HomeMy WebLinkAbout2382 FARADAY AVE; 300; CBC2023-0034; PermitBuilding Permit Finaled
Commercial Permit
Print Date: 10/03/2023
Job Address: 2382 FARADAY AVE, # 300, CARLSBAD, CA 92008
Permit Type: BLDG-Commercial Work Class:
Parcel#: 2120621800 Track#:
Valuation: $1,136,026.76 Lot#:
Occupancy Group: B
#of Dwelling Units:
Project#:
Plan#:
Tenant Improvement
Bedrooms:
Bathrooms:
Construction Type:VA
Orig. Plan Check#:
Occupant Load: 131 Plan Check#:
Code Edition: 2022
Sprinkled: Yes
Project Title:
Descri pt ion: 2382 FARADAY; SUITE 300/ COM-Tl (19,709 SF) NEW CORPORATE OFFICE
Applicant:
MAGGETTI ELAM ASSOCIATES INC
KRISTIE BERRILL
3160 CAMINO DEL RIOS, # 207
SAN DIEGO, CA 92108-3834
(619) 624-0521
FEE
BUILDING PLAN CHECK FEE (manual)
CERTIFICATE OF OCCUPANCY
COMM/IND Tl -NON-STRUCTURAL
Property Owner:
CEI OFFICE FUND 8 LLC
16870 W BERNARDO DR, # 360
SAN DIEGO, CA 92127
(714) 990-2100
SB1473 -GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION -COMMERCIAL (SMIP)
Total Fees: $4,403.00 Total Payments To Date: $4,403.00
Permit No:
Status:
{city of
Carlsbad
CBC2023-0034
Closed -Finaled
Applied: 02/08/2023
Issued: 06/08/2023
Finaled Close Out: 10/03/2023
Final Inspection: 09/05/2023
INSPECTOR: Kersch, Tim
Balance Due:
Ontiveros, Linda
de Roggenbuke, Dirk
AMOUNT
$1,832.05
$16.00
$2,508.45
$46.00
$0.50
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of !imitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.car[sbadca.gov
( City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check CBC2023-0034
Est. Value $1,136,026.76
PC Deposit _$_1_,8_3_2._05 _____ _
Date 2/8/2023
Job Address 2382 Faraday Avenue Suite: 300 APN: 212-062-18-00 ------
Tenant Name#: Breg Lot#: Year Built: 1986 -----------------------------------
Year Built: 1986 Occupancy: B-Office Construction Type:_V_A __ Fire sprinklers:(:)YESON0 A/C:OYESONO
BRIEF DESCRIPTION OF WORK: new corporate office with new Lobby, private offices, open offices, conference rooms, cafe, lounge, IT,
Data/Elec Room, huddle rooms, exam room, wellness room, storage rooms. collaboration room, work room and janitors closet
D Addition/New: ____________ New SF and Use, __________ New SF and Use
_______ SF Deck, SF Patio Cover, SF Other (Specify) ___ _
!ilTenant Improvement: _____ SF, Existing Use: _______ Proposed Use: ______ _
_ 1_91_0_9 ___ SF, Existing Use: Proposed Use: ______ _
D Other: __________________________________ _
PRIMARY APPLICANT PROPERTY OWNER
Name: Kristie Berrill Name: CEI Office Fund 8, LLC
Address: 3160 Camino Del Rio South, Suite 201 Address: 10920 Via Frontera, Suite 500
City: San Diego State: CA Zip:_9_2_10_8 ___ City: San Diego State:_C_A ___ Zip: 92127
Phone: 619-624-0521 Phone: 858-487-7100
Email: kris@maggetlielam.com Email: ---------------------
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name: Maggetti Elam Associates, Inc. Business Name: BYCOR General Contractors
Address: 3160 Camino Del Rio South, Suite 207 Address: 6490 Marindustry Place
City: San Diego State: CA Zip:_9_2_10_8 ___ City: San Diego State: CA Zip:_s_2_12_1 ____ _
Phone: 619-624-0521 Phone: 858-587-1901
Email: kris@maggettielam.com Email: ---------------------Architect State License: NA CSLB License#: 444203 Class: B General Construction
Carlsbad Business License# (Required): ________ _
APPLICANT CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): Kristie M. Berrill SIGN: ~ ~JJATE: 01/23/2023
1635 Faraday Ave Carlsbad, CA 92008 Ph·. 442-339-2719 Email: Building@carlsbadca.gov
REV. 04122
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: CB( 2o'Z.'3 -003"(
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. If THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
I herebyaffirm under penaltyof perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3
of the Business and Professions Code, and my license is in full forceandeffect. I also affirm under penalty of perjury one of the
following declarations (CHOOSE ONE):
DI have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the labor Code, for the performance of the
work which this permit is issued. Policy No. ___________________________________________ _
-OR-
[!I I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: lnsuranceCompany Name: _N_a_11o_n_w_1d_e_M_u_tu_a_I _1c_su_ra_n_c_e ______________ _
Policy No. ACPWCJ11009ao27 Expiration Date: _s_11_12_0_2_3 ______________ _
-OR-
D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
sub1ect to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY. IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: _______________________ Lender's Address: ______________________ _
CONTRACTOR CERT/FICA TJQN; The applicant certifies that all dacuments and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and
utilities/utility easements. All proposed modificotiom and/or additions are clearly labeled on the site plan. Any potentially existing derail wirhin rhese plans inconsistent with the site plan are not
approved for construction and may be required to be altered or removed. The citv's approval of the application JS based on the premise that the submirred documents and pfans show the correct
dimensions of, the property, buildings, structures and their setback!. from property lines and from one another: access roads/easements, and utilitie.s. The exi.sting and proposed use of each building
as stated is rrue and correct; all e-ase-menrs-and NhE-r enrnmbranr:es. to development /lave been arcLJrately shown and /abered as well as all on-site qrading/5ite pre()Qration. All improvements
existing on the property were completed in accordance with all regulation:, in existenci':' at the time of the·
NAME (PRINT): Kristie M. Berrill
Note: If the person signing above is an authorized agent for the contractor pr011ide a letter of authorization on contractor letterhead.
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale {Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
DI, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law}.
-OR-
DI am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
D FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior ID completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors. I understand that a copy of the applicable law, Section 7044of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http: I lwww.leginfo.ca.gov/ ca/aw. html.
OWNER CERT/FICA T/QN: The applicant certifies that oil documents and plans c/earlv and accurately show all existing and proposed buildings, structures, access roads, and utilities/utilrty
easements. AJJ proposed modifications and/or additions are cleorfy labeled on the site plan. Any ootentwl!y existing detail within these plans (ncomisrent with the 5/te plan are not approved for
construction and may be required to be altered or removed. The city's approval of the appfir:ation is based on the premise that the submitted dor:uments. and plans 5f10w the correct dimensions ofi
the property, buildings, structures and their setbacks from property lines and from one another; access road5/easements.r and utilities. The e,dsting and propmed use of each building as stated is. true
and correct; all easements and other enwmbrances. to development have berm accurately shown and labeled as well as all on-~ite grodinq/!.ite prepamrion All improvement5 existing on the property
were completed in accordance with all regulations in existence at the time of their construction, unless otherwise noted.
NAME (PRINT): SIGN: ___________ DATE: ______ _
Note: If the person signing above ls an authorited agent for the property owner include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Email: Building@carlsbadca.gov
2 REV. 04/22
PERMIT INSPECTION HISTORY for (CBC2023-0034)
Permit Type: BLDG-Commercial Application Date: 02/08/2023 Owner: CEI OFFICE FUND 8 LLC
Work Class: Tenant Improvement Issue Date: 06/08/2023 Subdivision: PARCEL MAP NO 16317
Status: Closed -Finaled Expiration Date: 02/20/2024 Address: 2382 FARADAY AVE, # 300
IVR Number: 46465 CARLSBAD, CA 92008
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Re inspection Inspection
Date Start Date Status
NOTES Created By TEXT Created Date
Angie Teanio 858-7 52-3989 07/20/2023
08/22/2023 08/22/2023 BLDG-43 Air 221345-2023 Partial Pass Tim Kersch Reinspection Incomplete
Cond./Furnace Set
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/30/2023 08/30/2023 BLDG-Final Inspection 222388-2023 Failed Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final Holds pending. No
BLDG-Electrical Final No
09/05/2023 09/01/2023 BLDG-71 Set Ups 222767-2023 Cancelled Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Final Inspection 222778-2023 Partial Pass Tim Kersch Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final Issued building TC O per phasing plan. Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Holds pending. Yes
BLDG-Electrical Final Yes
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Issued building TC O per phasing plan. Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Holds pending. Yes
BLDG-Electrical Final Yes
09/21/2023 09/21/2023 BLDG-LOE Final 203756-2023 Passed Linda Ontiveros Complete
Checklist Item COMMENTS Passed
BLDG-LDE Final Yes
NOTES Created By TEXT Created Date
Christopher Glassen TOM PLAN REQUIRED 02/17/2023
Tuesday, October 3, 2023 Page 2 of 2
Building Permit Inspection History Finaled
(cityof
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2023-0034)
Permit Type: BLDG-Commercial
Work Class: Tenant Improvement
Status: Closed -Finaled
Application Date: 02/08/2023 Owner: CEl OFFICE FUND 8 LLC
Issue Date: 06/08/2023 Subdivision: PARCEL MAP NO 16317
Expiration Date: 02/20/2024
IVR Number: 46465
Address: 2382 FARADAY AVE, # 300
CARLSBAD, CA 92008
Scheduled
Date
Actual Inspection Type
Start Date
Inspection No. Inspection Primary Inspector Reinspection Inspection
Status
06/12/2023 06112/2023 BLDG-84 Rough 213822-2023 Passed Tim Kersch
Combo(14,24,34,44}
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
NOTES Created By
Becky Falk
COMMENTS
TEXT
858-7 52-3989
06/2012023 06/20/2023 BLDG-17 Interior 214715-2023 Passed Tim Kersch
Lath/Drywall
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
COMMENTS
TEXT
858-752-3989
06/3012023 06/30/2023 BLDG-44 216063-2023 Partial Pass Dirk de Roggenbuke
Rough/Ducts/Dampers
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Angie Teanio
COMMENTS
6/30/23 partial, all areas except as noted
on 1D20
TEXT
858-752-3989 / Partial Pookie
07124/2023 07/24/2023 BLDG-85 T-Bar, Ceiling 218249-2023 Passed Tim Kersch
Tuesday, October 3, 2023
Grids, Overhead
Checklist Item
BLDG-Building Deficiency
BLDG-14
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough~Topout
BLDG-34 Rough Electrical
BLDG-44
Rough-Ducts-Dampers
COMMENTS
Complete
Passed
Yes
Yes
Yes
Yes
Yes
Created Date
06/09/2023
Complete
Passed
Yes
Created Date
06/1912023
Reinspection Incomplete
Passed
Yes
Created Date
06/29/2023
Complete
Passed
Yes
Yes
Yes
Yes
Yes
Page 1 of2
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
OFFICE USE ONLY
RECORD ID# __________________ _
PLAN CHECK# __________________ 1
BP DATE
Business Name
Breg
Business Contact
Dane Fetherling
City
Telephone#
760-795-5440
Project Address (include suite)
2382 Faraday Avenue, Suite 300 Carlsbad
State
CA
Zip Code
92008
APN#
212-062-18-00
Mailing Address (include suite) City Slate Zip Code Plan File#
Project Contact
Kristie Bemll
Applicant E-mail
kris@maggettie lam .com
Telephone#
619-624-0521
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT -HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: {not required for proiects within the City of San
Q.i.!l:921: Indicate by circling the ·1tem, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled,
applicant must contact the Fire Protection Agency with jurrsdiclion prior to plan submittal.
Occupancy Rating: Facility's Square Footage (Including proposed proJed):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These.
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS DIVISION HMO : If the ans\Ner to any of the
questions is yes, applicant must contact the County of an Diego Hazardous Materials Division. 5500 Overland Avenue, Suite 170, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit
FEES ARE REQUIRED Project Completion Date· Expected Date of Occupancy: 0 CalARP Exempt
I
1.
2.
3.
4.
5
6.
7
8.
YES NO (for new construction or remodeling projects)
Is your business listed on the reverse side of this form7 (check all that apply). □ Q
□ [:] Will your business dispose of Hazardous Substances or Medical Waste in any amount?
□ 0 Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
□
□ □
□ □
0 Will your business store or handle carcinogens/reproductive toxins in any quantity?
0 Will your business use an existing or ·1ns!all an underground storage tank?
Q Will your business store or handle Regulated Substances (CalARPJ7
0 Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)7
Q Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
Dale Initials
0 CalARP Required
I
Date Initials
0 CalARP Complete
I
Date Initials
PART IU: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCDl: The following questions are intended to identify the majority of air pollution
issues at the planning stage. Your project may require additional measures not iden1ified by these questions. Some residential projects may be exempt from APCD
requirements. If yes is answered for either questions 1, 2 or 5 or for more comprehensive requirements. please contact APCD at apcdcomp@sdcounty.ca.gov,
(858) 586-2650: or 10124 Old Grove Road. San Diego, CA 92131.
1
2.
3.
4.
5.
6.
YES NO
□
□ □
□
□
□
[:] Will the project disturb 100 square feet or more of existing building materials?
[:] Will any load supporting structural members be removed? O (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPA-approved
buildrng inspector course?
□
□
(ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing mater'1al? If yes, a
notification may be required at least 10 working days prior to commencing asbestos removal. Additionally. a notification may be required prior to
the removal of a load supporting structural member(s) regardless of the presence of asbestos.
Will the project or associated construcflon equipment emit air contaminants? See the reverse side of this form for typical equipment requiring an
APCD permit. If yes, contact APCD prior to the issuance of a building permit
(ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda ?
Briefly describe business activities: Briefly describe proposed project
Provides products, services, technology and consulting Tl -New cmpornte office with new lobby, private offices. open offices, conference rooms, cafe lounge" etc
d I lJ I d-f.i::r3
Date
FOR OF Fl CAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: ________________________________ _
BY· DATE· I I
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMo• APCD COUNTY-HMO APCD COUNTY-HMO APCD
•A stamp 1n thrs box only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may strll apply
HM-9171 (9/18) County of San Diego -DEH -Hazardous Materials Division
ENCINA WASTEWATER AUTHORITY
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
6200 Avenida Encinas, Carlsbad, CA 92011
Phone: 760-438-3941 Fax: 760-476-9852
SourceControl@encinajpa.com
The commercial enterprises listed below are a partial listing of businesses that are exempt from industrial wastewater discharge
permitting under normal operaflng conditions. They are exempt because (a) they discharge no process wastewater (i. e., they
only discharge sanitary wastewater with no pollutants exceeding any local limits). and (b) they have no potential to negatively
impact the EWPCF or other wastewater treatment plants in the ESS. Any questions regarding exemptions should be referred
to EWA Source Control staff.
□ Automobile Detailer s
□ Barber/Beauty Shops
□ Business/Sales Offices
□ Cleaning Services
□ Carpet/Upholstery
□ Childcare Facilities
□ Churches
□ Community Centers
□ Consulting Services
□ Contractors
□ Counseling Services
□ Educational Services (no auto repair/film
□ Financial Institutions/Services
□ Fitness Centers
□ Gas Stations (no car wash/auto repair)
□ Grocery Stores (no film developing)
□ Residential based Businesses
developing)
0 Hotels/ Motels (no laundry)
0 Laundromats
D Libraries D Medical Offices (no x-ray developing)
D Mortuaries
D Museums
D Nail Salons
D Nursing Homes
00 Office Buildings (no process flow)
D Optical Services
D Pest Control Services (no pesticide repackaging for sale)
D Pet Boarding/Grooming Facilities
D Postal Services (no car wash/auto repair)
D Public Storage Facilities
D Restaurants/Bars
D Retail/Wholesale Stores (no autorepair/film
developing)
D Theaters (Movie/Live)
CERTIFICATION STATEMENT
I cerl{(r Iha/ the i,?formalion ahore is /rue and correcl 10 the hes/ (!f my kno11 /ed[;I.'
Signature &1.~h..... Yi tbtMAl/ Print Name Kristie M. Berrill 2/8/2023 Date-____ _
Paula Richmond Facility Contact: ___________ _
General Counsel & Compliance Officer
Title: ______________ _
ENCINA WASTEWATER AUTHORITY
6200AVENIDA ENCINAS, CARLSBAD, CA Phone: 760-438-3941 Fax: 760-476-9852
SourceControl@enc1najpa corn
Page 2 of 2
( City of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit
application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) j ❖ Pool
The B-50 checklist was originally developed several years ago to support implementation of the CAP. Recent updates to
the California Building Standards Code have imposed newer performance standards on building permit applications.
Therefore, the applicant is advised to review an applicable code sections and apply the maximum performance standard,
which may exceed the CAP consistency checklist requirements
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. Appropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor familiar with Energy
compliance, IECC/HERS Compliance Specialist, ICC GB Energy Code Specialist, RESNET HERS rater certified, certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ICC CALgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
check N/A and provide an explanation or code section describing the exception.
The project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMG) and/or Energy Code and
Green Code sections.
Breg Tl
Property Address/APN: 2382 Faraday Avenue, Suite 300 Carlsbad, CA 92008
ApplicantName/Co.: Kristie M. Berrill Maggetti Elam Associates, Inc.
ApplicantAddress: 3160 Camino Del Rio South, Ste. 207 San Diego, CA 92108
Contact Phone: 619-624-0521 Contact Email: kris@maggettielam.com
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
B-50
Contact Phone:
Contact Emal
Page 1 of 7 Revised 12/22
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For alterations and additions to existing
buildings, attach a Permit Valuation breakdown on a separate sheet. For purposes of determining valuation, the amount should be upon either
the actual contract price for the work to be permitted or shall be determined with the use of the current 'ICC Building Valuation Data" as
published by the International Code Council, whichever is higher (refer to Section 18.04.035 of the CMC).
Building Permit Valuation (BPV) $ breakdown __________ _
D Residential
□ New construction 2A*, 3A", 4A" "Includes detached, newly constructed ADU
□ Additions and alterations:
□ BPV < $60,000 NIA All residential additions and alterations
□ BPV ~ $60,000 1A,4A 1-2 family dwellings and townhouses with attached garages
□ Electrical service panel upgrade only only.
*Multi-family dwellings only where interior finishes are
□ BPV ~ $200,000 1A,4A" removed and significant site work and upgrades to structural
and mechanical, electrical, and/or plumbing systems are
prooosed
2B' "Multi-family dwellings only 'Ml ere ~$1,000,000 BPV AND
BPV ~ $1,000,000 affecting ~75% existing floor area
iJ Nonresidential and hotels/motels
□ New construction 1B, 2B, 38, 4B and 5
!!!I Alterations:
□ BPV ~ $200,000 or additions~ 1B,5 1,000 square feet
!!!I BPV ~ $1,000,000 1B,2B,5 Building alterations of<! 75% existing gross floor area
~ 2,000 sq. ft. new roof addition 2B,5 1 B also applies if BPV ~ $200,000
Instructions:
1. Choose first between residenUal or non-residential based on the type of project being submitted.
2. Next chose between new construction or addition/alteration for residential or non-residential.
3. The columns to the right of your selection will determine which sections of the CAP program are applicable to your project.
4. Appropriate details must be included on the plans for selections made.
EXAMPLE:
Scope of work includes a new, 2 story, single family residential structure.
The selections would be: Residential and New construction in the table above. For a 2-story structure, CAP sections 2A, 3A and 4A would be
applicable. (Solar PV, water heating, EV charging) The • indicates that new detached ADU's are included.
EXAMPLE:
Scope of work includes a tenant improvement Q.e., alterations) valued at over one million dollars.
The selections would be: Non-residential and Alteration BPV ~ $1,000,000. CAP sections 1 B, 2B and 5 would be applicable to this project. (Energy
efficiency, Solar PV and Transportation Demand Management (TOM)*)
It may be necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate full compliance with
CAP ordinance requirements. For example, projects that propose or require a performance approach to comply with energy-related measures will need
to attach to this checklist separate calculations and documentation as specified by the ordinances,
,, .,
1. Energy Efficiency
Please refer to Section 18.30.060 of the Carlsbad Municipal Code (CMC) and Section 150.2 of the CEC for more information. Appropriate
details and notes must be placed on the plans according to selections chosen in the design.
A. 0 Residential addition or alteration~ $60,000 building permit valuation.
Details of selection chosen below must be placed on the plans
referencing CMG 18.30.060.
D NIA _________ _
□ Exception: Home energy score
~7 (attach certification)
Year Built Single-family Requirements Multi-family Requirements
□ Before 1978 Select one option:
□ Duct sealing □ Attic insulation □ Cool roof D Atticinsulation
D 1978 and later Select one option:
D Liqhtinc:, package □ Water heating package
□ Between 1978 -1991 Select one optiorr
□ Duct sealing □ Attic insulation □ Cool roof
□ 1992 and later Select one option:
□ Lighting package □ Water-heatinci packacie
8. 0 New Nonresidential construction (including additions over 1,000sf), new hotel/motel construction AND alterations~
$200,000 building permit valuation. See Section 1B.21.050 of the CMC and CALGreen Appendix AS.
At least one measure from each applicable building component requrred. □ N/A 1,909,110.73
A5.203.1.1 Choose one:
□ Outdoor lighting □ Restaurant service water heating (Section 140.5 of the CEC)
□ Warehouse dock seal doors □ Daylight design PAFs □ Exhaust air heat recovery
0 NIA ________ _
A5.203.1.2.1 Choose one: □ .95 Energy budget
(ProJects with indoor lighting OR mechanical)
□ .90 Energy budget
(Pro1ects with indoor lighting AND mechanical) 0 NIA ________ _
A 5. 211.1 ** □ On-site renewable energy:
0 NIA
A5.211.3 .. □ Green power: (If offered by local utility provider. 50% minimum renewable sources)
AS.212.1 D Elevators and escalators (Project with more than one elevator or two escalators)
0 N/A
AS.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen) 0 NIA ________ _
* High-rise residential buildings are 4 or more stories.
** For alterations~ $1,000,000BPV and affecting> 75%existing gross floor area. OR alterations that add 2,000 square feet of new roof addition: comply
with Section 18.030.040 of the CMC (section 2B below) instead.
4
2. Photovoltaic Systems
A. 0 Residential new construction. Refer to Section 150.1(c)14 of the CEC for single-family requirements and Section
170.2(d) of the CEC for multi-family requirements. If project includes installation of an electric heat pump water
heater pursuant to CAP section 3 below (residential water heating), increase system size by .3kWdc if PV offset
option is selected.
Floor Plan ID (use additional CFA orSARA #d.u. Calculated kWdc* Exception
sheets if necessary)
□
□
□
D
Total System Size: kWdc
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
•Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
B. Ii) Nonresidential, hotel/motel and multifamily additions, alterations and repairs of these projects ~$1,000,000 BPV AND
affecting ~75% existing floor area, OR adcfrtion that increases roof area by ~2,000 square feet. Please refer to
Section 18.30.040 and 18.30.070 of the CMC when completing this section.
Choose one of the following methods: (Gross floor area or Time-Dependent Valuation method)
II Gross Floor Area (GFA)Method
GFA: 19,709 Min.System Size: kWd -------
□ If< 10,000s.f. Enter: 5 kWdc
~ If~ 10,000s.f. calculate: 15 kWdcx (GFA/10,000) ** 15 x 2.0 '= 30.0
**Round building size factor to nearest tenth, and round system size to nearest whole number.
D Time-Dependent Valuation Method
C. D
Annual TDV Energy use:**" ________ x .80= Min. system size: ______ .kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
*All newly constructed non residential, hotel/motel and highrise multifamily buildings that are required by CEC sectioo
140.10(a) to have a PV system shall also have a battery storage system meeting CEC section 140.10(b). Non
residential, hotel/motel and multifamily additions, alteratioos or repairs that trigger solar due to the Carlsbad Climate Action
Plan will NOT require battery storage. Battery storage is required when triggered by CEC section 140.10(a) and/or 170.2(g).
5
3. Water Heating
A. Residential. Refer to Section 18.30.050 of the CMC and Sections 150.1(d) or 170.2(d) of the CEC when completing this
section. Provide complete detaNs on the plans.
Residential new construction and alterations:
D Required: 60% of energy needed for service water heating from on.site solar or recovered energy.
For systems serving individual units, choose one system:
D Single 240-volt heat pump water heater AND compact hot water distribution AND Drain water heat recovery {low·rise
residential only)
□ Single 240-volt heat pump water heater AND PV system .3 kWdc larger than required.
□ Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher.
D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
□ Gas or propane system with a solar water hearing system and recirculation system.
For systems serving multiple units, choose one system:
□ Pump water hearing system with recirculation loop tank with electric backup and recirculation system.
□ Solar water heating system that is either:
D .20 solar savings fraction □ .15 solar savings fraction, plus drain water heat recover
OR:
D System meets performance compliance requirements of section 15D.1(d) or 170.2(d) and deriving at least 60% of energy from
on-site solar or recovered energy.
□ Exception: ______________________________________ _
8. Nonresidential and hotel/motel new construction. This section also applies to high-rise residential. Refer to Sections 18.030.020
and 18.040.030 of the CMC and Sections 140.5 and 170.2 of the CEC when completing this section. Provide complete details
on the plans.
1. Non-residential:
□ Required: Water heating system derives at least 40% of its energy from one of the following:
D Solar-thermal □ Photovoltaics D Recovered energy
□ Required: High-capacity service water healing system
2. Water heating system is (choose one):
0 Heat pump water heater
□ Electric resistance water heate~s)
□ Solar water heating system with . 40 solar savings fraction
3. Hotel/motel:
□ Required: High-capacity service water heating system (meeting Section 170.2(d) of the CEC)
□ Required: Located in garage or conditioned space
Exception:
6
4. Electric Vehicle Charging
A D Residential• New construction and major alterations.* This section also applies to hotel/motel projects. Refer to Section
18.21.030 of the CMC and Section 4.106.4 of the GBSC when completing this section.
Choose one:
□ One and two-family residential dwelling alterations with no electrical panel upgrade (No EV space required)
□ ADU (no EV space required when no additlonal parking facilities are added)
□ One and w.o-family residential dwellings w·1th attached garage and electrical panel upgrade
□ One EV Ready parking space required □ Exception: __________ _
□ New and major alterations to multi-family and hotel/motel projects: □ Exception: _________________ _
Total Parking Spaces Proposed EVSE Spaces
EV Capable ( 10% of total) \ EV Ready (25% of Tata() \ EV chargers (5% of Total)
-·------------~~~~~-__J~~~~~-_L~~~~-~
*Major alterations are:
(1) for one and two-family dwelltngs and for town houses with an attached garage alterations have a building permit valuat1on<:$60,0DD or include
an electrical service panel upgrade.
(2) for multifamily dwellings (three units or more without attached garages). alterations have a building permit valuation;:: $200,000, interior finishes are
removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed.
B. D Non-Residential -New construction □ Exception: _____________ _
Please refer to Section 18.21.040 of the CMG when completing this section
Total Parking Spaces
Proposed >----·--·--·--~--------~-------~--------1
EV Capable I EVCS (Installed with EVSE) I EV Ready (optional) I EV Space (op1ional)
Calculation: Refer to the table below.
Total Number of Parking Spaces provided Number of required EV Capable Spaces Number of required EVCS (lnstalled with EVSE)
-~ --------------□ 0-9 1 1
□ 1G-25 4 1
□ 26-50 8 2
a 51-75 13 3
□ 76-100 17 5
I] 101-150 25 6
□ 151-200 35 9
□ 201 andover 20 percent of total 25 percent of Required EV Spaces
Calculations Total EV Capable spaces= .20xTotal parking spaces proposed (rounded up to nearest whole number)
EVSE Installed= Total EVSE Spaces x 25 (rounded up to nearest whole number)
EVSE other may be "EV Ready" or "EV Space"
7
5. D Transportation Demand Management (TOM): Nonresidential ONLY
An approved Transportation Demand Management (TDM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on your submitted plans to determine whether your permit requires a TOM plan. If TOM is applicable to
your permit, staff will con ta ct the applicant to develop a site-specific TD M plan based on the perm it details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Office (all)2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousing 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1(JlhEdition
13
11
4.5
3.5
3
2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store. supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be
contacted should my p r it require a TOM plan and understand that an approved TOM plan is a condition of permit issuance.
Applicant Signature: ~W.!A.~M_Ct-..B:::,,.,--~~~
Name: z ✓\~-(.. t:\. b:Y:r\\\
Date: -~d-~\-+<~--'""-+-'\ oJ?~ ..... @~';::,~----
Phor1e No.: _...,_l..,.....__l 9......__-~U~61._Y+-. -_o~~~~_\ __
8