Loading...
HomeMy WebLinkAboutDWG 478-3SW; MS 12-02; BMP SITE PLAN - ALPS INNOVATION HOTEL; 01BMP ID# BMPTYPE SYMBOL CASQA NO. QUANTITY TREATMENT CONTROL & HYDROMODIFICATION 0) BIORETENTION [//] AREA TC-32 3 LOW IMPACT DESIGN (L.I.D.) @ ROOF DRAIN TO SD-11 15 LANDSCAPING . SOURCE CONTROL CD EFFICIENT SD-12 IRRIGATION . . © TRASH STORAGE SD-32 2 AREAS . ® STORM DRAIN SD-13 3 STENCILING . BIORBTENTION TYPICAL SECTION DIP-2 BMP TABLE DRAWING NO. SHEET NO.(S) INSPECTION MAINTENANCE FREQUENCY FREQUENCY 6MONTHS & MIN. Bl-ANNUALLY DWG 478-3A 3-8 & 11 AFTER RAIN EVENT AS NEEDED DWG 478-3A 3 AS NEEDED AS NEEDED DWG 478-3A 3,4,6,7 MONTHLY AS NEEDED . . AS NEEDED AS NEEDED DWG 478-3A 3,4,6,7 1 YEAR AS NEEDED OUTLET STRUCTURE WITH 1.1" ORIFICE SEE DWG 478-JA PAGES:3, 6 & 11 CONSTRUCTION SIGN OFF 4.0' MIN BIORETENTION TYPICAL SECTION DIP-S O-H£1GHT CURB PIN LINER TO BACK OF CURB PONDING I -::----.:..A:::_C _ _J '. 0. 75' CLASS 2 BASE ' • ~ • ' BIORBTENTION TYPICAL SECTION DIP-1 4" PERFORATED SUBDRAIN DRAINS TO OUTLET BOX W/ 0.6" ORIFICE SEE DWG 478-JA, PG: 11 BUILDING VERIFIED BY: INSPECTOR DA1E INITIAL ENGINEER OF WORK LANDSCAPE VERIFIED BY: DATE INSPECTOR DA1E INITIAL REVISION DESCRIPTION OTHER APPROVAL LEGEND ITEM 2J,ffJm. INTEGRA TEO MANAGEMENT PRACTICE I/JP UM/TS • • IMP-fl: 8/0RETENTION AREAS - £XIST/NG CONTOUR • • • BIORETENTION AREA DATA /!.IP NO. AREA (SF) OE SCRIP 7/0N.· IMP-I 1,100 8/0RETENTION-TREATMENT & HIVR0!./00 STOIIAGf BIORETENTION Ill l!.IP-2 9,350 8/0RETENTION-TREA TMENT & HIVR0!.100 STOIIAGf BIOIIETENT/ON 12) IIJP-3 1,300 8/0RETENTION-TREA 1!.IENT & HIVR0!.100 STOIIAGf BIORETENT/ON fJ) SWMP NO. __ I_J-_10 __ _ MAJNTENANCEAGREEMENT DOCUMENT: YES_X_ NO __ RECORDATION NO. ____ _ PARTY RESPONSIBLE FOR MAINTENANCE: NAME A/PS HO !EIS ADDRESS 621 S HWY IOI SOLANA BEACH, CA 92075 CA 92075 PHONE NO. 858-350-0/11 PLAN PREPARED BY: NAME ANDREW KANN, PE COMPANY O!.IECA ENC/NEER/NC ADDRESS 9517 CROSS/JONT SUM!.1/T OR LA MESA CA, 91941 PHONE NO. 858-141-9456 BMP NOTES: CONTACT SHARAO KHANDWALA CERTIFICATION /50940 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS OR THESE PLANS. 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION AND INSTALLATION. SCALE: 1• = 40' MlEGA ENGINEERING CONSULTANTS 9517 GROSS MONT SUMMIT DRJl'E 0 20 40 80 LA MESA, CALIFORNIA 91941 PH'(619) 741-9456 FAX:(619) 664-4291 ENGINEERING VERIFIED BY: DATE INSPECTOR DATE I SH~ET I CITY OF CARLSBAD I SHE~TS I ENGINEERING DEPARTMENT BMP MAP ALPS INNOVATION HOTELS APPROVED M,, Y, 7/,._ -I),, , GLEN K~AN ESKI ENGINEERING M~NAGER PE 41204 EXPIRES 3/31/15 ATE DWN BY: PROJECT NO. DRAWING NO. DA1E INITIAL CHKD BY: CITY APPROVAL RVWD BY: MS 12-02 478-3SW