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 167 ADDRESS: 2344 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 WATER DATE: 07/26/91 PERMIT TYPE: SFD SEWER=DIST:==LC=======WATER DIST:==CA ==================x~,=========== INSPECTED DATE 55 J~)q, BY: _j)o.vicA '/e · INSPECTED: ~ APPROVED _ DISAPPROVED ~ INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: APPROVED DISAPPROVED APPROVED DISAPPROVED ======~==================-====-====-====-====---------=---==--=-==----=--===- COMMENTS: FINAL BUILDING INSPECTJD~'"'i DEPT: BUILDING ENGINEERING FIRE PLANNING &l) WATER ~LAN CHECK#: CB901119 DATE: 07/26/91 PERMIT#: CB901119 PERMIT TYPE: SFD PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 167 ADDRESS: 2344 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA =======================1===================================================-- INSPECTED () \i DATE , -' I / BY: • V INSPECTED: C:. -/-'/ I APPROVED _1 _ DISAPPROVED _ INSPECTED BY: INSPECTED BY: DATE INSPECTED: DATE INSPECTED: APPROVED DISAPPROVED APPROVED DISAPPROVED =------==~==================---======~--~---=------===~---====--=======---=== COMMENTS: WA--TEJZ.-cl- =~=-~AL BUILDING INSPECTION DEPT: BUILD ING (i~~RINd) FIRE PLANNING U/M PLAN CHECK#: cs~~-- PERMIT#: CB901119 PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 167 ADDRESS: 2344 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA WATER DATE: 07 /26/91 PERMIT TYPE: SFD ===================--~======-----===-~-----==-----===---======-===========~== INSPECTED~~ DATE BY: /. • :,,': INSPECTED: 7•30-,1 APPROVED DISAPPROVED JI. INSPECTED,.....-:-,~ DATE BY: /,.. ,',f', INSPECTED: 8-<j-'7/ APPROVED x DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED ================:==-========~~-~~-==----------------~-----------~----=------- FINAL BUILDING DEPT: BUILDING ENGINEERING FIRE PLANNING PLAN CHECK#: CB901119 PERMIT#: CB90lll9 PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 167 ·./ADDRESS: 2344 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA INSPECTED ~'-- DATE t ~ 0-9( BY: INSPECTED: ' INSPECTED DATE BY: INSPECTED: INSPECTED DATE BY: INSPECTED: COMMENTS: APPROVED APPROVED APPROVED DATE: 07/26/91 PERMIT TYPE: SFD 'vi DISAPPROVED DISAPPROVED DISAPPROVED I I I BDUTH■AN CALIFDRNIA BCIL AND TIIIITING, INC. 62B0 RIVERDALE STREET. P.O. BOX 20627. BAN DIEGO. CALIFORNIA 821 20 (61 9) 2B0-4321 678 ENTERFRISE STREET, EBCONOICO, CALIFORNIA 82020 (619) 746-4~44 REPORT CF COMPREBBION TEBTB FILE NUMBER .JOB AOORE:SS OVVNER 8912271 □ATe: December 27, 1990 Alga Hills 2344 Terraza Ribera -Lot 167 ARcHiTEcT Robert Bowl us Associates ENGINEER JEM I I I CONTRACTOR Fieldstone ASTM (C39) Oil CONCRETE 0 MORT...,R 0 GROUT 0 GUNITE D Permit #CB901119 ! LOCATION IN STRUCTURE CEMFNT N. W. corner of slab-on-grade II ,_-,□MIX TL.RE '.;,.-,NO RCJCt<, MIX '~CJ OR PROPORTIONS TIME1~-, Ml)(ER MINUTES SL UMP_ rNCHES FABRICATE"□ BY Tested bv: DJ l.A BO RAT ORY NO MARK Sorrento Sorrento S500016/5 50 5-1/4 MS 7677 sack TAUCK NO 7678 100 TICKET ND 139106 7679 r-,. i ' I I ! DATE MADE 12-18-90 DATE l=lECEIVED 12-19-90 r:JATE "ESTEO 12-26-90 DIAMETER. INCHES 6.00 "'REA SQ INCHES 28.27 rv1AXIMUM LOAD. LBS 65,500 COMPRESSIVE STR. PSI 2,320 AGE Tf:STEO. DAYS 8 REQ O PSI AT 28 DAYS 2,500 UNIT VVT/cu FT !PLASTIC) 015 TR IBU TION (3) Ben F. Smith, Inc. ( 1) JEM I II (1) City of Carlsbad (1) Sorrento Ready Mix 1-15-91 83,250 2,940 28 "' Discarded 1-- SOUTHERN CALIFDANIA B01L AND TESTING, INC. REVIEWED BY' Michael B. Wheeler, R.C.E. #45358 BDUTH■l=IN CALIFDl=INIA SOIL AND T■STING. INC. 6280 RIVERDALE STFIEET, P.O. BOX 20827. SAN DIEGO. CALIFORNIA BE 1 20 (S 1 BJ 280-432 1 678 ENTERPRISE STREET. ESCONOIOO. CALIFORNIA 8202!5 (B 1 BJ 746-4!544 REPORT CF CCMPREBSION TESTS Fil E NUMBER. 8912271 □ATE: December 27, 1990 ASTM (C39) ~ CONCRETE 0 MORTMR □GROUT .JOB Alga Hills i ,,[JORESS 2344 Terraza Ribera UVc1NER ARCHITECT Robert Bowlus Associates F~.JGINEER JEM I II I CONTRACTOR Fieldstone L I I L UCATION l~J STRUCTURE H(-lCK Cv11 X c-.u OR PRO PORTl01'sJS I ""-1E IN MIXER, MINUTES· '.·3t I_ ;f\/1 P lNC HES I Fl>,BRll;ATFO BY LTested by: DJ ,------=--------. I LABORATORY NO MAHK N. W. corner of slab-on-grade I I Sorrento Sorrento S500016/5 50 5-1/4 MS 7677 sack TRUCK NO: 100 7678 7679 0 GUNITE □ Permit #CB901119 TICKET 1'J0 139106 I r----~-~--~-------f------~~-------1--------1--~---+------+-------1 I DATE RECEIVED '."JATE 'ESTEO C·AME TF.R, INCHES Al=lEA. S □ INCHES tv1AXIMUM LOAD, LBS. C:OMPR E SSIVE STA. PSI AGE TESTED. DAYS RFO O PSI AT 28 DAYS· l.J".,1 T VV r/cu FT (PLASTIC} 12-18-90 12-19-90 12-26-90 6.00 28.27 65,500 2,320 8 2,500 OISTRIBLJTION (3) Ben F. Smith, Inc. (1) JEM I II (1) City of Carlsbad (1) Sorrento Ready Mix SOUTHERN CALIFORNIA SPIL AND TESTING. INC. FIEVIE\NEO BY· Michael B. Wheeler, R.C.E. #45358 SPECIAL INSPECTION SERVICE Southern Carifornla Soil & Testing, Inc. -lllftllDAU ff~ ... 0. -JIU'1 IHIITDID □ U INFGKID CCtCalTI Ct ,__ ffltHKD CCINCltlTt D •£ llllf'CltCID MASCNtY '/ ,. .., ": ,. , , fa l \lb ,l"l. "-~""~ ' j .... --.CM.wen•-~-..•• NO. 'JI 12 7 / :::.::-.-.. . . .. .. .. .. .. .. .. .. . . .. .. .. .. .. .. .... It □ STltUCT . STHL AS~Y □ GLUl•LMI. ,MRICATICIN □ lll1Nf'OIIC£D G'fPUI □ OTNH □ ,tLl 0•1v1NG .................... -....................... . ■1.111.04 ... •·•M1T .. .., ..... ,.., ~ o~_____, ••CNIT.CT _: C S LOCATIONI 01' •O•K INSltfCTl!D. TUT UMltlES TAKEN. •o•tc ■EJECTED, JOI P'■OILEMS. it•oG•EH, ., .... n . ETC. INCi. uoa:a , .... o ... a.TION •■OUT -A MOUN Tl O" ... T •• , ........ AC co o• wo•• ...... 0 ... a01 .. .., ...... T ..... lo IOCN T. NO·a. 0 .. TCIT ....... u.,. T&•CNI tT•ucT. c o• .. •CC:TIONS , .... 0. W&OC. w.T. •Ot.Ta To•ouco, C:Ml:CICCD! CTC. Iv 'I 2332.. 2 3'-Jo , I 2s'-ff-- , 7o 17/ .)..]72 , , CIITl,ICA TION a, COMPLIANCI I HIIIIY CBTIPY THAT I NAVI INSPICTID AU 0,. THI MOVI IIPOeTID WOh. UM.Ill OTHIIWIII NOTIO, I H.ll;VI FOUND • ?NII W0ltC TO CQMlll.'t' WlfN THI AHIIOVID l'LANS. INCIJICATIOHI. AND Al'l!\ICAILI SICTIONI 0,, TMI OOVHNING IUILDING lAWI. ,, , , . / , , GEOCON l"CO l\rOR ATED FOUNDATION OBSERVATION REPORT JOB NAME: di ,-. t/,1/~ LOCATION: 1 Jb3 Jt,,t! FILE NO.: 3ft/{:-{'tl-C4 DATE: I z /Ji /1c7 I PERMIT NO.: PLAN FILE NO.: ePURPOSE OF OBSERVATION: ~ Verify soil conditions exposed are similar to those anticipated. $1 Footing excavations extend to proper depth and bearing strata. □ · Verify foundation reinforcement complies with minimum recommended in soil report. 121 Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report. □ Other: ------------------------------- e SOIL REPORT RECOMMENDATIONS BASED ON: S Expansion Condition; 0 VERY LOW O LOW 3 Fill Geometry r--:·1/, D,fk:•-.vfr/~ -6,,.__,,_ ~ MEDIUM S: re 1£1 0 HIGH 0 VERY HIGH □ Other: _____________________________ _ e MINIMUM FOUNDATION RECOMMENDATION: Footing Depth: □ 12 INCHES )2118 INCHES □ 24 INCHES OTiiER----=------- Footing Reinforcement: 0 NO. 4 T&B O 2-NO.4 T&B O N0.5 T&B OTHER: R.,.sz: '7£1!:::¥:r"C /J Interior Slab Reinforcement: 0 6x~10/10 0 6x~/6 0 NO. 3 @ 24 INCHES O NO. 3 @ 18 INCHES Slab Bedding Material and Thickness: 5',pyO qA Vapor Barrier: L /:5 4; uo-Y11, I e FOUNDATION PLAN REVIEWED: YES □ If yes, identify and describe: e OBSERVATIONS: ~ SuOSQtmlll conformance with Soil Report (see "Purpose of Observation"). □ Su conformance with Foundation Plans. f2J 0th • COMMENTS: ,+;.! Get,;, :E)(c.,p,1--r-e,-,_,:'a .sJrC'r,(/,( h f.W<t d a-facKef<:i § /2-u;L1 t'I .;.,tvty /4·c>s-e s qt I £/Y ~Fl-te ;;{10?'1?K--K ,Z)/""lc &/t(&?Z:, I > , m: \ wpjob\ dratling\(dnobrpt.l 00 ENTATIVE