Loading...
HomeMy WebLinkAbout1923 CALLE BARCELONA; 143; CBC2022-0446; Recycle(city of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 442-339-2719 www. car/sbadca. gov APPLICABLE TO NEW CONSTRUCTION. ALL RESIDENTIAL ADDITIONS AND ALTERATIONS AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER.....$.J00K If you have questions about the recycling requirement or completing this form, please contact Republic Services at (760) 332-6464 a certified C&D recycler, or the Carlsbad Building Division at (442) 339-2700. Please note: Unless you are self-hauling, Republic Services or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Applicant Information Permit No. Cl3C -2.022 -0 4±<:; Project Title __,__A~L~O~------------~ Project Address _ _\ \1.3. CAL..LE BA~CELONA ~\."(E_"l.ltJ APN Owner C~ A□rchitect Applicant Name H A'-(1>8AJ ~\/I I> D ~ Last First -n+ Applicant Address 'ZCJ6 "34 N, 2.£> 5~P.et" 5°1A\Th ;p-l!O ftiOaJIK AZ 0SOG'Cl E-mail Address d bA~clevl@atrier1tpfl fe:h~.i \ eo11.,. eo,.,. Applicant Mailing Address (if different than project address) Project Type (check all that apply): Brief Description Residential □ TEaJAtJf" I -Public Building □ 0 Project Size __ ?~-~S'_0_2--_____ ~Estimated Cost of Project$ ________________ _ (square footage) Please check the appropriate box: LJ /I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction. L0" I plan on using a City Approved Hauler and will provide all receipts after construction. □ This is a proposed LEED certified project and I plan on separating materials on site in conjunction with Republic Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Print Name '2/l"-'ll? HNi2€t-/ Page 1 of 3 Rev, 05122 PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided In and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the Information, and that the Information Is true and correct to the best of my knowledge and belief. Permit No. c.@:::1412'2--t2W~ Address / f. tAtU ~H'I :i' Date Material Type Examr1.le: 01/01/2020 Concrete (broken) ~~ A Actual Amt Reused or Salvaged Print Name B C Actual Amt Actual Amt Destination Facility Recycled Disposed In (Name, Address, Phone) Landfill Palomar Transfer Station, 5960 El 5 tons Camino Real -760 603-0153 7, ~ ~ t t7 ~ d,6f Diversion Rate Achieved Contractor/Owner Signature · Attach the following docume atlon to this Report: Original recycling weight ticket , landfill weight tickets Original donation receipts with photos and/or itemized descriptions Any other relevant Information to support Recycling Report City of Carlsbad Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 ~ Rev. 04/22 FALLBROOK WASTE & RECYCLING 550 WEST AVIATION FALLBROOK, CA 92028 (760) 728-6114 Customer: 0000 Ticket: 65924 Date: 04/13/23 MISC. CASH DRIVE UP Commodity Rate • In: 10:32 Out: 10:44 105.00 per TON INVOICE Truck: 0000 Container: a R~ute: 0"5654 Origin:P56 FALLBROOK 54 CERTIFIED C&D [Gross(In): 3.42 tons Units .51 Scl#l Tare 2.91 tons Scl#l Net: .51 ·Extended Charge 75.00 tons] PAID CREDIT CARD 75.00 Construction & Demolition Diversion Certificate --Diversion Percentage 69% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with L~ED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. CESAR CAMPOS Driver FALLBROOK WASTE & RECYCLING 550 WEST AVIATION FALLBROOK, ',.CA 92028 (760) 728-6114 Customer: 0000 Ticket: 66947 Date: 04/21/23 COASTAL KINGDOM JOB: LULLABAR Commodity Units Rate In: 9: 23 Out: 9:38 C&D 1. 59 105.00 per TON INVOICE Truck: 4300/4300 Container: Route: 05354 Origin: 053 CARLSBAD 54 CERTIFIED [Gross ( In) : 7.10 tons Man Wt Tare 5.51 tons Man Wt Net: 1.59 Extended Charge 166.95 tons] PAID CREDIT CARD 166,.95 Construction & Demolition Diversion Certificate --Diversion Percentage 65% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in acco,,.,_ with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO 1" · · RODRIGO Driv~r \ EDCO Di';h/,Al FALLBRK 550 W AVIAllilli ~[I FALLBllOOK, I', i!!l;tl321.9 H)l)O!J :211d 11 ~:·1ip ca,a: \ID il~" l,1td1 I: ls VOICE \pprov;1I Code : ,ti, M,U1od /iocle· fo Amount: CRtDfT CARD VISA SALt o:xiXiY:tAXI Xii O ;-; VlSA ( Rl[1 I A,jl)QOOOO(IJ' 0 [ . i' /. CUSTOIIER. COP'I ?:. 2, i ein:ic:-·1 Contaclt{ I I~u___ \Ill~·'