Loading...
HomeMy WebLinkAbout2356 TERRAZA RIBERA; ; CB901120; Permit08/15~0 11:47 Pa~e 1 of 1 B U I L D I N G Job Address: 2356 TERRAZA RIBERA Permit Type: SINGLE FAMILY DWELLING Parcel No: 215-582-21-00 ,aluation: 143,262 P E R M I T Str: Permit Project Development Fl: Ste: No : CB901120 1 No: A9001226 No: DEV89063 • Construction Type: VN Occupancy Group: R3/M1 Description: PLAN 1 PC Class Code: CT 84-41 90-290 1875 SF 459 Status: Applied: ISSUED 07/06/90 08/15/90 DC : SF GARAGE PHASE 5 L 170 CONTRACTOR 0)1' liO FIELDSTONE OWNER 5465 MOREHOUSE DR #250 SAN DIEGO, CA 92121 FIELDSTONE CORPORATION *** Fees Required *** Fees: Adjustments: Total Fees: Fee description Building Permit Plan Check Strong Motion Fee 10,687.00 .00 10,687.00 Enter 'Y' to Autocalc P.F.F . F.M.F./G.M.F. and Zone(99) *** Enter 'Y' to Autocalc Lacosta TIF Enter 'Y' to Autocalc Bridge Fee or manually enter M.F.F. Enter Park-in-Lieu Dist#(9) twice * BUILDING TOTAL Enter "Y" for Plumbing Issue Fee > Each Plumbing Fixture or Trap > Each Building Sewer > Each Water Heater and/or Vent > Gas Piping System > Each Vacuum Breaker > * PLUMBING TOTAL Enter "Y" for Electric Issue Fee > Single Phase Per AMP > * ELECTRICAL TOTAL ($10 Minimum) Enter 'Y' for Me chanical Issue Fee> Install Furn/Ducts > Each Install/Reloc Appliance Vent> Each Hood/Fireplace > * MECHANICAL TOTAL Apr/Issue: Validated By: Lie. C 402826 619-546-8081 Lie. OWNER Fees Collected & Credits *** Total Credits : Tot al Paymen ts : Balance Due: Units Fee/Unit • 0 1.00 1.00 1.00 2.00 100.00 1.00 4.00 2 .00 2.50 6.50 2 .50 2.50 2.50 .25 9.00 4.50 6.50 7437 08/ .00 250.00 10,437.00 Ext fee 794.00 516.00 10.00 Data 5014.00 Y 310.00 06 670.00 Y 530.00 Y 1713 .00 983.00 10540.00 7 .50 Y 37.50 6.50 2.50 2 . 50. 5.00 62 .00 5.00 Y 25.00 30.00 15.00 Y 9.00 18.00 13.00 55.00 .,. 02 1041: CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad CA 92009 (619) PERMIT# CB901120 DESCRIPTION: PLAN 1 PC SF GARAGE TYPE: SFD CITY OF CARLSBAD INSPECTION REQUEST FOR 08/06/91 90-290 1875 SF 459 PHASE 5 LOT 170 JOB ADDRESS: 2356 TERRAZA RIBERA APPLICANT: FIELDSTONE COMPANY CONTRACTOR: FIELDSTONE PHONE: PHONE: OWNER: FIELDSTONE CORPORATION PHONE: STR: INSPECTOR AREA MP PLANCK# CB901120 OCC GRP CONSTR. TYPE NEW FL: STE: 5468081 619-546-8081 REMARKS: MH/MARK/438-0468 INSPECTOR SPECIAL INSTRUCT: TOTAL TIME: CD 19 29 39 49 DATE LVL DESCRIPTION ST Final Structural PL Final Plumbing EL Final Electrical ME Final Mechanical DESCRIPTION ***** 052191 Interior Lath/Drywall 052191 Exterior Lath/Drywall 050791 Rough Combo 050391 Shear Panels/HD's 050191 Rough/Topout 042991 Rough/Topout 042691 Rough/Topout 042391 Roof/Reroof 121490 Ftg/Foundation/Piers 120790 Underground/Under Floor ACT COMMENTS ~----- INSPECTION HISTORY ***** ACT INSP COMMENTS AP MP AP MP AP MP AP MP OK TO WRAP AP MP NR MP NR MP AP MP AP MP AP MP FINAL BUILDING INSPECTION -----. --- DE PT: BUILDING ENGINEERING & PLANNING U/M PLAN CHECK#: CB901120 PERMIT#: CB901120 PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 170 ADDRESS: 2356 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA ~~~PECTE~~ DATE .:::: INSPECTED: INSPECTED DATE BY: INSPECTED: INSPECTED DATE BY: INSPECTED: WCJdt APPROVED APPROVED APPROVED RECEIVED J li ~ 3 0 199f WATER DATE: 07/26/91 PERMIT TYPE: SFD )s_ DISAPPROVED DISAPPROVED DISAPPROVED =====================================---------=============================== COMMENTS: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING PLAN CHECK#: CB901120 PERMIT#: CB901120 FIRE~ U/M PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 170 ADDRESS: 2356 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA WATER DATE: 07/26/91 PERMIT TYPE: SFD ===================--------------------------------------------============== INSPECTED '3/71/1~ DATE ~ DISAPPROVED BY: INSPECTED: qpc, APPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED ==========-----===================------------------------------------======= COMMENTS: FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING ~WATER .'LAN CHECK#: CB901120 DATE: 07/26/91 PERMIT#: CB901120 PERMIT TYPE: SFD PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 170 ADDRESS: 2356 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA INSPECTED BY: INSPECTED BY: INSPECTED BY: COMMENTS: );UA-7'.'f'E -( ((_ cSeWf..12..-( I'. s DATE INSPECTED: DATE INSPECTED: DATE INSPECTED: APPROVED ,==7================ _V_ DISAPPROVED APPROVED DISAPPROVED APPROVED DISAPPROVED _ --EINAL BUILDING INSPECTION DEPT: BUILDING (ENGINEERING FIRE PLANNING U/M ~ PLAN CHECK#: CB901~~0~- PERMIT#: CB901120 PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 170 ADDRESS: 2356 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA INSPECTED ~/.?. DATE BY: /-• • INSPECTED: 7-J c:, • "} I INSPECTED 0/.fl DATE ,a.q.'j', BY: INSPECTED: INSPECTED DATE BY: INSPECTED: COMMENTS: /H d',1C-..Z:&,'~t7 V4'H?IM7".S l'Vc:77' APPROVED APPROVED APPROVED C6'""1,,.,.7'1: WATER DATE: 07/26/91 PERMIT TYPE: SFD DISAPPROVED L DISAPPROVED DISAPPROVED -/. FINAL BUILDING INSPECTION ··e.-/ • DEPT: BUILDING ENGINEERING FIRE PLANNING U/M ATER PLAN CHECK#: CB901120 E: 07/26/91 PERMIT#: CB901120 PERMIT TYPE: SFD PROJECT NAME: PLAN 1 PC 90-290 1875 SF 459 SF GARAGE PHASE 5 LOT 170 /ADDRESS: 2356 TERRAZA RIBERA CONTACT PERSON/PHONE#: MARK/438-0468 SEWER DIST: LC WATER DIST: CA =============--------===================-=----============~=============----- INSPECTED m DATE 6-fc-91 ✓ BY: INSPECTED: APPROVED DISAPPROVED ' , ~G INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED INSPECTED DATE BY: INSPECTED: APPROVED DISAPPROVED =-============-------=====------------------------------------=---------===== COMMENTS: I ' I ' ' BOUTHl!RN CALIFORNIA BOIL AND Tl!BTING, INC. 6280 RIVERDALE STREET. P.O. BOX 20827. SAN DIEGO. CALIFORNIA 92120 (61 9) 280-4321 678 ENTERPRISE STREET. ESCONOIOO, CALIFORNIA 9202~ (B 1 SJ 746-4544 REPORT OF COMPRESSION TESTS FILE NUMBER 8912271 DATE: December JOB Alga Hills ;.'.l.00RESS 2356 Terraza OWNER Ribera -Lot 170 ARCHITECT Robert Bowlus Associates ENGINEER JEM I II CONTRACTOR Fieldstone LOCAT1QN IN STRUCTURE CEMENT N. W. corner of slab-on-grade II AOl\,11 X TL_ RE SC.NO RC,Cr< 27, 1990 ASTM (C39) ~ CONCRETE 0 MORT ... R □GROUT 0 GUNITE D Permit# CB901120 i M1 X ~"G O!=l PRO PORTIONS Sorrento Sorrento S500016/5 sack 100 ' 5 LTll\,1E 1,"J Ml><ER. MINUTES SL.L,MP INCHES FABRICATED BY Tested bv: DJ MS TAUCK NO 84 LABOl=lATORY NO MARK DATE MADE DATE RECEIVED DATE ,..ESTED OIAME TF.:R. INCHES ;.'.l.R E ,:i. SQ INCHES MAXIMUM LOAD, LBS COMP,:::lESS1VE STR, PSI AGE TESTED. DAYS RE=Q O PSI AT 28 DAYS UNIT vv r/c u FT (PLASTIC] 7686 12-18-90 12-19-90 12-26-90 6.00 28.27 75,250 2,660 8 2,500 01STR1Bu TION (3) Ben F. Smith, Inc. (1) JEM III (1) City of Carlsbad (1) Sorrento Ready Mix 7687 1-15-91 85,000 3,010 28 TlCKET NO 139226 7688 Discarded ,....- SOUTHERN CALIFORNIA BOIL AND TESTING, INC. REVIEWED BY: Michael B. Wheeler, R.C.E. #45358 I ' r ' I I BOUTHl!RN CALIFORNIA BOIL AND TESTING, INC. 62B0 RIVERDALE STREET. P.O. BOX 20627. SAN DIEGO. CALIFORNIA 92120 {61 SJ 280-4321 678 ENTERPRISE STREET. ESCONDIDO. CALIFORNIA 8202~ (8 19) 746-4544 REPORT OF COMPRESSION TESTS FILE NUMBER 8912271 □ATE December 27, 1990 COB Alga Hills AOORE:SS 2356 Terraza Ribera OvVNER ARCHITECT Robert Bowlus Associates ENG!NEER JEM III CONTRACTOR Fieldstone L.OCAT10N IN STRUCTURE CEMENT ADMIX Tc_,RE S,c.N □ RCJCi< MIX r,_,u OA PROPORTIONS N. W. corner of slab-on-grade I I ASTM (C39) ~ CONCRETE 0 MORT ...... R 0 GROUT 0 GUNITE D Permit# CB901120 LTl!'V1E:: IN Mr><ER, MINUTES SLL,MP 1NCHES FABl=l•CATEO BY Tested bv: DJ Sorrento Sorrento S500016/5 sack 100 5 MS TAUCK NO 84 TICKET NO 139226 LABOAATORY NO MAAK 0.C..TE MADE DATE RECEIVED DATE TESTED 01AME TER. INCHES AREA SD INCHES MA XiMUM LOAD, LBS COMPRESSIVE STR, PSI AGE TESTED. DAYS Rf"Q C PSI AT 2B DAYS U"-.)1 T vvT/Cu FT (PLASTIC) 7686 12-18-90 12-19-90 12-26-90 6.00 28.27 75,250 2,660 8 2,500 01STR1BuTtON (3) Ben F. Smith, Inc. {l) JEM Ill (1) City of Carlsbad {1) Sorrento Ready Mix 7687 7688 SOUTHERN CALIFORNIA BOIL ANO TESTING, INC. REVJE W-ED BY Michael B. Wheeler, R.C.E. #45358 - ;. , --•DEUff,.11,0. _ _, ........ CMJP ......... a.41b "°· 811:12, I :::..-:r:.. ..................................... " □ S111UCT, STIii. AftD&'( Q &&a•L•. ,,_1CATICII □ IIIIW.CIO G'fPUI □ OTNI• □ "LI D•IVING ............................................. . oa,c•••• ... .,.'-· ,,.,. ••••N. •••-•••o• • .. ~•-· ••'-0-1100. a Tc., ' ' :Sc s' LOCATIONS 01' •O•K INSIIICT!O, TUT SAMIILU T AKIN. •O•K •tJ!CTIO. JOe ... O.LIMS, ll110G•1u .• , .... u . ITC. , .. c'-uoa:i.tN"o•,.• TtON ••ouT -•..ouN T• o,. ... Ta•••'-•'-•c ao o• wo•• •••,.o-•oi Nuw•••· .,.,•&. • ,oaNT. NO'■. 0 .. Ta•T ., .... , ,. T•••N1 9TIIUCT. CONNaCTION9 ·••1.oit .. •o• .... T. •O\.TI T0•-•01 CNac••Da • ., •• '-~ !it, /(.,, s /c, </ / -'.> 5 <- I (o Cc, 2 3 40 lb 7 .2 -g'-{t{ I 1af-25 '-(y ~JS-7.... ,lsS(.. 17/ .;)3{.,8 .,2..]72. I ..... C.aTlf'f '"4f I MVI INll'IQID Ml a,, WCllt. UNUa onawtll NOTIO, I MW COMl'I.Y Wint M AMIOVllt PIANI. INClflCA IICftONI Of TMI GCWaMlllt IUIUMIG V.WI. , f . ,, , I "I I• , ' ,, , . c.B '10 / I S-2 ,, ,, C .!3 'TOI/ zo // 'I Cd 1'0 11 S-3 , f > I ............ ..,.. ... GEOCON t,.COR r ORA T.:O FOUNDATION OBSERVATION REPORT JOB NAME: ,+J~"l //,-/)~ LOCATION: !..✓,-rs IG~ /7 < ~4:0 172 - (ADD T NUMBER/BUILDING NO., ETC.) FILE NO.: 3~·'16 -c:-q, 0 L./ DATE: /2. _/ 170/ 1C- PERMIT NO.: PIAN FILE NO.: ePURPOSE OF OBSERVATION: ~ Verify soil conditions exposed are similar to those anticipated. ~ Footing excavations extend to proper depth and bearing strata. D · Verify foundation reinforcement complies with minimum recommended in soil report. &I. Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report. □ Other: ------------------------------ e SOIL REPORT RECOMMENDATIONS BASED ON: ~ Expansion Condition; 0 VERY LOW O LOW ~ Fill Geometry e1 ,¾ c:z/-, ~ fr ~ te 00 HIGH 0 VERY HIGH 0 MEDIUM z::e ?::?: , D Other: ____________________________ _ e MINIMUM FOUNDATION RECOMMENDATION: Footing Depth: 0 12 INCHES D 18 INCHES .18124 INCHES OTIIER:. ___ __,,,,__ _____ _ Footing Reinforcement: 0 NO. 4 T&B O 2-N0.4 T&B O N0.5 T&B OTHER: ,~s t -T 0,.,5,~p~-..._e r Interior Slab Reinforcement: 0 6x6-10/10 0 6x6-o/6 0 NO. 3 @ 24 INCHES O NO. 3 @ 18 INCHES Slab Bedding Material and Thickness: S,mo,, 3/11 Vapor Barrier: fti'Sft:<-<e,.,, . e FOUNDATION PLAN REVIEWED: YES □ If yes, identify and describe: e OBSERV !Z1. ~ D a:\ wpjob\ draft.int\ (dnobrpt..100 ormance with Soil Report (see "Purpose of Observation"). ormance with Foundation Plans.