HomeMy WebLinkAboutCD 2019-0020; PACIFIC RIM; INFILTRATION FEASIBILITY LETTER, PROPOSED RENOVATIONS; 2019-12-30Leighton and Associates, Inc.
A LEIGHTON GROUP COMPANY
December 30, 2019
Rra' 1 ID
To: Xenia Hotels & Resort, Inc. JAN 13 2C20 200 S. Orange Ave. Suite 2700
Orlando, FL 32801 LAND DEVELOPMENT
Attention: Mr. Stephen Long ENGINEERING
Subject: Infiltration Feasibility Letter, Proposed Renovations to the Park Hyatt
Aviara Resort, Carlsbad, California
References: Leighton Consulting, 2019a, Geotechnical Investigation Report, Exterior
Renovations, Park Hyatt Aviara Resort Golf Club & Spa, Carlsbad,
California, Project No. 12493.001, dated October 23, 2019.
Leighton Consulting, 2019b, Addendum - Additional Field Percolation
Testing for New Bio-filtration Basin Location, Proposed Renovations to the
Park Hyatt Aviara Resort, Carlsbad, California, Project No. 12493.001,
dated November 21, 2019.
As requested, we have prepared this letter to discuss the infiltration feasibility of the
proposed Drainage Management Areas associated with the renovation project at the
Park Hyatt Aviara Resort, located in Carlsbad, California. The site is currently occupied
by existing hotel buildings, pool areas, an event lawn courtyard, and associated
landscape and hardscape areas. As shown on the attached Fuscoe Engineering
exhibit, there are three proposed Drainage Management Areas (DMAs) for the project.
As background, Leighton Consulting, Inc. (Leighton) has performed a geotechnical
study for the proposed project, which included field percolation testing at four potential
Bio-filtration areas for determining the feasibility of on-site near surface storm water
infiltration in general accordance with the County of San Diego Storm Water Standards
(County of San Diego, 2019).
3934 Murphy Canyon Road, Suite B205 • San Diego, CA 92123-4425
858.292.8030 • Fax 858.292.0771 • www.leightongroup.com
I
12493.001
For an assessment of the overall feasibility of infiltration of the DMAs, we have utilized
the seven items that are key in determining feasibility in our professional opinion. Note
that these items are also used by the City of San Diego in determining infiltration
feasibility (Section C.1.1, of San Diego Storm Water Standards, 2018).
I The phase of the project in which the geotechnical engineer first analyzed the site for
infiltration feasibility.
As encountered during our field exploration (Leighton, 2019a), the site is
underlain by artificial fill extending to varying depths up approximately 13 feet
below the existing ground surface (bgs). The fill soil was derived from on-site
excavations that was placed and compacted during the original grading of the
site in the late 1990s.
As part of our geotechnical investigation, three proposed BMP locations for the
project were first analyzed for infiltration feasibility during the field investigation
for the geotechnical report dated October 23, 2019. Subsequently, a four
proposed BMP location was analyzed for infiltration feasibility, as documented in
our addendum letter, dated November 21, 2019. In summary, field percolation
testing was done to determine the feasibility of on-site near surface storm water
infiltration in general accordance with the County of San Diego Storm Water
Standards (County of San Diego, 2019) using section D.2.1, Borehole
Percolation Test Method. Based on the field percolation testing, the four
proposed BMP sites were categorized as "Partial Infiltration" condition, as
determined by the County of San Diego Infiltration Form 1-8, Categorization of
Infiltration Feasibility Condition.
However, based on further assessment by the project civil engineer, Fuscoe
Engineering, the proposed BMP sites were subsequently eliminated due to
parcel boundaries and a Deed Restriction (Environmental Restricted Area)
issues.
It should be noted that localized infiltration within the existing hotel pool areas, an
event lawn courtyard, and associated landscape and hardscape was not
considered feasible for storm water infiltration due of the existing underlying fill
soil.
2 Results of previous geotechnical analyses conducted in the project area, if any.
As discussed above, the artificial fill beneath the site was encountered and
extended to varying depths up approximately 13 feet below the existing ground
surface (bgs) (Leighton, 2019a). The artificial fill consists of moist, light-yellowish
brown, loose to medium dense, silty sands and was derived from on-site
excavations and the original grading of the site. In general, the existing artificial
-2-
Leighton
12493.001
fill beneath the project area has a high potential for preferential pathways and
transmitting groundwater/seepage down gradient.
3 The development status of the site prior to the project application (i.e., new
development with raw ungraded land, or redevelopment with existing graded
conditions).
This is a renovation project with existing hotel buildings, pool areas, an event lawn
courtyard, and associated landscape and hardscape. The site was developed
prior to the 2000's. Currently, storm water infiltration at the site does not occur.
4 The history of design discussions for the project footprint, resulting in the final design
determination.
We were not involved in design discussions related to project footprint and final
design determination.
5 Full/partial infiltration BMP standard setbacks to underground utilities, structures,
retaining walls, fill slopes, and natural slopes applicable to the DMA that prevent
full/partial infiltration.
As shown on the attached Fuscoe Engineering exhibit, there are three DMAs for
the project:
DMA I is an existing courtyard area which is underlain by fill. Immediately south
and down gradient of DMA I is a facility access road with a service entry that
would be adversely affected by infiltration of storm water.
DMA 2 is generally an existing pool area, which is underlain by fill and has
numerous existing underground utilities. These utilities include wet utilities such
as storm drain and sewer lines that can act as preferential pathways and
adversely affected by infiltration of storm water.
DMA 3 is an existing pool area, which is underlain by fill and has numerous
existing underground utilities. These utilities include wet utilities such as storm
drain and sewer lines that can act as preferential pathways. Of particular concern
is an existing Keystone Retaining wall along the eastern boundary, which is an
up to 28 feet high that would be adversely affected by infiltration of storm water.
6 The physical impairments (i.e., fire road egress, public safety considerations, etc.)
that prevent full/partial infiltration.
Immediately south and down gradient of DMA I is a facility access road with a
service entry that would be adversely affected by infiltration of storm water.
Leighton
12493.001
7 Conclusion or recommendation from the geotechnical engineer regarding the DMA's
infiltration condition.
As previously mentioned above, all of the DMAs are underlain by up to 13 feet of
existing fill. In accordance with County of San Diego Storm Water Standards
(County of San Diego, 2019) Section B.2.2, these fills (i.e., greater than 5 feet in
thickness) should therefore be considered for an Infiltration Restriction by the
SWQMP preparer.
Of particular concern is the existing facility access road with a service entry down
gradient of DMA 1, the existing underground utilities within DMA 2, and existing
Keystone Retaining wall along the eastern boundary of DMA 3 that would all be
adversely affected by infiltration of storm water.
It is therefore our professional opinion that storm water infiltration at DMAs 1, 2,
and 3 is not feasible (see attached Fuscoe Engineering exhibit for DMA
locations).
If you have any questions regarding our letter, please do not hesitate to contact this
office. We appreciate this opportunity to be of service.
Respectfully submitted,
LEIGHTON CONSULTING, INC.
CO
fls No. 45283
\\* Exp.'V30/20 *
2 d -ofIO51
William D. Olson, RCE 45283
Associate Engineer
Attachments: Fuscoe Engineering - Attachment 1 - DMA Exhibit
Distribution (1) Digital Copy
-4-
Leighton
3' tVVU2SR' V-N
0.50
EASING
15 N AS L'S
NS TOtT.AR'S
"3., N .'N• 7Sf /
SET
EXISTING G EST WING
EXISTING GUEST WING
- I / v/- '•—--
LEGEND
BIOP]LTRATION BASIN PROPERTY LINE
UNIT OF WORK (DISTURBED AREA) - - - -
STREET CENTERUNE - - —
EXISTING CONTOUR PERVIOUS AREA
£015590 STORM DRAIN —st— ARTIFICIAL TURF
PROPOSED STORM DP"JP) — — -
DMA UNFIX
GRASSCRETE I DIRECTION OF FLOW
DMA DESIGNATION DMA 1 POOL AREA
PROJECT SITE NFO
UNDERLYING ITF'DROLOGIC SOIL! D
APPROXIMATE DEPTH TO GROUNDWATER; > 20 Fl
EXISTING NATURAL HYDROLOGIC FEATURES (WATERCOURSES, SEEPS, WETL9A4DS)! NONE
CRITICAL COARSE SEDIMENT TOLD AREAS TO BE PROTECTED NONE
EXISTING IMPERVIOUS AREA. 59,910 SF
DISTURBED AREA: 97,169 SF
PROPOSED IMPERVIOUS AREA: 16,643 SF
PROPOSED PERVIOUS AREA, 543,302 SF (INCLUDES POOL AREA 7.363 SF)
PERMANENT STORM WATER BMP NOTES
Q BIOFILTRA'TlON BASIN BEEP (BF-1)
DMA SUMMARY TABLE
MWS MI
PERVIOUS GRASSCRETE IMPERVIOUS POOL TREATMENT TREATMENT
DMA TOTAL TOTAL AREA AREA AREA- AREA METHOD OF FLOWRATE FLOWEATE MI
AREA (AC) AREA (SF) (SF) (SF) ASPEUSLT. (SF) TREATMENT 98013960 PROVIDED MODEIM
CONCRETE ISP) (GPO) (CFS)
1.1 065 28,340 0 S 23,340
BMP 1)MWS) 0.187 0 230 L-8-8
1.2 0,91 39,706 22,368 4,936 12,802 I
21 013 5,478 0 0 5,473 0 BMP 2 (MWS) 0.176 0230 L-8-3
2.2 0/2 31452 7,903 2,2132 16,223 5126
3 060 26,064 5,321 0 18,ORR 2,624 BMP3(MWS) 0.132 0.144 L-4-53
PARK HYATTAVIARA
ATTACHMENT 1a-
35 0 5' 35 DMA EXHIBIT
SCALE: 1 = 30' JOB NO. 1111
DATE REVISION
883-001
FUSCOE
ENNUI III Ull L.S
6390 Gr..nwirh Dr., OMit. 170
Son Di.go, Colifoosro 92122 SHEET
to) 858.554A 500 fox 856.097.0335
x,.,.w.fx,xx..xxn, 1 of 1