Loading...
HomeMy WebLinkAboutPRE 2023-0027; STATE AND BEECH VILLAGE HOTEL; Admin Decision Letter{"cityof Carlsbad July 27, 2023 8fllE COPY Caine Group, Inc. P.O. Box 594 Solana Beach, CA 92075 SUBJECT: PRE 2023-0027 (DEV 2023-0090)-STATE AND BEECH VILLAGE HOTEL APN: 203-101-03, -04, -15 Thank you for submitting a preliminary review to demolish four commercial main buildings and multiple accessory buildings and to construct a four-story, 26,000-square-foot, 68-guest room hotel with underground parking and a rooftop deck and pool, at 2680-2698 State Street. The underground parking level will contain 68 valet parking spaces as well as "back of house" and storage areas. The subterranean level will also accommodate employee meeting and break area and ancillary floor area for the restaurant uses on the floors above. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. This preliminary review does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans, policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: 1. General Plan and zoning designations for the property are as follows: a. General Plan: Village and Barrio (V-B) b. Zoning: Village-Barrio Zone (V-B) c. Master Plan: Village and Barrio Master Plan, Village Center (VC) District 2. The project requires the following permits: a. Conditional Use Permit -Pursuant to Village and Barrio Master Plan (VBMP) section 2.3.3, a Conditional Use Permit is required to permit a hotel in the Village Center district. The project will require approval from the City Council pursuant to VBMP section 6.3.4((}(1). Community Development Department Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 j 442-339-2600 www.carlsbadca.gov PRE 2023-0027 (DEV 2023-0090} -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 2 b. Site Development Plan-Pursuant to VBMP section 6.3.3.A(l)(a) a Site Development Plan is required for new construction of building(s} over 5,000 square feet (cumulative gross · r fld'c5r_area) in size. The project will require approval from the City Council. .. ; c. Lot Merger d. Landscape Plan e. Grading Permit f. Building Permit g. Sign Permit 3. Project Description. Please provide a detailed project description with square footages of each area/use. Please ensure the project description matches what is shown on the plans and includes the following information: number and square footage of hotel rooms, number and square footage of commercial/retail units, square footage of lobby area, square footage of cafe, more information on intent of cafe (for example, is the cafe intended as an accessory to the hotel or is it intended for the public as well?), and number of employees. 4. Plans. Please provide a fully dimensional site plan drawn to scale. a. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes, as well as the offsite slope to the north). Provide legal description of property and assessor's parcel number. b. Provide floor plans and elevations drawn to scale. c. Provide a conceptual landscape plan. Please note that Conceptual Landscape Exhibits shall be prepared in accordance with the General Requirements listed in Section 3 of the City of Carlsbad Landscape Manual (February 2016) and also the Village and Barrio Master Plan of La Costa Master Plan. The City of Carlsbad's Landscape Manual document can be found on the Planning Division's web page at the following address: https:ljwww.carlsbadca.gov/home/showpublisheddocument/234/6374259740862700 00 d. Indicate the number of hotel rooms and square footages of each use (i.e. hotel rooms, meeting rooms, lobby, restaurants, commercial/retail units, etc.). e. Provide a parking calculation on the plans and dimension and number spaces to show compliance (see planning comment 9 below). 5. New requirements related to the city's goals to reduce greenhouse gas (GHG) emissions will likely impact development requirements of this project. A formal application submittal will need to include a completed Climate Action Plan Checklist (Form P-30) to determine what requirements PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 3 will apply to the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in the California Green Building Standards Code and in Carlsbad Municipal Code Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the following address: http://www.geode.us/ codes/ ca rlsba d/view. ph p ?topic=18&fra mes=on To the extent that new GHG reduction requirements are in effect at the time of application for grading or building permits, the project will be required to comply with the effective requirements even if different than what is proposed in the project's planning approvals. GHG reduction requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new GHG reduction requirements results in substantial modifications to the project after planning approvals are obtained, then prior to issuance of grading or building permits, the applicant may be required to submit and receive approval of a Consistency Determination or an Amendment application for the project through the Planning Division. 6. Cultural Resource Analysis. It is unclear when the existing structures were built, however from historic aerials it appears they may have been built in the 1960s. Please provide the building records from the assessors' office. Any structure greater than 45 years of age will require a historical analysis report to determine if the structures are significant pursuant to CEQA. In addition, subterranean parking is proposed which requires extensive excavation. To determine if there will be significant impacts to tribal, cultural, and paleontological resources pursuant to the California Environmental Quality Act (CEQA), a cultural/paleontological report prepared by a registered professional will need to be submitted. Both the historical analysis and tribal, cultural, and paleontological analysis can be prepared under one report. The report shall be consistent with the city's Tribal, Cultural, and Paleontological Resources Guidelines and can be found on line at: 7. https://www.carlsbadca.gov/home/showpublisheddocument/254/637425976516870000 Noise Analysis. The proposed use could create a potential noise impact. Please submit a noise analysis analyzing the project's consistency with the General Plan and Noise Guidelines Manual. The Noise Guidelines Manual can be found on line at the following address: https://www .ca rlsbadca .gov /home/showpu blisheddocu ment/238/637 42597 40923 70000 8. Vehicle Miles Traveled (VMT). The project must demonstrate that it will not result in any significant effects relating to traffic. Please provide a Vehicle Miles Traveled (VMT) analysis at submittal. Add the average daily trips (ADT) to the site plan. Please see the Vehicle Miles Traveled Analysis Guidelines at the following address: https://www.carlsbadca.gov/home/showpublisheddocument/312/638004852643630000 9. Access: Pursuant to Village and Barrion Master Plan (VBMP) section 2.6.l(A): PRE 2023-0027 (DEV 2023-0090} -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 4 10. a. Where alley access is not available, development sites shall be permitted a maximum one access point from a public street. The project currently complies with this requirement. b. Driveway aprons shall not exceed 20 feet in width. Please provide details of driveway apron to show compliance. c. A clear zone shall be provided at the intersection of a street and driveway to maintain a free line of sight. The clear zone shall consist of an isosceles right triangle measured 7.5 feet in both directions from the intersection of the two property lines. The ground floor building footprint, site features taller than 36 inches, or landscaping that is taller than 30 inches is not permitted within the clear zone. Please depict the clear zones on each side of the driveway entrance to show compliance. Height. a. The maximum height in the VC district is 45 feet and 4 stories. Please provide elevations showing the height of the building from existing or proposed grade (whichever is lower} to the top of the structures. b. In the VC district, a maximum of 30 percent of the fourth story street facing fa~ade can have a 0-foot setback (as measured from the property line}. The remaining 70 percent shall be set back a minimum of 10 feet (as measured from the property line}. On the floor plans for the fourth story, show the location of the property lines along State Street and Beech Street and show the applicable setbacks. Dimension the street facing building fa~ade and provide a calculation for the percentage of the building fa~ade with a 0-foot setback and the percentage of the building fa~ade with a 10-foot or greater setback. c. The total square footage of enclosed fourth floor space shall not exceed 80 percent of the largest enclosed floor space below (floors one, two, or three}. However, in no case shall the fourth-floor enclosed space exceed the amount of third floor enclosed space. Please provide calculations for the square footage of the enclosed space of each floor and show that the project will not exceed 80 percent of the largest enclosed floor space, nor will it exceed the third-floor enclosed space. 11. Setbacks. The following setbacks apply to the development: a. Front/Corner Setbacks (front yard/street side yard}: Minimum of O feet; maximum of 5 feet to building (at the ground floor} measured from the property lines fronting State Street and Beech Street. b. Side Yard Setbacks: 0 feet from south or west property line. c. Rear Yard Setback: 0 feet from south or west property line. Please provide a plot plan with all setbacks indicated to show compliance. PRE 2023-0027 (DEV 2023-0090)-STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 5 12. 13. Building Mass and Scale. To reduce the massing of the structure, please incorporate the following standards and guidelines from the VBMP: a. Pursuant to VBMP section 2.7.l(H) no building fac;ade visible from any public street (excluding alleys) shall extend more than 40 feet in length without a 5-foot minimum variation in the wall plane, as well as a change in roofline. Although dimensioned elevations were not provided, the building fac;ade and rooflines along State Street and Beech Street appear to exceed these limitations. Please provide elevations with variations in the wall plane and rooflines alone State Street and Beech Street. Dimension all rooflines and building fac;ade variations to show compliance. b. Pursuant to VBMP section 2.8.3(A), reduce the imposing appearance of tall buildings by stepping back from street level on elevations above the ground floor. Please revise the building to comply. c. Pursuant to VBMP section 2.8.3(A), utilize horizontal and vertical articulation to break up monolithic street walls and facades. Please revise the building to comply. d. Pursuant to VBMP section 2.8.3(A), utilize techniques to reduce massing, such as variation in wall plane and height and variation in roof form and levels. Please revise the building to comply. e. Pursuant to VBMP section 2.8.3(A), utilize details such as wall surfaces constructed with patterns, changes in materials, building pop-outs, columns, and recessed areas to create shadow patterns and depth on the wall surface. Please implement these details into the project. f. Pursuant to VBMP section 2.8.3(D), utilize multi-roof forms, hips, gables, shed roof combinations, and sufficiently articulated flat roofs to create interesting and varying roof forms that will reduce building mass, add visual appeal, and enhance existing Village and Barrio character and massing. Avoid long, unbroken, horizontal roof lines. Revise the roof to comply. Area Wide Standards. Pursuant to Village and Barrio Master Plan section 2.6, the project shall comply with the following area wide standards: a. Buildings, including the primary entrance of ground floor commercial uses, shall be oriented towards the primary street frontage. The primary street frontage for the project is State Street. The project appears to comply with this requirement, however, show building entrances at State Street on the floor plans and elevations to show further compliance. b. All roof structures including protrusions such as equipment housing, guardrails, parapets and equipment screening, architectural feature, and roof decks and their amenities, shall be consistent with the design of the building. This requirement will be reviewed in greater detail with the submittal of the elevations. Please also provide roof plans showing equipment and screening and renderings. Provide a screening material display PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 6 consisting of multiple cross sections to ensure the roof mounted equipment is screened from all property lines. Please see Attachment A for an example. c. Roof mounted mechanical equipment and freestanding screening that is not architecturally integrated shall be set back from the building face at least equivalent to the height of the screening. Please note, the project will be conditioned to screen all roof mounted mechanical equipment. Proposed screening should be shown on the elevations and roof plans for the CUP. d. Roof structures specifically for the housing of elevators, stairways, tanks, ventilating fans or similar equipment required to operate and maintain a building are allowed up to 10 feet above maximum height and shall be setback from the building face one foot for every foot over 45', or a minimum of 5'. Although the project appears to comply with this requirement. Please dimension the height of the roof protrusion for the housing of elevators and dimension the distance of the roof protrusion to the building face. e. The cumulative area devoted to roof structures (excluding roof decks, parapets, solar energy systems and skylights) shall not exceed 10 percent of horizontal roof area. The project appears to comply with this requirement. However, on the roof plan provide the square footage of the fourth-floor roof and the square footage of the roof protrusions to show compliance. f. The ground-floor fa~ade for retail uses adjacent to a public street shall maintain a minimum of 45% glazing. Fa~ade shall be measured from plate height to finish floor. Please ensure the project will comply with this requirement. g. Transparent or translucent glazing is required on the ground-floor fa~ade of a commercial or retail use facing a public street. Opaque, reflective, or dark tinted glass is not permitted. Please ensure the project will comply with this requirement. h. The bottom of any window or product display window shall not be more than 3.5 feet above the adjacent sidewalk. Please provide measurements on the elevations to show how the project complies with this requirement. If the windows on the first floor are higher than 3.5 feet above the adjacent sidewalk, the window openings must be extended. Please ensure the project will comply with this requirement. i. Window stickers or exterior window treatments that obstruct interior building views at the street level are prohibited (except for allowable window signs). 14. Area Wide Design Guidelines. Please note the following design guidelines pursuant to section 2.8 of the VBMP: a. Utilize accent materials to highlight building features and provide visual interest. Accent materials may include any of the following: wood, glass, glass block (transom), tile, brick, concrete, stone, awnings, plaster (smooth or textured). Provide colored elevations with materials and colors listed to show compliance. PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 7 b. Use building materials and finishes that are true to the structure's architectural style. Provide colored elevations with materials and colors listed to show compliance. c. Generally, use no more than three different materials on exterior wall surfaces. While certain styles may successfully incorporate multiple surface materials, caution must be used as too many materials can result in a less than aesthetically pleasing building. Provide colored elevations with materials and colors listed to show compliance. d. Ensure material changes occur at intersecting planes, preferably at inside corners of changing wall planes or where architectural elements intersect, such as a chimney, pilaster, or projection. Provide colored elevations with materials and colors listed to show compliance. e. Utilize light and neutral base colors. Generally muted color schemes will promote visual unity and allow awnings, window displays, signs and landscaping to be given proper emphasis. Provide colored elevations with materials and colors listed to show compliance. f. Ensure lighting is. architecturally compatible with the building. Provide elevations and renderings to show how the project complies. g. Ensure that the main entrance to a building is clearly identifiable and unique, as it is the primary point of arrival and should be treated with significance. Provide elevations and renderings to show how the project complies. h. Window type, material, shape, and proportion should complement the architectural style of the building. Provide elevations and renderings to show how the project complies. i. Utilize recessed windows where appropriate to the architectural style, to provide depth. Provide elevations and renderings to show how the project complies. j. Visually support all balconies, either from below by decorative beams and/or brackets, from above by cables, or by other parts of the building. Provide elevations and renderings to show how the project complies. k. Ensure that roof materials and colors are consistent with the desired architecture or style of the building. Provide elevations and renderings to show how the project complies. I. Avoid flat roofs unless sufficient articulation of detail is provided, such as precast treatments, continuous banding or projecting cornices, lentils, caps, corner details, or variety in pitch (sculpted), height, and roofline. Revise the roof to comply. m. Avoid the "tacked on" appearance of parapets, and ensure their appearance conveys a sense of permanence. If the interior side of a parapet is visible from the pedestrian and/or motorist area of the project, utilize appropriate detail and properly apply materials. Provide elevations and renderings to show how the project complies. PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 8 For additional area-wide design standards, please reference section 2.8 of the Village and Barrio Master Plan: https://www.carlsbadca.gov/home/showpublisheddocument/7950/637685893245300000 15. Parking. a. Please provide a parking table that provides a breakdown of required parking for all land uses. Parking shall be calculated as follows. i. Hotel: 1 parking space per guest room ii. Restaurant: 1 space per 170 square feet iii. Retail/Commercial Business: 1 space per 415 square feet b. Assembly Bill 2097 (AB 2097), effective January 1, 2023, which added Government Code §65863.2, effectively eliminated parking requirements in new residential and commercial developments when located within a half-mile of a major transit stop. The project is within one-half mile of Carlsbad Village Train Station and therefore the project qualifies for AB 2097. The intent of AB 2097 is to provide flexibility for project design, concurrent with planning studies that have shown that parking should be market driven. Developers could still voluntarily provide onsite parking, but the number of parking spaces provided will be based on builder preference and market demand, not by city- established minimum parking standards. For additional information on AB 2097, please see the City of Carlsbad Information Bulletin, 18-131, located at the following link: https://www.carlsbadca.gov/home/showpublisheddocument/12218/63808352180920 0000 The applicant has indicated that the project will utilize Assembly Bill 2097 (AB 2097) for the retail/commercial and restaurant uses. c. Irrespective of proximity to public transit, state law allows the city to continue to apply minimum parking standards for electric vehicle (EV) charging stations as well as required parking spaces accessible to persons with disabilities (ADA). Please determine the number of required EV capable spaces and EV charging stations, accessible spaces and accessible EV charging stations required pursuant to CMC 18.21.040, and the California Building Code Title 24 Part 2. Show, dimension and label the location of these spaces on the plans to show compliance. d. Please provide a detailed description of the valet parking plan. Clarify in the description if the valet parking will be open to the public for restaurant/beach use. Indicate the location in which vehicles will be queued for the valet. Include details on circulation and turn around. PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 9 16. 17. 18. Trash & Recycling. Please show the location of trash and recycling on the plans and provide a will-serve letter from Carlsbad Republic Service. SDG&E Transformer and Air Conditioning Units. Please show the location of the SDG&E transformer on the plans. Ensure the transformer is located outside of the front yard setba<;:k. Landscaping shall be provided to screen the transformer from the street. Please also show any air conditioning units proposed on the roof plan. These shall also be screened from the public street. Stakeholder Outreach. The project is subject to City Council Policy Statement No. 84, Development Project Public Involvement. A notice sign is required to be posted onsite by the applicant and an early public notice is required to be prepared by the applicant and mailed to all owners located. In addition, the applicant is required to complete enhanced stakeholder outreach to further engage the community on their project. Examples of enhanced public outreach includes, a public meeting or open house, a project website, an onsite meeting or information booth, etc. See the Guidance on Development Project Public Involvement, P-21, at the following link for more information: https://www.carlsbadca.gov/home/showpublisheddocument/452/637843403622900000 19. Title Report. Please provide a title report for the project site. The title report must be dated within the last 6 months. All necessary application forms, submittal requirements, and fee information are available at the Planning counter located in the Faraday Building at 1635 Faraday Avenue or online at https://www.carlsbadca.gov/departments/community-development/planning. You may also access the General Plan Land Use Element and the Zoning Ordinance online at the website address shown. Please review all information carefully before submitting. Land Development Engineering comments: Land Development Engineering Division staff has completed a preliminary review of the above- referenced project. Prior to formal application for the discretionary permit submittal the following items must be adequately resolved/addressed, unless otherwise noted: 1. Contact Nick Gorman in the Traffic Division at Nick.Gorman@carlsbadca.gov , a division of the Public Works Department, to determine if a Scoping Agreement is required. Scoping Agreements are used to determine if a Local Mobility Analysis is required and the scope of analysis. Submit either an approved Scoping Agreement or correspondence from the Traffic Division indicating one is not required. Provide ADT and peak hour trips per generation rates from SAN DAG Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region on the site plan/tentative map. 2. If a Local Mobility Analysis is required, refer to the Transportation Impact Analysis Guidelines at https:ljwww.carlsbadca.gov/home/showpublisheddocument/328/637425982502330000. PRE 2023-0027 {DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 10 3. Depending on the CEQA determination, which is determined after the application for discretionary permits is submitted, a Vehicle Miles Traveled (VMT) analysis may be required per the Vehicles Miles Traveled Analysis Guidelines available at https://www.carlsbadca.gov/home/showdocument?id=312. 4. A Transportation Demand Management {TOM) plan may be required depending on the number of employee vehicle trips the project will generate. Calculate the gross employee ADT using the generation rates from Table 2-2 of the TOM Handbook at https :ljwww.carlsbadca.gov/home/showpu blisheddocu ment/310/637 4259813383 70000 Show calculations on the Climate Action Plan checklist, Form P-30. If applicable, submit a TDM plan with your application for discretionary permits. 5. Complete a Stormwater Standards Questionnaire Form E-34. This questionnaire will guide you and the city in determining what type of reports and storm water mitigation must be completed to satisfy state and City storm water quality requirements. The questionnaire is located on the City of Carlsbad website. 6. Based on a preliminary analysis it appears that this project is a Priority Development Project (PDP). All impervious surfaces being created or replaced (onsite and offsite) shall be included for treatment. Submit a Storm Water Quality Management Plan. This project is exempt from Hydromodification. The post construction stormwater treatment BMPs shall be shown on a conceptual grading plan and drainage plan with the discretionary application. 7. Based on this project's general land use V-B, this project is subject to the City of Carlsbad trash capture requirements. Incorporate trash capture measures on the project plans and incorporate into the Storm Water Quality Management Plan. 8. Provide a Preliminary Title Report {current within the last six (6) months). 9. Annotate and delineate all existing easements and encumbrances listed in the Preliminary Title Report on the site plan. If any vacations or quitclaims are planned with this development annotate on the site plan. 10. A Preliminary Hydrology Study including map and calculations is required to demonstrate capacity/sizing of proposed and existing storm drain infrastructure. Show 100-year storm hydrologic calculations before and after development for each drainage basin. 11. A preliminary geotechnical report is required to evaluate the feasibility of the project to evaluate the remedial requirements and infiltration feasibility of the BMPs. Guidelines for preliminary geotechnical studies are available on the City of Carlsbad Engineering website. 12. Per CMC15.16.060 this project will require a grading permit and grading plan. 13. This project shall utilize City of Carlsbad Survey Control Network established on Record of Survey Map 17271, NAD83, Zone VI, 1991.35 Epoch for horizontal control and NGVD 29 datum for vertical control per City Engineering Standards Volume 1, Chapter 2. PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 11 14. Delineate and annotate the limits of grading. Include remedial grading quantities on the plan. 15. Delineate and annotate approximate topographic contours for existing and proposed condition. Provide 1-foot contours for slopes less than 5%; 2' intervals for slopes between 5% and 10%, and 5' intervals for slopes over 10%. Extend contours a minimum 25 feet beyond the project boundary. 16. On the site plan, show and identify all existing surface improvements screened back (curb, gutter, sidewalk, paving, manholes, inlets, street lights, adjacent driveways, vaults, transformers, etc.) at the project site, project frontage and within 25 feet of the boundary. 17. Indicate the earthwork quantities (cut, fill, import, export, remedial) proposed for the project in cubic yards. 18. Provide spot elevations at the corners of each pad in the proposed condition. Include finish pad and floor elevations. 19. Provide the method of draining the property. Unless otherwise specified by a geotechnical engineer, method of drainage shall comply with California Building Code (latest version) section 1804.4. 20. Delineate all retaining walls that will be utilized on the project site and show top of wall and bottom of wall elevations, including at the highest and lowest points. Indicate maximum height of retaining wall measured from bottom of footing to top of wall and maximum height measured from finish surface to top of wall. 21. Provide cross sections to show the existing and proposed ground, the proposed wall, the footing, the property line and remedial excavation required for the basement construction. Indicate if temporary shoring will be needed for this project and indicate on the cross section. 22. Delineate location of all existing and proposed buildings, walls, fences and permanent structures onsite and within 25 feet of the site. 23. The trees along the State Street and Beech Avenue frontage are included in the city's street tree inventory. Indicate on the site plan that they are to remain or to be removed. Proposed removal of street trees will require approval per Section 11.12.090 of the Carlsbad Municipal Code. Coordinate with the parks and recreation department for additional information. 24. Show existing lot line bearing and distance and setback to the building lines. 25. An adjustment plat with a certificate of compliance will be required for the lot consolidation. 26. Show location and dimensions of all accessways and pathways as required for compliance with Title 24-State Accessibility Requirements. 27. Provide typical street cross sections for existing frontage streets and proposed streets. Provide existing right-of-way width and existing improvements and proposed improvements and dedications. PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 12 28. Delineate and annotate all proposed driveways, driveway widths and grades into the basement and ensure compliance with City of Carlsbad engineering standards. It is unclear from the plans which street will provide access to the parking garage. 29. Clarify if all parking area provided will be valet only. Show dimensions of all parking spaces and p-vehicle turning movements within the parking area, specifically for spots 41 and 42. Provide 5-foot minimum from edge of building to parking space for back up purposes. Delineate and annotate any columns required in the basement to ensure parking clearances. 30. Show all existing utilities and callout size for: water, sewer, storm drain, underground dry utilities, overhead lines, traffic signals, street lights in State Street and Beech Avenue and laterals affecting the property. See City of Carlsbad drawings 376-5, 462-6, 118-9, and dwg 131-9 for reference. 31. All transformers and electrical facilities solely serving this project site shall be located on site and outside of the public right-of-way. 32. Provide a Sewer Study for new development based on City of Carlsbad Sewer Master Plan Update 2019, Section 4.2 Design Criteria. 33. Provide a Water Study for the new development based on City of Carlsbad Potable Water Master Plan 2019, Section 4.2 Design Criteria. 34. Public potable water and sewer mains along project frontages must meet minimum design diameter and material as specified in City of Carlsbad Engineering Standard Vol. 2 Section 3.2.2 for water and Volume 1 Section 6.2 for sewer. Utility replacement and/or upsizing may be required as a condition of development. 35. Locate fire service, backflows, potable and recycled water services, meters, landscape irrigation services, and sewer laterals for the new development in compliance with 2022 Carlsbad Engineering Design Standards requirements. 36. Delineate and annotate the proposed trash enclosure location and ensure design is consistent with the City of Carlsbad standard drawing GS-16. Any deviation from the City of Carlsbad standard may require approval from Republic Services to ensure that the trash enclosure is serviceable. 37. Provide multiple cross-sections of the site to demonstrate differences in grade from adjacent properties, existing and proposed grades on-site, fences and location of structures on-site and on adjacent properties. 38. Frontage improvements are required per CMC18.40. Public street frontage improvements required include curb and gutter, sidewalk, driveway, utility removal and relocation, etc. 39. A 3" AC grind and overlay may be required for State Street and Beech Avenue, once a more complete plan set is prepared. PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 13 40. Meet with the Fire Department to identify the necessary fire protection measures required for this project (access, fire hydrants, sprinkler system, on-site circulation, emergency access, etc.} 41. Delineate and annotate any proposed gates for the parking garage and ensure that no stacking of vehicles will occur in the public right-of-way. 42. Plot stopping sight distance at all driveways. 43. Please be advised that a more in-depth review of the proposed development will occur with the discretionary permit application when a more complete design of the project is provided. Fire: 1. Please provide a detailed site plan showing distances from property lines and adjacent buildings to evaluate for fire department access. 2. NFPA 13 Fire Sprinklers and fire alarms are required throughout the entire structure for all hotels. 3. The plans show assembly size meeting rooms subterranean in the basement. Applicant must demonstrate how egress will comply with Building Code prior to approving meeting rooms below grade. Building: The Building Division has no comments at this time regarding this latest submittal for conceptual plan review. The following comments are provided courtesy of the Building Division and will need to be clearly detailed in your final design prior to submitting for building permit construction plan review. Carlsbad requirements: CLIMATE ZONE 7 SEISMIC (R=6.S} = .12 W; SDC = D; SDS;::: .75, ~1.00; Dl/D2 RAINFALL ("/hr.): 3.7" WIND VELOCITY: 96mph 2019 California codes are adopted until December 31, 2022. 2022 codes take effect on January 1, 2023 PRE 2023-0027 (DEV 2023-0090) -STATE AND BEECH VILLAGE HOTEL July 27, 2023 Pa e 14 If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact Lauren Yzaguirre at the number below. You may also contact each department individually as follows: • Planning Division: Lauren Yzaguirre, Associate Planner, at (442) 339-2634 • Land Development Engineering Nichole Fine, Project Engineer, at (442) 339-2744 • Fire Department: Randy Metz, Fire Marshal, at (442) 339-2661 • Building Division: Jason Pasiut, Building Official, at (442) 339-2788 Sincerely, ERIC LARDY, AICP City Planner EL:LY:es Attachment: A-Screening of Equipment Example c: Laura and Dain Blackburn, 4668 Silent Knoll DR Fallbrook, CA 92028-9200 Nichole Fine, Project Engineer Randy Metz, Fire Prevention Jason Pasiut, Building Division File Copy Data Entry /Laserfiche