HomeMy WebLinkAbout2642 VALEWOOD AVE; ; CBR2022-4452; PermitBuilding Permit Finaled
Residential Permit
Print Date: 08/03/2023
Job Address: 2642 VALEWOOD AVE, CARLSBAD, CA 92010-7925
Permit No:
Status:
( City of
Carlsbad
CBR2022-4452
Closed -Finaled
Permit Type: BLDG-Residential Work Class: Second Dwelling Unit
Parcel#: 1675610100 Track #:
Valuation: $75,529.50 Lot#:
Occupancy Group:
#of Dwelling Units: 1
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check#:
Applied: 11/30/2022
Issued: 02/24/2023
Finaled Close Out: 08/03/2023
Final Inspection: 06/22/2023
INSPECTOR: Dreibelbis, Peter
Alvarado, Tony
Description: VASQUEZ: DETACHED ADU (430 SF) MFG HOME ON PERMANENT FOUNDATION (SILVERCREST MODEL 5333H) // 4.5'
RETAINING WALL PER SDRSD C-02 STD FOR ADU PAD
Applicant: Property Owner:
MITCHELL BLOSKY
171 CALLE DE LOS NINOS
CO-OWNERS VINCENT VASQUEZ AND DENISE
GONZALEZ
RANCHO SANTA MARGARITA, CA 92688-2828 2642 VALEWOOD AVE
(949) 342-4482 CARLSBAD, CA 92010-7925
FEE
BUILDING PLAN CHECK
BUILDING PLAN REVIEW-MINOR PROJECTS (LDE)
BUILDING PLAN REVIEW-MINOR PROJECTS (PLN)
CERTIFICATE OF OCCUPANCY
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
RETAINING WALL-NON-ENGINEERED -CITY STANDARD
SB1473-GREEN BUILDING STATE STANDARDS FEE
SFD & DUPLEXES
STRONG MOTION -RESIDENTIAL (SMIP)
Total Fees: $2,668.97 Total Payments To Date: $2,668.97
Contractor:
INSTANT LIVING LLC
4028 CAMINITO MELIADO
SAN DIEGO, CA 92122-5104
(858) 205-8014
Balance Due:
AMOUNT
$813.15
$194.00
$98.00
$16.00
$175.00
$108.00
$4.00
$1,251.00
$9.82
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitat'1on has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
)
(_ City of
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-1
Plan Check CSt!:u:,7..'2,•L/'1~
Est. Value 7~ fi;)c3, cnr-'
PC Deposit Kl'&, IC
Date I 1/ de) jz_z_ •
Job Add res~ ALE WOOD AVE, CARLSBAD, CA 92010 Suite:. ___ _,,PN: 167-561-01-00
CT/Project #: __________________ Lot #: ____ Vear Built: _________ _
Fire Sprinklers: OYEs{!) No Air Conditioning:Q YES 0 NO Electrical Panel Upgrade:QYES0 NO ,
BRIEF DESCRIPTION OF WORK: Slt.v~ 53,s /.I l !!>O ,~
New 430 sf ADU oxry ~r»c,t QIJ pp,a,, rt-Npn'. f'cMI\IQIHU'N (rn,O{J..@ ;p iJ aj
t,v't-nf l{ y,a.., ~~~,~&,... e.;14-1 (,,..
~ Addition/New: ADU Living SF, 430 Deck SF, ____ Patio SF, ____ Garage SF __ _
Is this to create an Accessory Dwelling Unit? 0Y ON New Fireplace? Qv ON, if yes how many? __
□Remodel: SF of affected area Is the area a conversion or change of use ? Ov ON
0 Pool/Spa: ___ ~SF Additional Gas or Electrical Features? ____________ _
osolar: ___ KW, ___ Modules, Mounted:0Roof 0Ground, Tilt: 0 vO N, RMA: Ov ON,
Battery:Ov ON, Panel Upgrade: Ov ON
D Reroof: ------------------------------------□ Plumbing/Mechanical/Electrical
0 Only: Other:
This permit is to be issued in the name of the Property Owner as Owner-Builder, licensed contractor or Authorized Agent of the
owner or contractor. The person listed as the Applicant below will be the main point of contact throughout the permit process.
PROPERTY OWNER APPLICANT O PROPERTY OWNERS AUTHORIZED AGENT APPLICANT [j]
Name: VINCENT & FATH/MA VASQUEZ Name: Mitchell Bloskv
Address: mitchell@affordabledrafting.com Address: 171 CALLE DE LOS NINOS
City: Carlsbad State: CA Zip:_9_20_o_s __ City: RANCHO SANTA MARGARITA state: CA Zip:_9_26_8_8 __ _
Phone: Phone: 949-342-4482
Email: Email: mitchell@affordabledraftinq.com
DESIGN PROFESSIONAL APPLICANT O CONTRACTOR OF RECORD APPLICANT 0
Name: Mitchell Blosky Name: Instant Living-Michael Avery
Address: 171 CALLE DE LOS NINOS Address: 8775 Costa Verda Blvd
City: RANCHO SANTA MARGARITA State:_C_A __ .Zip: 92688 City: San Diego State:._c_A _ __,..Zip: 92122
Phone: 949-342-4482 Phone: 858-205-8014
Email: Email: team@instantguesthomes.com
Architect State License: State License/class: B Bus. License: 0931231
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: ~ujl(ling«VC1r_l.,,bci_dggov
REV 08/20
IDENTIFY WHO WILL PERFORM THE WORK BY COMPLETING (OPTION A) OR (OPTION B) BELOW:
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 {commencing with Section 7000) of Division 3
of the Business and Professions Code, and my license is in full force and effect, I also affirm under penalty of perjury one of the
following declarations:
0 I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. Policy No._,_20_00_,_, -"'-"--------------------------------------~
DI have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance at the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: ______________________ _
Policy No. ____________________________ Expiration Date: _______________ _
liJ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING; Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name:. ______________________ .Lender's Address: _____________________ _
CONTRACTOR PRINT: Michael Avery SIGl\mi.,e,,W,l ~ATE: 11/14/22
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
DI, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
D l am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
D1owner Builder acknowledgement and verification form" ha.~ been filled out, \Igned anrl attach Pd to th1~ application.
0 Owners "Authorized Agent Form" ha,; been fillPd out, signed anrl ilttached to this application q1ving the agent authority to obtain the permit on the owner'> hehalf.
By niy ~rgnature below I acknowledge that, except for my personal rPsidence m which I must have residerl for c1t least one year prior to completion of the
ImprovemC'nts rnve:red by this permit I cannot legally sell a structure that I havP built as an ownPr-builder if it has not been constructPrl in its entirety by licenSPrl
contractors. I understand that a copy of the applicable Jaw, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http://www.leginfo.ca.gov/caJaw.html.
OWNER PRINT: SIGN: DATE: 11 /14/22 ------------
APPLICANT CERTIFICATION: SIGNATURE REQUIRED AT THE TIME OF SUBMITTAL
By my signature below, I certify that: I am the property owner or State of California Licensed Contractor or authorized to act on the property
owner or contractor's behalf. I certify that I have read the application and state that the above information is correct and that the information on
the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SA VE,
INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE
AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and
demolition or construction of structures over 3 stories in height.
APPLICANT PRINT: Mitchell Blosky ~ !I.. /3,,!. /_ ..
SIGN: r ,-..r.v~ DATE: 11 /14/22 ------------
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760--602-2 719 Fax: 760-602-8558 Email: 5_t1__1Jijing_@i:.il..!J~bad __ c..4,.g_11v
2 REV. 08120
( City of
Carlsbad
OWNERS
AUTHORIZED
AGENT FORM
B-62
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
OWNER'S AUTHORIZED AGENT FORM
Only a property owner, contractor or their authorized agent may submit plans and applications for building
permits. To authorize a third-party agent to sign for o building permit, the owner's third party agent must bring
this signed form, which identifies the agent and the owner who s/he is representing, and for what jobs s/he
may obtain permits. The form must be completed in its entirety to be accepted by the City for each separate
permit application.
Note: The following Owner's Authorized Agent form is required to be completed by the
property owner only when designating on agent to apply for a construction permit
on his/her behalf.
AUTHORIZATION OF AGENT TO ACT ON PROPERTY OWNER'S BEHALF
Excluding the Property Owner Acknowledgement, the execution of which I understand is my personal responsibility,
I hereby authorize the following person(s) to act as my agent(s) to apply for, sign, and file the documents necessary
to obtain an Owner-Builder Permit for my project.
Scope of Construction Project (or Description of Work): New 439 sf ADU
2642 VALEWOOD AVE, CARLSBAD, CA 92010 Project Location or Address: ____________________________ _
Name of Authorized Agent: _M_it_c_h_e_l_l _B_l_o_s_k_y _____ Tel No. _9_4_9_-_3_4_2_-4_4_8_2_
AddressofAuthorizedAgent: 171 Calle de Los Ninos
Rancho Santa Margarita, CA 92688
I declare under penalty of perjury that I am the property owner for the address listed above and I personally filled
out the above information and certify its accuracy.
Property Owner's Signature: _(/i_t,t,1_._MJ' __ ~U~'M~~;,,-l-~-------Date: 11 /14/22
1
PERMIT INSPECTION HISTORY for. (OBR2022-4452)
Permit Type: BLDG-Residential Application Date: 11/30/2022 Owner: CO-OWNERS VINCENT VASQUEZ AND
DENISE GONZALEZ
Work Class: Second Dwelling Unit Issue Date: 02/24/2023 Subdivision: CARLSBAD TCT#84-35 UNIT#03
Address: 2642 VALEWOOD AVE Status: Closed -Finaled Expiration Date: 12/11/2023
IVR Number: 44963 CARLSBAD. CA 92010-7925
Scheduled
Date
06/22/2023
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector
Checklist Item
BLDG-Building Deficiency
BLDG-18 Exterior Lath and
Drywall
COMMENTS
June 12, 2023: (2nd phase -electrical
meter release to new detached ADU)
-approved.
1. New electrical main service panel
upgrade to accommodate new ADU
accessory structure located at rear side of
property yard.
2. Inspected location of new electrical main
service panel, SDG&E work order and
diagram-drawing, cold water grounding
bond and UFER main electrical grounding
bond connection, scope of panel upgrade
-approved.
3. SWPPPS and BMPS, and all other
sediment and erosion control measures
and devices, installed in-place
correctly-approved.
June 12, 2023: (2nd phase -electrical
meter release to new detached ADU)
-approved.
1. New electrical main service panel
upgrade to accommodate new ADU
accessory structure located at rear side of
property yard.
2. Inspected location of new electrical main
service panel, SDG&E work order and
diagram-drawing, cold water grounding
bond and LIFER main electrical grounding
bond connection, scope of panel upgrade
-approved.
3. SWPPPS and BMPS, and all other
sediment and erosion control measures
and devices, installed in-place
correctly-approved.
06/22/2023 BLDG-Final Inspection
Checklist Item
215013-2023
COMMENTS
Passed Tony Alvarado
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
NOTES Created By
Angie Teanio
TEXT
949-342-4482 Mitchell
Thursday, August 3, 2023
Reinspection Inspection
Passed
Yes
Yes
Passed
Yes
Yes
Yes
Yes
Created Date
06/21/2023
Complete
Page 7 of7
" '
PERMIT 'INSPECTION HISTORY fQr JCBR.2022-4452)
Permit Type: BLDG-Residential Application Date: 11/30/2022 Owner: CO-OWNERS VINCENT VASQUEZ AND
DENISE GONZALEZ
Work Class: Second Dwelling Unit Issue Date: 02/24/2023 Subdivision: CARLSBAD TCT#84-35 UNIT#03
Address: 2642 VALEWOOD AVE Status: Closed -Finaled Expiration Date: 12/11/2023
IVR Number: 44963 CARLSBAD, CA 92010-7925
Scheduled
Date
06/12/2023
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector
Checklist Item
Are inactives slopes properly
stabilized?
Are areas flatter than 3: 1
covered or protected?
Are sediment controls properly
maintained?
Are erosion control BMPs
functioning properly?
Are natural areas protected
from erosion?
Do basins appear to be
maintained as required?
Are perimeter control BMPs
maintained?
Is the entrance stabilized to
prevent tracking?
Have sediments been tracked
on to the street?
Have materials collected
around the storm drains?
Has sediment accumulated on
impeivious surfaces?
Are dumpsters and trash
receptacles covered?
Has trash/debris accumulated
throughout the site?
Are stockpiles and spoils
protected from runoff?
Are all storage areas clean
and maintained?
Were spills/leaks observed
during the inspection?
Were there any discharges
during the inspection?
Are portable restrooms
properly positioned?
Do portable restrooms have
secondary containment?
Are BMPs stockpiled for
emergency deployment?
COMMENTS
New ADU accessory structure.
1. SWPPPS and BMPS, and all other
sediment and erosion control measures
and devices, installed in-place
correctly-approved.
06/12/2023 BLDG-82 Drywall, 213943-2023 Passed Tony Alvarado
Exterior Lath, Gas Test,
Hot Mop
Thursday, August 3, 2023
Reinspection Inspection
Passed
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Complete
Page 6 of7
PERMIT INSPECTION HISTORY for (CBR2022-4452)
Permit Type: BLDG-Residential
Work Class: Second Dwelling Unit
Status:
Scheduled
Date
Closed -Finaled
Actual Inspection Type
Start Date
BLDG.Electric Meter
Release
Checklist Item
Application Date: 11/30/2022
Issue Date: 02/24/2023
Expiration Date: 12/11/2023
IVR Number: 44963
Inspection No.
213429-2023
COMMENTS
Inspection
Status
Passed
Owner: CO-OWNERS VINCENT VASQUEZ AND
DENISE GONZALEZ
Subdivision: CARLSBAD TCT#84-35 UNIT#03
Address: 2642 VALEWOOD AVE
CARLSBAD, CA 92010-7925
Primary Inspector Reinspection Inspection
Tony Alvarado Complete
Passed
BLOG-Building Deficiency 1. New electrical main service panel
upgrade to accommodate new ADU
accessory structure located at rear side of
property yard.
Yes
BLDG-SW•lnspection
Thursday,August3,2023
2. Inspected location of new electrical main
service panel, SDG&E work order and
diagram-drawing, cold water grounding
bond and LIFER main electrical grounding
bond connection, scope of panel upgrade
-approved.
3. SWPPPS and BMPS, and all other
sediment and erosion control measures
and devices, installed in-place
correctly-approved.
213457-2023 Partial Pass Tony Alvarado Reinspection Incomplete
Page 5 of 7
RERMIT INSPECTION l;IISTOR¥ for (CBR~022-4452)
Permit Type: BLDG-Residential Application Date: 11/30/2022 Owner: CO-OWNERS VINCENT VASQUEZ AND
DENISE GONZALEZ
Work Class: Second Dwelling Unit Issue Date: 02/24/2023 Subdivision: CARLSBAD TCT#84-35 UNIT#03
Address: 2642 VALEWOOD AVE Status: Closed -Finaled Expiration Dale: 12/11/2023
IVR Number: 44963 CARLSBAD, CA 92010-7925
Scheduled
Date
06/06/2023
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector
Checklist Item
BLDG-Building Deficiency
COMMENTS
May 30, 2023:
New 200 amp panel upgrade -(failed), not
ready.
1. Spoke to contractor representative
Mitchell and Robert and informed
FIRST-removal of existing 100 amp
electrical main panel needs to be removed.
2. install new 200 main electrical service
panel, and connect water pond grounding
and UFER grounding to bus bar.
3. then, call for electrical panel
upgrade-inspection.
06/06/2023 BLDG-33 Service
Change/Upgrade
213448-2023 Passed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
COMMENTS
1. New electrical main seivice panel
upgrade to accommodate new ADU
accessory structure located at rear side of
property yard.
2. Inspected location of new electrical main
seivice panel, SDG&E work order and
diagram-drawing, cold water grounding
bond and UFER main electrical grounding
bond connection, scope of panel upgrade
-approved.
3. SWPPPS and BMPS, and all other
sediment and erosion control measures
and devices, installed in-place
correctly-approved.
BLDG-34 Rough
Electrical
213272-2023 Passed Tony Alvarado
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
COMMENTS
1. New electrical main service panel
upgrade to accommodate new ADU
accessory structure located at rear side of
property yard.
2. Inspected location of new electrical main
service panel, SDG&E work order and
diagram-drawing, cold water grounding
bond and UFER main electrical grounding
bond connection, scope of panel upgrade
-approved.
3. SWPPPS and BMPS, and all other
sediment and erosion control measures
and devices, installed in-place
correctly-approved.
TEXT
949-342-4482 Mitchell
Thursday, August 3, 2023
Reinspection Inspection
Passed
Yes
Passed
Yes
Passed
Yes
Created Date
06/05/2023
Complete
Complete
Page4of7
-
PERMIT INSPECTION HISTORY Jor {~BR2022-4452)
Permit Type: BLDG-Residential Application Date: 11/30/2022 Owner: CO-OWNERS VINCENT VASQUEZ AND
DENISE GONZALEZ
Work Class: Second Dwelling Unit Issue Date: 02/24/2023 Subdivision: CARLSBAD TCT#84-35 UNIT#03
Status: Closed -Finaled Expiration Date: 12/11/2023 Address: 2642 VALEWOOD AVE
IVR Number: 44963 CARLSBAD, CA 92010-7925
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
Checklist Item COMMENTS Passed
Are inactives slopes properly Yes
stabilized?
Are areas flatter than 3:1 Yes
covered or protected?
Are sediment controls properly Yes
maintained?
Are erosion control BMPs Yes
functioning properly?
Are natural areas protected Yes
from erosion?
Do basins appear to be Yes
maintained as required?
Are perimeter control BMPs Yes
maintained?
Is the entrance stabilized to Yes
prevent tracking?
Have sediments been tracked Yes
on to the street?
Have materials collected Yes
around the storm drains?
Has sediment accumulated on Yes
impervious surfaces?
Are dumpsters and trash Yes
receptacles covered?
Has trash/debris accumulated Yes
throughout the site?
Are stockpiles and spoils Yes
protected from runoff?
Are all storage areas clean Yes
and maintained?
Were spills/leaks observed Yes
during the inspection?
Were there any discharges Yes
during the inspection?
Are portable restrooms Yes
properly positioned?
Do portable restrooms have Yes
secondary containment?
Are BMPs stockpiled for Yes
emergency deployment?
05/30/2023 05/30/2023 BLDG-34 Rough 212390-2023 Failed Tony Alvarado Reinspection lncompk!te
Electrical
Thursday, August 3, 2023 Page 3 of7
"',
, PEQ.MIT INSPECTION HISJQRY for (,CBR2022-4452)
Permit Type: BLDG-Residential Application Date: 11/30/2022 Owner: CO-OWNERS VINCENT VASQUEZ AND
DENISE GONZALEZ
Work Class: Second Dwelling Unit Issue Date: 02/24/2023 Subdivision: CARLSBAD TCT#84-35 UNIT#03
Address: 2642 VALEWOOD AVE Status: Closed -Finaled Expiration Date: 12/11/2023
IVR Number: 44963 CARLSBAD, CA 92010-7925
Scheduled
Date
Actual Inspection Type
Start Date
Checklist Item
Inspection No.
COMMENTS
Inspection
Status
Primary Inspector
BLDG-Building Deficiency April 4, 2023:
1. Pre-fabricated, engineered ,
manufactured home -set up
inspection-approved.
2. SWPPPS and BMPS, erosion and soil
control devices and measures in place
during entire ADU construction
process-partial pass.
3. exterior new sewer line connection from
new pre-fabricated ADU to existing sewer
line, scope of work-approved.
4. Water plumbing line and seismic hold
down system, verified prior approved
engineered plans-approved.
BLDG-24 Rough/Topout 207128-2023 Passed Tony Alvarado
Checklist Item COMMENTS
BLDG-Building Deficiency April 4, 2023:
BLDG-71 Set Ups
Checklist Item
1. Pre-fabricated, engineered,
manufactured home -set up
inspecfron-approved.
2. SWPPPS and BMPS, erosion and soil
control devices and measures in place
during entire ADU construction
process-partial pass.
3. exterior new sewer line connection from
new pre-fabricated ADU to existing sewer
line, scope of work-approved.
4. Water plumbing line and seismic hold
down system, verified prior approved
engineered plans-approved.
207127-2023
COMMENTS
Passed Tony Alvarado
BLDG-Building Deficiency April 4, 2023:
BLDG-SW-Inspection
1. Pre-fabricated, engineered ,
manufactured home -set up
inspection-approved.
2. SWPPPS and BMPS, erosion and soil
control devices and measures in place
during entire ADU construction
process-partial pass.
3. exterior new sewer line connection from
new pre-fabricated ADU to existing sewer
line, scope of work-approved.
4. Water plumbing line and seismic hold
down system, verified prior approved
engineered plans-approved.
207130-2023 Partial Pass Tony Alvarado
Thursday,August3,2023
Reinspection Inspection
Passed
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Reinspection Incomplete
Page2of7
Building Permit Inspection History Finaled
( City of
Carlsbad
PERMIT INSPECTION H,ISTORV for (CBR2022-4452)
Permit Type: BLDG-Residential Application Date: 11/30/2022 Owner: CO-OWNERS VINCENT VASQUEZ AND
DENISE GONZALEZ
Work Class: Second Dwelling Unit Issue Date: 02/24/2023 Subdivision: CARLSBAD TCT#84-35 UNIT#03
Status: Closed -Finaled Expiration Date: 12/11/2023 Address: 2642 VALEWOOD AVE
IVR Number: 44963 CARLSBAD, CA 92010-7925
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection
Date Start Date Status
03/06/2023 03/06/2023 BLDG-21 204857 -2023 Passed Tony Alvarado Complete
Underground/Underflo
or Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Underground, water lines, sewer lines, Yes
and electrical conduit for new ADU
structure -approved.
BLDG-22 Sewer/Water 204859-2023 Passed Tony Alvarado Complete
Service
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Underground, water lines, sewer lines, Yes
and electrical conduit for new ADU
structure -approved.
BLDG-31 204858-2023 Passed Tony Alvarado Complete
Underground/Conduit -
Wiring
Checklist Item COMMENTS Passed
BLDG~Building Deficiency Underground, water lines, sewer lines, Yes
and electrical conduit for new ADU
structure -approved.
03/17/2023 03/17/2023 BLDG-11 2057 40-2023 Passed Peter Dreibelbis Complete
Foundation/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG~Building Deficiency Pier pads on slab ok No
NOTES Created By TEXT Created Date
Angie Teanio 949-342-4482 Mitchell 03/16/2023
04/04/2023 04/04/2023 BLDG-23 207126-2023 Passed Tony Alvarado Complete
GasfT est/Repairs
Thursday, August 3, 2023 Page 1 of7
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE
AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION
OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN
IS EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION
CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION
OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING
RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION
CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY
INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE
AT THE END OF EACH WORKING DAY WHEN THE FIVE (5)
DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT
( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER
EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM
AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER
PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST
BE INSTALLED AND MAINTAINED.
7. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER
THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED
TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY
REGULATIONS.
OWNER'S CERTIFICATE:
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT
BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION
ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID
THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO
AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION
RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES,
COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP
THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES
UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED
BY THE CITY OF CARLSBAD.
t-A ·~ gu.., Ii 14Si,c;'('
OWNER(S)/OWNER'S AGENT NAME (PRINT)
l-u.M~~
OWNER S /OWNER ME SIGNATURE
E-29
ol /,.tJ/ .,,L ~
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
Erosion Control Sediment Control BMPs Tracking Non-Stnnm Water
BMPs Control BMPs Management BMPs
cc -cc cc 0
0 0 :;::; cc
-0 :;::; :;::; 0, 0 Q)
"' cc " " cc £ 0, E -0 ::, ::, 0 ·c: CL 0 E -L L :;::; -0 L ::,; -0 "' 0, L Q) --cc ':, L Q) c "' "' "' ~ '-0, cc " a. £ ·c: CT
Oo " ·c: -cc "' cc L w Best Management Practice• ~ cc 0 en a. L 0 " 0 L (!) Q) :c: "' ;: "' I i-'= " 0 cc UL u " -cc E "' ;£ -0
(BMP) Description ➔ "' " "en ·e "' 0, " 0, (D "i5 C o> cc -0 "' cc
" :5 " 0 0 ;: cc -ow cc cc ~ Cl) " -0 LO -0 >-0 "' 0 :;::; cc 0 (D en·-0, D:;:; .,-....., 0 " 0 0 0,
X ::,; 0 0, 0 cc " "' _E 0 N u, ii 0 " en:;:; " ~ .!: " 0 " E -"' Q) .0 E al = en =~ L'-:i'i Q) LL Q) ::, cc 0 --0 .s::; cc " L -0 :0 ID ·--0 BO 0 " cc 0 -·-a. '5 Q) > " ::, L-.0 0 -~ & ·-0 0 LO -Q) 0 L (J cc 00 OL -.s::; " Q) ;£ OL 0 = Q) .s::; .0 L -o 0 -L -0, .8 0 00 0 ~u (!) WO vi en en 0 G: (!) en> en "'Q_ en cc "' "' ;;,: ct 0--0 Q_
CASOA Designation ➔ r--<X) en .... '° 0 N "' r--<X) i i "' <D r--<X) i i i I I I I I I I I I I I I I
u u u u w w w w w w w w "' g: (/] (/] (/] (/]
Construction Activity w w w w en en (/] en en (/] en en f--z z z z
Gradinn/Soil Disturbance
Trenchina/Excavation
Stockcilina
Drillinn /Borina
Concrete/Aschalt Sawcuttina
Concrete Flatwork
Pavina
Conduit/Pipe Installation
Stucco/Mortar Work )(
Waste Disposal ]<:
Staainn /Lav Down Area
Eauicment Maintenance and Fuelinn
Hazardous Substance Use/Storaae
Dewatering
Site Access Across Dirt ~
Other (list): M ,. ... -1-. /(aWA.t l•Stt.,11
Instructions: 1. Check the box to the left of all applicable construction activity (first column) expected to occur during construction.
Waste Management and Materials
Pollution Control BMPs
-cc -0 Q) -0 cc E cc 0 0 Q) Q) c 0, -cc "' I 0 ,g cc 0 0 :;::; ;;,:_ " 0 -Qj I "' ::,; cc " cc cc
0 ,g -Q) "' " ::::, [!l E " "E " 0 " 0 "5-L-;;,: " 0 " ·-0, ·c: Q_ 0 0, ~ 0, LO ti L " ---0 0 oo OJ L -o -0 = C ·-cc N CC o_ 0 -a.o oo 00 ::,; en ::,; en (/] u en::,; :r: ::,;
N "' ..,_ '° <D i I I I I I ::,; ::,; ::,; ::,; ::,; ::,; ;;,: ;;,: ;;,: ;;,: ;;,: ;;,:
X
X
)(,
2. Located along the top of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Association (CASQA) designation number. Choose one
or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column.
3. Refer to the CASQA construction handbook for infom1ation and details of the chosen BMPs and how to apply them to the project.
PROJECT INFORMATION
" -"' o-;;:: 5i
" E -" ~ 0,
" 0 cc cc
0 0 u::,;
<X)
I ::,; ;;,:
Site Address: 2' Yz. v,.,k.,,_f /tVt. wltl..Ji '/2,.ot(J
Assessor's Parcel Number: ti, 1: • s-, I-OJ-00
Emergency Contact:
Name: .,A,~U etosl6f
24 Hour Phone: ,.,, '~'f 2-• 'f'lt/7,
Construction Threat to Storm Water Quality
(Check Box)
□ MEDIUM ~LOW
.
Page 1 of 1 REV 11/17
{_ City of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Devg_J_Qpment Servii;_es_
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) must be included with the building permit application for all projects
that require CAP compliance. The Carlsbad Municipal Code (CMC) can be referenced during completion of this
document by clicking on the provided links to each municipal code section.
NOTE: The following type of pemiits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document.
Homeowners should not attempt to fill this out without consultation. Appropriate certification
includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy compliance,
IECC/HERS Compliance Specialist, ICC GB Energy Code Specialist, RESNET HERS rater certified, certified ICC
Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
check N/A and provide an explanation or code section describing the exception.
Details on CAP ordinance requirements are available at each section by clicking on the municipal code link provided. The
project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections.
Project Name/Building
Permit No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
BP No.:
2642 VALEWOOD AVE, CARLSBAD, CA 92010 / 167-561-01-00
Mitchell Blosky
171 Calle de Los Ninos, Rancho Santa Margarita, CA 92688
Contact Phone: Contact Email: mitchell@affordabledrafting.com
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
Contact Phone:
Contact Email:
Applicant Signature: __ ~ J· ~ ____ Date: rn1,122
B-50 Page 1 of 7 Revised 04/21
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For
alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet.
Building Permit Valuation (BPV) $ breakdown _______ _
I!] Residential
~ New construction
D Additions and alterations:
□ BPV < $60,000
□ BPV 2c $60,000
□ Electrical service panel upgrade only
□ BPV 2c $200,000
D Nonresidential
□ New construction
D Alteratlons:
□ BPV 2c $200,000 or additions 2c 1,000
square feet
□ BPV 2c $1,000,000
□ 2c 2,000 sq. ft. new roof addition
1. Energy Efficiency
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at /east 20% of its ccnditioned floor
area is residential use
2A", 3A*, 1B, 2B, 'Includes detached, newly ccnstructed ADU 4A', 38,4A
NIA N/A All residential additions and alterations
1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
only.
'Multi-family dwellings only where interior finishes are removed
1A, 4A' 18,4A' and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
1 B, 28, 3B, 48 and 5
1B, 5
18,28,5 Building alterations of 2c 75% existing gross floor area
28,5 1 B also applies if BPV 2c $200,000
Please refer to Carlsbad Municipal Code (CMG) 18.21.155 and 18.30.190,and the Caloomia Green Building Standarus Code (CALGreen) for more
information. Appropriate details and notes must be placed on the plans acccrding to selections chosen in the design.
A. D Residentialadditionoralteration~$60,000buildingpermitvatuation. □ N/A _________ _
Details of selection chosen below must be placed on the plans referencing CMC □ Exception: Home energy score 2: 7
18.30.190. (attach certification)
Year Built Single-family Requirements Multi-family Requirements
o Before 1978 Select one option:
D Ductsealing □Atticinsulation □Coo/roof D Attic insulation
D 1978 and later Select one option:
D Lighting package D Water heating Package
D Between 1978and 1991 Select one option:
D Ductsealing □Atticinsulation D Coot roof
D 1992 and later Select one option:
D Lighting package D Water heating package
Updated 4/16/2021 3
8. D Nonresidentiar new construction or alterations~ $200,000 building pennit valuation,
or additions~ 1,000squarefeetSeeCMC 18.21. 155and CALGreen Appendix AS D NIA
AS.203.1.1 Choose one: D .1 Outdoorlighting □ .2 Restaurant service water heating (CEC 140.5)
D .3Warehousedocksealdoors. D .4 DaylightdesignPAFs D .5 Exhaustairheatrecovery □ NIA
AS.203.1.2.1 Choose one: □ .95 Energy budget (Projects with indoor lighting OR mechanical)
□ .90 Energybudget (Projects~thindoorlightingANDmechanical) □ NIA
AS.211. 1" □ On-site renewable energy:
D NIA
AS.211.3~ D Green power (If offered by local utility provider, 50% minimum renewable sources)
D NIA
AS.212.1 D Elevators and escalators: (Project with more than one elevatorortwo escalators)
D NIA
AS.213.1 □Steelframing: (Provide details on plans for options 1-4 chosen)
D NIA
• Includes hotels/motels and high-rise residential buildings
"Foralterations~$1,000,000 BPV and affecting> 75%existinggrossfloorarea, ORalterationsthatadd2,000squarefeetofnewroofadd~ion: comply
with CMC 18.30.130 (section 28 below) instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building pennit applications submitted after 111/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to
CAP section 38 below(low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) 11,000 + (1.15 x #d.u.)
•Fonnula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
kWdc
Exception
D
D
D
D
8. D Nonresidential new construction or alterations ~$1,000,000 8PV AND affecting ~75% existing floor area, OR addition that increases
roof area by ~,000 square feet Please refer to CMC 18.30.130 when completing this section. 'Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
□ Gross Floor Area (GFA)Method
GFA:
□ If< 10,000s.f. Enter: 5 kWdc
Min.System Size:
□ If~ 10,000s.f. calculate: 15 kWdcx (GFA/10,000) ••
kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
Updated 4/16/202 I 4
D Time-Dependent Valuation Method
AnnualTDVEnergy use:•-______ x .BO= Min. system size: ______ kWdc
-Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A. D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section.
Provide complete details on the plans.
l!!I For systems serving individual dwelling units choose one system:
l!!I Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
□ Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential)
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
□ Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Exception:
□ For systems serving multiple dwelling units, install a central water-heating system with ALL of the following:
□ Gas or propane water heating system
□ Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
□ Solar water heating system that is either:
□ .20 solar savings fraction
□ .15 solar savings fraction, plus drain water heat recovery
□ Exception:
B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide
complete details on the plans.
□ Water healing system derives at least 40% of its energy from one of the following (attach documentation):
□ Solar-thermal □ Photovoltaics □ Recovered energy
□ Water heating system is (choose one):
□ Heat pump water heater
□ Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
□ Exception:
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to
demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a
performance approach to comply with energy-related measures will need to attach to this checklist separate calculations
and documentation as specified by the ordinances.
Updated 4/16/21 5
4. Electric Vehlcle Charging
A D Residential New construction and major alterations•
Please refer to CMC 18.21.140 when completing this section.
□ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE Ready parking space required □ Exception :
□ Multi-family residential· □ Exception •
Total Parking Spaces EVSE Spaces
Proposed EVSE (10% of total) Installed (50% of EVSE) Other "Ready" Other "Capable"
Calculations: Total EVSE spaces= .1 Ox Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready' or "Capable"
*Major alterations are: ( 1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit
valuation~$60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached
garages), alterations have a building permit valuation~ $200,000, interiorfinishesare removed and significant site work and upgrades to
structural and mechanical, electrical, and/or plumbing systems are proposed.
*ADU exceptions for EV Ready space (no EV ready space required when):
(1) The accessory dwelling unit is localed within one-half mile of public transit.
(2) The accessory dwelling unit is located within an architecturally and historically significant historic district.
(3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure.
(4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit.
(5) When there is a car share vehicle located within one block of the accessory dwelling unit.
B. D Nonresidential new construction (includes hotels/motels) □ Exception: ____________ _
Please refer to CMC 18.21.150 when completing this section
Total Parking Spaces
Proposed EVSE (10% of total) I Installed (50% ofEVSE) I Other "Ready" I Other "Capable"
I I I
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
□ 201 andover 1 0 percent of total 50 percent of Required EV Spaces
Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready' or "Capable"
Updated 4/16/202 I 6
5. □Transportation Demand Management (TOM): Nonresidential ONLY
An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will usethetablebelowbased on yoursubmitted plans to determinewhetherornoryourpermtt requires a TDM plan. lfTDM isapplicableto your
penmit, staff will contad the applicant to develop a stte-specific TDM plan based on the penmit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Use
Office (all),
Restaurant
Retaib
Industrial
Manufacturing
Warehousing
EmpADTfor
first 1,000 s.f.
20
11
8
4
4
4
EmpADTI
1000 s.f.1
13
11
4.5
3.5
3
1
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1 QlhEdition
2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to
calculate employee ADT
, Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Samole calculations·
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my penmit require a TDM clan and understand that an approved TDM plan is a condttion of penmtt issuance.
ApplicantSignature ~ J· ~ Date: 11 /14/22
Person other than Applicant to be contacted for TOM compliance (if applicable):
N (p . t d) Mitchell Blosky ame nne :. __________________ _ 949-342-4412 Phone Number.. ____ _
E .
1
,,.d mitchell@affordabledrafting.com maI,.,. ress: __________________ _
Updated 4/ 16/202 I 7