Loading...
HomeMy WebLinkAboutCD 2019-0020; PACIFIC RIM; DRAINAGE REPORT; 2020-01-10JAN 13 2420 LAND DEVELOPMENT ENGINEERING a Irvine San Diego Ontario Los Angeles El Centro San Ramon Nil II.IIHi 0 FUSCOE • I iuui Ihi E U 6 I U £ E fl I U 6 January 10, 2020 David Rick City of Carlsbad Engineering Division 1 635 Faraday Avenue Carlsbad, CA 92008 Re: Drainage Report for Park Hyatt Aviara CD 2019-0020, GR 2019-0043 APN: 215-750-01 David, This letter is regarding the standard requirement to prepare a Drainage Report for Grading Plans. The scope of this project is to refurbish and redevelop the existing function courtyard and pool courtyard for the Hotel. The limits of work do not extent beyond the existing developed area. Because the project disturbs more than 5,000 SF of surface area a SWQMP is required. Also, the project will move more that 200 CY's of earth. Both of these facts trigger the need for a grading permit. There is no change to the tributary area. The total disturbed area is 100,935 SF, and there is a slight decrease in impervious area from 57,438 SF to 55,941 SF. Because this project does not result in a changed drainage tributary area, does not increase the area impacted by development, and does not increase impervious area, a new Drainage Report is not warranted. If you have any questions or require additional information regarding this matter, please do not hesitate to contact me at (858) 554-1500. / Sincerely, QGFESS,S%. FUSCOE ENGINEERING, INC. loll m ( cr Exp._____ 83 UJ 4%CIVIL Eric K. Armstrong, RCE 36083 Page 1 o 1 full circle thinking ® 6390 Greenwich Drive, Suite 170, San Diego, CA 92122 0 tel 858.554.1500 0 fax 858.597.0335 0 www.fuscoe.com 3-