Loading...
HomeMy WebLinkAbout1990-09-19; Planning Commission; ; LOCAL FACILITIES MANAGEMENT PLAN - ZONE 5 AMENDMENTSTAFF REPORT (i) DATE: SEPTEMBER 19, 1990 TO: PLANNING COMMISSION FROM: GROWfH MANAGEMENT DIVISION SUBJECT: LOCAL FACTLITIES MANAGEMENT PLAN -ZONE 5 AMENDMENT - Deletion of a drainage condition in the LFMP for Zone 5. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 3107 Recommending APPROVAL of an amendment to LFMP Zone 5 that deletes a drainage condition based on the findings contained therein. II. PROJECT DESCRIPTION AND BACKGROUND On June 17, 1987, the Planning Commission approved the Local Facilities Management Plan for Zone 5. The LFMP for Zone 5 was conditioned to construct a drainage facility with the approval of future development in Drainage Area 13. III. ANALYSIS The LFMP for Zone 5 was approved by the Carlsbad City Council on August 4, 1987. As a condition of the adoption of Zone 5, future development in the zone is required to provide for the construction of various public facilities. The analysis of the impact on the city drainage system was evaluated. As a result of this study, the following condition was included in the drainage section of Zone 5: Prior to issuance of further development permits within Drainage Area 13 of Zone 5, the developer shall install the desiltation basin identified as a 2 700 cubic yard basin at the north end of Master Drainage Plan Facility 'BL'. Facility 'BL' is located at the intersection of El Camino Real and College Blvd. and drains easterly into the Sunnycreek drainage basin. This storm drain and desiltation basin is identified in the city's current Drainage Master Plan as necessary to accommodate storm runoff from Drainage Area 13. Since the adoption of Zone 5, the property owners in Zones 14 and 15 have completed the Local Facilities Management Plans for the respective areas. The drainage analysis in those zone plans did a more detailed evaluation of the runoff flows and the impact of downstream facilities including a report by Dr. Howard Chang. LFMP ZONE 5 -CI1Y OF CARLSBAD SEPTEMBER 19, 1990 PAGE 2 The report prepared by Dr. Chang evaluated the drainage characteristics of the Sunnycreek Channel. Cross sections of the existing creek were performed to determine the carrying capacity of the main channel. Projected water surface elevations for a 100 year design storm were plotted to determine the flood water elevations. The report also took into consideration the effects of silt deposition on the flow line of the creek. The results of this analysis indicated the slope of the creek is enough to allow natural scouring of the creek bottom that precludes the depositing of additional silt. The silt material flows into an existing major desiltation basin at the intersection of El Camino Real and Cannon Road. This basin was construction in conjunction with the grading of the Kelly Ranch project. The hydrology report goes one step further in recommending that the line 'BL' and the 2700 cubic yard desilt basin be deleted from the Drainage Master Plan. Due to the updated hydrology analysis of the Sunnycreek basin, staff is recommending that the Local Facilities Management Plan for Zone 5 be amended to delete the specific drainage condition as identified above. ENVIRONMENTAL REVIEW The Planning Director has determined that the environmental impacts of the project have already been considered in the original issuance of a Negative Declaration dated June 5, 1987 and therefore a Notice of Prior Environmental Compliance was issued. Attachments 1. Planning Commission Resolution No. 3107 2. Location Map 3. Notice of Prior Environmental Compliance August 30, 1990 SJ:km ZONE 5 City of Carlsbad Local Facilities Management Plan City of Carlsbad -:.f 6\elil 1h•i•l4•fiiiil,t4,il PUBIJC NOTICE OF PRIOR ENVIRONMENTAL COMPLIANCE Please Take Notice: The Planning Department has determined that the environmental effects of the project described below have already been considered in conjunction with previously certified environmental documents and, therefore, no additional environmental review will be required and a notice of determination will be filed. Project Title: Local Facilities Management Plan Zone 5 Amendment. Project Location: Adjacent to Intersection of El Camino Real and College Boulevard. Project Description: Deletion of drainage condition from original approval. Justification for this determination is on file in the Planning Department, Community Development, 2075 Las Palmas Drive, Carlsbad, California 92009. Comments from the public are invited. Please submit comments in writing to the Planning Department within twenty (21) days of date of publication. Dated: AUGUST 29, 1990 Case No.: LFMP 5 Applicant: CITY OF CARLSBAD Publish Date: SEPTEMBER 6, 1990 BH:km ' j~~-o~~ Planning Director 2075 Las Palmas Drive • Carlsbad, California 92009-4859 • (619) 438-1161