CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
APPLICABLE TO NEW CONS RUCTION, RESIDENTIAL ADDITIONS AND ALTERATIONS OVER $6OK
VALUATION AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER $ZOOK You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464, a certified C&D recycler, or
the Carlsbad Building Division at {442) 339-2719 Please note: ~~L~ss _yo_l:J_ are self-hauling, Republic Se_rvices or approved
haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
Permit No.----'-''--'--'-\---,--""tJ-43 ~()DJ_ lj ProjectTitle Breg Suite 300 Tl
ProjectAddress2382 Faraday Ave;fu;, Suite 300 Carlsbad, CA 92008 APN 212-062-18-00
Applicant Name Berri II Kristie □ 'E'.:r □" Other
l ✓I Owners Rep
Last First
ApplicantAddress 3160 Camino Del Rio South, Suite 207 San Diego, CA 92108
Phone 1619 l 624-052~ __
Applicant Mailing Address
(if different than project address)
Project Type
(check afl that apply):
Res1dent1al
□
E-mail Address kris@maggettielam.com
Commercial
0
Public Building □ Industrial □
Brief Description new corporate office with new Lobby, private offices, open offices, conference rooms, cafe, lounge, IT, etc
Project Size_1_9_,_7_0_9 ________ Estimated Cost of Project$ 1,909,110.73
(square footage)
Please check the appropriate box:
I ✓ I I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
D I plan on using a City Approved hauler and will provide all receipts at the final occupancy inspection.
D This is a proposed LEED certified project. I plan on separating materials on site in conjunction with Republic.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name Kristie M. BerriU __ Signature _____________ Date 2(2(2023
Page 1 of 4 Rev. 2.10.21
DEBRIS RECYCLING ESTIMATE:
I • Permit No. CBC2023-0034 Project Title Breg Ste. 300 Tl
Project Address 2382 Far.,da_y_Avenue, Suite_300_Carlsbad. CA 9200_(1 APN 212-062-18-00
---------------·-
Applicant Name Berrill Kristie Phone 619-624-0521 --------·---
Last First
I : Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
A B C
Material Type Estimated Place a(✓) check Place a(✓) check next Place a(✓) check next
Waste Quantity next to items to be to items to be to items to be
(tons) reused or salvaged recycled disposed at landfill
Complete this line of the table only if 2 Tons X only using WASTE MANAGEMENT
roll-off bins. i ,
Mixed C&D Debris i
Parking lot Asphalt & Concrete I ------------------------------
I Brick/ Masonry/ Tile I
Mixed Inert Debris I
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall {used, new, scrap) 1-1/2 Tons X
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets --I------
Concrete Roofing Materials
Scrap Metal
Stucco 1/2 Ton X
--
Other:
: TOTAL '
I
To meet 65% Diversion Requirement (estimate) X 0.65 = tons
Total Estimated Waste from above Minimum Required Diversion
Contractor/Owner Signature Date 216123
Valerie Hudson
-
PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final
building approval.
DEBRIS RECYCLING REPORT (ACTUAL):
Acknowledgement
I certify under penalty of perjury under the laws of the State of California that the information provided in and with this
form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
-----------------------------------------------
Permit No.~C:~· ... B~C-,~2~Q.,.__,2c.....;.;o>--__,C')_._.o..,_,3,--'-'-L.-j...__Print Name J~'f C.0 __1L _ ---------
Address {t;L--f'?Q yY);.\jL/NDl25Tfl\/ PY±CE Date _Q'2,-50_:_2.-_3
Use this Final Log below to track loads of materials as they leave the job site.
LJLJSAVE RECEIPTSI.JLJ
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available ff necessary. Use City Conversion Table to convert volume to tons.
A B C
Date
Example:
01/05/2018
Material Type
Concrete (broken)
...-------~ --------
,------t-------------
Actual Amt
Reused or
Salvaged
Actual Amt
Recycled
5 tons
Actual Amt
Disposed in
Landfill
---------+--
Destination Facility
{Name, Address, Phone)
Palomar Transfer Station, 5960 El
Camino Real
-{760) 603-0cc_1=c53,__
1-----t-----------,----+---------
------+--------+---------+-------f-----
---t ---+--------+-----------------~-t-
□TOTAL
Diversion Rate Achieved
L.1 7 C::, > 65%
-----~-------= 2.., • %""'-n, NS~ Gs% 0
Total of columns A+ B
Contractor/Owner Signat, ·--~
Total of columns A+ B + C DIVERSION
~ -
Attach the following documentation to this Report:
• Original recycling weight tickets, landfill weight tickets
• Original donation receipts with photos and/or itemized descriptions
• Any other relevant information to support Recycling Report
Return completed form and documentation to:
City of Carlsbad
Building Division (1st Floor)
1635 Faraday Avenue
Carlsbad, CA 92008
Rev. 5/612022
(:city of
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59 part 2
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP): Section 4.408.1 and Section 5.408.1
of the 2019 California Green Building Standards requires at least 65% of non-hazardous construction debris is recycled and/or
salvaged for reuse.
NEXT STEPS:
STEP 1. Before the project -
a. Review your CWMP completed prior to permit issuance. {copy is attached to your job card) This plan demonstrates how
you will recycle a minimum of 65% of the construction waste generated from your project by choosing: Waste
Management or Self Haul.
STEP 2 -During the Project
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are
(at a minimum) 65% of the waste generated by your project
STEP 3 -After the Project
a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Occupancy, Applicant must submit the
fully completed and approved (DRR) of the Construction Waste Management Plan (CWMP) Table.
b. Provide the ORR and receipts to your building inspector.
FOR MORE INFORMATION:
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the Applicant's
responsibility to confirm that the bins are collected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible.
2. Waste Management Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
create receipt(s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies,
etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from
a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
http://www.sa n d iego.gov / e nvi ran me nta I-services/recycl i ng/ cd /index.sht m I.
5. If contractors/subcontractors furnish their own debris boxes as part of their scape of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated
Recycling Facility.
Rev. 5/612022
Republic Services, Inc.
Tonnage ReportA
Account: BY COR
Total Service Count:
Account Number: 6611003821
21
Total Weight: 24.75 Tons
Container ID# Site Name Site Address
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad. CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad. CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad. CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
66110038210000101 BYCOR 2382 Faraday Ave Carlsbad, CA 92008
'Large containers (roll-off or compactors) only.
Site Number
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
00001
Unit of Post Collection
Account Type Schedule Tonnage Measure Site Ticket Number PO Number
Temporary OnCall 2.18 Tons PT ByCor
Temporary OnCall 1.05 Tons PT Ciccio
Temporary OnCall .75 Tons PT ByCor
Temporary OnCall 2.16 Tons PT Ciccio Mililell
Temporary OnCall 1.44 Tons PT Ciccio Militell
Temporary OnCall .41 Tons PT Ciccio Militell
Temporary OnCall 1.98 Tons PT Ciccio Mililell
Temporary OnCall 2.34 Tons PT Ciccio Militell
Temporary OnCall 1.39 Tons PT Ciccio Militell
Temporary OnCall .68 Tons PT Ciccio Mililell
Temporary OnCall .99 Tons PT Ciccio Militell
Temporary OnCall 1.47 Tons PT Ciccio Militell
Temporary OnCall 1.31 Tons PT Ciccio Militell
Temporary OnCall 1.08 Tons PT Ciccio Mililell
Temporary OnCall .95 Tons PT ByCor
Temporary OnCall .86 Tons PT Ciccio Militell
Temporary OnCall .91 Tons PT Ciccio Mi/ilell
Temporary OnCall .78 Tons PT Ciccio Militell
Temporary OnCall .71 Tons PT Ciccio Militell
Temporary OnCall .51 Tons PT Ciccio Militell
Temporary OnCall .80 Tons PT Ciccio Militell
TOTAL TONS 24.75
Disposal Container
Container Name Haul Date Arrival Time Size Compactor Special Handling Waste Type
WASTE CONTAINER 10 CU YD 03/01/2023 16:45 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 03/04/2023 12:46 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 03/11/2023 6:19 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 03/25/2023 12:47 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 04/07/2023 14:47 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 04/19/2023 14:31 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 04/28/2023 14:04 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 05/05/2023 13:08 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 05/19/2023 16:50 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 06/06/2023 13:45 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 06/16/2023 11 :13 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 06/21/2023 10:05 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 06/24/2023 8:24 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 07/06/2023 18:10 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 07/14/2023 8:35 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 07/19/2023 9:16 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 07/27/2023 15:17 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 08/01/2023 9:34 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 08/03/2023 15:44 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 08/08/2023 15:57 10.00 Construction/demolition Debris Other
WASTE CONTAINER 10 CU YD 08/14/2023 15:41 10.00 Construction/demolition Debris Other