HomeMy WebLinkAbout1995-03-15; Planning Commission; ; CT 94-04|PUD 94-03 - POINSETTIA SHORES PLANNING AREA A-1• -APPLICATION COMPLETE DA TE:
DECEMBER 12. 1994
STAFF PLANNER: ERIC MUNOZ iJ:Z IJ
STAFF ENGINEER: TIM DA VIS Vt(_){
STAFF REPORT
DATE: MARCH 15, 1995
TO: PLANNING COMMISSION
FROM: PLANNING DEPARTMENT
SUBJECT: CT 94-04/PUD 94-03 -POINSETTIA SHORES PLANNING AREA "A-1" -A
request for approval of a Tentative :rract Map and Planned Unit Development for
36 single family detached homes on 5,000 square foot minimum sized lots within
the 8.4 acre P-C (Planned Community) zoned parcel of Planning Area "A-1" in
the Poinsettia Shores Master Plan located north of the Batiquitos Lagoon and east
of the railroad right of way, in the Coastal Zone, within Local Facilities
Management Zone 9.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution Nos. 3751 and 3752,
APPROVING CT 94-04 and PUD 94-03, respectively, based on the findings and subject to the
conditions contained therein.
Il. PROJECT DESCRIPTION AND BACKGROUND
This project is proposing a Tentative Tract Map and Planned Unit Development to develop
Planning Area "A-1" in conformance with the Poinsettia Shores Master Plan with 36 detached
single family homes. A Tentative Tract Map is required per the Subdivision Map Act to
subdivide the property into 5,000 square foot minimum sized lots. A Planned Unit Development
Permit (PUD) is required since the project addresses several components of the intent and
purpose of the Planned Development Ordinance as listed in Section 21.45.010 of the Zoning
Ordinance. Specifically involved are: separate ownership of planned unit development lots,
development in accordance with the General Plan and applicable master plan, the allowance of
flexibility in project design while providing for essential development standards and the provision
of development which will be compatible with existing and permitted future surrounding
developments. Accordingly, the project proposal includes subdivision into less than 7,500 square
foot lots and the use of private streets.
CT 94-04/PUD 94-03
POINSETTIA SHORES P~G AREA "A-1"
MARCH 15, 1995
PAGE2
•
The site has a General Plan land use designation of RM (Residential-Medium). Per the Master
Plan and RM designation, Area "A-1" is allowed a density range of 4-8 dwelling units per acre
(du/ac). The proposed density of 4.3 du/ac, therefore, is consistent with the Master Plan.
The site itself is essentially flat and has no unique topographic features or significant
environmental resources. North of the site is the Lakeshore Gardens mobile home park. East
and south of the site is the future Avenida Encinas roadway alignment. West of the site is the
vacant land associated with Planning Areas "M" and "B-1 ".
The master tentative map for Poinsettia Shores (CT 94-01) approved in August 1994 allowed the
mass grading of the master plan property, the construction of the A venida Encinas roadway and
related infrastructure to allow the development of individual planning areas. Only finish grading
is required to the mass graded site for the devetopment of Area "A-1". The project's finish
grading involves 13,900 cubic yards (CY) of cut, 20,600 CY of fill with 6,700 CY of import.
The location of Planning Area "A-1" within the Master Plan is depicted on the attached Location
Map. The detached single family homes will feature three floor plan types as shown on Exhibits
"E" -"G": Plan type A has 2,282 square feet (proposed height 20½ feet); Plan type B has 2,549
square feet (proposed height 26½ feet), and; Plan type Chas 2,760 square feet (proposed height
25 feet). Elevations are depicted on Exhibits "H" -"J". No plan type exceeds two stories. The
proposed architecture is contemporary with roof tile, stucco accented with wood trim and a
variety of roof planes and articulation so that consistency is maintained with the City's Small Lot
Architectural Guidelines (which applies to detached single family homes on lots less than 5,000
square feet). Every unit provides more than the minimum area requirement for a two car garage.
An internal 36 foot wide private street will serve the project with guest parking allowed on each
side. The overall site plan for the project is depicted on Exhibit "C". The project is designed
to meet the City's Noise Policy that applies to new residential development (over 5 units) within
the City. Noise barrier wall heights and details (consistent with the project's noise study) are
shown on Exhibits "J" and "K". A trail segment consistent with the Master Plan is shown on
Exhibits "C" and "J". As also shown on these exhibits, a pedestrian access gate through the noise
wall is provided in the northeast comer of the site. This allows pedestrian access to A venida
Encinas and the existing commercial retail services of Poinsettia Plaza.
The project will take access from A venida Encinas via a private street. Gated entries are
proposed and designed into the project consistent with Engineering Department and Master Plan
standards. Signage is proposed for the subject planning area near the project entrance in the form
of the Village Identity Sign which meets pertinent Master Plan criteria (Exhibits "J" and "K").
The proposed landscape concept (Exhibits "J" and "K") is designed to screen the development
along the perimeter and from A venida Encinas; and to promote land use compatibility with
adjacent future planning areas.
• CT 94-04/PUD 94-03
POINSETTIA SHORES PIANNING AREA "A-1"
MARCH 15, 1995
PAGE3
ill. ANALYSIS
The proposed project is subject to the following land use plans and regulations:
A. Carlsbad General Plan
B. Poinsettia Shores Master Plan -MP 175(0)
C. Carlsbad Municipal Code, Title 20 (Subdivision Ordinance)
D. Carlsbad Municipal Code, Title 21 (Zoning Ordinance), including:
1. Chapter 21.45 Planned Development
2. Chapter 21.85 Inclusionary Housing
3. Chapter 21.90 Growth Management
E. West Batiquitos Local Coastal Program (LCP)
A. GENERAL PLAN
The approval of the Poinsettia Shores Master Plan involved several findings of consistency with
the City's General Plan. All development consistent with the master plan is therefore inherently
consistent with the General Plan. By providing a product type at or below the approved density
for the subject planning area, the master plan's implementation maintains consistency with the
General Plan.
By supplying residential market rate units per the master plan, the project is consistent with the
Land Use and Housing Elements of the General Plan. The master plan was not required to
provide any additional open space beyond natural open space areas previously dedicated by the
master plan property. Since natural open space dedications are not required of this planning area,
this project is consistent with the Open Space Element of the General Plan. By conducting a
noise study and designing the project to comply with the City's noise policy for new residential
development, the project is consistent with the Noise Element of the General Plan.
B. POINSETTIA SHORES MASTER PLAN -MP 175(0)
The proposal for Area "A-1" is in conformance with the governing master plan. The master plan
allows up to 41 single family dwelling units to be constructed on 5,000 square feet minimum
sized lots (36 dwelling units are proposed). The master plan provides certain development
standards and design criteria which are complied with and summarized as follows: (1) an 80 foot
structural setback is maintained between the homes of Area "A-1" and the mobile home property
CT 94-04/PUD 94-03
POINSETTIA SHORES PI.ANNING AREA "A-1"
MARCH 15, 1995
PAGE4
•
line boundary to the north. Improvements within this buff er area are consistent with the Master
Plan (underground utilities, parking, landscaping and a private trail segment); (2) the Lakeshore
Gardens mobile home park has been consulted and approves of the proposed landscaping in the
80 foot buffer; (3) an average setback of 25 feet for all homes within the planning area from
Avenida Encinas is maintained; (4) minimum lot size is 5,000 square feet; (5) no structures will
exceed the 30 feet/two story height limit associated with this planning area; (6) the proposed
architecture is consistent with the City's Small Lot Architectural Guidelines. In addition, the
Master Plan refers to the PD Ordinance (since a Planned Unit Development Permit is involved).
Compliance with the PD Ordinance development standards is discussed in Section D.l of this
report.
All other aspects of the master plan pertinent to Area "A-1" are complied with by the proposed
project including the provision of a trail segment, adequate and appropriate landscaping and the
provision of private passive and active recreation areas.
C. CARLSBAD l\RJNICIPAL CODE -TITLE 20
Since land subdivision into 5,000 square feet minimum sized lots consistent with the Master Plan
is proposed, this project must comply with the Subdivision Map Act and the City's Subdivision
Ordinance (Title 20). As reviewed and conditioned by the Engineering Department, the proposed
project meets all applicable requirements relating to subdivisions in the City. No serious public
health problems will be created by the proposed subdivision. All necessary public facilities and
infrastructure improvements, including circulation, drainage, sewer, water and utilities have either •
already been provided through the master tentative map (CT 94-01) or are conditions of approval
for this project. All required findings per the Subdivision Map Act and the City's Title 20 are
contained in Planning Commission Resolution No. 3751 for CT 94-04.
D. CARLSBAD l\RJNICIP AL CODE -TITLE 21
D.1. Chapter 21.45. Planned Development
In addition to the specific development standards established by the Poinsettia Shores Master Plan
(as discussed above) the Planned Development (PD) Ordinance is designated as the
implementing ordinance for Planning Area "A-1". All of the required findings for the granting
of a Planned Unit Development Permit (governed by the PD Ordinance) are contained in
Planning Commission Resolution No. 3752 for PUD 94-03. Below is an overview of the PD
standards compared against the proposed project.
(a) Density: The number of dwelling units in a planned development shall not exceed
the density permitted by the underlying zone. The proposed density of 4.3 du/ac
is within the allowed range of 4-8 du/ac per the Master Plan and RM designation.
• • CT 94-04/PUD 94-03
POINSETTIA SHORES PIANNING AREA "A-1"
MARCH 15, 1995
PAGES
(b) Setbacks:
(1) Required setbacks from Arterials/Major Arterials/Secondary Arterials. The
Master Plan allows a 25 foot average setback from A venida Encinas with
a minimum of 20 feet. This project exceeds the standard.
(2) Front Yard setbacks. Twenty foot front yard setbacks provided on each
lot.
(3) Comer Lot setbacks. Ten feet or more provided for comer lot setbacks.
(4) All setbacks are measured from the property line, or in the case where
individual property lines are not present, at the edge of the street curb or
sidewalk, whichever is closest to the structure to the subject setback.
Setbacks measured from back edge of sidewalk closest to structure.
(5) Distance between single story structures and/or between structures when
more than ten structures in a row front or back on a street. Although no
standard is given for the distance between two story structures when more
than ten in a row front on a street, the average distance between two story
structures is twenty feet. The project also complies with the City's Small
Lot Architectural Guidelines which prevents monotonous streetscapes and
ensures architectural quality and variety.
(c) Resident Parking: All units must have at least two full sized covered residential
parking maces. All units provide more than the minimum area for a two car
garage to accommodate either an additional compact or standard sized car. 72
covered resident spaces are required; 108 covered resident spaces provided.
(d) Visitor Parking: 12 guest snaces required; 55 guest spaces provided.
(e) All building setbacks from open parking areas shall not be less than five feet: No
open parking areas associated with this project; only on-street parking allowed on
both sides of 36 foot private streets for guest parking. _
(f) Screening of parking areas: All open parking areas shall be screened from
adjacent residences and public rights of way. No open parking areas associated
with this project as stated above.
(g) Recreational Space: 200 square feet per unit is required. This project exceeds
this standard with the provision of 15 by 15 feet of private passive recreation area
with each unit (Exhibit "C"), and access to the master plan recreation center -
Planning Area "M" (SDP 94-03).
CT 94-04/PUD 94-03
POINSEITIA SHORES PLANNING AREA "A-1"
MARCH 15, 1995
PAGE6
•
(h) Streets: 36 foot private street allowed with parking on both sides. The project
proposes the above allowed type of private street to serve the development.
(i) Lighting: Lighting adequate for pedestrian and vehicular safety and sufficient to
minimize security problems shall be provided. Project lighting is designed and
conditioned to prevent illumination onto adjacent properties. A lighting plan
subject to Planning Director approval is required prior to final map recordation.
(j) Utilities: There shall be separate utility systems for each unit. This will be
provided for each unit.
(k) Recreational Vehicle storage mace: Planning Area "E" (SOP 94-03) is the
designated RV storage site for the Master Plan and subject planning area.
(1) Storage mace: Separate storage mace of at least 480 cubic feet (CF) shall be
provided for each unit. Each unit provides garage space in excess of the
minimum required for a two car garage, satisfying this standard.
(m) Refuse areas. Curbside refuse pick up is adequate for this detached single family
subdivision, eliminating the need for centralized refuse pick up areas.
(n) Antennas. No individual antennas will be permitted. Each project shall have a
master antenna or a cable television hookup. No individual television antennas
will be allowed; satellite antennas may be allowed as regulated by Section
21.53.140 of the Carlsbad Municipal Code.
The project also is consistent with the design criteria outlined in the PD Ordinance. Findings
relating to the project's conformance to these design criteria are contained in Planning
Commission Resolution No. 3752 for PUD 94-03. In summary, the plan is comprehensive and
innovative in that it accounts for the location, constraints (noise) and shape of the site. Adequate
usable open space and recreation areas are provided. Buildings are well integrated and the
provision for required parking areas and vehicular and pedestrian circulation is made. Being a
part of an approved master plan, there will be no disruptive elements introduced into the
community by the proposed project. The internal street system is functional while not
dominating the site and all common areas are accessible to the future residents and well related
to each other. Finally, architectural harmony will be obtained within the area through appropriate
building height limitations, perimeter screening/buffering and proper planning of adjacent
planning areas.
D.2. Chapter 21.85, Inclusionary Housing
This project's inclusionary affordable housing requirement is satisfied by the approval and
development of Planning Area "D" within the Master Plan (CT 94-10/CP 94-03/SDP 94-08) or
• CT 94-04/PUD 94-03
POINSETTIA SHORES PIANNING AREA "A-1"
MARCH 15, 1995
PAGE7
the approval of an offsite Affordable Housing Agreement. Either case will result in the provision
of 90 affordable housing units, consistent with the Master Plan. A detailed summary of master
plan affordable housing provisions is contained in the staff report for Area "D" (CT 94-10).
While no units in the subject subdivision are required to be restricted as affordable housing units,
the project will be conditioned so that no final map approval will be granted until the on-site
project for Area "D" (CT 94-10) receives final map approval; or an off-site Affordable Housing
Agreement is approved by the Planning Director and Community Development Director.
D.3. Olapter 21.90, Growth Management
The proposed project is located within Local Facilities Management Plan Zone 9 in the
Southwest Quadrant. The impacts created by the d~velopment on public facilities and compliance
with the adopted performance standards are sutnrnarized as follows:
FACILITY IMPACTS COMPLIANCE
CITY ADMINISTRATION 133 square feet Yes
LIBRARY 71 square feet Yes
WASTE WATER TREATMENT 36 EDUs Yes
PARKS N/A Yes
DRAINAGE N/A Yes
CIRCULATION 360 ADT Yes
FIRE Station No. 4 Yes
OPEN SPACE N/A Yes
SCHOOLS CUSD Yes
SEWER COLLECTION SYSTEM 36 EDUs Yes
WATER 7,920 GPD Yes
The project is 5 dwelling units below the Growth Management Dwelling Unit allowance for the
property as permitted by the Poinsettia Shores Master Plan. Required facilities and services will
be available to serve the project and the master plan. All required Growth Management findings
are contained in Planning Commission Resolution No. 3751 for CT 94-04.
E. WEST BATIQUITOS LCP
The approval of the Poinsettia Shores Master Plan in. January 1994 included a Local Coastal
Program (LCP) Amendment (LCPA 91-02) for the West Batiquitos LCP which was approved by
the California Coastal Commission on May 12, 1994. Coastal Commission's certification of
LCP A 91-02 established the Poinsettia Shores Master Plan as the implementing
CT 94-04/PUD 94-03
POINSETTIA SHORES PIANNING AREA "A-1"
MARCH 15, 1995
PAGE8
•
ordinance/document for the West Batiquitos LCP. All development consistent with the master
plan, such as the proposal for this planning area, is therefore in conformance with the West
Batiquitos LCP and all applicable coastal regulations. A Coastal Development Permit issued by
the California Coastal Commission will be required prior to final map approval.
IV. ENVIRONMENTAL REVIEW
As discussed in the Initial Study for this project (Environmental Impact Assessment Form, Part
II), all potential environmental impacts associated with the development of this planning area
have already been identified and mitigated to a level of insignificance. Environmental analysis
and documentation for the master plan and subsequent planning areas was conducted for the
Poinsettia Shores Master Plan (MP 175(0)) and the master tentative map (CT 94-01) resulting
in the issuance and approval of Mitigated Negative Declarations. Since all applicable mitigation
measures have either been completed or designed into the project (i.e. noise attenuation and noise
policy compliance), no environmental impacts will result from the proposed development of this
planning area. Therefore, a Notice of Prior Compliance was issued and duly noticed on January
30, 1995.
V. SUMMARY AND RECOMMENDATION
The proposed project is in compliance with the Carlsbad General Plan, Poinsettia Shores Master
Plan, West Batiquitos LCP and Carlsbad Municipal Code, Titles 20 and 21 as described in this
report. Therefore, staff recommends approval of CT 94-04 and PUD 94-03, based on the
findings and subject to the conditions contained within their respective resolutions.
A TI ACHMENTS
1. Planning Commission Resolution No. 3751
2. Planning Commission Resolution No. 3752
3. Location Map
4. Environmental Impact Assessment Form, Part II dated January 24, 1995
5. Notice of Prior Compliance dated January 30, 1995
6. Background Data Sheet
7. Disclosure Form
8. Local Facilities Impact Assessment Form
9. Reduced Exhibits "A" -"K"
10. Exhibits "A" -"K", dated March 15, 1995.
ENM:vd:lh ,_,.,~-
\
\
\
F
8-1
A-4
K
BATIQUITOS LAGOON
POINSETTIA SHORES
P.A. A-1--CT 94-04/PUD 94-03
ENVIRONMENTAL IMPACT ASSE§MENT FORM -PART B
(TO BE COMPLETED BY 1HE PLANNING DEPAR'IMENT)
CASE NO.. CT 94-04/PUD 94:03 er 94-0S/PUD 94-04
DA TE: JANUARY 24. 199S
BACKGROUND
1. CASE NAME: Poinsettia Shores -Plannin1 Area-, "A-1· and ·A-Z-
2. APPLICANT: KaiR Poinsettia Cou,oration
3. ADDRESS AND PHONE NUMBER OF APPLICANT: 7220 Avenjda Enema., -Suite 200
C.arlsbad. CA 92008
(619) 931-9100
4. DATE EIA FORM PART I SUBMITI'ED: ..... N_.o.._v .. em .... ber ...... __ 4.._, ..,.1994.......__ __________ _
s. PROJECT DESCRIPrlON: Two plannina areas within the Poinsettia Shores Master Plan· (1) Area
• A-t • coDSj;stina of 36 sinaJe family detached homes on s,ooo sq, ft, minimum sized lots on 8.4 acres
and <2) Area • A-2· consistina of 49 sinde family detached homes on s,ooo sq. ft, minimum sized lots
on 10.s acres. Both plannina areas are conss.,ni with the Poinsettia Shores Master Plan
ENVIRONMENTAL IMPACTS
STATE CEQA GUIDELINES, Olapter 3, Article S, section 15063 requires that the City conduct an Environmental
Impact A~ent to determine if a project may have a significant effect on the environment. The Environmental
Impact A~ent appears in the following pages in the form of a checklist. This checklist identifies any physical,
biological and human factors that might be impacted by the proposed project and provides the City with information
to use as the basis for deciding whether to prepare an F.nvironrnental Impact Report or Negative Declaration.
* A Negative Declaration may be prepared if the City perceives no substantial evidence that the project or any of
its aspects may cause a significant effect on the environment. On the checklist, "No• will be checked to indicate
this determination.
* An EIR must be prepared if the Qty determines that there is S1.1hstantial evidence that any aspect of the project
may cause a siiOWfrlP& effect on the environment. The project may qualify for a Negative Declaration however,
if adverse impacts ate mitigated so that environmental effects can be deemed jrutj gnifigmt. These findings are
shown in the checklist under the headings •YES-sig• and •YES-insig• respectively.
~: If "YES-sig• is checked, the project is not necessarily required to prepare an EIR if the significant effect
has been analyzed adequately in an earlier EIR pursuant to applicable standards and the effect will be mitigated;
or a "Statement of Overriding Considerations• has been made pursuant to that earlier E1R.
A discussion of potential impacts and the proposed mitigation measures appears at the end of the form under
DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention should be given to discll§ing
mitigation for impacts which would otherwise be determined significant.
--PHYSICAL ENVIRONMENT
Wll..L niE PROPOSAL DIRBCTL Y OR INDIRECTLY: YES YES NO
(sig) (mlig)
1. Result in unstable earth conditions or
increase the exposure of people or p1operty
to geologic hazards'?
2. Appreciably change the topography or any
unique physical features?
3. Result in or be affected by erosion of soils
either on or off the site?
4. Result in changes in the deposition of beach
sands, or modification of the channel of a
river or stream or the bed of the ocean or
any bay, inlet or lake?
5. Result in substantial adverse effects on
ambient air quality?
6. Result in subc;tantial changes in air
movement, odor, moisture, or temperature? _x_
7. Substantially change the course or flow of
water (marine, fresh or flood waters)?
8. Affect the quantity or quality of surface
water, ground water or public water supply? _x_
9. Substantially increase usage or cause
depletion of any natwal resources? _x_
10. Use substantial amounts of fuel or energy? -..A_
11. Alter a significant archeological,
paleontological or historical site.
structure or object?
-2-
BIOLOGICAL ENVIRONMENT
wn..L 1HE PROPOSAL DIREC'IL Y OR INDIRECTLY: YES YES NO
(sig) (msig)
12. Affect the diversity of species, habitat
or numbers of any species of plants (including
trees, shrubs, grass, microflora and aquatic
plants)? _x__
13. Introduce new species of plants into an area.
or a barrier to the normal replenishment of
existing species? _x__
14. Reduce the amount of acreage of any
agricultural crop or affect prime, unique
or other farmland of state or local
importance? _x.__
1S. Affect the diversity of species, habitat
or numbers of any species of animals (birds,
land animals, all water dwelling organisms
and insects? _x__
16. Introduce new species of animals into an
area, or result in a barrier to the
migration or movement of animals? _x__
BUMAN ENVIRONMENT
WILL THE PROPOSAL DIRECll.. Y OR INDIRECTLY: YES YES NO
(sig) (msig)
17. Alter the present or planned land use
of an area? _x__
18. Substantially affect public utilities,
schools, police, fire, emergency or other
public services? _x__
-3-
HUMAN ENVIRONMENT
Wll..L TiiE PROPOSAL DIRECn Y OR INDIRECTLY: YES YES NO
(sig) (mlig)
19. Result in the need for new or modified sewer
systems, solid waste or hazardous waste
control systems? _L
20. Increase existing noise levels? _x_
21. Produce new light or glare? _x_
22. Involve a significant risk of an explosion
or the release of hazardous substances
(including, but not limited to, oil,
pemcides, chemicals or radiation)? _x_
23. Substantially alter the density of the
hllDWl population of an area?
24. Affect existing housing, or create a demand
for additional housing?
25. Generate substantial additional traffic? _L
26. Affectexistingparkingfacilities,or
create a large demand for new parking? _x_
27. Impact existing transportation systems or
alter present patterns of circulation or
movement of people and/or goods?
28. Alter waterborne, rail or air traffic? _L
29. Increase traffic huaJds to motor
vehicles, bicyclists or pedestrians? _x_
30. Interfere with eme,pncy response plans or
emergency evacuation. plans? _x_
31. Obstruct any scenic vista or create an
aesthetically offensive public view?
32. Affect the quality or quantity of
. existing recttational opportunities?
-4-
MANDATORY FINDINGS OF SIGNIFICANCE
Wll..L nm PROPOSAL onmcn. y OR INDIRECTLY:
33. Does the project have the potential
to substantially degrade the quality
of the environment, substantially
reduce the habitat of a fish or wild-
life speci~ cause a fish or wildlife
population to drop below self-sustaining
levels, threaten to eliminate a plant or
animal community, reduce the number or
restrict the range of a rare or en-
dangered plant or animal, or eliminate
important examples of the major periods
of California history or prehistory.
34. Does the project have the potential
to achieve short-term, to the dis-
advantage of long-t~ environmental·
goals? {A short-term impact on the
environment is one which occurs in a
relatively brief, definitive period of
time while long-term impacts will
endure well into the future.)
35. Does the project have the posgble
environmental effects which are in-
dividually limited but cumulatively
considerable? ("Cumulatively con-
siderable• means that the incremental
effects of an individual project are
considerable when viewed in connection
with the effects of past projects, the
effects of other cunent projects, and
the effects of probable future projects.)
36. Does the project have enviroometttaJ
effects which will cause s11bstantial
adverse effects on human beings.
either directly or indirectly?
-S-
YES
(sig)
YES
(msig)
NO
DISCUSSION Of ENVIRONMENTAL EVALUATION
' .
PROJECT BACKGROUND AND ENVIRONMENTAL SE'l"l'ING
This project involves two planning areas c•A-1• and •A-i■) within the Poinsettia Shores Muter Plan located
west of Interstate 5, eaat of Carlsbad Boulevard and north of Batiquitos Lagoon in the southwest quadrant of
the City (Location Map attached). Planning Area •A-i■ (8.4 acteS) is designated for up to 41 detached single
family residential units; 36 units are proposed. Planning Area •A-2• (10.5 acteS) is ~gnated for up to SO
detached single family residential units; 49 units are proposed. Reduced exhibits are attached showing the
proposed development for each of the subject planning areas. The project area has been maa graded with the
approval of the Poinsettia Shores Master Tentative Map (CT 94) in August 1994. Approval of CT 94--01
followed the approval of the Poinsettia Shores Master Plan (MP 175-D} in January 1994. Each of these
approvals (CT 94-01, MP 175-D) involved Mitigated Negative Declarations which set forth the environmental
mitigation measures required for the mass grading of the master plan property and development of the individual
planning areas. Prior to the Poinsettia Shores approvals, the master plan property was known as the Batiquitos
Lagoon Educational Park which was approved ·with the certification of an Environmental Impact Report (EIR
84-03). All environmental impacts associated with the. development of the master plan property have been
identified. Based on all environmental review and documenta~ the master plan contains required
environmental mitigation measures on a planning area by planning areas basis. 'The development proposals for
PA's "A-1• and •A-2• are in compliance with the masta-plans's mitigation requirements. This subsequent,
planning area level, "Initial Study• is intended to supplement the existing environmental documents covering
the master plan property. Pertinent mitigation measures have either been already completed or have been
considered{tmplemented in the project's design. Because of this, no new environmental impacts will result from
the approval and development of these planning areas and this project will be determined to be found in prior
compliance with existing environmental review and documentation.
Construction and development pursuant to CT 94--01 will provide the • necessary infrastructure to allow the
development of the master plan's planning areas including PA's •A-t• and •A-2•. This includes the construction
of Avenida Encinas (a Circulation Element roadway per the City's General Plan) with a new bridge over the
railroad tracks and a new intersection with Carlsbad Boulevard, mass grading of the site and required drainage
facilities. Required grading for the development of the subject planning areas will require a grading permit,
however, only consists of final finish grading of mass graded areas.
Since the approvals of the existing Mitigated Negative Declarations for the Poinsettia Shores Master Plan, the
City, in September 1994, certified a Final Muta Environmental Impact Report for an update of the General
Plan. The certified Master EIR (and all referenced environmental documents) is on file in the. Planning
Department. 'The Master EIR (MEIR) serves as the basis of environmental review and impact mitigation for
subsequent projects Cltywide that are cmsistent with the General P1an. Subsequent projects under the Master
EIR for the General Plan 'include the approval of development plans which implement General Plan land use
designations including tentative maps, planned development permits, condominium permits, site development
plans and other land use permits.
PHYSICAL ENVIRONMENT
1. As documented in EIR 84-03 and the Mitigated Negative Declantions for MP 175(0) and CT 94-01, the
site is not located near any active faults and no geologic conditions exist that would constrain the
development of the subject planning areas or increase the exposme of people or property to geologic
-6-
huards. Development of PA •A-1• will involve approximately 13,900 cubic yards (c.y.) of~ 20,600
c.y. of fill with 6,700 c:y of import; PA •A-i■ involves 22,000 cy of cut, 18,800 c:y of fill and 3,200 cy
of export. All grading will be pursuant to standard grading permits issued by the Engineering
Department. 'Ibis ensures that the project has proper erosion control measures and conforms with the
City's Master Drainage Plan.
2. The master plan propertf is mostly flat except for the lagoon bluff areas which has not been altered
through mass grading. The subject planning areas have been mass graded to accommodate refined
finished grading at the planning area level and have no unique physical features associated with them.
3. Mass grading associated CT 94-01 included drainage facilities and temporary detention basins to prevent
the erosion of soils on or off the site. In addition. the subject planning areas will be conditioned to
comply with the Oty's Grading Ordinance and standard landscaping and erosion control measures to
prevent soil erosion as well as adverse soil erosion offsite into Batiquitos Lagoon.
.
4. Development of the subject planning areas will not affect the natural sand movement patterns of the
nearby coastal littoral area. No changes will occur to the clwmels or any streams of the Batiquitos
Lagoon.
5. Previous environmental documentation for the site including the Mitigated Negative Declarations for
Poinsettia Shores discus.,ed air quality, however, these discussions have now been superseded by the Air
Quality Section (5.3) of the General Plan Update Master EIR (MEIR). Implementation of the updated
General Plan, including projects in the Poinsettia Shores Master Plan, will result in increased gas and
electric power consumption and vehicle miles traveled. In tum, increases in the emwion of carbon
monoxide, reactive organic gases, oxides of nitrogen and sulfur, and suspended particulates will result.
These aerosols are the major contributors to air pollution· in the City as well as in the San Diego Air
Basin. Since the San Diego Air Basin is a •non-attainment basin•, any additional air emmions could be
considered significant. Therefore, continued development to Citywide buildout consistent with the
General Plan, as partially represented by the development proposals for the subject Master Plan planning
areas, will have impacts on the air quality of the region.
Because of this, the checklist on page 2 is marked •significant• for this item. However, the certification
of the ~ by City Council Resolution No. 94-246, included a •Statement of Overriding
Considerations• for Air Quality Impacts. This • Statement of Overriding Considerations• applies to all
subsequent projects covered by the MEIR, inlcuding projects in the Poinsettia Shores Master P~
therefore, no further environmental review of air quality impacts is required.
6. Approval of the subject planning areas will not impact or substantia11y change air movements. odor,
moisture or temperature. Standard grading conditions and procedures will minimi7.e ~ impacts during
grading and construction phases.
7. The project will not have any impacts on the physical dynamict of the Batiquitos Lagoon or Pacific
Ocean. Drainage infrastructule bas been provided by CT 94-01 and the project will be subject to a
grading pennit so that c.ompliance with the City's Master Drainqe Plan and the drainage section of the
Local Facilities Management P1an for Zone 9 (which covers the master plan property) will be maintained
-7-
and no enviroomeotal impacts will result. This is also consistent with the existing Mitigated Negative
Declatations fm Poinsettia Shores.
8. No significant surface waters exist on the mass graded planning area sites. In addition, ground water
resources are not associated with the master plan property or planning area sites as noted in the existing
Mitigated Negative Declarations. Appropriate drainage facilities are provided in conjunction with the
infrastructure associated with CT 94-01 to accommodate the increases in surface nlllOff and NDOff
velocities resulting from development induced impervious surfaces and reduced absorption rates.
Drainage from roofs, streets, driveways, slopes and yards within the subject planning areas would
constitute a potentially significant impact to water quality due to urban pollutant runoff. However, the
project will be conditioned to comply with all grading permit requirements including provisions of the
National Pollutant Discharge Elimination System (NPDES) so that any potential water quality impacts
including impacts to the Batiquitos Lagoon will be reduced to below a level of significance. This is also
consistent with the existing Mitigated Negative Declarations aw;ociated with the master plan and master
tentative map.
9. The Mitigated Negative Declaration for CT 94-01 documents the lack of any significant natural resources
on the site and the previous use of the site for agriculture; the conversion from former agricultural uses
to urban uses as been mitigated prior to the final map approval of CT 94-01 consistent with that project's
Mitigated Negative Declaration through the payment and bonding of appropriate conversion fees.
10. Fuel and energy will be used during the grading and construction phases of this project in the form of
gasoline and fuel. This will be a short term impact that will not create a significant adverse impact to
fuel and energy resources.
11. EIR 84-3 for the former educational park master plan identified four archeological sites within the master
plan property; three were determined to be significant. Follow up data recovery efforts were carried out
by archeologist Brian Smith and summarized in the report, "The Archeological Excavations of Cultural
Resources at Sites W-84, W-88, W-95, W-97 and W-2251• incorporated herein by reference and on file
in the Planning Department. One of the sites had human rem.aim which have since been reinterred in
an open space area within the master plan with the coordination and direction of a qualified Archeologist
and Native American Coordinator. This was done in compliance with the mitigation measures of EIR
84-3. As concluded in the above referenced report, the sites are no longer considered significant. As
documented in the Mitigated Negative Declarations for MP 175(0) and CT 94-01, further mitigation to
allow mas grading of the rnasttt plan property and planning area development involved the retention of
an archeologist and paleontologist to monitor the mass grading effort. As part of the implementation of
the approval of er 94-01, all cultural ~ce monitorings have been completed in compliance with
applicable Oty regulatials and policies. No potential exists for adverse significant impacts to cultural
resources from grading or development of the roaster p1an or the subject planning areas. F.nsuring the
monitoring of cultural resources during mass grading of the site (through CT 94-01) bas occurred with
regards to Planning Area •A-19 and •A-2•. No historical sites, structures or objects are associated with
the master plan site or subject planning areas as documented in previous environmental reviews for the
area.
-8-
BIOLOGICAL ENVIRONMENT
12/13. The. Mitigated Negative Declarations for MP 175(0) and CT 94-01 outline the lack of sensitive
biological teSOWtes on the master plan site. Sensitive biological resources are JimW to the lagoon
and bluff areas or other sites lorated offsite from the subject planning areas. Consistalt with the
existing Mitipted Negative Declarations, the development of the subject planning areas will not
adversely impact any biological resources. No plant species exist onsite, therefore, bmiers to the
normal replenishment of existing species will not be created. Project tandscaping associated with the
subject planning areas will be the only plants introduced into the area. Project level landscaping and
~iated erosion control does not constitute a significant environmental impact. Biological impacts
resulting from the consttuction of major inftastructure (drainage alignments and facilities) have already
been identified and mitigated with CT 94-01.
14. The Mitigated Negative Declaration for CT 94-01 outlines the historical use of the master plan site
including the subject planning areas for agriculture. Pursuant to that project and &B>Ciated
environmental review, all outstanding agricultural cooversion fees have been paid or bonded for with
the mas., grading allowed with CT 94-01. No further mitigation measures are required and no impacts
to agricultural areas or farmlands of importance will result from the development of the subject planning
areas. As also outlined in previous environmental documents for the site, onsite soils are mostly Marina
loamy coarse sand (MIC) which is not considered -prime• agricultural lands per the Williamson Act
definition.
15/16. As discussed in the Mitigated Negative Declarations for MP 175(D) and CT 94-01, there is minimum
habitat value for animal species in the project area which has been recently mass graded. The exception
would be the animal biodiversity associated with the lagoon and adjacent wetland areas which will
remain open space and are located offsite and away from the subject planning areas so that there will
be no impacts to the habitats or diversity of sensitive animal $peCies &B>Ciated with Batiquitos Lagoon;
or their natural patterns of movements or migrations. The biological resources of the lagoon will not
be impacted by the development of the planning areas within the master plan. Domesticated animals
in the form of household pets will likely be introduced into the area by future residents; however, this
will not significantly impact the diversity or habitat of animal species.
HUMAN ENVIRONMENT
17. The project will not alter the plamwl land uses of the subject sites as designated by the General Plan and
Poinsettia Shores Masta Plan. Land uses and densities proposed for the subject planning areas are
consistent the master plan.
18. The project is located within 7.one 9 per the Oty's Growth Management Ordinance. As documented in
the Mitigated Negative Declaration for CT 94--01, development of the master plan including the subject
planing areas will not adversely impea any public services or facilities. The project is consistent with
the City's Growth Management Ordinance and the Local Facilities Management Plan for 1.one 9. Public
service and facility impacts, and financing, have been accounted for with the final map approval of CT
94-01 to accommodate the master plans's residential/planning uea development. In addition, the
applicant has entered into a schools agreement with the School District to mitigate school facility impacts.
-9-
19. Previous environmental reviews have documented the lack of a need for new or modified solid waste or
hu.ardom waste C0lltJOl systems. Infrastructure needs including sewer alignments and service have been
accounted for with er 94-01. This project will receive standard conditiom of approval ensuring adequate
sewer service.
20. The Poinsettia Shores Master Plan, which implements the mitigatim requirements of the Mitigated
Negative Declaration prepared for MP 175(0) on a planning area by planning area basis, requires that
every residential planning area be subject to a noise study that ensures compliance with the Oty's noise
policy. In accordance, PA's •A-1• and •A-2• have been designed to attenuate noise levels impacting their
projects in conformance with the City's noise policy to reduce noise impacts to below a level of
significance. The approval and development of the subject planning areas will not increase existing noise
levels to a level of significant environmental impact •
21. Through the site design and conditions of approval for the subject planning areas, no light or glare will
be directed offsite to adjacent planning areas or outside of the master plan property. Lighting within
planning areas will be low intensity and shielded from upward retlectiom. New light associated with the
development of the subject planning areas will not be a significant environmental impact.
22. The finish grading and construction proposed for the subject planning areas will not involve the
application, use or disposal of hazardous materials or substances so as to create a significant
environmental impact.
23. The approval and development of the subject planning areas will not substautiaJJy alter the density of the
human population of the area since only the densities already allowed by the General Plan and· the
Poinsettia Shores Master Plan are proposed. The allowed densities associated with this project are also
consistent with the City's Growth Management Program and the Zone 9 Local Facilities Management Plan
(LFMP). The proposed densities of 4.3 du/ac (•A-i■) and 4.7 du/ac (A-2) are within the Residential
Medium {RM) General Plan designation emblished by the master plan for the subject plamung areas.
The RM designation allows a range of 4-8 du/ac, with a Growth Control Point of 6 du/ac. '
24. The project proposes to construct market rate residential dwelling units on PA's "A-1• and ,.A-2•
consistent with the governing master plan. Exiqing housing stocks in the City will not be impacted by
this project. There will be no demand for additional housing cieated· by the development of the subject
planning areas. This project will supply housing units; not create a need for additional housing.
25. The development of the subject planning areas will increase traffic in the area. However, as discussed
in the Mitigated Negative Declaration for MP 175(0). the muter plan at buildout will generate
approximately half of the traffic associated with the former educational park master plan as documented
in the applicant's traffic study by Urban Systems Associates Inc., dated May 17, 1993. In addition, the
project will comply with the circulation improvement requirements of the master plan (MP 175-D) as well
as the muter tentative map (CT 94-01) and the Local Facilities Manaaement Plan for Zone 9 so that local
traffic impacts would be mitigated to below a level of significance.
While the Mitigated Negative Declarations and previous envimnmental documents that exist for Poinsettia
Shores evaluated circulation h:npects, those discussiom have now been superseded by the Circulation
Section (5. 7) of the Genaal P1an Update Fmal Master EIR (MEIR); especially with regards to regional
traffic impacts. Implementatioo of the updated General ~ including projects in the Poinsettia Shores
-10-
Masts Plan, will result in increased traffic volumes. Roadway r.gments will be adequate to
accommodate bui1dout traffic; however, 12 full and 2 partial intersections will be severely impacted by
regional throu~ over which the City bas no jurisdictiooal control. these generally include all 1-5
freeway intercbanae areas and major intersections along C.arlsbad Boulevard includin1 the intersection
of C.arlsbad Blvd/Avenida Encinas which is associated with this master plan _propertf. Even with the
implementation of roadway improvements, a number of intersections Citywide are projected to fail
adopted Growth Management performance standards at buildout.
Mitigation measures have been recommended in the MEIR to reduce circulation impacts. These include
measures to ensure the provision of circulation facilities concurrent with need and provisions to develop
alternative modes of transportation such as trails. bicycle routes, sidewalks and pedestrian linkages. The
diversion of regional through-traffic from a failing Interstate or State Highway onto City streets creates
impacts that are not within the jurisdiction of the Oty to control.
While local traffic impacts for the subject planning areas can be mitigated to below a level of
significance, regional impacts associated with the development and buildout of the master plan in general
are still considered cumulatively significant because of the failure of intersections at buildout due to
regional through-traffic. Therefore, the checklist on page 4 is marbd •significant• for this item. The
recent certification of the General Plan MEIR, by Oty Cowicil Resolution No. 94-246, included a
"Statement of Overriding Considerations• for Circulation Impacts. This •Statement of Overriding
Considerations• applies to all subsequent projects covered by the MEIR, including projects within the
Poinsettia Shores Master Plan. Therefore, no further environmental review of circulation impacts is
required.
26. No existing parking facilities will be affected by the buildout the master plan inch~ing development of
the subject planning areas. The parking demand created by each pJanning area will be accommodated
by the provision of required parking spaces and facilities within each planning area.
27. Infrastructure a.BXiated with CT 94-01 including the Avenida Encinas roadway will provide alternative
circulation routes which could alter the present patterns of circuJation or the movement of people and/or
goods. The subject planning areas will contribute to the buildout of the master plan which will impact
transportation systems and nearby intersections identified in the General Plan MEIR. Because of this,
the checklist on page 4 is marked •significanr' for this item for the same reasons as discussed above
under #25 of this Initial Study.
28. The master plan site and subject planning areas are outside of the McClellan-Palomar Airport influence
area so no impacts to or from air traffic will result. No waterborne traffic occurs in the vicinity and the
operations of the railroad right of way will not be impacted by the approval and development of the
subject planning areas.
29. The master plan circulation system as well as the design of the subject planning areas will include
standard provisions for transportation systems accommodating vehicles, with bicycle Janes and sidewalks
for pedestrian movements, so that there will be no increased traffic huards to motor vehicles, bicyclists
or pedestrians. There will be no significant conflicts with competing modes of transportation.
30. As documented in the MP 175(0) Mitigated Negative DecJaration, no impacts to City emergency
response plans will result from buildout of the master plan including the development of the subject
-11-
plannin1 areas. In addition. the subject planning ueas .have been reviewed by all peninmt Oty
departments to ensure that there will be no impacts to any mJerlfflCy respottse procedures or evacuation
plans.
31. Previous mviJmrnfflta) documentation, including the MP 175(D) Mitigated Negative Declaration, does
not identify any potential significant aesthetic or visual impacts associated with the development of the
subject planning sueaa. Development of the proposed project will not obstruct any scenic vistas or create
an aesthetically offensive public view.
32. No impacts to the quality or quantity of existing recreational opportunities will be created by the
development of the subject planning areas. Residents of PA's •A-1• and •A-2• will have acces., to the
master plan recreation center, PA •M' (SDP 94-03), in addition to the private recreation area as.,ociated
with wtlt.
-12-
ANALYSIS OP VIABLE ALTERNATIVES TO 1JiE PROPOSED PROJECT SUCH AS:
a) Phased development of the project,
b) alternate site designs,
C) alternate scale of dev~
d) alternate uses for the site,
e) development at some future time rather than now,
f) alternate sites for the proposed project, and
g) no project alternative.
a) Planning area phasing will not offer superior environmental benefits since proposed land uses are consistent
with MP 175(0) and major infrastructure and mass grading as been provided with CT 94-01.
b) Alternate site designs were analyzed during the processing of the subject planning areas, however, the
proposed site plans meet all development standards and design criteria as required by the master plan.
c) The proposed scale of planning area development is consistent with the allowed dwelling units and permitted
land uses for the subject planning areas.
d) N/A
e) Development at some future time, although feasible, would not be environmentally superior since all potential
environmental impacts have been identified and mitigated. All approvals, infrastructure and mitigation of
potential environmental impacts are in place or have been completed to allow the approval and development
of the subject planning areas at this time.
f) The subject planning areas are specifically designed for the implementation of the Poinsettia Shores Master
Plan. Relocation of the project to another site is neither logical nor neceswy.
g) The no project alternative would leave the subject planning area undeveloped which is not consistent with
the master plan or City's General Plan.
-13-
PETERMINADON (To Be Completed By 1be Pltooma Department)
On the basis of this initial evaluation:
I find the proposed project COULD NOT have a significant effect on the environment, and a
NEGA TIVB DECl..ARA TION will be prepared.
_x_ I find that although the proposed project could have a significant effect on the environment, there JllLL
tfil'.l:. be a significant effect in this case because all potentially significant effects (a) have been analyzed
adequately in an earlier EIR/Mitigated Negative Declaration pursuant to applicable mndards and (b)
have been avoided or mitigated pursuant to that earlier EIR/Mitigated Negative Declaration. including
revisions or mitigation measures that have been imposed upon the proposed project. Therefore, a Notice
of Prior Compliance has been prepared.
I find that although the proposed project could have a significant effect on the environment, there will
not be a significant effect in this case because the mitigation measures described on an attached sheet
have been added to the project.· A Mitigated Negative Declaration will be proposed. •
I find the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
Date Signature
Date Planning Director
LIST MITIOA TING MEASUV.., (JF APPLICABLE}
-14-
APPLICANT CONCURRENCE WITH MITIGATING MEASURF:$
ENM:11
nns IS TO CP.RTIFY THAT I HA VE REVIEWED nm ABOVE MITIGATING MEASURES
AND CONCUR WITH nm ADDfflON OP THESE MEASURES TO nm PROJECT.
Date Signature
J-, 24, 1995
\
\
\
F
B-1
A-4
K
BATIQUITOS LAGOON
POINSETTIA SHORES
P.A. A-1--CT 94-04/PUD 94-03
P.A. A-2--CT 94-05/PUb 94-04
hl
l
h
l
hl
l
l
l
l
/J
i
Cl
£-,
I
0
..
I
I
~!
I
~-
u:
◄~
~
I.
..
&
f
i
'
li
t
I
bl
I
• •
Pt
l
f
I ' I
I
I
I
I
0
IJ
I
J
I
J
U!
ul
~L
t
•
..
.
.
nb
•
1-
9
1
1
1
1
1
:
I
di
l
l
!
le
1
12
I
11
1
I I
I I
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
:
~r
.
:
VI •e
~
10
ul
J
j
J
j
I
I
..
I
~
I
--
..
.
I
•I
I
;
p
I
"'
t:
;
w
:z
:
"'
..
.,
00
"'
I
I
..
.
.
~c
a
a
•
..
,
E-
:
~
t.
>
:
:
,
..
.
.
w
A.
w
:i
:
:
Il
l
.:
·"
?
·
-
•
t.
:
:
(
T }'
;_
-
_
, ...
.
••
·
·_
.
~
·
~-
·
•
•
f I I I
I
• hl
l
l
h
1r
1
1
U
,
I
II
II
II
ns
~~
~
~~
:
~l
:
j•
• • u
Ii
I
_.
:
~
:
:
:
:
:
=
~
-
1
'
-~
-
!
1·
I
!
I
II
~
I
II
!
I;
'1
1
,
:!
!
1
r
t
I
~
I
•
•
!1
1
1
1
..
1
II
,
;
l
-•
I
~!
I
u:
◄~
~
I
ll
•
&
t
I
I
HI
WI
• •
f~
I
I
I
. .
.
I
.
I
I
I
.
(!
)
L:
~
•
'l
"
l
l
b
;1
1
1
1
:
lel
H
I
I I
I I
I
Iii
VI
~!
~
..
.
91
I
1,
IJ
,
II
, .
. , ll
I
.
I
I
r
.
:
!
'I
!
I
!
I
I
I
, ..
!I ~ ..
;
I
I I
Ii
i
11
1
.
II
__
...
1
1
(D
•I
;
p
I
I
• •
I
.
I I
j
-
-
..
:-
:
:
:
:
:
:
-
-·
-~
/
/
l
• • I I I
I
-
I
• •
·-
IPTXCI or couL1Tio• IJ-----~-----~~ Natl to: State Cl•ri~. 1400 1 h Street,.._ 121. S.Craanto, CA 95114 • u/445·0613
ProJct Title: POJNRJTIA s,r, · P\MIJNi WM •A·]• NI •A·Z-••• IIO'fm Belows
LHd AtlncY: CITJ 9f MM Contact P9"Clf'I: ...,e..,1,.1c .... MQZ ...... -. ____ _
StrNt Addi' ... : 2075 W HUM DIIVE Phone: <619) 431·1161 X 4441
Cfty: CARLSUQ Zfps pg ecu,ty: .... SM ..... Rr.aJ.-EGQ-.. __________ _
···················~----------------------------------------------------------------------------------------------------·····--PIO.IECT UICATIC:W:
Cou,ty: SM DIEGO Cftyllleer•t ~·ty~ _CAl_ .. u_uo __________________ _
crou StrNta: FUJUBE AYEUDA ENCJW MP CARLSUQ ll)1) Total Acr•: _1,..8,..9,.__ _________ _
Aaa .. aor's Parcel IO. 216·140·27. 32. l3 S.Ctfon: ____ Twp. ____ 1.,..: lae:
Wfthfn 2 NH .. : state 11VV t: JNTEISJATE 5 wat.,.,..,.: MUCNUQI Wi'l'!ff,CIFJC 0CEAfl
Airports: Raf lways: ... IIC......,TD ____ Schools:
DOalEIIT TYPE
_NOP SIJS:lpl wnt/Sl&l9eqaa,t DTIIEll:
_ Early eon. _ .... o.c EIR CPrfor SCI No.) -=---
..L_ Other PBJQI aJflLIAlfCE
_1101
EA
Draft Ell
FOUi
_ Joint Doe1a1nt
_ FfNl Docullnt Other _____ _
Draft EIR
LOCAL ACTIC:W TYPE
_ GeNral Plan Update
General Plan AN!...,,,
_ General Plan El-,t
_ C~ity Plan
DOEUIIIIEIIT TYPE
_ Specfffc Plan
_ Neater Plan
_ Pl...i Unit Dewlas-ant
_ Site Plan
Uni ta _.as.._ __ Acr• 11.9
Rezone
Prezone
__ Use Penaft
..L_ Land Dfvfafon C~fvfafon,
Parcel Nap. Tract Nap. etc.>
Amuatfon = RedawlQfant
Coastal Pet'llft
..L_ Other _.,,,, __ _
-water Fact l ftfN: Type ----MGD ---..L_ R"fdentfal:
0ffic•: Sq. Ft. Acr• ___ Ellplayoaes __ _ -Tr-.portatfon: Type _______ _
Caaaercfal:
lnclatrial:
Euational
Sq. Ft. AcrN Ellplayoaes __ _
Sq. Ft. Acr• Ellpl~ __ _ -Nfnfftl: NfNral -------Powr: Type ____ watts
W.te Tr .. tiaant: Type _______ _
Recr .. tional ______________ _ Naurdoua W..t•: T~ _______ _ Other: ______________ _
PIIO.ECT ISSI.ES DISCIIISB II DGalEl'T
Aesthetfc/Yfaual = Agricultural Land
..!,_ Air Quality
..L_ Archaeological/Historical
..L_ Coutal Zane
_ Drain._e/A.baorptfon
_ Eeoncafc/Joba
Fiscal
-Flood PlafrvFloodf"I -Sc:hoole/Unfwnftf• _ For•t Land/Ffr• Hazard __ Septfc Syat-
-Geologfc/Sef•tc _ s-r Capacity
-Mineral• --sot l El'Olllan/CCllllplCtfan/Gradf"I
..L_ IOfM _ SOl fd W..te
_ Populatfan/Nouaf"I lalance _ Toxfc/Nuardoua
_ P\Gltc ServfCN/Fectlftf• ..L_ Trafftc/Cfrculatton
_ Rec,...tfan/Parta __ v..-tatfon
Present Land UN/Zanf ....... l Pl• 11N
_ water Guel tty
_ water ~ly/
GrCU1d water
_ wetland/Riparian
_ Wildlife
_ Growth lnducf"I
..!,_ Lancue .
..L_ c.a,tatfw Effect _Other ___ _
THE PROJECT JS SUIJECT TOT. IIEGUIISEITI Of UIID UII DESIGNATIONS 0, TIii POIN.TTIA SNORES MITEI PLAI.
Projct Dacrfptfcn
TWO (2) PUNNING AREAS WITHIN THE POINSETTIA SlaES MSTEI PW: (1) •A·1•; 36 DETACHED SINGLE FMILY IDES ON 5,000 SQ. FT. LOTS.
(2) •A·2•; SANE Al •A-1• M WITH 49 UIIITI. IOTH PUIIIIIN AIIEAI AH COIIIIITEIIT WlTI Allf\.lCAIU MITER PUii l'tlOVlSlONI/IECIJlREMENTS.
IIJ1'E: Clearinghouae Nill uatgn fdlntfffcatfon l'tUllben for all ,_, projects. If a SCN l'Ullber already ufsta for a project (e.g.
froa a Notfce of Pr1P9ratfon or prevfoua draft doaaanO pl .... ffll ft fn. llevisad Octooer 1989
Cit of CarlSbad ..___--==:-~:;....,,.,1~--:=.---=--
Planning Dcpar-tment
PVBLIC NOTICE OF PRIOR ENVIRONMENTAL COMPLIANCE
Please Tab Notice:
The Planning Department has determined that the enviroomental effects of the project described
below have already been considered in conjunction with previously certified environmental
documents and. therefore, no additional environmental review will be required and a notice of
determination will be tiled.
Project Title: Poinsettia Sh9rea -Planning Atta's •A•t• and •A-2•
Project Location: Poinsettia Shores Master Plan, north of Batiquitos Lagoon and east of the
railroad right-of-way.
Project Description: "A•t• consists of 36 detached single family homes. •A-2• consists of 49
detached single family homes. Minimum lot size for both P1anning Areas.
is 5,000 square feet.
Justification for this determination is on tile in the Plannin1 ~ Community
Development, 2075 Las Palmas Drive, Carls~ California 92009. Comments from the public
are invited. Please submit comments in writin1 to the Associate Planner, Eric Munoz, in the
Planning Department within thirty (30) days of date of publicatiaL
DATED:
CASE NO:
JANUARY 30, 1995
CT 94-04/PUD 94-03 -PA • A-1 •
CT 9,J-05/P{JD ~ -PA •A-2•
APPLICANT: POINSETI'IA SHORE.S -PLANNING AREA'S •A-t• AND •A-2•
PUBLISH DATE: JANUARY 30, 1995
-BACKGROUND DATA SHEET-
CASE NO: CT 94-04/PUD 94-03
CASE NAME: Poinsettia Shores Planning Area "A-1"
APPLICANT: Kaiza Poinsettia Coa,oration
REQUEST AND LOCATION: Thirty-six {36) single family homes on 5,000 square foot
minimum sized lots consistent with the Poinsettia Shores Master Plan.
LEGAL DESCRIPTION: Lot 1 of CT 94-01 in the City of Carlsbad according to Map No.
13181, as filed in the Office of the San Diego County Recorder.
APN: 216-140-32,33 Acres _.8 ...... 4 ______ _ Proposed No. of Lots/Units ... 3 .... 6 ____ _
(Assessor's Parcel Number)
GENERAL PLAN AND ZONING
Land Use Designation --R-=M"""--_
Density Allowed 4-8 du/ac Density Proposed 4.3 du/ac
Existing Zone PC Proposed Zone -=PC--=---
Surrounding Zoning and Land Use: (See attached for information on Carlsbad's Zoning
Requirements)
Zoning Land Use
Site
North
South
East
West
PUBLIC FACILITIES
PC
RMHP
PC
PC
PC
Vacant (PA "A-1")
Lakeshore Gardens
Mobilehome Park
A venida Encinas
A venida Encinas
Vacant (PA "B-1" and "M"
School District Carlsbad Water District Carlsbad Sewer District Carlsbad -=~------Equivalent Dwelling Units (Sewer Capacity) ..... 3 .... 6 _______________ _
Public Facilities Fee Agreement, dated __ D_e .... c __ em ......... be-r~9 ........ 1 __ 9~9_4 ___________ _
ENVIRONMENTAL IMPACT ASSESSMENT
_ Negative Declaration, issued ___________________ _
_ Certified Environmental Impact Report, dated _____________ _
Other, Notice of Compliance issued January 30. 1995
EM:vd
--a -
~,.,. _c....;;,_.·_, t__,_y____,;;,;;;;o f Car Is bad -:;.e 1,1 ,d,t·••t4•& ,,;,,rq, ,,
DISCLOSURE STATEME.'lT
AP0UO.NrS ST.:.7cMENT' OF QISCLOSU~E OF CERT.S.IN OWNERSHP INTE,;ESTS ON Ml. APPU~TIONS ~ICH WtU. ~ouu.e
OISCi-ETiONAAY ACT'ION CN TI-IE ?Afff OF THE CITY COUNOL. OR J.NY APPOINTED SOARO. COMMISSION OR COMMITiE:.
(Please PrrnrJ
The following information must be disclosed:
Ust the names and addresses of all persons having a financiaJ interest in tne application.
I<aiza Poinsettia Corooration
7220 Avenida Encinas.
Suite 200
Carlsoaa, CA 92009
2. Owner
List the names and addresses of ail persons having any ownership interest in the property involved.
Kaiza Poinsettia Corporation
7220 Averu.da Encinas
sw.te 200
Carlsbad, CA 92009
3. If any person identified pursuant to (1) or (2) above is a corporation or partnership, list the names an=
addresses of all individuals owning more than t 0% of the shares in tne ccrpcration or owning any paru,ersr.:;:
interest in the partnership. •
Saioa. California, Inc.
7220 Avenid~ -i=ncinas
·suite 200
CarJsbad, CA Q?QQ9
4, If any person identified pursuant to (1) or {2) above is a non-profit organization or a trust. list tne names anc
addresses ot any person serving as officer or diredor of the non-profit organization or as trustee or cenefic:ary
of the trust.
FR.M00013 8/90
Disclosure Statement
(Over)
Page2
s. Have you had more than $250 worth of business transacted with any member of City staff. ecar=3
Commissions. Committees and Council within the past twelve months?
Yes _ No _ If yes. please indicate person(s) ____________________ _
~,,defined u: • Any individual. firm. coi:iattt11rsnip. joint venture. auociation. social club. fratemal organization. corporaraon. 11tate. m .. st.
receiver. syndicate, ltlia and any otl"ler counry, crty and county. city mun,c1pa!ity, di11ne1 or ou,e, potilic&I ~DC1iv11ion, or any omer ;ro1.,o or
comt:11nat10n ect1ng u a unrt •
(NOTE: Attach additionaJ pages as necessary.)
Signature of applicant/date
Print or type name of owner Print or type name of applicant
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILmES IMPACTS ASSESSMENT FORM
(To be Submitted with Development Application)
PROJECT IDENTITY AND Th1PACT ASSESSMENT:
FILE NAME AND NO: Poinsettia Shores Planning Area "A-1" -CT 94-04/PUD 94-03
LOCAL FACILITY MANAGEMENT ZONE:_9_ GENERAL PLAN: ____ RM ______ _
ZONING: PC -Poinsettia Shores Master Plan
DEVELOPER'S NAME: Kaiza Poinsettia Co1:p0ration
ADDRESS: 7220 A venida Encinas, Suite 200, Carlsbad, CA 92009
PHONE NO.: (619) 931-9100 ASSESSOR'S PARCEL NO.: 216-140-32, 33
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): ....;:8::.:...4__,a...,.c=re=s _____ _
ESTWATED COMPLETION DATE: _______________ _
B. Demand in Square Footage = 71
C. Wastewater Treatment Capacity (Calculate with J. Sewer)
D. Park: Demand in Acreage = NIA
E. Drainage: Demand in CFS = NIA
Identify Drainage Basin = B
(Identify master plan facilities on site plan)
F. Circulation: Demand in ADTs = 360
(Identify Trip Distribution on site plan)
G. Fire: Served by Fire Station No. = 4
H. Open Space: Acreage Provided -NIA
I. Schools: NIA
(Demands to be determined by staff)
J. Sewer: Demand in EDUs -36
Identify Sub Basin -NIA
(Identify trunk line(s) impacted on site plan)
K. Water: Demand in GPD -7,920 GPD
L. The project is 5 units below the Growth Management Dwelling unit allowance. EM:vd
EASEMENT NOTES;
mll lllllflln illWI JU iw:....:AD: • .. ,.. -Ill 71)1, l"G )al.Oft 11/l '!II ,. -,oc,co f/t41.i-11~1.011 5/l. ., ..
oa:as ,OC,CO f/'4 7ol-115J",o,t 'll.r"•
" --'lt4 11-21•:u,.011 7/11,'N
21 ..... -f/N 17-0,IU?,011 212'/17 -,oc,a, ,,,_ 7.f-,i!J!O !,'3,"'•
PARKING SUMMARY; -"""""" ,MKN:: 72 101
VISl'fOftl'AltlCN:! 12 5!1 (Ote-STJlttf ,..DC;)
lOTM.: ---.r-"""TIT
YIGt~'HtMAP
= ....,,. -...... ---
GENERAL NOTES;
~ll'NICll.MO. ,,....., ..... --
SAN DIEGO NORTHERN RAILROAD
-----:--; • ----~---==-=--=---=-~-==~--
211-1~-».-»
l'C (,o,r,$['ffl,l SHOltCS WASltR ~
IIC (~ IHOlll3 WASITJI PVN).
[)DSJ11111i000M.l'Url0DION,l,notril ..
~ GDIEIW. "-#II D(SIGJ-.TDI -----• .,..m oisnacr ..... -.
,1,vOlriG( twl.Y TIWTIC
""" ""°
NIJll9DI 0, LOTS
NIJlllatJt or I.MIT'S
"°""" -,OU,,ct
($0: c;lt,t,DINGNW.'l'S'S)
~ t.NFl£D SOOlLDISTJIICT
CNt1.SN litUNICPAL ..._TP 0l5Tll1Cl'
CMI..A,,ll MUNIC)PJll ,.,;rt,t 0ISTJtCT ,..
1.4.C.c.llOSS
le IICSIDCN1W. UJfS
t OPtK sP-.a. um
1 f'ttMIITt ST11£[T LOT
JI L01'S ,.
4.3 0.U./ACRl'
Vk-LO ~ SUfNt'l'S DATED t-11-90
~~
·c,;:·
~ 1·-.n:r
/ ~~J~,:
KEY MAP SCM.E-,~. 200'
GRADING ANALYSIS;
THISSfft,..tSc,w)(t)IJHOCJltTM[~ OIF MAS'l'tlt TDITATM: ...,., C.T. "'-01 ,.,.,.._ r.JIAONCitOflT1115~--M[,A.1NVOL'ICS:
CUT: tl.toO CY .
'U: :10,600 CY._
IIIIPOlll'T: 1,700 CT.
BENCHMARK;
LOT
OC.Cllll"'°N: 5TAl'60M0 DISC S£t nuSH • UST COMdJI ON ltOlll'nl ""1fWENT OF" [AST BRIDGt
LOCATlON: APP1tOX JOO rttT 5()UT'l-t or 50Vf\,; CIIITln'
TO CAltl..Sa-D STATt PA/ff(. .0 n:tT lA$T OIF CD(T£/tLJN(OI" NQRl'W 60Vf,,l(l CA.Rt..$fMD "-"'°· Ott POHTo ~en 9RIOGC ti10.,..,9111
lt[COffD fqow a.o«tH COUlffi' V£1mCAL co,,rnitOI,. DllA, 1()()1(, PA<,[ 1J5 NO. 0C 0167
ll.EVATIOf,,I; !JO~ll.5.L
9
SHEET OF 3 SHEET~
C.T. 94-04
P.U.D. 94-03
TENTATIVE MAP
FOR
POINSETTIA SHORES
PLANNING AREA A-1
LEGEND;
'"""""""'--
CXISTlNCCONTOUltS .,..,,.....,.,,_
()(!SnNG S(\lllfJI ....... 1,1 "·
C:Xl$TINCST~ORMN
PIST'!IIIG NIC ~
0USTM.STil£CTUCHT
-.a>roa
PffOPOS[D~t()C!)lr(t()UttS
PIIOf"OSCDW.T[JtWAIN
l'flOPOS(DS('WER-•111.H..
l"tlOPOSCDSTOlllii~•c:.O. _,,.,.....,,
ei
---l.1
a
---sc-==-
"""""""""""""" '"'"""" =°~~(2:1 W.U:)
~
y
.>U-" !P'AOPOS{D5POTfi.C\IATlON
c:o,.cR("I[ a.otK RCT...,...,.. •ALL
~~(u-t)
~ICWQlllrOftt(l,ll,IN
fttOPOSm f'llll ~
,ooPOSO)sn,m......,
____ ,,_
'""'"' ,-()IS(.....O:•AU.
"1Sl"TOIII ~---.
LEGAL DESCRIPTION;
= ----L..!!....L_
':
LOT 1 OI CML.SBAD TJtlr,C1 M-01. IN n'4[ OTT 0r ~-• ccu,.tr'f OF SAN [)r(GO. 51'.lTt OF CAl..lf"OIII""'-~ TO .....,. THOl'tor NO u,a,. n1.to IN TMC on,a: OF Tl4E cc;u,m 11cC01tOOt OI s..N occ:o c:ov,m-Ott .JIH.J/l,Rf 21. ,ns. or OfllCW. U'CXl«OS ■·
CIVIL ENGINEER /LAND SURVEYOR:
0°0\"TCOIISul.l~. NC. 722(l.lY[fr$(frrlC~. Sit 204 CAlt..SB,lrO. CA. 12001
OWNER/SUBDJY]DER;
Miz,t, ~ CORf'OR,lTION. A CAUFl:)RNIA co,tJIOfl,t,TlON
7220 A'-OIG\ CNCIIIIAS. STE 200 ~.CA.12009
RCV,S(O,O e.,995 FlfV'SEOJM :?7, 1995 •~S[0.,11111 1995 llfV1S[OOC1 1996 ll[\IIS(t)JUfll("1ll6
ll(\•'<S[O WAIi !lllf•
""-""""-=.~ .... =---
~-1-nl
Fl81Clft .. ,._,,.
0 /S,...~ lxooo<,., J.L_ '"" -""<...llll (',,,I-I~·-•~-__ILL_ ~C-...l .AZ....lNIJmf ....s =":u-z-r.: -Ts_l""!J..f:CT ..... li.Jl'..12.. ..ci•oCJ U:.llll1
; :.~~:;····-.. I cr...c;1N£c1< or 1.10R1<.
~-_:'.:::.."" .JL... dlJ-t__..PATE,_l_~.pt
-~ ~~!lo-CJ#.Y_/!._ '1'tl-J101•
EXHIBIT "A"
i i
!r
l'Yf'ICAL SCCTIOH -oasnHG WIHDROSC CIRCLE ,,.,.,,,,
ANO AVCHIDA CHCIHAS OH-SITC (NIIJC)
""'"'
.,....,..,.,,,,
.If.
A ~
\ ·--..c-.ooa
M/CA.L SCCDPH -QICBGCHCY ACCCSS
"""" STRUT I
COOl(IIIU't•..:::::mrASDOf
I • W
' ' ! !
..,. .....
(.,,,,.., ... ,.,.,
r:mc:.u sccnOH -PBfYAT£ mar .. ...,.
STR££1S A, F, G, H
~i ~J"~'"'jJ" A k ., CUllnU C ( .,.,,.....,
M(;C".= U.MOD'l'OIO.......CN'
IIe#C4l $CCDPN -A.YOflQA. CHQNA.S .,..., .
c·· i
I
' ti -['-J_ y I, ; !'is.¾~¾---::r
:: ti 11
,·,I
;:ti
1ou,.1. 101.0NO •• '
TYPICAi. LOT ORAINAGI: 0£TAIL
O()sc.ii..l
l(JTL LOT111'11J.5Ullf.r.c(~Olt ~'51: ALl[Jllr,;l,ft ""CA OA¥cS ll(t);rAIL.Slflo-{~
BENCHMARK;
OCSCJbP'TIOtll: ST~ OISC S£T ~ ~ EAST CO'INOt 01<1 MCMtn. .aBLITTiltNT or CAST "'10C.C
LOCAT101i: ~-lOO ra, S0UTl1 OF 50UTl1 [lrrlTR'r 10 ~ ST.&T[ P.tlb( -0 F"[[l Wt 0, C[NT[JIUli[Of"li0lfTH80UtwDCARI..S8AD
k\lD °"' Po,,tTO stRat BRIOC( ..0 .&?&82
lt[(X)ltD r-llOM: ~ COUfriT'r vomtAI.. CCWl1lOI. 1)1,1.& IOOK. P.&G( ll!I NO. 0C DU?
tL£\'AT101i: ~-!l!>ll ... SL
Si-iET 2 OF SHEETS
oJl,t(S[,l,Jl[AS~l(DIPI.Nll,(1DIII M0M£JIIU9!t-lOS
lt[YIS(O '11 I. I"~ iltfV.~0.-:1 :ffl ll~~OC"l ,,.._ ~-,,...
C.T. 94-04
P.U.D. 94-03
LOT AREAS
lO'fNO LO'fJl<(J,/Sf)
' ,,.,
' -' ,.,. . "" ' -I ""' ' ,..,
I ,,.,
I .,.
" "" " "" " -" .,.
" -" """ " ..., ,, ""' " ....
" .... .. -" "'' " ..,,
" ..., ,. "" " "" " ""' " ""' " "" " -" ""' " -" -" -" -" -" , .. -" 172.lC11/0.JIL -" JIClJ./0.1.-C.
-• -Nllt.&1t5 (IJIOI PG
IIIC1Tt:,..._Tl:Jflll'.tT!WIJ.a: "stl'IN,T[rJJff
~--
H8101!!95 .. ,._,,.
t';
0 /<,..~ u'""'" ..Ji._~" --...at>. u 1111'•-••• __11.L_ lC'-' 1,S_St,OWIL
c::;N~uLi ...... i ts ..a.A:c1oar-'-._'1'.12._..m<Gll:.lQJ.J_
., .. ,:.: ;_:.-:::·~::•: ~iis•·~ [NGl"[(R rY w(JR.:,
b/(...~--ite~~1~
"-I' •,J•<~o:•1"'-"''I•':-.
EXHIBIT "B"
en
,_
w w
::c
en
'<
!
'
M
oo
l'
l
I
I
'<
!
'
~
..
.
c,
,
Cl
)
0
..
E-
-
Q
l'
l
•.
u~
ti
c.
.
w
::c
en
,i
--
-
. e
I
e a
--
-
-
-
-
-
-
I
I.
!
~ .
il
~
~
!g
~'
::
~-
-,
:,
1
•
u~
I
I
1 ·I
J
5
r-~
...
,
_
j
''
·
~
•1
j
~
~
i ~
-!
i
n
~.,,,,
NIMl"'f c:,1/C..
CJ
PLANA
1.A1FT
U-11./1
SECOND FLOOR PLAN
. .
. •
6'o' !.ol
6IDB
~ it. II :::1 • ii li1 'I' :A
·~-►
-16"111r,•
=.:z =-==----~ r----1
' MYJ','e) ~
-~ ~· ~-
• ___ j
~Ch'lL [S'[S~
PLAN A 2282 S.F.
FIRST FLOOR PLAN
. •
•
.... ~ ~
Jl('AL.:1/C'"al'-r rLI7 I I 4 I
LEGEND
, .... •-..,. ---p. ,.. .... •·-•· -••----•·-----.. , .. ~ , .•. -.-...-
PLANNING AREA A-1 AND A·2
THE VILLAGE OF DEAUVILLE
II !il
~
en
r:.:1z. ~ 0
0 ~ ~ ~ en 8
~I µ;1 2 ~ ~
~c ~ I=.,_
i
1 Ol"6
EXHIBIT "0"
-·
·
-
-
39
'
/
J
~
W
~
=~
.
~
~J
.
J
1
L
I
V ~
NO
L
L
V
l
l
O
d
l
l
O
O
VL
L
L
:
l
!
i
N
I
O
d
4
S3
:
H
O
H
S
VI
U
3
:
S
N
I
O
d
:
-~
~
..
..
..
"'
ti
l
i
,$
:
,\
ff
i
E
.
,,
I
><
~~
:
,
,
'
~
~
.~
,
~
.
..
~
'l
t
~-
l
I
I
:_
'I
GJ
I I I I t
'
..
e□IJ
r
,
+.
~
~
('
;
-·
,:
'
V
~
k
i.
J
~
,
. .
.
' Ii
i
r
~i
..
..
••
.
_L
-
!
=-
.,
~
~
~
~
~-
-
·
·
-
-
-
"
-
-
-
-
·
·
-
-
-
-
t!
~ #eQW
•·
PLANC
0
SECOND FLOOR PLAN
9""' --~
LEGEND
L• -•· -•--•--•--•--••----••------.,.-----....
UL•-
t-o' l"Wl._").
I • '"'
r-J ~
~·=·
'flN~ ri ~,.J
\( ~-, •
~/
.-~
' ~--
F-t
_A'U)t..
1"x11jl,!1 ~
-----
1 I
§!-•
~ /ti/#.
I :
llli
... • ~~iiT; ~0 u r ijl
, 1 , ~---.-ill 0
~-c=.1 i.:11 ...... --..._; . .,., _J -,._ -A
~-~~~-
">
I~ [SP.
t ' ~ t
li! ~
PLAN C 2760 S.F.
FIRST FLOOR PLAN SCALE: u.-.1,_, ~ I 4 I
PLANNING AREA A-1 AND A-2
THE VILLAGE 01' DEAlMLLK
n r• Jj !l■
t;a;.J ~6
00 ~ ~
0 ~
=:t: ~
00 8 ~, ~ :5 µ:l i 00 ~
0 ~
as..'1fliiii ~-....,_ ...,...,_
'i
3 01'6
EXHIBIT "f"
~
[l ml ffl
LEFT ELEVATION
nn;+I,"""' """'''' ~ ... ~-·--...... ~..._ .. .._ ~ .......... -..-~ ~ .............. ___,,. ... _ -......... _ .............. ~---...... ....... ....... ......__. ................................. ... ---....ooma ...,......_...,.,_,_._......._ -__________ ...._ ........
..,,,.... ---.... ~ .. ,..__ ... ...aac .......... ~ .. ...___ -..._.. __ ,_...__ anw...-.., _ __. ... _..__..,_..
RIGHT ELEVATION
EE~ 83 83 8
PLAN A
FRONT ELEVATION
B
REAR ELEVATION
IC&l.a:ur-r..r ~ • • •
aa.a..-,.. __ ...,, __ ~-
♦--·==-♦ --~ --------I."=. __ _
□--
[I] BmB
PLANNING AREA A-1 AND A-2
THE VIIL\GK 01' DEAUVILLK
II m hi
en tl ~
0~ ffi i 8 :s ~ ~ l2 rx1-rn ~ • '14.
~ ~,~ _., -i
40P6
EXHIBIT "G"
LEFT ELEVATION
DIKcM, nmw Nt:Jllltf I -........ _ .................... ..... -........... _,..... .... -______ ._._.... ... ~ -........ _.. ............. ~-------. --...................................... .._ ---............... ..., ..... ..... -~------..... --~ --................ ---.
=-...qa ...... ..., ............. ...., _____ ....., --.., ______ __.~ J'' ,,, .......,
n 8 8 BB
RIGHT ELEVATION
PLAN D
FRONT ELEVATION ICAU : u.-.a•-r r-,..-r--, I 4 I
C0LOfl LEGEND
,._ --"" --<S>-
0 --
0~-
~ --~ --___ ...,. ____ ___ .. __ --·
BB □ EEEI me!
REAR ELEVATION
PLANNING AREA A-1 AND A-2
THE VILLAGE OF DEAlMLLE
II r• J! !le
a~
~
~
00
rzl ~ ~ . 0 I'.! _, ::i:: ~
00 ~ 8 :s ~ ~ m rzl i5 w
~ ~ ....... -i
50F 6
EXHIBIT "H"
LEFI' ELEVATION
ftlll;H. ..... llt1Rlt91 ---------....... -----
,..,..._ ..... __. ................
~ ..... --.... -----.... _.. ... ..__ ..................... .-..--... -~ ................................... .._..._ -........................ ..__ -----------~----.. ~ .... -------...... .-.. ...... ---. ~-----,.._,_ ... _ ...... _. .... ..._
B
RIGHT ELEVATION
rn ~
B
EB Er-
-L
PLANC
FRONT ELEVATION
m
ICAL&: Uir■a•..-r'L..r--1 I I 4 I
00l0R USOIND ,._ __
,;,, --~-
~ --
~ =-------~ --~ -----------·-----------
BBl BB lwl EDB
REAR ELEVATION
PLANNING AREA A-1 AND A-2
THE VILLAGE Ofl' DEAUVJLLE
JI r• Ji, !l
~
~
Ui tl i§
0 ~ ~E rn 8
El r:i:i g ~ ~
.... _ .. 4{,.~ ~
-.L -i
60P6
EXHIBI
..
.
:
o
cJ
:::
i
p.
;
:
'
-:---~~-
1 11.0CluNOli.li IAIUlll:M1 WALi. l::1.fVAUUN _.,..,..
.,,. c;.&a•••• •oi.r•~':-
11•••· •ou ._,,.., •• ••••• •
~
co•c•■n wu■
,it0t■, AU .oo• •••u. •• ••u~•• ,ia. WU~ IIIAU •• a •o.,.. •• ., ........ .
4 WOOD GATE AT NOISE BARRIER WA~-~-•-0 ...... .
u·■ 12"' CANTIRIIA a TONI eli:IGI----
COLOII W/ 8110Nl■ LITTIRIHG
~--~·
_..._::~~_.. .... _fflM.._.
?:::f =i~;-~·:-... / .. ·,-::=::.=:.:.~
' ; ., ..... '. . .. ___ -. . . ·. •• •• •• ·--· f'. .. , · : '. · j ss9=,-@~~~:;:;;:;;.;.,2:.~•'---~
• ~i!iiCt.~;;i;;::;;;_~"'
[~ .~ ' :::.':! . .-::,;::~ ... U.titru
L
~:::.":::.-~.-1.r •··-~·
~-~ -n ~·--~~-.. --~~i-~~~:5:::--=:~::-~i= •. •
G)-t/\MJ,!.!!..lliJlillt ~.:::;~:~ ..
(!.'t:o~•• UA"I fO CONfOIU& ~ ....... , ....
""11._l"l_llt:ltt-t.llTtl,,_J"1<u lUNt,.ll>1t.,.-Tff .r-.aoo..'"JUAl.uoo.;.,.u•
(3
B-RK:.ltt. \
111·1••111"SU,1A,U'S-IUO<t1CAI
•·••·111·1u1.wnUN&1,o,,,u1.....,..nr1
f1l_A.J"fUlAl~IN1tl~
::~-; .... g..,,~:~.~= ~.!!:.~ .
SOI II) 81.lll"K ~u:no .... 1N01i.t: !_U.~!!ll!
MH10SCAUi
.
:--;
;
/11-; ---,·. ····~-...... ,
;
I '
~
/
,·-···-~--
SCALE 314": 1'· o•
~ .... ,,. /:,'\
..
~, u D i.::: ~ i :;i: iii t !J•i "'~~ l,,;;
Q 33 II l ~~ Pt~ :i:3 J .. <II "' 'I--
t~\~tlV.J~ 8&mn',.',!~ HNU
. ........... t;:-v ,\j;: -_,,,,,uu, .. , ... u ........ ---I
CROW~
!
~!\J~":l !t:.f'l~lL~,:""'·L MtlLPINGS
7 COMMUNITY lllENTITY ~IC.ti e:Ll;IIATIQN
SCALI": 112•;: 1'•o•
I ~
; \ SIGH PLAN VIEW .,,.Ji; i= "F1"1 .... ,, '··:c..--·~·----··: . .1; 11·~··..--,-~ ··~ _ , l::=_ __ ----I j_ ~ ~
l----· -H·. --·-----.J MAX.
ELIEVA.flON
(a.) VILLA~I!! IDENTITl' __ §J9,,-. , __
LANDSCAPE CONCEPT PLAN
POINSETTIA SHORES,AREA A-1 PL-2
EXHIBIT "K"