HomeMy WebLinkAboutPD 2018-0052; REED RESIDENCE; GEOTECHNICAL INVESTIGATION AT 1375 BUENA VISTA WAY; 2020-09-12. CONSULTANTS
geotechnical & forensic engineering
September 12, 2020
1941-A Friendship Drive
El Cajon, CA 92020
TEL (619) 258-9000
wwiv.applied-consuItanti corn
Holly Reed
1375 Buena Vista Way
Carlsbad, CA 92008
C/O Brian Enright
Design Drafting
Via E-mail - bpeddp@gmail.com,
Subject: Geotechnical Investigation at the Subject Property Located at 1375 Buena Vista
Way, Carlsbad, CA 92008
Dear Mrs. Reed:
In accordance with your request we have prepared this geotechnical investigation report
for the subject property located at 1375 Buena Vista Way, Carlsbad, CA 92008. The purpose of
this geotechnical investigation was to provide geotechnical parameters for the design of the
proposed development.
The proposed development is the demolition of the existing residence and construction of
a new single family residence and ADU.
GEOTECHNICAL INVESTIGATION CONCLUSIONS
After reviewing the results of our geotechnical investigation we conclude that there are no
significant geotechnical or geologic constraints that cannot be mitigated by proper planning,
design, and the utilization of sound construction practices. We certify that the development of the
site is feasible from a geotechnical standpoint.
We approximate a removal and recompaction of the upper three feet. All deleterious and oversized
materials shall be screened and removed from the fill soils. The bottom of excavation shall be
approved by a representative of our firm. Upon approval, the upper 6"of the key shall be scarified,
and the fill soils recompacted to greater than 90% of optimum compaction to the required finish
grade. The removal and recompaction shall extend to at least 5 feet outside the proposed building
footprint.
Design of the shallow foundation system of the proposed structures shall be based on a 2,000 psf
allowable bearing capacity.
IIECEIIVEII
DEC 172020
1375 Buena Vista Way - Geotechriical Investigation
JED 9/12/2020 Page 1 of 24 LAND DEVELOPMENT
ENGNEERNG
We appreciate this opportunity to be of service. Shall you have any questions, please call our office
at (619) 258-9000.
Sincerely,
- Joshua E. Devera PE77618 Bernard J. Luther, RCE 63653,
President CEO
Ol"id4L 'N
j)j 00
C653
r\>1
\0.CQ1
CALIF
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 2 of 24
TABLE OF CONTENTS
1.0 SITE DESCRIPTION ..........................................................................................................4
Fig. I Site Location........................................................................................................................5
2.0 SURFACE AND GROUND WATER.................................................................................6
3.0 SITE GEOLOGY.................................................................................................................6
3.1 Geologic Literature Review and Field Findings ..............................................................6
3.2 Tectonic Setting................................................................................................................7
Fig. 2 Geologic Map .....................................................................................................................8
3.3 Seismic Design Recommendations ..................................................................................9
3.5 Geologic hazards..............................................................................................................9
Fig. 3 Flood Insurance Rate Map................................................................................................10
4.0 FIELD WORK AND SOIL SAMPLING .......................................................................... 11
4.1 Subsurface Investigation ................................................................................................11
4.2 Soil Sample Analyses.....................................................................................................11
5.0 FINDINGS ......................................................................................................................... 11
5.1 Soils Laboratory Analyses Findings...............................................................................11
Table 1: Soils Analyses Results...........................................................................................11
6.0 CONCLUSIONS................................................................................................................12
6.1 Impact of Geologic Hazards upon Subject Property......................................................12
6.2 Geotechnical Investigation Conclusions ........................................................................12
7.0 RECOMMENDATIONS...................................................................................................13
7.1 Grading...........................................................................................................................13
7.2 Shallow Foundations......................................................................................................14
7.3 Concrete Slabs On-Grade ............................................................................................... 14
8.0 REVIEW, OBSERVATIONS, AND TESTING ...............................................................15
FIGURES......................................................................................................................................18
GENERAL EARTHWORK AND GRADING ............................................................................20
GUIDELINES................................................................................................................................20
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 3 of 24
1.0 SITE DESCRIPTION
The location of the property is at latitude 33°10'6.8"N and longitude 117°20'314"W. The subject
property is located in a residential neighborhood of Carlsbad, California (Figure 1). The subject
property is bounded to the north by Buena Vista Way; and to the east, west, and south by existing
single family residences. Review of the current topographic map for the site indicates that the
subject property is at approximately 0 feet above average mean sea level (NAVD88).
The subject property is a rectangular shaped parcel of land of approximately 0.4 acres. Site
topography at the subject property is relatively flat.
The proposed development is the demolition of the existing structures and the construction of a
new 2-story dwelling and detached ADU.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 4of24
I Cener
SUBJECT
PROPERTY
Geographic Location
1375 Buena Vista Way,
Carlsbad, CA 92008
APPLIED
Vicinity Map Fig. I
CONSULTANTS
,rtlro,,I,Ict, Ia! t (e/t5I <!
375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 5 of 24
2.0 SURFACE AND GROUND WATER
We performed our field investigation was performed on August 28, 2020. Two exploratory test
pits were dug. We obtained bulk and in-situ density samples within the vicinity of the proposed
development.
No groundwater was encountered in the exploratory trenches to the maximum depth of five feet
below existing grade.
3.0 SITE GEOLOGY
3.1 Geologic Literature Review and Field Findings
We reviewed the Geologic Map of the Oceanside 30'x 60' Quadrangle, California (Kennedy and
Tan, 2005) for references concerning the geologic structure underlying the subject property and
surrounding areas.
Review of the geologic map indicates that the site is underlain by Old Paralic deposits, Units 2- 4
(Qop2-4). These Old Paralic deposits, Units 2-4 are described as "Mostly poorly sorted,
moderately permeable, reddish-brown, interfingered strandline, beach, estuarine and colluvial
deposits composed of siltstone, sandstone and conglomerate."
is
Locally the materials encountered in the borings are:
Boring #1 (B-i):
Topsoil was encountered from grade to 3 inches below grade.
From 3 inches below grade to 18 inches below grade a fine to medium grained, reddish
brown poorly graded sand with silt (SP-SM) was encountered.
From 18 inches below grade to 36 inches below grade a fine to medium grained, dense
reddish light brown poorly graded sand with silt (SP-SM) was encountered.
Boring #2 (B-2):
Topsoil/gravel was encountered from grade to 6 inches below grade.
From 6 inches below grade to 18 inches below grade a fine to medium grained, reddish
light brown poorly graded sand with silt (SP-SM) was encountered.
From 18 inches below grade to 60 inches below grade a fine to medium grained, moist
reddish brown poorly graded sand with silt (SP-SM) was encountered.
1375 Buena Vista Way - Geotecimical Investigation
JED 9/12/2020 Page 6of24
3.2 Tectonic Setting
Southern California, including Oceanside and surrounding areas, is located in an area of late
Tertiary to Quaternary-aged fault zones (Kennedy 1975) which strike conservatively to the
northwest. Some of these fault zones are known to be active according to the California Division
of Mines and Geology. "Active" faults are ones which have had faulting activity within the
Holocene Epoch, or the last 11,000 years (California Division of Mines and Geology).
Based upon magnitude of the earthquake event and distance from the subject property, an
earthquake on any of the above mentioned faults would cause slight to severe shaking at the subject
property.
S
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 7of24
Geographic Location
1375 Buena Vista Way,
Carlsbad, CA 92008
APPLIED
CONSULTANTS
Ii/Ci(IfIl(Zt K t,It'f,II(I,fl
Geologic Map Fig. 2
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 8 of 24
3.3 Seismic Design Recommendations
The proposed development shall be designed in accordance with seismic considerations contained
in the 2019 California Building Code (2019 CBC), American Society of Civil Engineers/Structural
Engineering Institute (ASCE/SEI) Standard 7-16: Minimum Design Loads for Buildings and other
Structures and City of Carslbad requirements. Based on 2019 CBC and ASCE/SEI 7-16, the
following parameters may be considered for design:
Seismic Importance Factor (I): 1.0 (ASCE/SEI 7-16)
Occupancy Category: II (2016 CB9)
Site Class: D (2019 CBC)
Spectral Response Coefficient (SDS) 0.837g (ASCE/SEI 7-16)
Seismic Design Category (SDS - based) D (2019 CBC)
3.5 Geologic hazards
The most significant probable earthquake to affect the subject site would be a 7.0 magnitude
earthquake on the Newport-Inglewood/Rose Canyon fault. We feel that the potential for damages
due to earthquake is high.
Liquefaction of cohesionless soils can be caused by strong cyclic accelerations resulting from
nearby earthquakes. Research and historical data indicate that loose, granular materials saturated
by a near-surface groundwater table are most susceptible to liquefaction.
The risk of seismically induced liquefaction to affect the proposed construction is considered
low due to the relatively dense underlying soil.
The Federal Emergency Management Agency, Flood Insurance Rate Map, states that the subject
property does not rest upon a flood zone. The subject property is categorized as, "Areas determined
to be outside the 0.2% annual chance floodplain (Other areas, Zone X)."
Based upon the local topography and the FEMA Flood Insurance Rate Map, we feel that the
potential for flooding at the subject property is low.
The Geologic Map of the Oceanside 30' x 60' Quadrangle, California does not indicate any near
landslides. Additionally, site topography is relatively flat. We feel that the potential for failure in
landslide is low.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 9of24
Geographic Location
1375 Buena Vista Way,
Carlsbad, CA 92008
OTHER AREAS
ZONE X Areas determined to be outside the 0.2% annual chance floodplain.
FEMA
YAPPL1ED Flood Insurance Rate Map Fig. 3
CONSULTANTS
en nuecr,q
1375 Buena Vista Way - Geotechnical Investigation
() In
4.0 FIELD WORK AND SOIL SAMPLING
4.1 Subsurface Investigation
On August 28, 2020 we performed a field investigation at the subject property. Two exploratory
borings were dug within the outline of the proposed development.
Boring #1 (B-i) was augered towards the northwestern portion of the proposed structure to a depth
of thirty six inches below existing grade.
Boring #2 (B-2) was augered towards the southeasterb portion of the proposed structure to a depth
of sixty inches below existing grade.
4.2 Soil Sample Analyses
We collected bulk and in-situ samples to determine the soil's physical characteristics through
laboratory testing. We performed the following tests
- Optimum Moisture Content and Maximum Density - ASTM D1557
- Particle-Size Analysis of Soils - ASTM D422
- Liquid Limit, Plastic Limit, and Plasticity Index - ASTM D4318
- Standard Test Method for Unconfined Compressive strength of Soil - ASTM D2166
5.0 FINDINGS
5.1 Soils Laboratory Analyses Findings
The following table (Table 1) is a compilation of our soils analyses results from the samples
collected within the vicinity of the subject property:
Table 1: Soils Analyses Results
Sample ID
Opt.
Moist.
Max
Density
(%) (pcf)
B-1@24"-36" 1 ii 1245
B-2 @ 48"-60" 1 10.5 127.5
E.I. - Expansion Index pcf - pounds per cubic foot
Pot. - Potential psf - pounds per square foot
1375 Buena Vista Way - Geotecimical Investigation
JED 9/12/2020 Page 11 of 24
6.0 CONCLUSIONS
6.1 Impact of Geologic Hazards upon Subject Property
In Applied Consultants' professional opinion, geologic hazards of significant magnitude are not
present. Based upon our field work and historical research results, Applied Consultants makes the
following conclusions:
Ground Shaking is a likely hazard to the site. Seismic activity on any active and
potentially active faults would cause ground movement at the subject property that will be
proportional to the magnitude of seismic event. Ground movement at the subject property
would be moderated by the distance from the epicenter of the seismic event. It is expected
that the structure will have to endure this to some degree.
Liquefaction. Due to the soil characteristics at the subject property we feel that the potential
for soil liquefaction at the subject site is low.
Flooding. Given the topography of the site, flooding is not considered a hazard.
Landslide and Earth Movement is not a likely hazard to the site. Topography and
geology of the subject property are not susceptible to earth movement. We feel that the
potential for earth movement or landslide at the subject property is low.
40 6.2 Geotechnical Investigation Conclusions
After reviewing the results of our geotechnical investigation Applied Consultants concludes that
there are no significant geotechnical or geologic constraints that cannot be mitigated by proper
planning, design, and the utilization of sound construction practices. Consequently, it is our
opinion that the development of the site is feasible from a geotechnical standpoint.
Due to potential differential settlement we recommend removal and replacement of the upper three
feet.
Removal of the upper thirty six inches within a five foot offset of the proposed structure shall be
performed.. All deleterious and oversized materials shall be screened and removed. The bottom of
excavation shall be approved by a representative of our firm. Upon approval, the upper 6"of the
key shall be scarified, and the fill soils recompacted to greater than 90% of optimum compaction
to the required finish grade. The removal and recompaction shall extend to at least 5 feet outside
the proposed building footprint.
Design of a shallow foundation system of the proposed residence shall be based on a 2,000 psf
allowable bearing capacity.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 12 of 24
7.0 RECOMMENDATIONS
7.1 Grading
General
All earthwork shall comply with the grading requirements of the City of Carlsbad, and
California Building Code 2019 except where specifically superseded in this section. Prior
to grading a representative of Applied Consultants shall be present to discuss the current
conditions of the site, grading guidelines and schedule of the earthwork to be completed.
Grubbing / Clearing
Grading shall begin with the removal of all structures and improvements as well as all
vegetation. These materials shall be hauled off the site to a suitable location.
C. Site Preparation
Removal of the upper thirty six inches within a five foot offset of the proposed structure
shall be performed. All deleterious and oversized materials shall be screened and removed.
The bottom of excavation shall be approved by a representative of our firm. Upon approval,
the upper 6"of the key shall be scarified, and the fill soils recompacted to greater than 90%
of optimum compaction to the required finish grade. The removal and recompaction shall
extend to at least 5 feet outside the proposed building footprint.
Fill Material
The materials onsite may be used as compacted fill. If it is necessary to import fill material,
the material shall be approved by the geotechnical consultant. All fill material must be
compacted uniformly to 90% of the maximum dry density (ASTM D1557).
Please refer to section III and IV of the "GENERAL EARTHWORK AND GRADING
GUIDELINES" provided at the end of this geotechnical investigation report for further
recommendations on fill material and fill placement and compaction.
Grading Observation
It is necessary for a soils engineer, or their representative, to be present and test the
compaction during the basic grading operations and placement of fill material. The
engineer will be able to confirm the conditions stated in this report and verify that the
grading operations are in compliance with all plans and specifications. . 1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 13 of 24
7.2 Shallow Foundations . General
The proposed structure can be constructed on a shallow foundation supported on
recompacted soils
Where foundations are to be located seven feet and further away from the top of slopes,
standard design may take place in conformance with the recommended soil bearing values.
In situations where foundations, footings, walls, etcetera, are located closer than seven feet
from the top of slope they shall be deepened so that the bottom edge of the footing is 7 feet
horizontally from daylight in the slope.
Dimensions and reinforcement
In our opinion the foundation design for this project may be conventional spread and/or
continuous footings. The spread footings shall be embedded a minimum of 18 inches for
a one-story structure and have a minimum width of 12 inches. The spread footings shall
be embedded a minimum of 24 inches for a two-story structure and have a minimum width
of 18 inches. The steel reinforcement for the spread footings shall consist of a minimum of
two #4 rebar placed near the top and bottom of the footing with a minimum of 3" of
concrete covering the top and bottom layers.
The continuous footings shall be embedded a minimum of 18 inches for a one story
structure below the lowest grade of the finished pad and must have a width of at least 18
inches. The continuous footings shall be embedded a minimum of 24 inches for a two
story structure below the lowest grade of the finished pad and must have a width of at least
15 inches. The steel reinforcement for the continuous footings shall consist of a minimum
of two #4 rebar placed near the top and bottom of the footing with a minimum of 3" of
concrete covering the top and bottom layers.
C. Bearing Capacity
A safe soil bearing capacity of 2,000 Pounds per Square Foot may be used in the design of
shallow foundation with recompacted soils.
7.3 Concrete Slabs On-Grade
a. Floor Slab
If any interior floor slabs are used for this project they shall be no less than 4" (actual). For
one-story or greater structures, slab reinforcement shall consist of minimum of #3 rebar
placed at 18" on center. All slab reinforcement shall rest on concrete chairs or a suitable
substitute.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 14 of 24
b. Moisture Protection
The areas covered by the interior floor slab shall be covered with a 10 mil Visqueen
moisture barrier. The moisture barrier shall rest on finish grade and be overlain by two
inches of clean sand.
8.0 REVIEW, OBSERVATIONS, AND TESTING
The final foundation/grading plans shall be provided to our office for review in
order to evaluate the acceptability of the recommendations presented herein, and
provide additional recommendations, as appropriate.
All construction activities during grading and foundation excavations shall be
continuously monitored and observed by the Geotechnical Engineer and
Engineering Geologist of Record.
All grading and foundation excavations on-site shall be observed and tested as
required, by a representative of the Geotechnical Engineer and or Engineering
Geologist to verify conformance with the intent of the geotechnical/geological
recommendations provided herein and to evaluate the acceptability of these
recommendations for the actual site conditions.
fl
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 15 of 24
CONSTRUCTION INSPECTION AND LIMITATIONS
The recommendations contained within this report are based upon Applied Consultants' field
investigation. The interpolated subsurface conditions shall be checked during construction by a
representative of Applied Consultants. We recommend that all grading operations be observed by
a representative of this firm.
The recommendations contained within this report are based upon our field study, laboratory
analyses, and our understanding of the proposed construction. If any soil conditions are
encountered differing from those assumed in this report, Applied Consultants shall be immediately
notified so that we can review the situation and make supplementary recommendations.
Additionally, if the scope of proposed work changes from that described in this report, Applied
Consultants shall be notified.
This report has been prepared in accordance with generally accepted soil and foundation
engineering practices within the greater San Diego area. Professional judgments contained herein
are based upon our evaluation of the technical information gathered, our understanding of the
proposed work, and our general experience in the geotechnical field. Our engineering work and
judgments rendered meet current professional standards. We do not guarantee the performance of
the project in any respect.
We do not direct the contractor's operations and we cannot be responsible for the safety of field
personnel on the site; therefore, the safety of field personnel during construction is the
responsibility of the contractor. The contractor shall notify the owner if he considers any of the
recommended actions contained herein to be unsafe.
It is a pleasure to be of service to you. Shall any questions arise, please contact our office at 619-
258-9000.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 16 of 24
REFERENCES
is 1. American Society of Civil Engineers/Structural Engineering Institute (ASCE/SEI)
Standard 7-16.
Bearing Capacity for Shallow Foundations -T. William Lambe & Robert V. Whitman,
"Soil Mechanics", John Wiley & Sons, 1969.
California Building Code (CBC 2019), 2019
California Mines and Geology Division (DMG), 1974, "Maximum Credible Rock
Acceleration From Earthquakes in California", Roger W. Greens felder.
California Department of Conservation, Division of Mines and Geology (CDMG), 1987.
"CSMIP Strong-Motion Records from the Whittier, California Earthquake of 1 October,
1987", OMS Report 87-05.
City of San Diego Seismic Safety and Geologic Hazards Maps 25, April 3, 2008
Geology of the Oceanside 30'x 60', California Division of Mines and Geology, Michael P.
Kennedy and Siang S. Tan, 2005.
TOPO! [Computer Software] 1997wi1dflower productions (www.topo.com) San
Francisco, CA: ESRI
Structural Engineers Association of California - Seismic design maps
https://seismicmaps.orgl
ASCE 7 Hazard Tool https://asce7hazardtool.online/
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 17 of 24
FIGURES
1375 Buena Vista Way - Geotechnical Investigation
lED 9/12/2020 Page 18 of 24
42t
21
10 DEPOSITS, UNITS 2-4
r —'i REMEDIAL GRADING
J LIMITS
ch
REFERENCE: This map was
PROPERTY LINE 188.55'
prepared from a Site Plan by
Brian Enright & Adrian
Deadwyler
Design Drafting and from the
field investigation performed by
APPLIED CONSULTANTS.
4MAPPLIED FIFURE A: GEOLOGIC I GEOTECHNICAL MAP
CONSULTANTS 1375 BUENA VISTA WAY, Date: 8/28/20
-,,, _w• CARLSBAD, CALIFORNIA 92008 Drawn by: JLVG
ASCE
AMENCAN SOC4ETY OF OU. EWNEERS
Address:
1375 Buena Vista Way
Carlsbad, California
92008
ASCE 7 Hazards Report
Standard: ASCE/SEI 7-16 Elevation: 0 ft (NAVD 88)
Risk Category: I Latitude: 33.168558
Soil Class: D - Default (see Longitude: -117.342058
Section 11.4.3)
Wind
Results:
Wind Speed; 89 Vmph
10-yearMRI 66Vmph
25-year MRI 72 Vrnph
50-year MRI 77 Vnph
100-year MRI 82 Vnph
Data Source ASCE/SEI 7-16, Fig. 26.5-1A and Figs. CC.2-1—CC.24
Date Accessed: Sat Sep 12 2020
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind speeds
correspond tc approximately a 15% probability of exceedance in 50 years (annual exceedance probability =
0.00333, MRI = 300 years).
Site is not in a hurricane-prone region as defined in ASCE/SEI 7-16 Section 26.2.
Mountainous :errain, gorges, ocean promontories, and special wind regions should be examined for unusual wind
conditions.
https://asce7hazrdtool.onIine/ Page 1 of 3 Sal Sep 12 2020
. MCN saaETyavt 4GN
Seismic
Site Soil Class: 0 - Default (see Section 11.4.3)
Results:
Ss : 1.047 S01 N/A
S1 : 0.38 TL: 8
Fa 1.2 PGA: 0.46
F N/A PGA m: 0.552
SMS : 1.256 FPGA : 1.2
SM1 : N/A le : 1
SDS 0.837 C, : 1.309
Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8.
Data Accessed: Sat Sep 12 2020
Date Source: USGS Seismic Design Maps
htts://asce7hazardtool.oriline/ Page 2 of 3 Sat Sep 12 2020
-A 2~1z~
N,ICAN SE1Y OF aV. ENNS
The ASCE 7 Hazard Tool is provided for your convenience, for informational purposes only, and is provided "as is and without warranties of
any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers;
or has been extrapolated from maps incorporated in the ASCE 7 standard. While ASCE has made every effort to use data obtained from
reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability,
currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement,
affiliation, relationship, or sponsorship of such third-party content by or from ASCE.
ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent
professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such
professionals in interpreting and applying the contents of this Tool or the ASCE 7 standard.
In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors,
employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential
damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by
law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data
provided by the ASCE 7 Hazard Tool.
https://asce7hazardtool.online/ Page 3 of 3 Sat Sep 12 2020
EXPLORATORY BORINGS
S
S
S
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 19 of 24
S
S
S
Project Name: 1375 BUENA VISTA WAY I
Address: 1375 BUENA VISTA WAY I
CARSLBAD, CA I
Location: NORTHWEST PORTION OF PROPERTY
Date: 8/28/2020
Logged By: JLVG
Reviewed By: BJL
Footing Thickness (in.):
Test Pit/Test Boring ID: B-1 I Excavation Method- AUGER
I Sample Type: BULK
Total Depth (ft):3.0
I Depth to Water (ft): —NA
Caving: NONE
(Depth of Footing:NA
Depth
(Inches)
Gradc-
6
12
24
30
96
102 -
108
Soil Description
gradedSand with Silt (SP-SM): HPoorly
Sample
- Discrete
Sample Interval
Bulk
Sample
Interval
Lithology & Footing
Details
V
6—
-
12—
18-
24—
30—
36—
-
42-
48-
54-
60-
66-
72-
78-
84-
90-
96-
102-
108
114—
- Type
-
Topsoil
ID
Poorly graded Sand with Silt (SP-SK :
MC%
-
fine to medium graded, reddish brown
poorly graded sand with silt
------ 18--
fine to medium graded, dense reddish
light brown poorly graded sand with silt
_____
B-i
24fl_36t
_ _
-
-
36—
END OF BORING @36"
- ____ -
42—
-
48—
54—
60—
66—
72 —
78 —
94
90 —
-
APPLIED CONSULTANTS
BORING LOG: B# 1
1375 BUENA VISTA
I_
CARLSBAD, CA
DATE: 8/28/2020
Drawn By: JLVG
S
S
Project Name: 1375 BUENA VISTA WAY
Address: 1375 BUENA VISTA WAY
CARSLBAD, CA
Location: SOUTHEAST PORTION OF PROPERTY
Date: 8/28/2020
Logged By: JLVG
Reviewed By:_BJL
Footing Thickness (in.):
Test Pit/Test Boring ID: B-2
(Excavation Method: AUGER I Sample Type: BULK
Depth (ft): 5.0
Depth to Water (ft): NA
Caving: NONE
Depth of Footing: NA
Depth
(Inches)
Grade—
12
36
54
102 -
108 -
1141
Soil Description
-------
Poorly graded Sand with Silt (SP-SM):
-
Sample
- Discrete
Sample
Interval
1
Bulk
Sample
Interval
Lithology & Footing
Details
6"-18"12—
6 -
18-
24-
30—
- 36—
-
42-
48—
54—
60-
-
66-
72-
78-
84-
90-
96-
102-
108
114
Type
Topsoil
ID MC%
6 --
-
____
B-2
-
- fine to medium graded, reddish light
brown poorly graded sand with silt
- ------
Poorly graded Sand with Silt (SP-SK:
-
18 - - _____ -
24—
30—
-
- fine to medium graded, moist reddish
brown poorly graded sand with silt.
______
42—
-
48— - _____
B-2
48"-60"
_
-
p
-
-
6C—
- END OF BORING @36't
-
66—
72 —
78 —
84 —
90 —
96 —
APPLIED
CONSULTANTS —
BORING LOG: B# 2
1375 BUENA VISTA
I CARLSBAD, CA
DATE: 8/28/2020
Drawn By: JLVG
GENERAL EARTHWORK AND GRADING
GUIDELINES
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 20 of 24
S
. GENERAL EARTHWORK AND GRADING GUIDELINES
EARTHWORK OBSERVATION AND TESTING
Prior to commencement of grading, a qualified geotechnical consultant shall be employed
for the purpose of observing earthwork procedures and testing the fills for conformance with the
recommendations of the geotechnical report and these specifications. The consultant is to provide
adequate testing and observation so that he may determine that the work was accomplished as
specified. It shall be the responsibility of the contractor to assist the consultant and keep him
apprised of work schedules and changes so that the consultant may schedule his personnel
accordingly.
The contractor is to provide adequate equipment and methods to accomplish the work in
accordance with applicable grading codes or agency ordinances, these specifications, and the
approved grading plans. If in the opinion of the consultant, unsatisfactory conditions are resulting
in a quality of work less than required in these specifications, the consultant may reject the work
and recommend that construction be stopped until the conditions are rectified.
Maximum dry density tests used to determine the degree of compaction shall be performed
in accordance with the American Society for Testing and Materials Test Method ASTM: D 1557-
82.
PREPARATION OF AREAS TO BE FILLED
Clearing and Grubbing: All brush, vegetation, and debris shall be removed and
properly disposed of.
The Geotechnical Consultant shall evaluate the extent of removal of these items
depending on site conditions. Fill material shall not contain more than 1 percent of organic
material by volume. No fill shall contain more than 5 percent organic matter.
No fill shall contain hazardous materials or asphalt pavement. If asphalt pavement
is removed, it shall be disposed of at an appropriate location. Concrete fragments which are free
of reinforcing steel may be placed in the fills.
Processing: the existing ground which is evaluated to be satisfactory for support of
fill shall be scarified to a minimum depth of 6 inches. Existing ground which is not satisfactory
shall be over-excavated as specified in the following section. Scarification shall continue until the
soils are broken down and free of large clay lumps or clods and until the working surface is
reasonably uniform and free of uneven features which would inhibit uniform compaction.
Overexcavation: Soft, dry, spongy, or otherwise unsuitable ground, extending to
such a depth that surface processing cannot adequately improve the condition, shall be over-
excavated down to firm ground as approved by the consultant.
Moisture Conditioning: Over-excavated and processed soils shall be watered,
dried-back, blended, and/or mixed, as necessary to attain a uniform moisture content
approximately 2 percent over optimum.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 21 of 24
Recompaction: Over-excavated and processed soils which have been properly
mixed and moisture-conditioned shall be compacted to a minimum relative compaction of 90
percent according to ASTM: D1557-82.
Benching: Where fills are to be placed on ground with slopes steeper than 5:1
(horizontal to vertical units), the ground shall be benched. The lowest bench shall be: a minimum
of 15 feet wide, at least 2 feet deep with a minimum 2% slope into the fill bank for horizontal
stability, expose firm materials, and be approved by the consultant. Other benches shall excavate
into firm material for a minimum width of 4 feet. Ground sloping flatter than 5:1 shall be benched
or otherwise over-excavated when considered necessary by the consultant.
Approval: All areas to receive fill, including processed areas, removal areas, and
toe-of-fill benches shall be approved by the consultant prior to fill placement.
III. FILL MATERIAL
1. General: Material to be placed as fill shall be free of organic matter and other
deleterious substances, and shall be approved by the consultant. Soils of poor gradation,
expansion, or strength characteristics shall be placed in areas designated by the consultant or mixed
with other soils until suitable to serve as satisfactory fill material.
2, Oversize: Oversize material defined as rock, or other irreducible material, with a . maximum dimension of greater than 4 inches, shall not be buried or placed in fill unless the
location, materials, and disposal methods are specifically approved by the consultant. Oversize
disposal operations shall be such that nesting of oversized material does not occur, and such that
the oversized material is completed surrounded by compacted or densified fill. Oversize material
shall not be placed within the range of future utilities or underground construction, unless
specifically approved by the consultant.
Import: If import fill is necessary for grading, the import material shall be approved
by the geotechnical consultant.
IV. FILL PLACEMENT AND COMPACTION
Fill Lifts: Approved fill material shall be placed in areas prepared to receive fill in
near-horizontal layers not exceeding 6 to 8 inches in compacted thickness. The consultant may
approve thicker lifts if testing indicates that the grading procedures are such that adequate
compaction is being achieved with lifts of greater thickness. Each layer shall be spread evenly
and shall be thoroughly mixed during spreading to attain uniformity of material and moisture in
each layer.
Fill Moisture: Fill layers at a moisture content less than optimum shall be watered
and mixed, and wet fill layers shall be aerated by scarification or blended with drier materials.
Moisture conditioning and mixing of fill layers shall continue until the fill material is at a uniform
moisture content at or near two percent over optimum.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 22 of 24
Compaction of Fill: After each layer has been evenly spread, moisture conditioned
and mixed, it shall be uniformly compacted to not less than 90 percent of maximum dry density in
accordance with ASTM: D1557-82. Compaction equipment shall be adequately sized and either
specifically designed for soil compaction or of proven reliability, to efficiently achieve the
specified degree of compaction.
Fill Slopes: Compacting of slopes shall be accomplished, in addition to normal
compaction procedures, by backrolling of slopes with sheepsfoot rollers at frequent intervals of 2
to 3 feet in fill elevation gain, or by other methods producing satisfactory results. At the
completion of grading, the relative compaction of the slope out to the slope face shall be at least
90 percent.
Compaction Testing: Field tests to check the fill moisture and degree of
compaction will be performed by the consultant. The location and frequency of tests shall be at
the consultant's discretion. In general, the tests shall be taken at an interval not exceeding 2 feet
in vertical rise and/or every 1000 cubic yards of embankment.
SUBDRA1N INSTALLATION
Subdrain systems, if required, shall be installed in approved ground to conform to the
approximate alignment and details shown on the plans or shown herein. The subdrain location or
materials shall not be changed or modified without the approval of the consultant. The consultant,
however, may recommend and upon approval, direct changes in subdrain line, grade or material. . All subdrains shall be surveyed for line and grade after installation and sufficient time allowed for
surveys, prior to commencement of filling over the subdrains.
EXCAVATIONS
Excavations and cut slopes shall be examined during grading. If directed by the consultant,
further excavation or overexcavation and refilling of cut areas shall be performed, and/or remedial
grading of cut slopes performed. Where fill-over-cut slopes are to be graded, unless otherwise
approved, the cut portion of the slope shall be made and approved by the consultant prior to
placement of the fill portion of the slope. Excavations may require the consultant to produce an
alternate sloping plan if the excavation
TRENCH BACKFILL
The Contractor shall follow all OSHA and CAL/OSHA requirements for
maintaining safety of trench excavations.
The bedding and backfill of utility trenches shall be done with the applicable
provisions of Standard Specifications of Public Works Construction. Bedding material shall have
a sand equivalent of (SE >30). Bedding shall be placed 1 foot above the top of pipe. All backfill
shall be compacted to 90 percent from 1 foot above the pipe to the surface.
3. The geotechnical consultant shall test the trench backfill for relative compaction.
At least one test shall be performed for every 300 feet of trench and every two feet of trench fill.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 23of24
The lift thickness of the trench backfill shall not exceed what is allowed in the
Specifications of Public Works Construction unless the contractor can demonstrate that the fill can
be compacted by an alternative means to the minimum relative compaction.
All work associated with trenches, excavations and shoring must conform to the
local regulatory requirements, State of California Division of Industrial Safety Codes, and Federal
OSHA requirements.
VIII. FOUNDATIONS NEAR TOP OF SLOPES
Where foundations, footings, walls and other similar proposed structures are to be located
seven feet and further away from the top of slopes, standard design may take place in conformance
with the recommended soil beating value. In situations where foundations, footings, walls, et
cetera, are located closer than seven feet from the top of slope they shall be deepened so that the
bottom edge of the footing is 7 feet horizontally from daylight in the slope.
1375 Buena Vista Way - Geotechnical Investigation
JED 9/12/2020 Page 24 of 24