HomeMy WebLinkAboutCDP 2017-0069; CIARMOLI RESIDENCE; SITE INSPECTION; 2018-01-30U
U
I
I
:
January 30, 2018
P.O. Box 119
Lakeside, Califorrti
9204(
(619) 443006(
I
I
I
Dino Ciarmoli
4205 Skyline Road
Carlsbad, California 92008
SUBJECT: File No. 1106H6-17
SITE INSPECTION
Proposed Residential Building Site
4205 Skyline Road
City of Carlsbad
Dear Mr. Ciarmoli:
SCOPE
R1FCEVEI
MA'( 16 2019
LAND DEVELOPMENT
ENGINEERING
I In accordance with your request, a Site Inspection has been performed at the subject site. The
purpose of this investigation was to examine existing site conditions and provide engineering
recommendations for the proposed addition and 2nd story addition over the existing single
I family residence and the proposed detached accessory unit.
FIELD INSPECTION
In order to accomplish this purpose, a representative of this firm visited the site, reviewed the
topography and site conditions and visually and textually classified the surface and near
surface soils. Representative samples of the on-site soils were obtained from 2 test
explorations approximately 4 feet in depth and tested for density, shear strength and
expansive characteristics. Existing footings, where exposed, were 16 inches in depth.
SITE CONDITIONS
The subject site is located on the west side of Skyline Road and south of MacArthur Avenue.
The site descends at an approximate 6 to 9 degree inclination from the west to the east. The
site is currently occupied by a single family split level residence with the garage level lower
than the main floor. Other neighboring properties are occupied by residential structures. Fill
materials were encountered to a depth of 2.5 to 3 feet during course of this inspection and
native soils were loose and compressible to a depth of 12 inches.
I 1
I
I
I
fl
fl
I
I
I
Dino Ciarmoli File No. 1106H6-17 January 30, 2018
SITE EROSION CONTROL
I During the construction, surface water should be controlled via berms, gravel bags and/or
sandbags, silt fence, straw wattles, siltation basins, while maintaining positive surface
grades or other methods to avoid damage to the finish work or adjoining properties. All
I site entrances and exits must have coarse gravel or steel shaker plates to minimize offsite
sediment tracking. Best management Practices (BMP's) must be used to protect storm
drains and minimize pollution. The contractor should take measures to prevent erosion of
I graded areas until such time as permanent drainage and erosion control measures have been
installed. After completion of grading, all excavated surfaces should exhibit positive
I
drainage and eliminate areas where water might pond.
SOIL CONDITIONS
I Soils encountered in the test exploration in the front of the existing house were fill soils
consisting of firm to medium dense, tan brown, silty cemented sands with clay binder to
approximately 2.5 to 3 in depth. These surface soils were underlain firm to medium dense,
I tan, silly cemented sands with clay binder to the bottom of the exploration approximately 4
feet in depth.
I The soils we encountered were not considered to be detrimentally expansive with respect to
change in volume with change in moisture content.
I CONCLUSIONS AND RECOMMENDATIONS
1. A representative sample of the foundation soil was remolded to 90% of maximum
I dry density. Based on the following test results, a safe allowable bearing value of at
least 2000 pounds per square foot for 12 inch deep footings may be used in
designing the foundations and slab for the proposed structures. This value may be
I increased by one third for wind and/or seismic loading. This value may be
increased according to the CBC Table 1 8A-I-A by 20 percent for each additional
foot of depth and or width to a maximum of 3 times the designated value.
I Maximum Dry Density 123.2 pcf
Optimum Moisture 9.0%
I Angle of internal friction 34°
Cohesion 148 psf
Unit weight 110.7 pcf
I Expansion Index 25
H
I
I
I
1 Dino Ciarmoli File No. 1106H6-17 January 30, 2018
Lateral resistance to horizontal movement may be provided by the soil passive
pressure and friction of concrete to soil. An allowable passive pressure of 250
I pounds per square foot per foot of depth may be used. A coefficient of friction of
0.35 is recommended. The soils passive pressure may be increased by 1/3 for wind
I
and seismic loading.
The seismic parameters for the site coordinates 33.15266°N, 117.31917'W for
I
assumed Site Class D are as follows:
USGS—Provided Output
I S, = i,1iiQ S,, 1.173 g SL,= 0.782g
= 0427 g S = 0.672 a SL = 0.448
For information on hovr the SS and Si values above have been calculated from probabilistic (risk-targeted) and
I trnmntc ground motions in the direction of maximum horizontal repon5e, please returnto the application
and select the '2DOY NEHRP building code reference document.
MCE Reooic Strum fleqn Roic Spvn
IH
I
I
F' PdJ •)
The existing single family residence appears to be located on a transition lot. The
soils encountered along the west side of the house were native soils and fill
materials were encountered in the front east side of the house to a depth of 1 to 3
feet. Footing excavations, where exposed, were 16 inches in depth. The design
engineer should take into account whether the proposed second story addition is
compatible for the final structurally local demand.
For the proposed addition to the footprint of the existing house, to prevent
differential settlement, the footings excavations should extend an additional 18
inches below approved footing depth. A suitable backfill material such as Class II
base should be compacted to a minimum of 95% relative compaction or a 2 1/2 sack
slurry with 3/8" aggregate mix with 8" slump may be used to back fill the bottom of
the footing excavations up the approved footing depth.
I
I 3
I
I
U
I
I
I Dino Ciarmoli File No. 1106116-17 January 30, 2018
Footings for the proposed detached accessory structure may extend through the
existing loose native soils a minimum of 12 inches into firm natural ground.
Anticipated foundation depth is 24 to 30 inches. Footing excavations should be
inspected by a representative of this firm prior to placement of forms and reinforcing
steel in order to insure that adequate depth has been achieved and that all footings are
founded a minimum of 12 inches into firm natural ground. Loose soils should be
removed from excavations prior to our inspection. Proposed concrete slabs areas
should be prepared according to the slab recommendation below. These
recommendations are based entirely upon the soil types and do not take into
consideration the requirements of the proposed structure.
Reinforcing in footings should consist of at least one 94 steel bar placed continuously
in the top and bottom of continuous footings regardless of structural requirements.
Reinforcing for isolated footings is dictated by the structural requirements. These
recommendations are based upon on the soil type encountered and do not take into
consideration the proposed bearing load. Footings deeper than 24 inches should have
an additional #4 steel bar for each additional foot of depth.
Concrete Slab-On-Grade, SOG, should be designed by the project's structural
engineer based on anticipated loading conditions. We recommend that
conventional reinforced concrete SOG for this project be founded on 4 inches of
Class II Virgin Aggregate Base (with approximately 2% +1- over optimum moisture
content and 90% compaction, relative to the lab maximum dry density, ASTM D
1557), overlying a 12 inch thick zone of adequately placed and compacted
structural fill. We recommend that a moisture barrier be provided by a membrane,
visqueen 10 mils in minimum thickness or equivalent, be placed at top of well
compacted Class II Aggregate Base, then covered with 2 inches of moist clean sand
having a minimum sand equivalent of 30 when tested in accordance with the
American Society of Testing and Materials test method 'ASTM D1555.
Floor slabs, as a minimum, should be 5 inches thick with #4 reinforcing steel at 16"
on-center each way. Reinforcement should be placed at mid-height of the slab. The
final slab thickness and reinforcement should be determined by the structural design
engineer. Control joints should be provided in accordance with the
recommendations of the structural design engineer.
SITE AND SURFACE DRAINAGE
I Drainage at the site should be directed away from foundations, collected and tight lined to
appropriate discharge points. Consideration may be given to collecting roof drainage by
eave gutters and directing it away from foundations via non-erosive devices. Water, either
I
I 4
I
I
I
Li
I
'I
I
I
I
I
I
Li
I
I
I Dino Ciarmoli File No. 1106H6-17 January 30, 2018
natural or from irrigation, should not be permitted to pond, saturate the surface soils or
flow towards the foundation. Landscaping requiring a heavy irrigation schedule should not
be planted adjacent to foundations or paved areas. The type of drainage issues found within
the project and materials specified and used should be determined by the Engineer of
Record. GROUNDWATER AND SURFACE WATERS
I There was no indication of a near-surface groundwater table within our exploratory trench
or perched groundwater. Although groundwater is not expected to be a significant
constraint to the proposed development, our experience indicates that near-surface
I groundwater conditions can develop in areas where no such groundwater conditions
previously existed, especially in areas where a substantial increase in surface water
infiltration results from landscape irrigation or unusually heavy precipitation. It is
I anticipated that site development will include appropriate drainage provisions for control
and discharge of surface water runoff. The type of drainage issues found within the project
and materials specified and used should be determined by the Civil Engineer. The type of
I plants and soil specified along with proper irrigation used should be determined by the
Landscape Architect.
I The following grading specifications should be utilized if grading is proposed.
RECOMMENDED GRADING SPECIFICATIONS
I For
Proposed Residential Building Site
4205 Skyline Drive
I City of Carlsbad
GENERAL: Soil Testers and 'Engineer' are synonymous hereinafter and shall be employed
I to inspect and test earthwork in accordance with these specifications, the accepted plans, and
the requirements of any jurisdictive governmental agencies. They are to be allowed adequate
access so that the inspections and tests may be performed. The Engineer shall be apprised of
I schedules and any unforeseen soil conditions.
Substandard conditions or workmanship, inadequate compaction, adverse weather, or
I deviation from the lines and grades shown on the plans, etc., shall be cause for the engineer to
either stop construction until the conditions are corrected or recommend rejection of the
work. Refusal to comply with these specifications or the recommendations and/or
I interpretations of the engineer will be cause for the engineer and/or his representative to
immediately terminate his services.
Deviations from the recommendations of the Soil Report, from the plans, or from these
I
I 5
I
n
I Dino Ciarmoli File No. 1106H6-17 January 30, 2018
I Specifications must be approved in writing by the owner and the contractor and endorsed by
the engineer.
SOIL TEST METHODS:
Maximum Density & Opt Moisture
Density of Soil In-Place
Soil Expansion
Shear Strength
Gradation & Grain Size
Capillary Moisture Tension
Organic Content
-- ASTM D1557-70
-- ASTM D1556, D2922 and D3017
-- UBC STANDARD 29-2
-- ASTM D3080-72
I
[I
F
I
-- ASTM D114O-71
-- ASTM D2325-68
-- % Weight loss after heating for 24 hours
at 300° F and after deducting soil moisture.
LIMITING SOIL CONDITIONS:
I Minimum Compaction 90% for 'disturbed' soils. (Existing fill,
newly placed fill, plowed ground, etc.)
84% for natural, undisturbed soils.
95% for pavement subgrade within 2' of I finish grade and pavement base course.
Expansive Soils Expansion index exceeding 20
Insufficient fines Less than 40% passing the #4 sieve. I Oversized Particles Rocks over 10" in diameter.
I PREPARATION OF AREAS TO RECEIVE FILL:
Brush, trash, debris and detrimental soils shall be cleared from the areas to receive fill.
Detrimental soils shall be removed to firm competent soil. Slopes exceeding 20% should be
I stepped uphill with benches 10' or greater in width. Scarify area to receive fill to 6" depth and
compact.
I FILL MATERIAL shall not contain insufficient fines, oversized particles, or excessive
organics. On-site disposition of oversized rock or expansive soils is to be at the written
direction of the Engineer. Select fill shall be as specified by the engineer. All fills shall be
I compacted and tested.
SUBDRAINS shall be installed if required by and as directed by and detailed by the
I engineer and shall be left operable and unobstructed. They shall consist of 3" plastic
perforated pipe set in a minimum cover of 4" of filter rock in a 'vee' ditch to intercept and
drain free ground from the mass fills. Perforated pipe shall be schedule 40,
I Poly-Vinyl-Chloride or Acrylonitrile Butadienne Styrene plastic. Rock filter material shall
conform to the following gradation:
I
I [.1
I
Li
I Dino Ciarmoli File No. 1106H6-17 January 30, 2018
Sieve size: 3/4" #4 #30 #200
I
%Passing: 90-100 25-50 5-20 0-7
Subdrains shall be set at a minimum gradient of 0.2% to drain by gravity and shall be tested
I
by dye flushing before acceptance. Drains found inoperable shall be excavated and replaced.
CAPPING EXPANSIVE SOILS: If capping expansive soils with non-expansive soil to
mitigate the expansive potential is used, the cap should be compacted, non-expansive, select
I soil placed for a minimum thickness 3' over the expansive soil and for a minimum distance of
8' beyond the exterior perimeter of the structure. Special precautions should be taken to
ensure that the non-expansive soil remains uncontaminated and the minimum thickness and
I dimensions around the structure are maintained. The expansive soils underlying the cap of
non-expansive cap should be pre-saturated to a depth of 3' to obtain a degree saturation
I
exceeding 90% before any construction supported by the compacted cap.
The non-expansive soil comprising the cap should conform to the following:
I Minimum Compaction 90%
Maximum Expansion Index 30
Minimum Angle of Internal Friction 33 Deg
I Cohesion Intercept 100 psf
UNFORESEEN CONDITIONS: Soil Testers assume no responsibility for conditions,
I which differ from those, described in the applicable current reports and documents for this
property. Upon termination of the engineer's services for any reason, his fees up to the time of
termination become due and payable. If it is necessary for the engineer to issue an
I unfavorable report concerning the work that he has been hired to test and inspect, the
engineer shall not be held liable for any damages that might result from his 'unfavorable
report'.
I If we can be of any further assistance, please do not hesitate to contact our office. This
opportunity to be of service is sincerely appreciated.
I Respectfully submitted, ESS/
Chin C. Chen, RPE C34442 0 No. C 034442
C10-
I 7
I