Drainage Study
Speer Residence
PD202 1-0019/GR202 l-OO14fDWG 530-9A
Lot 3, Map No. 4393
3342 Donna Drive
Carlsbad, California 92008
Prepared for:
Jeff and Marsha Speer
3342 Donna Drive
Carlsbad, CA 92008
Prepared by:
Christensen Engineering & Surveying
7888 Silverton Avenue, Suite "J"
San Diego, CA 92126
(858) 271-9901
July 28, 2021
IT
I
Introduction
This project involves construction of single-family residence on Lot 3 of Map No.
4393, in the City of Carlsbad. The project is located at 3342 Donna Drive. Other
improvements include landscaping to treat runoff, walkways, masonry walls and
pool & spa.
The attached drainage area map is from a topographic survey prepared by Teas
Land Surveying, Inc. dated February 26, 2019.
No runoff is tributary to the project parcel, only runoff generated from the site, is
the subject of this study. Currently, runoff from the site flows onto Donna Drive.
Following construction, the same pattern will persist with runoff flowing onto
Donna Drive. Proposed pool and spa area are not included in the analysis.
The Rational Method was used to calculate the anticipated flow for the 100-year
storm return frequency event.
I
I
I ,id
Antony K. Christensen
RCE 54021
Exp. 12-31-21
iN A2020-113
I
I
I
I
07.28.21
Date
I
I
I
Li
I
I
I
I
I
I
Calculation
1. Coefficient Determination
For residential area
From Table 3-1
Soil Type = B
Determine per NRCS web Soil Survey
CP = 0.25
Pre-construction
Impervious area = 6,722 sf
Imperviousness pre-construction = (6,722/11,831)100% = 56.8%
Post-construction
Impervious area = 6,809 sf
Imperviousness post-construction= (6,809/11,831)100% = 57.5%
C = 0.90 x (% Impervious) + Cp x (1Ô/oImpervious)
Pre-construction
C = 0.90 x 0.568 + 0.25(1-0.568)
C = 0.619
Post-construction
C= 0.90 x 0.575 + 0.25(1-0.575)
C= 0.624
I 2. Intensity Calculation
(From San Diego County Hydrology Manual, Figure 3-3)
I =
Tc Time of concentration
1.8(1.1-C)Dist. 1/2
( S'13 )
I
Pre-construction slope over the area with the greatest elevation change
is (261'-250.5')/122' = 8.61% over the site and the distance traveled is
122 feet and the runoff coefficient is 0.619 pre-construction.
I Post-construction slope over the area with the greatest elevation change
is (260-250.8')/161' = 5.71% over the site and the distance traveled is
161 feet and the runoff coefficient is 0.624 post-construction.
I
Tc = 4.7 minutes pre-construction
I Tc =6.1 minutes post-construction
I
I
Ix = 7.44 P6 Duration .0.645
Since D= 4.6 min pre-construction and D = 5.1 min post-construction
Ix = 2.74 P6 pre-construction
Ix = 2.32 P6 post-construction
from: San Diego County Hydrology Manual Rainfall Isopluvial
Map for 100-year Rainfall Event —6 Hour
P6 (100) = 2.7, P24 (100) = 5.0
Adjusted P6 = 2.7
So:
Iioo = 2.74 (P6)
11 o = 2.74 (2.7)
Loo = 7.4 inches pre-construction
boo= 2.32 (P6)
Iioo = 2.32 (2.7)
Iioo = 6.3 inches post-construction
3. Volume calculations
Q=CIA
Areas of Drainage
Pre-Construction
Area of site flowing to street A = 0.266 Acres
Area of site flowing to neighboring area B = 0.006 Acres
Impervious ROW area C = 0.004 Acres.
Qioo (A) = (0.619) (7.4) (0.266) = 1.218 cfs
Qioo (B) = (0.619) (7.4) (0.006) = 0.027 cfs
Qioo (c) = (0.90) (7.4) (0.004) = 0.027 cfs
Qioo = 1.272 cfs pre-construction
Qioo flowing to Donna drive = 1.282 - 0.027 = 1.245 cfs
I
I Post-Construction
Area of site flowing to sidewalk underdrain 1
Area of site flowing to sidewalk underdrain 2
Area of site flowing to the street
Area of site flowing to trench drain
Area of site flowing to neighboring property
Area of site flowing to the street
Area of pool and spa (retained)
Impervious ROW area
Qioo (PCA) = (0.624) (6.3) (0.108) = 0.424 cfs
Qioo (PCB) = (0.624) (6.3) (0.101) = 0.397 cfs
Qioo (PCC) = (0.624) (6.3) (0.020) = 0.079 cfs
Qioo (PCD) = (0.624) (6.3) (0.012) = 0.047 cfs
Qioo (PCE) = (0.624) (6.3) (0.006) = 0.024 cfs
Qioo (PCF) = (0.624) (6.3) (0.014) = 0.055 cfs
Qioo (PCP) = (0.624) (6.3) (0.011) = 0.043 cfs
Qioo (PCR) = (0.90) (6.3) (0.008) = 0.045 cfs
Total Qioo = 1.114 cfs post-construction
PCA= 0.108 Acres
PCB = 0.10 1 Acres
PCC = 0.020 Acres
PCD = 0.012 Acres
PCE = 0.006 Acres
PCF = 0.014 Acres
PCP = 0.011 Acres
PCR = 0.008 Acres
LI]
I
I
I
I
I
I
I
I
I
Vioo (PCP) = 0.043 cfs x 6.1 minutes (time of concentration) x 60 = 15.74 cf
The pool will have a minimum 3" freeboard.
Pool capacity = 566 sfx 3/12' = 141.5 cf> 15.74 cf
Therefore, the expected addition of 15.74 cf will be retained.
Qioo flowing to Donna drive = 1.114 - 0.024 = 1.09 cfs
1 4. Discussion
I The site drains to Donna Drive before and after development except
small area flowing to neighboring area. There is a calculated decrease of
0.131 cfs (from 1.245 cfs to 1.114 cfs) for the 100-yr return frequency
I event following development. This is due to the increase of time of
concentration.
1 5. Tesl for Adequacy
The sidewalk underdrain is tested for adequacy and found capable of I conveying the expected volume of runoff. See attached printouts.
I
I
The proposed system on maintenance area requires the use a pump to
convey 0.047 cfs (100 year storm) of runoff from 2424 catch basin onto
the landscape. The pump will need to be capable of conveying 0.058 cfs
onto the landscape. The pump needs to overcome head loss from
elevation changes, friction and small bends. Entrance and exit losses are
ignored since they are insignificant.
The pumps in this system will deliver flow through a 4" PVC drain to
the landscape area, changing from 2" outlet from the pumps in a
manifold to the 4" PVC drain. The sum of the head losses results in the
Total Dynamic Head.
The total elevation change is 10'.
I To determine other head losses, the velocity in each pipe must be
known. To provide conservative values for each head loss it will be
assumed that the flow from the pump is at the approximate TDH value.
I For the 1/3 HP Goulds pump the maximum flow for a static head of 20
feet is 30 gpm. This is equivalent to 0.067 cfs.
I
I V=Q/A
A=itr2
For a 4" pipe; r = .165
A =it (0.165)2
A= 0.085 ft2
V= 0.245/0.085
V2.88fps
The friction loss for the length of pipe can be calculated using the following Hazen
- Williams formula:
hr= 3.02LD 167 (V/Ch)'85
for a 4" pipe
L = 12 ft (from catch basin to landscape)
D=4"= 0.33'
V = 2.88
Ch = 140 (plastic pipe)
hf = 3.02(12)(0.33)''67 (2.88/140)1.85
hf= 0.10'
Therefore, the elevation and frictional headloss is
TDH= 10+0.10=10.1'
Since the Q = 0.047 cfs = 7.48 gal/ft3(0.047 ft3/sec) (60sec/min)
=21 gpm
Therefore, pump must be capable of conveying 21 gpm with a total dynamic
head of 10.1 feet.
1/3 hp Goulds pump is capable of conveying 30 gpm at a head of 20 feet and
is therefore adequate. Even assuming some loss for the manifold in the system
the pumps will be adequate.
The pump will be placed in a storm drain cleanout and an alarm system will be
needed to alert the development owner to the failure of the pump. A check
valve will be needed to keep the runoff from flowing back into the catch basin,
once the pumps shuts off.
0 1 1
249.00
249.25
Elev (ft)
250.00
249.75
249.50
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Jul 292021
<Name>
Circular Highlighted
Diameter (ft) = 0.25 Depth (ft) = 0.20
Q(cfs) = 0.140
Area (sqft) = 0.04
Invert Elev (ft) = 249.54 Velocity (ftls) = 3.32
Slope (%) = 2.00 Wetted Perim (ft) = 0.55
N-Value = 0.011 Grit Depth, Yc(ft) = 0.23
Top Width (ft) = 0.20
Calculations EGL (ft) = 0.37
Compute by: Known Q
Known Q(cfs) = 0.14
Elev (if)
250.00
249.75
249.50
249.25
249.00
248.75
Section
0 1
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
<Name>
Circular Highlighted
Diameter (if) = 0.25 Depth (if)
Q (cfs)
Area (sqft)
Invert Elev (if) = 249.07 Velocity (ft/s)
Slope (%) = 2.00 Wetted Perim (ft)
N-Value = 0.011 Crit Depth, Yc (ft)
Top Width (if)
Calculations EGL (ft)
Compute by: Known Q
Known Q (cfs) = 0.13
Thursday, Jul 29 2021
= 0.19
= 0.132
= 0.04
= 3.29
= 0.53
= 0.22
= 0.21
= 0.36
Reach (if)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Thursday, Jul 29 2021
<Name>
Circular Highlighted
Diameter (ft) = 0.25 Depth (ft) = 0.18
I Q(cfs) = 0.126
Area (sqft) = 0.04
I
Invert Elev (ft) = 251.00 Velocity (ft/s) = 3.32
Slope (%) = 2.00 Wetted Perim (if) = 0.51
N-Value = 0.011 Crit Depth, Yc (ft) = 0.22
I
Top Width (if) = 0.22
Calculations EGL (if) = 0.35
Compute by: Known Q
Known Q (cfs) = 0.13
I
Elev (if)
Section
252.00—
I
I
251.75
251.50
I
U 251.25
251.00
I
I 250.75
0 1
I Reach (if)
- - - - - - - - - - - - - - - - - - - 2.50% slope OOF
2.0-
100 30
w co F-
W U- ________ 20
I
Cl)
W
0 0 —090 -J
Cl) -0 95 U..
10
o 0 _0l• _____ ______ -J
W W >
0
EXAMPLE:
Given: Watercourse Distance (D) = 70 Feet
Slope (s)=1.3% 1.8 (1.1-C) Vi5 = Runoff Coefficient (C) = 0.41 3 VS Overland Flow Time (1) = 9.5 Minutes
SOURCE: Airport Drainage, Federal Aviation Administration, 1965
FIGURE
Rational Formula - Overland Time of Flow Nomograph
6.1
Directions for Application:
From precipitation maps determine hr and 24 hr amounts
for the selected frequency. These maps are included in the
County Hydrology Manual (10, 50, and 100 yr maps included
in the Design and Procedure Manual).
Adjust 6 hr precipitation (if necessary) so that it is within
the range of 45% to 65% of the 24 hr precipitation (not
applicaple to Desert).
Plot 6 hr precipitation on the right side of the chart.
Draw a line through the point parallel to the plotted lines.
This line is the intensity-duration curve for the location
being analyzed.
Application Form:
(a) Selected frequency 50 year
; (b) P6 = 3 in., P24 = 5.5 P6 54.5 %(2)
6.0 : (c) Adjusted p6(2) = 3 in.
5.5 a,1I s (d) t = min.
4.5 (e) I = 3.2 in./hr.
4.0
3.541 Note: This chart replaces the Intensity-Duration-Frequency
310 curves used since 1965.
2.5
2.0
1.5
20 1.08 !1.6?2.i5?.693,23.774.31 .45
25 003 140 18712331200 3r374204cfl613ic60
30 0.83 1.24 2.07 2.492.90! 3.32 3.73 4j 4.564.98
40 069 103 138 1.72!_2.07; 241 i 270 1 310 345 k379 413 i 3.28
_0 03:o.00 loG 1,30i1Z,1.0G 2.12 2.39 2.0 2.92010
0.4 0,610.82 i.02!1.23- 1.431 1.63 t.84 2.04 2.25 2.45
120 0.34 0.510.68 0.85i1,02 1.191 1.36 31.531 1.70 1.87 2.04
150 0.29 i0.440.59 0.730.8&1.03i 1.18 t32 1 1.471 1.82 1.76
180 0.26 10.30lO,52.:0.650.7810.01, 1.04 1.18 1.31 1.44 1,57
240 0.22 O.3310.43i 54.!0.6$ 0.76087 0.98 1.08 11.19 r 1.30
300 0.10jO.28102& 0.47 0560.6 0.75 0.85 I 0.04 C 1.03 1.13
360 0.17 10.2510.33 0.42 O.500.581 0.67 0.76! 0.841 0.92 1.00
1.0
25,,3 35 4 45 5 1 55 '6 ilti C
6.59 7.90:9.22110.5411.86 13.17! 14.49 15.81
6.3016.3617.42! 8.48 9.54 10.60i11.6612.72
- - - - - - - - - - - - - - - - - - -
2.1
0.1
0.
%flhIUhIIHllllH1ItHHuhIIHIllIllhIUhtllllll1llUIIlI$I1IflflIHhIHflflMh1
EQUATION IIIII
_ii'Intensity
P6 6-Hour
_11111111
I_Duration I
IuIh!Ihh4hhRg!h1Ih.. 4Ii'hih I II II II I iuniiirn IIIIIIIIIIIIUU .....uani.nal UUII1IIIIIIIII RR5UUHUl
IIIIiiiiilIHIll!
Rill
llllllllllluhlul III !IIUIIIIIHIIIIR!JIHIIJlil IHIHhIIIb 1 II1!!Hi I IRIIIIUIIIIUIIIII IIIIlIh!IllhIIIIIllhIIiIIIlHIllllffl lflhiII liii !Ifi IN I
IIIIIII•IIIIIUII uulllnhll Ih;ani;!1
lIllIllIlUhlIllI IIIIllhIU1llllllhIII!!I 11111 111101110 III!iIIllhlll1!!R I
IIIHhI1IIIIIIIII IIIIIINIIllhIIIllh1I !!flIHhIII11UMII!iIh!!Uhi!!0hi! I
IIIIIII1I1IHOII HIIIOIIIII011hIIIIllIHI1III !OIIIIiIOIIhi!hi!'i I
IIIIIIIIIIIIIHII IIIlluhIffluIHh1IllllhI1IllhIIIIlHMfllli!iOIIiIIffl!!llflI1IIi I In Ian
i•
UUR a*1I UflalI Ii ,i..uIIUl
O M ua *N UUSlUlU uuauiui,uu.u1UUU .mUWUUUlIl N.'UItIIIItUU
nN•IUI IIIIIIUhtIflflhlfflII5I1I1IU uImuvIuuuiuNWUIu1III2'IIUU a.UIII .... IuIIIIIrnilummu.IuInI iiiiiiuiiuiiiai ..imiiiiiuiuih.
I8# IluUflUhIllffltItllUhIHIflhIflhlIIlflhIIIf!lINIlllIlIUIIflflhlIIl auuur-
FRI
UUlNURUlftHIfthIflIIIIIIPIUIIIIIluhIlIIuIIIIIUIIIIIIlUIUIIIllIIJII1
IllIllhIllllfth1HIIUIIIIIlluhIIUuhIIllhI I I 5 6 78910 15 20 30 40 O 1 2 3 4 5 6
Minutes Hours Duration
4.(
3.1
FIGURE
Intensity-Duration Design Chart - Example 34
- - - - - - - - - - - - - - - - - - -
San Diego County Hydrology Manual Section: 3
Date: June 2003 Page: 6 of 26
Table 3-1
RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use I Runoff Coefficient "C"
Soil Type
NRCS Elements County Elements % IMPER. A B C D
Undisturbed Natural Terrain (Natural) Permanent Open Space 0.20 0.25 0.30 0.35
Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41
Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46
Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49
Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52
Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57
Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60
Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63
High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71
High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79
Commercial/Industrial (N. Corn) Neighborhood Commercial 80 0.76 0.77 0.78 0.79
Commercial/Industrial (Ci. Corn) General Commercial 85 0.80 0.80 0.81 0.82
Commercial/Industrial (O.P. Corn) Office Professional/Commercial 90 0.83 0.84 0.84 0.85
CominercialJlndustrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85
Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 0.87 0.87
*The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff
coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area
is located in Cleveland National Forest).
DU/A dwelling units per acre
NRCS National Resources Conservation Service
3-6
0 . -
County of San Diego
Hydrology Manual
3330
/
... - / / .-- .-. --.. --.
. :. -. •'. •--. .-. ..- -.' .-
' (
cce
- L
- - •- -- - - '-- - -- U)
RainfaflIsopIui ia/s
335 .-
-,
— 331 \ 100 Year Rainfall Event 6 hours VsTk
zt
SIT E
5y I - (
IsopluvIal (inches)
—
CARLSAD
-- - -------
ENC!NIT;S —
3300 - - - 0 SO.ANftBACFI' - - ( - .-• 300
o U - -
V. -- -. -----------. -- -. -. ..- .
-. ) )
J U) -J -Cj -' - ..• . -- ----------
% - - - SAN DIE
— C' L CAJC
3245
L GROVE . -.
.•_—_.. --
-
- - GIS saTiGIS '3H CorL
- tt) C-) -- - -f rqCW(TADtYAa rf..YfrN,Apfrcrwff-Jr-n _%L aE
.- .--3
3230 ---- - -- -
a - - - --.- - ------ - ,,-_I- S
3 0 3Miles
0
DArEE . -;--:----
- ...: - .
7 ..-...---- ............
— ( 0
-4,b ....- -------. ....-.............
r .: ,- ..- -.--.........
'
B /
\' ,J
3d
..............-.-.....
. ... . .
-t
A I
- ...... -
I
3245---------
3230 ---------- -- --------------
b
N-
- 323O LiS 0 U) c-S -
5' 5'
I
b 0 b r tn
-OUflV -
3330'
3330
-. 0 Iv ?- •.- -- •'.-'.-' .. .- .. .. . ..., .... .-.... -.. -.
3315
OCEANSFOS '3.W'
-. -
County of San Diego
Hydrology Manual
5%
Raiiifi// fxoplui ia/s
100 Year Rainfall Event -24 Hours
soptuvial (inches)
3300' ----- ---- --
CARLSBAD
ENCNFTAS
CC SOLANA BEACH
DEL WAR
Ci
..-------------- . . .- -... . --.. .- •.:- -. - - .- - - -. 0 CO
r-
7 -i - A 0 7c1
......0 I
-
3 0 3 Miles
DRAINAGE AREA MAPS
I
I
I
I
I
I
I
I
I
I
I
- .............
110.43 -,------ N612256E
- -.--- -
PRE-CONSTRUCTION DRAINAGE
AREA MAP
- NJ1
IMPERVIOUS
0.154 AC (BLI
FLOW PATH
A= 0.266 AC (GREEN)
FLOWS TO DONNA DR
POC
QULT = 1.245 CFS
w
0
z z
0
0
! ().004 AC (RED)
OW IMP. AREA
LOWS TO DONNA DRIVE
POST-DEVELOPMENT
DRAINAGE AREA MAP
I
I
I
I
I
I
I
I
I
I
'3)3" PIPE SID AL
JNDERDRAIN
I00 = 0.397 C —1
= 0.132C$/EAf
CB = 0.100 AC (MAG
FLOWS TO DONNA DR
HRU SIDEWALI
JNDERDRAIN 2 cn
H
PCRI 0.008 AC tBLUE)
OW IMPERVIOUfS ARE
QIOO = 0.16CFS1
OFF AREA CONVEY
BY SIDEWALK UNDERDRAIN 1
ONTO DONNA DRIVE / AREA = 0.108 AC
RUNOFF AREA CONVEY
BY SIDEWALK UNDERDRAIN 2
Fzle, ONTO DONNA DRIVE
A=0.101AC
7777 RUNOFF AREA CONVEY
ONTO DONNA DRIVE
A=0.O2OAC
RUNOFF AREA CONVEY
ONTO TRENCH DRAIN,
TO 2424 CATCH BASIN'
PUMPED TO PCC (GREEN)
A= 0.012 AC
OTHER RUNOFF AREA CONVE
ONTO DONNA DRIVE
A= 0.014 AC
RUNOFF AREA FLOWS
TO NEIGHBORING AREA
A= 0.006 AC
POOL AND SPA
A = 0.012 AC
H9ULT. = 1.09 1212 CATCH BASIN (1W. DOWNSPOUT
N66°2700E 110.00
7
ROW IMP. AREA CONVEY
ONTO DONNA DRIVE
A= 0.012AC
(I)
PCC =0.020A (GREEN)
FLOWS TO DO NA DR
cn
PROPOSED
2424 CATCH B4SIN
WITH 113 HP PMP
H
TRENCH DIMIN
J QIOO = 0.424
= 0.141 CFS/EA
[ju PIPE IDEWAL
UNDERDR4IN
PCF = 014 AC RANGE)
LowS O DON A DR
CP = 0.011 AC (POOL & SPA)
II 11 RUNOFF WILL BE RETAINED
LTh—AREA/DECK DRAIN (TYP.)!
PCE = 0.006 AC (YELLOW)
FLOWS TO NEIGHBORING
PROPERTY
P
- I FLOW PATH (RED) I
N61c2256E 110.43
0+14.64-- SPLASH P \ PCD = 0.012 AC (RED) (TYP) FLOWS TO TRENCH DRAIN
PUMPED TO PCC
POST—CONSTRUCTION DRAINAGE
APFA MAP
4 -611 PVC DRAIN PIPE (TYP.)
PCA = 0.108 AC (CYAN)
FLOWS TO DONNA DRIVE
THRU SIDEWALK UNDERDRAIN 1
0