HomeMy WebLinkAbout2332 TERRAZA RIBERA; ; CB901150; Permit•
08/15/90 11:49
Page 1 of 1
B U I L D I N G
Job Address: 2332 TERRAZA RIBERA
Permit Type: SINGLE FAMILY DWELLING
Parcel No: 215-582-15-00
Valuation : 174,996
P E R M I T
Str:
Permit
Project
Development
Fl: Ste:
No: CB901150
No: A9001256
No: DEV89063
Construction Type : VN
Occupancy Group: R3/M1
Description: PLAN 3 PC
Class Code: CT 84-46
90-290 2325 SF 422
Status:
Applied:
/,_~~f:sf:'
07/06/90
07/06/90
DC
: SF GARAGE PHASE 5u.),!.l.-4~:__
CONTRACTOR FIELDSTONE
OWNER
***
5465 MOREHOUSE DR #250
SAN DIEGO, CA 92121
FIELDSTONE CORPORATION
Fees Required *** ***
Fees:
Adjustments:
Total Fees:
Fee description
Building Permit
Plan Check
Strong Motion Fee
11,978.00
.00
11,978 .0 0
Enter , y, to Autocalc P .F.F.
F.M.F./G.M .F. and Zone(99}
Enter , y' to Autocalc Lacosta
Enter , y, to Autocalc Bridge
or manually enter M.F.F.
TIF
Fee
Enter Park-in-Lieu Dist#(9} twice
* BUILDING TOTAL
Enter "Y" for Plumbing Issue Fee
Each Plumbing Fixture or Trap
Each Building Sewer
Each Water Heater and/or Vent
Gas Piping System
Each Vacuum Breaker
* PLUMBING TOTAL
Enter Uy II for Electric Issue Fee
Single Phase Per AMP
* ELECTRICAL TOTAL ($10 Minimum}
> > >
> > >
>
>
Enter , y' for Mechanical Issue Fee>
Install Furn/Ducts >
Each Install/Reloc Appliance Vent >
Each Hood/Fireplace >
* MECHANICAL TOTAL
Apr/Issue:
Validated By:
Lie. C 402826 619-546-8081
Lie, OWNER
Fees Collected & Credits ***
Total Credits:
Total Payments:
Balance Due:
Units Fee/Unit
1713 .00
4.00
.0 2.50
1.00 6 .50
1.00 2 .50
1.00 2.50
2.00 2 .50
100,00 .25
1.00 9.00
4.00 4.50
2,00 6.50
.00
250.00
11,728.00
Ext fee Data
902.00
586.00
12.00
6125.00 y
310.00 06
670.00 y
530 .00 y
1713.00
983,00
11831.00
7.50 y
37.50
6.50
2 .50
2.50
5.00
62.00
5.00 y
25.00
30 .00
15,00 y
9,00
18.00
13.00
55,00
7437 08/15/90 0001 0 02
1172 •
CITY OF CARLSBAD
L APPROVAL
1N~Pi.M"""--DATE __
CLEAR r--~-----~~Att<.~
2075 Las Palmas Dr., Carlsbad CA 92009 (61
CITY OF CARLSBAD
INSPECTION REQUEST
PERMIT# CB901150 FOR 09/26/91
DESCRIPTION: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 164
TYPE: SFD
JOB ADDRESS: 2332 TERRAZA RIBERA
APPLICANT: FIELDSTONE COMPANY
CONTRACTOR: FIELDSTONE
OWNER: FIELDSTONE CORPORATION
PHONE:
PHONE:
PHONE:
INSPECTOR AREA MP
PLANCK# CB901150
OCC GRP
CONSTR. TYPE NEW
STR: FL: STE:
5468081
619-546-8081
REMARKS: MH/RUDY/529-9964 PAGER
SPECIAL INSTRUCT:
INSPECTOR ___________ _
TOTAL TIME:
CD LVL DESCRIPTION ACT COMMENTS
19 ST Final Structural
29 PL Final Plumbing
39 EL Final Electrical
49 ME Final Mechanical
----------------------------------------
--------------------
***** INSPECTION HISTORY*****
DATE DESCRIPTION
071091 Interior Lath/Drywall
071091 Exterior Lath/Drywall
062091 Rough combo
061891 Shear Panels/HD's
061891 Roof/Reroof
061891 Rough/Topout
061891 Gas/Test/Repairs
061191 Roof/Reroof
060491 Roof/Reroof
121390 Ftg/Foundation/Piers
120590 Underground/Under Floor
ACT
AP
AP
AP
PA
AP
AP
AP
AP
NR
AP
AP
INSP
PY
PY
MP
MP
MP
MP
MP
TP
MP
MP
MP
COMMENTS
OK TO WRAP
OK TO WRAP
DEPT: BUILDING
FINAL BUILDING INSPECTION
ENGINEERING ~PLANNING U/M
PLAN CHECK#: CB901150
PERMIT#: CB901150
PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 164
ADDRESS: 2332 TERRAZA RIBERA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
RECEIVF:O SEP 1 7 1991
WATER
DATE: 09/16/91
PERMIT TYPE: SFD
============================================-------=-=-==-=-=================
INSPECT~ D«!rfl
DATE 9p5 K INSPECTED: APPROVED DISAPPROVED BY:
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
=-=--=-------------==-====-==-=--=-==-=-==-=---------------=-=--=-=-==----=--
COMMENTS:
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING
PLAN CHECK#: CB901150
PERMIT#: CB901150
FIRE PLANNING
PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 164
ADDRESS: 2332 TERRAZA RIBERA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
U/M
_,,,--;-·\ ~
DATE: 09/16/91
PERMIT TYPE: SFD
===============================-=============================================
INSPECTED ~ DATE APPROVED ✓ BY: INSPECTED: q-23-9/ DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
==========================-====-=======-====--=-=-==-====-===================
COMMENTS:
FINAL BUILDING .INSPEC ON
DEPT: BUILDING ENGINEERING FIR PLANNING /M WATER
PLAN CHECK#: CB901150
PERMIT#: CB901150
PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 164
ADDRESS: 2332 TERRAZA RIBERAC
\,, 7"•tt
CONTACT PERSON/PHONE#: /438-0468
SEWER DIST: LC W DIST: CA
DATE: 09/16/91
PERMIT TYPE: SFD
-=--=-==-=-==-====-----=-=--=-=--=-=========-------=-===-==-=-=-------=-=----
INSPECTED DATE # ~ DISAPPROVED BY: P[L. INSPECTED: APPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
============================================-------=-==-=-===================
COMMENTS:
J
FINAL BUILDING INSPECTION
/ / ',,
DEPT: BUILDING ~NGINEERINV FIRE
PLAN CHECK#: CB9~
PERMIT#: CB901150
PLANNING
PROJECT NAME: PLAN 3 PC 90-290 2325 SF 422
SF GARAGE PHASE 5 LOT 164
ADDRESS: 2332 TERRAZA RIBERA
CONTACT PERSON/PHONE#: MARK/438-0468
SEWER DIST: LC WATER DIST: CA
U/M WATER
DATE: 09/16/91
PERMIT TYPE: SFD
=====================-======-=-======-======------=-=========================
INSPECTED /./AP. DATE ~-1'£-'l/ BY: INSPECTED: APPROVED L DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
============================================---------=-=-=-===========-=-====
COMMENTS:
BOUTH■RN CALIFORNIA BOIL AND T■BTING, INC.
6280 RIVERDALE STREET. P.O. BOX 20827. SAN DIEGO. CALIFORNIA 821 20 (61 BJ 2B0-4321
67B ENTERF>RISE STREET. ESCONOIOO. CALIFORNIA B202e (61 BJ 746-4e44
REPORT OF COMPRESSION TESTS
FILE NUMBER 8912271
Alga Hills □ATE December 26, 1990 ASTM (C39) ~ CONCRETE
0 M□RT...,R ,)08
400RESS 2332 Terraza Ribera -Lot 164 0 GROUT
UVVNER 0 GUNITE
ARCHITECT Robert Bowl us Associates Permit #CB901150 D
Er"-JGrNEER JEM III
CONTRACTOR Fieldstone
l CJCATION IN STRUCTURE
l.EMFNT
N. W. corner of slab-on-grade
II ADM1.><"T1 HE
Sorrento
i MIX '"[; OR PROPORTIONS
'I TIME IN MIXER, MINUTES
:_;L L,Mp rNCHES
Sorrento
5500016/5 sack
67
5
MS TRUCK NO 75 TICKET NO 1:38690 LF'ABR1r:ATE'O BY
Tested by: DJ ~~~-==""'======,=====a;-======r=====,====;==-===r-~----,
I l.ABORATORY NO
~~AR~-
2------1-------+----+----+----+-----+----i
7553 7554 7555
i DATE MADE 12-17-90
QATE RECEIVED
DATE 'ESTEO
O!AME:TF.:R. INCHES
APEA SQ INCHES
MAXIMUM LOAD, LBS
CCMPAESSIVE STR. PSI
AGE TESTED, DAYS
RE □ 0 PSI AT 28 DAYS
UNIT WT/CUFT(PLASTICJ
12-18-90
12-24-90
6.00
28.27
62,000
2,190
7
2,500
D1sTR1suT1□N (3) Ben F. Smith, Inc.
(1) JEM III
(1) Sorrento Ready Mix
(1) City of Carlsbad
1-14-91
99,000
3,500
28
Discarded
SOUTHERN CALIFORNIA
BOIL AND TESTING, INC.
AEVIEWE □ BY:
11t,L/ 6k£L:
Michael B. Wheeler, R.C.E. #45358
BOUTHl!RN CALIFORNIA BOIL AND T■BTING, INC.
6280 AIVER□ALE STREET. P.O. BOX 20827. SAN DIEGO. CALIFORNIA. 92120 (S 1 S} 280-4321
679 ENTERPRISE STREET, ESCONDIDO, CALIFORNIA e202e {S 19] 74B-4'544
REPORT OF COMPRESSION TESTS
Fil E NUMBER 8912271
Alga Hi 11 s □ATE December 26, 1990 ASTM (C39) ~ CONCRETE
0 MORT..._R .,lJB
'
•'-DDRESS 2332 Terraza Ribera -Lot I 164
UVVNEA
I ARCHITECT Robert Bowlus Associates
I Er-JGrNEER JEM II I
l CONTRACTOR Fieldstone
'
~ OCAT1CJN IN '=,TRUCTLJRE
'\111X ·"tJ CJR PROPORTIONS
! Tll\,1£.. 1,"'J MIXER MINUTES
:;L L,MP INCHES
F-AEJR1r_:ATE'O BY
LTeste_d by: DJ r-----
N. W. corner of slab-on-grade
II
Sorrento
Sorrento
S500016/5 sack
67
5
MS TRUCK NO 75
0 GROUT
0 GUNITE
Permit #CB901150 D
TICKET NO 138690
·, ASORATORY NO 7553 7554 7555 r\,1 ARK 2
QA TE 1\,1 ADE
DATE: RECEIVED
~JATE TESTED
2 1 Al\,1E: TF.:R. INCHES
,.:1,1::=if:A SQ 1NCHES
C\/1AX;MlJM LOAD. LBS
COMPRESSIVE STR. PSI
AGE Tf:STEO, DAYS
RFQ Cl PSI AT 28 DAYS
LJ''Ji T V✓ r/cu FT {PLASTIC)
12-17-90
12-18-90
12-24-90
6.00
28.27
62,000
2,190
7
2,500
DISTRIBUTION (3) Ben F. Smith, Inc.
(1) JEM III
(1) Sorrento Ready Mix
(1) City of Carlsbad
SOUTHERN CALIFORNIA
BOIL AND TESTING. INC.
REVIEWED BY
ntLf4fdwe---
Michael B. Wheeler, R.C.E. #45358
SPECIAL INSPECTION SERVICE
■IGIITUID
Southern California Soil & Testing, Inc.
... lll¥IIIIMU ff .. P. 0. .. 211117
......... CM.If' ---PNOIII. ...... ,
No. J'h:n.71 iro•·--•• aND1Ne 01111. " I □ H 1..-Qllao C-Tl
CJ-~-• STHSRD COCIIITI □ R[INFDIIClD Ml-Y
Q STIIUCT, STll1. •s-.Y □ GLUl • LMI. •-ICATICIII
□ HINFDIIClD G>P-□ OTNU
□ PIL[ 0111/ING
A■CMIT&CT
·N•t~S• \.c,,,.,,,_ :rrr
--T
IMIP''M.
DATI
LOCATIONS Of WOIK INSPECTED, TEST SAMPLES TAKEN, WOIK REJECTED, JOI P■OaLEMS, IIIOGIES$, IEWAIKS, ETC.
INCLUOZ.S I_Nf'OaMATIO .. ••ouT ~ &MOUNTS Of'MATCIIIIAL •i..&CI.D 011 wo•• •• , .. ,o ..... o, NUMeCfl. ,. •••. • IO&NT. NO'S.
Of',. ... ,. ...... -~··,. ......... , sTIIIUCT. CO ... NllCTIONIIW&LOSMAO& .... T. •01..TS To•ouco1 CM&c••o-&TC.
2 3 <-I ci
70
I 7 I
' ,
CIRTIPICATIDM DP COMPLIANCE
I HIUIY CIITlfY THAT I HAYI INSNCTID AU Of THI AIOVI HPOl'flD
W0111<. -OtMIWISI N0ffl), I NAVI ,_ 'TMIS WO .. TO
COMJII.Y WITH THI AHIOVIO ftANI. INClflCAftONI. AND IJ'PI.ICAM.l
SICl'IONI o, -GOVIIINING IIIILDING LAWS.
''
' '
, ,•
' ,
✓A
(" I
(' e
r" r2
Cd
(' r}
~B
, !5
Cd
cu
;-? .;--...... ' -f-
0c II I
70 11S-o .,
90 I I 3
9o Ir "51
0 (J I I /9
'IO I I J"i-
1o I' )2.
"i o I I ?0
'f'U 11 S'J
Jt! I I 3G.
GEOCON
1'.'IICOl\f"OR•\TE:D "'~
FOUNDATION OBSERVATION REPORT
JOB NAME: __ , ..... /,;. .. "--'...:/'-'-/'--'1 sa..-_________ _ FILE NO.:_·_··_.· ___ _
LOCATION: .. -'~;, 1; ;; 0 , · DATE:...:../_: __ ~---
(ADDRESS, LOT NUMBER/BUILDING NO .. ETC.)
PERMIT NO.: PIAN FILE NO.:
ePURPOSE OF OBSERVATION:
t:l Verify soil conditions exposed are similar to those anticipated .
. ti Footing excavations extend to proper depth and bearing strata.
□ Verify foundation reinforcement complies with minimum recommended in soil report.
□ Verify slab reinforcement, sand bedding and moisture barrier comply with minimum
recommended in soil report.
□ Other:. ______________________________ _
DATE: , . IL
e SOIL REPORT RECOMMENDATIONS BASED ON:
Jill Expansion Condition; 0 VERY LOW □ LOW iJJ MEDIUM O HIGH 0 VERY HIGH
~ Fill Geometry L,·/j :f.-,•, .. ,,J..,.,. •· ... p ... " s-· ~ .. z,
□ Other:-------------------------------
e MINIMUM FOUNDATION RECOMMENDATION:
Footing Depth: 0 12 INCHES ,a 18 INCHES O 24 INCHES OTHER: __________ _
Footing Reinforcement: 0 NO. 4 T&B O 2-N0.4 T&B O N0.5 T&B OTHER: /.·-· ',1, -, ,. ,
Interior Slab Reinforcement: 0 6x6-10/10 0 6x6-6/6 0 NO. 3 @ 24 INCHES O NO, 3 @ 18 INCHES
Slab Bedding Material and Thickness: a .. ,. "' Vapor Barrier:_~~~~~-
e FOUNDATION PLAN REVIEWED: YES D NOlil
If yes, identify and describe:
e OBSERVATIONS:
,!Sl Substantial conformance with Soil Report ( see "Purpose of Observation"),
□ Su~ conformance with Foundation Plans.
tJ Othd'. All lb(/frx;., f1r' . 'li ... t ': ,_ J , .. ( 'r:LI/ "c'..,, L; :\J. ! t,, ...
. , ....
n:\ wpjob\ draft.ing\fdnobrpt.100
. ,
,· ·-·~,,, ~-/''""/:-/
GEOCON REPRESENTATIVE
✓