Loading...
HomeMy WebLinkAbout2812 CAZADERO DR | 2814 CAZADERO DR; ; CBRA2018-0148 | CBRA2018-0149; Recycle( City of Carlsbad Owner: WASTE MANAGEMENT PLAN B-59 Contractor: Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Job Address: 2'itlp 'ii 'f C rn4,,,f.,, k, Phone Number: C/'IJ-7 Tf -'1£'13 Permit#: Cl}l,ft 2,()/S,.,. Oll/f'. f OJU'f Estimated Cost of Project: $ _____________ _ Type of Project: l)aNew Construction D Remodel or T.I. □ Residential □ Commercial D Demolition (check all that apply) □ Other _____________________________ _ Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area. ________ X 2 lbs. = ________ lbs. of allowable waste. D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash / Garbal!e Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled ______ % I certi ovided herein, to the best of my knowledge, is true and correct. Da"!~/7 op,, Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by: _________________ _ Page 1 of 2 REV.01-2017 Table 2 -Actual Waste (To be completed after construction.) MATERIALS Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash Ga rba e Other: TOTAL lbs.: lbs. of waste taken to LANDFILL Actual Percentage Re-Use Official Use Only lbs. of waste RE-USED or RECYCLED " Waste Hauling Company or Re-Use Method (complete only if different than Table 1) I If D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _ Reviewed/ Approved by: __________________ _ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be taken to lbs. of waste to be LANDFILL RE-USED or RECYCLED Asphalt/ Concrete 0 3000 Brick/ Masonry 100 950 Cardboard 0 150 Drywall 0 50 Landscape Debris 0 1:20 Lumber/ Wood 500 0 Metals 300 2-00 Mixed Waste 1500 0 Trash / Garbage 300 0 Other: Pool c;ccvclte 0 'j00 TOTAL lbs.: -:r;-oo 5,3-_J-0 Percentage to be Re-Used or Recycled 6 7 % Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) Waste Hauling Company or Re-Use Method A1'SC 1-tC!e<l[vcCi Co. WM/ R.e-vi.sevl 1'Srlclz Ovc-slte A-g,r I-IC!e<l[vcCi Cn. A1'SC 1-tC!e<llvcCi Co. Me<lc~evl E; Re-e<serl Ovc-slte wnste MC1vcne1e'1,\,evct WM/ A1'SC f-tC!e<llVcg WM WM vi.Serl ns Cre<s~erl ,;nse ovc-slte 5370 X 100 = 67% Re-Used or Recycled (2700 + 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page 2 of 2 ( City of Carlsbad DCC E l\lfi!@pment Services WASTE MANAGEMEN'f Building Division Owner: R.E. HAZARD CONTRACTING COM PAY Job Address: 2812 CAZADERO DRIVE PLAN AUG 2 9 2018 B-59 ITY OF CARLSBAD BUILDING DIV Contractor: CYPRESS VIEW BUILDERS. INC. Phone Number: 619-795-8593 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Permit#: CBRA2018-0148 Estimated Cost of Project: $, ____________ _ Type Of Project: IX! New Construction D Remodel or T.I. □ Residential □ Commercial D Demolition (check all that apply) D other ------------------------------- Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area, _______ X 2 lbs.; ________ lbs.of allowable waste. lxl I plan on using a WASTE MANAGEMENT roll-of/ bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete .., ·,;&;n n ' .. , \ '11.7),1, ~ A.~r1.lh#"' Brick/ Masonry ~ -OD u . Cardboard ' "JI\ I~\ ' " ,Ir/ .All ,AA_r:-- Drywall ' )1) 1 I Landscape Debris ,1 In l I Lumber/ Wood ✓ tl/\ D- Metals "I-An Ulh \ I Mixed Waste I l){)f) ,!>,, Trash / Garbaa<> \ C}N(J .,,,.. Other: TOTAL lbs: '1ftDV C,f)"()(} Estimated Percentage to be Re-Used or Recycled, ______ % to the best of my knowledge, is true and correct. oa,. 1 lut I 1~ Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by:, _________________ _ Page 1 of2 REV.01-2017 ('city of Carlsbad WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Owner: R.E. HAZARD CONTRACTING COM PAY Contractor: CYPRESS VIEW BUILDERS. INC. Job Address: 2814 CAZADERO DRIVE Phone Number: 619-795-8593 Permit#: CBRA2018-0149 Estimated Cost of Project $ _____________ _ Type of Project: Ill] New Construction □ Remodel or T.I. □ Residential □ Commercial D Demolition (check all that apply) D Other------------------------------- Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (W selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area ________ X 2 lbs.= ________ lbs. of allowable waste. lxl I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete ;;;, '/ Cf-,D , )11_ ~., -;:,.1 ""-C:::F'fu n, a:; Brick/ Masonry -9--< /"vi\ LI -er I tr, I \~°l'v, Ml lJ -Cardboard " " " Drywall ,t,,. l 0\, 1\ Landscape Debris ..l>r L 1'l1) u Lumber/ Wood / f) t--. .)..) Metals '7,hn I ()0 i l Mixed Waste \ \'IP\ 1') s:y- Trash / GarbaE!:e ,,,,._t, _c.-Y C Other: TOTAL lbs: ~)..f/iV-, Estimated Percentage to be Re-Used or Recycled. ______ % o the best of my knowledge, is true and correct. Con Con Date Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by: __________________ _ Page 1 of2 REV.01-2017 w WASTE MANAGEMENT DUMPSITE/LANDFILL Palomar Landfill (PAL) 5960 El Camino Real Carlsbad CA 92008 ' ' DATE OF SERVICE SVC TICKET# 6/10/2021 788913 7/9/2021 868129 7/15/2021 881455 8/13/2021 957129 9/8/2021 22295 9/28/2021 76687 10/25/2021 134477 1/20/2022 342157 4/15/2022 511746 5/26/2022 597958 6/7/2022 779254 6/30/2022 659968 Total Tons Total Tons Diverted Total Tons Landfilled Total Diversion GENERAL CONTRACTOR: CYPRESS VIEW BUILDERS 2814 CAZADERO DR CARLSBAD, CA. 92009 Construction & Recycling Services 5701 5. Eastern Ave., STE 300, Commerce, CA 90040 714-480-2317 (Direct) 866-459-3985 (Fax) C&D SORT & TRANSFER FACILITY EDCO CDI Recycling & Buy Back Center 224 S Las Posas Rd Acct: 150-72778 Sales Rep: Victoria Brown ron@cypressview.com Prepared Date· 7/13/2022 San Marcos CA 92078 ' Total Tons RECY BIN SIZE MATERIAL TYPE Tons RCY RATE% FACILITY 3yd MIXED C & D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC& D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC& D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD) 3yd MIXED C & D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC& D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC& D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC&D 0.25 0.21 82.00% EDCO SAN MARCOS (EDD) 3yd MIXED C & D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC& D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC& D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC&D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD) 3yd MIXEDC& D 0.25 0.20 80.00% EDCO SAN MARCOS (EDD) 3.00 2.43 0.57 81.00% SANCO source Recovery 6750 F, ,ra:l Blvd. Lemon Grove, CA 91945 (619) 287-7555 Customer: 0000 ARMANDO SILVA. Commcdity Ticket: 18063 Date: 07/26/22 Rate In: Out: TON INVOICE 9:11 Truck: 8795 9:41 Container: Route: 02034 Origin: 020 SAN DIEGO 34 CONSTRUCTION/ DEMOL (Gross(In): 12,400. lbs Units 2.41 Scl#2 83.00 per Tare 7,580. lbs Scl#2 Net: 4,820. Extended Charge 200.03 lbs] PAID CREDIT CARD 200.03 Construction & Demolition Diversion Certificate -Diversion Percentage 69% This certifies that the company listed above has utilized an EDCO facility to divert construction demolition materials in accordance with LEED requirement. The diversion tonnage is based on an overall tonnage percentage of the respective EDCO facility. NOLAN LEON Driver ,, , ; l~J~J. • ij·Jl-*'J -& /t'-f(Z> No. :K,,;.:1vu:, 1-H<.-,1\/i 7)'POf OPP fi·----•• ···-· --J ----------~~~-[ F#£) ,,,,,_, __ :,;),-,-,,:;', 8 ;:;;; :rci'T ---. -t/.i.Q_]~ ···-·-----· ----- ! ;;COLJ;;; i-- 1--~~~;;l;':~;·:l~ !------ j ~f\l~~;-l~E---~ --- 1,,,, ___ ,,,,,),,,,,,, DOU /\HS ) (' Ii' ; (J: d l, -' J-11 I