HomeMy WebLinkAbout2812 CAZADERO DR | 2814 CAZADERO DR; ; CBRA2018-0148 | CBRA2018-0149; Recycle( City of
Carlsbad
Owner:
WASTE MANAGEMENT
PLAN
B-59
Contractor:
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Job Address: 2'itlp 'ii 'f C rn4,,,f.,, k, Phone Number: C/'IJ-7 Tf -'1£'13
Permit#: Cl}l,ft 2,()/S,.,. Oll/f'. f OJU'f Estimated Cost of Project: $ _____________ _
Type of Project: l)aNew Construction D Remodel or T.I. □ Residential □ Commercial D Demolition
(check all that apply) □ Other _____________________________ _
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area. ________ X 2 lbs. = ________ lbs. of allowable waste.
D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1 -Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash / Garbal!e
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled ______ %
I certi ovided herein, to the best of my knowledge, is true and correct.
Da"!~/7 op,,
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: _________________ _
Page 1 of 2 REV.01-2017
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash Ga rba e
Other:
TOTAL lbs.:
lbs. of waste taken to
LANDFILL
Actual Percentage Re-Use
Official Use Only
lbs. of waste
RE-USED or RECYCLED
"
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
I
If
D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _
Reviewed/ Approved by: __________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete 0 3000
Brick/ Masonry 100 950
Cardboard 0 150
Drywall 0 50
Landscape Debris 0 1:20
Lumber/ Wood 500 0
Metals 300 2-00
Mixed Waste 1500 0
Trash / Garbage 300 0
Other: Pool c;ccvclte 0 'j00
TOTAL lbs.: -:r;-oo 5,3-_J-0
Percentage to be Re-Used or Recycled 6 7 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
Waste Hauling Company or Re-Use Method
A1'SC 1-tC!e<l[vcCi Co.
WM/ R.e-vi.sevl 1'Srlclz Ovc-slte
A-g,r I-IC!e<l[vcCi Cn.
A1'SC 1-tC!e<llvcCi Co.
Me<lc~evl E; Re-e<serl Ovc-slte
wnste MC1vcne1e'1,\,evct
WM/ A1'SC f-tC!e<llVcg
WM
WM
vi.Serl ns Cre<s~erl ,;nse ovc-slte
5370 X 100 = 67% Re-Used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2
( City of
Carlsbad
DCC E l\lfi!@pment Services WASTE MANAGEMEN'f Building Division
Owner: R.E. HAZARD CONTRACTING COM PAY
Job Address: 2812 CAZADERO DRIVE
PLAN AUG 2 9 2018
B-59 ITY OF CARLSBAD
BUILDING DIV
Contractor: CYPRESS VIEW BUILDERS. INC.
Phone Number: 619-795-8593
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Permit#: CBRA2018-0148 Estimated Cost of Project: $, ____________ _
Type Of Project: IX! New Construction D Remodel or T.I. □ Residential □ Commercial D Demolition
(check all that apply) D other -------------------------------
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area, _______ X 2 lbs.; ________ lbs.of allowable waste.
lxl I plan on using a WASTE MANAGEMENT roll-of/ bin. All receipts shall be provided to the Building Official prior to final.
Table 1 -Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete .., ·,;&;n n ' .. , \ '11.7),1, ~ A.~r1.lh#"'
Brick/ Masonry ~ -OD u .
Cardboard ' "JI\ I~\ ' " ,Ir/ .All ,AA_r:--
Drywall ' )1) 1 I
Landscape Debris ,1 In l I
Lumber/ Wood ✓ tl/\ D-
Metals "I-An Ulh \ I
Mixed Waste I l){)f) ,!>,,
Trash / Garbaa<> \ C}N(J .,,,..
Other:
TOTAL lbs: '1ftDV C,f)"()(}
Estimated Percentage to be Re-Used or Recycled, ______ %
to the best of my knowledge, is true and correct.
oa,. 1 lut I 1~
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by:, _________________ _
Page 1 of2 REV.01-2017
('city of
Carlsbad
WASTE MANAGEMENT
PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Owner: R.E. HAZARD CONTRACTING COM PAY Contractor: CYPRESS VIEW BUILDERS. INC.
Job Address: 2814 CAZADERO DRIVE Phone Number: 619-795-8593
Permit#: CBRA2018-0149 Estimated Cost of Project $ _____________ _
Type of Project: Ill] New Construction □ Remodel or T.I. □ Residential □ Commercial D Demolition
(check all that apply) D Other-------------------------------
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (W selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area ________ X 2 lbs.= ________ lbs. of allowable waste.
lxl I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1 -Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete ;;;, '/ Cf-,D , )11_ ~., -;:,.1 ""-C:::F'fu n, a:;
Brick/ Masonry -9--< /"vi\ LI
-er I tr, I \~°l'v, Ml lJ -Cardboard " " " Drywall ,t,,. l 0\, 1\
Landscape Debris ..l>r L 1'l1) u
Lumber/ Wood / f) t--. .)..)
Metals '7,hn I ()0 i l
Mixed Waste \ \'IP\ 1') s:y-
Trash / GarbaE!:e ,,,,._t, _c.-Y
C Other:
TOTAL lbs: ~)..f/iV-,
Estimated Percentage to be Re-Used or Recycled. ______ %
o the best of my knowledge, is true and correct.
Con
Con Date
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: __________________ _
Page 1 of2 REV.01-2017
w
WASTE MANAGEMENT
DUMPSITE/LANDFILL
Palomar Landfill (PAL)
5960 El Camino Real
Carlsbad CA 92008 ' '
DATE OF SERVICE SVC TICKET#
6/10/2021 788913
7/9/2021 868129
7/15/2021 881455
8/13/2021 957129
9/8/2021 22295
9/28/2021 76687
10/25/2021 134477
1/20/2022 342157
4/15/2022 511746
5/26/2022 597958
6/7/2022 779254
6/30/2022 659968
Total Tons
Total Tons Diverted
Total Tons Landfilled
Total Diversion
GENERAL CONTRACTOR:
CYPRESS VIEW BUILDERS
2814 CAZADERO DR
CARLSBAD, CA. 92009
Construction & Recycling Services
5701 5. Eastern Ave., STE 300, Commerce, CA 90040
714-480-2317 (Direct) 866-459-3985 (Fax)
C&D SORT & TRANSFER FACILITY
EDCO CDI Recycling & Buy Back Center
224 S Las Posas Rd
Acct: 150-72778
Sales Rep: Victoria Brown
ron@cypressview.com
Prepared Date· 7/13/2022 San Marcos CA 92078 ' Total Tons RECY
BIN SIZE MATERIAL TYPE Tons RCY RATE% FACILITY
3yd MIXED C & D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC& D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC& D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD)
3yd MIXED C & D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC& D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC& D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC&D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD)
3yd MIXED C & D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC& D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC& D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC&D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD)
3yd MIXEDC& D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD)
3.00
2.43
0.57
81.00%
SANCO source Recovery
6750 F, ,ra:l Blvd.
Lemon Grove, CA 91945
(619) 287-7555
Customer: 0000
ARMANDO SILVA.
Commcdity
Ticket: 18063
Date: 07/26/22
Rate
In:
Out:
TON
INVOICE
9:11 Truck: 8795
9:41 Container:
Route: 02034
Origin: 020 SAN DIEGO
34 CONSTRUCTION/ DEMOL
(Gross(In): 12,400. lbs
Units
2.41
Scl#2
83.00 per
Tare 7,580. lbs Scl#2 Net: 4,820.
Extended
Charge
200.03
lbs]
PAID CREDIT CARD 200.03 Construction & Demolition Diversion Certificate -Diversion Percentage 69%
This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance
with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility.
NOLAN LEON Driver
,, ,
; l~J~J. • ij·Jl-*'J -& /t'-f(Z> No.
:K,,;.:1vu:, 1-H<.-,1\/i 7)'POf OPP fi·----•• ···-· --J
----------~~~-[ F#£) ,,,,,_, __ :,;),-,-,,:;',
8 ;:;;; :rci'T ---. -t/.i.Q_]~ ···-·-----· -----
! ;;COLJ;;; i--
1--~~~;;l;':~;·:l~ !------
j ~f\l~~;-l~E---~ ---
1,,,, ___ ,,,,,),,,,,,,
DOU /\HS
) ('
Ii' ; (J: d l, -'
J-11 I